Waybill timeliness change method and device, computer equipment and readable storage medium

The method and device facilitate dynamic adjustment of waybill validity periods by analyzing user requests and system conditions, addressing the inflexibility in existing logistics systems and reducing customer complaints.

CN119168510APending Publication Date: 2024-12-20SHENZHEN S F TAISEN HLDG (GRP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310741021.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-20
Publication Date
2024-12-20

AI Technical Summary

Technical Problem

Existing logistics systems struggle to efficiently accommodate user requests for changing the validity period of a waybill, leading to customer complaints due to the complexity and inflexibility in modifying timeliness options after the shipment has been initiated.

Method used

A method and device that allow for obtaining and analyzing user instructions and waybill information to determine if a time limit change is feasible, generating interception instructions, and updating the waybill's validity period upon successful interception, with feedback mechanisms for successful or failed changes.

Benefits of technology

Enables users to dynamically adjust waybill timeliness according to their needs, reducing customer complaints by providing a flexible and responsive logistics management system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119168510A_ABST
    Figure CN119168510A_ABST
Patent Text Reader

Abstract

The invention provides a waybill aging change method and device, computer equipment and a readable storage medium. The method comprises the steps of obtaining an aging change instruction and an aging change type of a target waybill; determining whether the target waybill meets the aging change requirement of the aging change type or not based on the aging change instruction; if the target waybill meets the aging change requirement of the aging change type, generating an interception instruction, and sending the interception instruction to a target route; acquiring interception feedback information from the target route, and determining whether the target waybill is intercepted successfully according to the interception feedback information; and if the interception is successful, carrying out aging change on the target waybill. According to the invention, a service of carrying out aging change on the target waybill during transportation is provided for the user, the aging change demand of the user is met, and the customer complaint rate of the user is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of logistics and transportation technology, and in particular to a method, device, computer equipment and readable storage medium for changing the validity period of a waybill. Background Art

[0002] With the progress of the times and the rapid development of society, the rapid development of e-commerce logistics is already changing our way of life. Consumers have higher and higher requirements for the quality of life. In daily life, consumers' demand for food types is becoming more and more abundant. Due to the large land area of ​​our country, the challenges of logistics distribution are also increasing.

[0003] Timeliness has always been a major concern in the logistics field. Today, the logistics field is developing rapidly, and different timeliness products are emerging one after another. Since there is timeliness, it is divided into fast and slow. Different timeliness types correspond to different promised delivery times. The promotion of the concept of timeliness has a great effect on reducing the number of timeliness complaints and making users more aware of timeliness products. This is particularly important. In addition, at this stage, once the express is successfully collected and enters the transit link, it is difficult to manually intervene to change the timeliness. If the recipient user wants to modify the timeliness type, it is very complicated and cannot meet the recipient's requirements for timeliness. Summary of the invention

[0004] The present application provides a method, device, computer equipment and readable storage medium for changing the validity period of a waybill, aiming to solve the technical problem of how to meet the user's requirements for changing the validity period of a waybill and reduce customer complaints.

[0005] On the one hand, the present application provides a method for changing the time limit of a waybill, the method comprising:

[0006] Obtain the time limit change instruction and time limit change type of the target waybill;

[0007] Based on the time limit change instruction, determining whether the target waybill meets the time limit change requirement of the time limit change type;

[0008] If the target waybill meets the time limit change requirements of the time limit change type, an interception instruction is generated and sent to the target route;

[0009] Obtaining interception feedback information from the target route, and determining whether the target waybill is successfully intercepted according to the interception feedback information;

[0010] If the interception is successful, the validity period of the target waybill will be changed.

[0011] In a possible implementation of the present application, before obtaining the time limit change instruction and time limit change type of the target waybill, the method further includes:

[0012] Obtaining waybill information of the target waybill;

[0013] Based on the waybill information, determining user portrait information corresponding to the target waybill;

[0014] Determine whether the user profile information meets the recommended requirements for timeliness change;

[0015] If the user portrait information meets the recommendation requirements for timeliness change, then generate timeliness change recommendation information;

[0016] The timeliness change recommendation information is sent to the user terminal of the user corresponding to the user portrait information.

[0017] In a possible implementation of the present application, determining whether the target waybill meets the timeliness change requirement of the timeliness change type based on the timeliness change instruction includes:

[0018] Based on the time limit change instruction, obtaining first routing information of the target waybill;

[0019] Obtaining a prediction result of the timeliness of the target waybill;

[0020] Based on the first routing information and the timeliness achievement prediction result, determine whether the target waybill meets the timeliness change requirements of the timeliness change type.

[0021] In a possible implementation of the present application, the method further includes:

[0022] Obtaining a time limit change cancellation instruction for the target waybill;

[0023] Based on the time limit change cancellation instruction, obtaining the transportation status information of the target waybill;

[0024] Based on the transportation status, determining whether the target waybill meets the time limit change cancellation requirement;

[0025] If yes, a cancellation time limit change instruction is generated, and cancellation success feedback information is generated, and the cancellation success feedback information is sent to the user terminal of the user corresponding to the target waybill;

[0026] If not, cancellation failure feedback information is generated, and the cancellation failure feedback information is sent to the user terminal of the user corresponding to the target waybill.

[0027] In a possible implementation of the present application, the changing the time limit of the target waybill includes:

[0028] Obtaining waybill information of the target waybill;

[0029] Determine a change strategy based on the waybill information and the time limit change type;

[0030] Based on the change strategy, the time limit of the target waybill is changed.

[0031] In a possible implementation of the present application, after determining whether the target waybill meets the timeliness change requirement of the timeliness change type based on the timeliness change instruction, the method further includes:

[0032] If the target waybill does not meet the time limit change requirements of the time limit change type, an upgrade failure feedback message is generated;

[0033] The upgrade failure feedback information is sent to a user terminal of a user corresponding to the target waybill.

[0034] In a possible implementation of the present application, the method further includes:

[0035] Calculate the time limit change fee after the time limit of the target waybill is changed;

[0036] The time limit change fee is sent to the user terminal of the user corresponding to the target waybill.

[0037] On the other hand, the present application provides a device for changing the time limit of a waybill, the device comprising:

[0038] A first acquisition unit is used to acquire a time limit change instruction and a time limit change type of a target waybill;

[0039] A first determining unit, configured to determine whether the target waybill meets the timeliness change requirement of the timeliness change type based on the timeliness change instruction;

[0040] A first generating unit and a first sending unit, configured to generate an interception instruction if the target waybill meets the time limit change requirement of the time limit change type, and send the interception instruction to the target route;

[0041] A second acquisition unit and a second determination unit, configured to acquire interception feedback information from the target route, and determine whether the target waybill is successfully intercepted according to the interception feedback information;

[0042] The first time-limit changing unit is used to change the time limit of the target waybill if the interception is successful.

[0043] In a possible implementation of the present application, before obtaining the time limit change instruction and time limit change type of the target waybill, the device is further used to:

[0044] Obtaining waybill information of the target waybill;

[0045] Based on the waybill information, determining user portrait information corresponding to the target waybill;

[0046] Determine whether the user profile information meets the recommended requirements for timeliness change;

[0047] If the user portrait information meets the recommendation requirements for timeliness change, then generate timeliness change recommendation information;

[0048] The timeliness change recommendation information is sent to the user terminal of the user corresponding to the user portrait information.

[0049] In a possible implementation of the present application, the first determining unit is specifically configured to:

[0050] Based on the time limit change instruction, obtaining first routing information of the target waybill;

[0051] Obtaining a prediction result of the timeliness of the target waybill;

[0052] Based on the first routing information and the timeliness achievement prediction result, determine whether the target waybill meets the timeliness change requirements of the timeliness change type.

[0053] In a possible implementation of the present application, the device is further used for:

[0054] Obtaining a time limit change cancellation instruction for the target waybill;

[0055] Based on the time limit change cancellation instruction, obtaining the transportation status information of the target waybill;

[0056] Based on the transportation status, determining whether the target waybill meets the time limit change cancellation requirement;

[0057] If yes, a cancellation time limit change instruction is generated, and cancellation success feedback information is generated, and the cancellation success feedback information is sent to the user terminal of the user corresponding to the target waybill;

[0058] If not, cancellation failure feedback information is generated, and the cancellation failure feedback information is sent to the user terminal of the user corresponding to the target waybill.

[0059] In a possible implementation of the present application, the first timeliness changing unit is specifically used to:

[0060] Obtaining waybill information of the target waybill;

[0061] Determine a change strategy based on the waybill information and the time limit change type;

[0062] Based on the change strategy, the time limit of the target waybill is changed.

[0063] In a possible implementation of the present application, after determining whether the target waybill meets the timeliness change requirement of the timeliness change type based on the timeliness change instruction, the device is further used to:

[0064] If the target waybill does not meet the time limit change requirements of the time limit change type, an upgrade failure feedback message is generated;

[0065] The upgrade failure feedback information is sent to a user terminal of a user corresponding to the target waybill.

[0066] In a possible implementation of the present application, the device is further used for:

[0067] Calculate the time limit change fee after the time limit of the target waybill is changed;

[0068] The time limit change fee is sent to the user terminal of the user corresponding to the target waybill.

[0069] On the other hand, the present application also provides a computer device, the computer device comprising:

[0070] one or more processors;

[0071] Memory; and

[0072] One or more applications, wherein the one or more applications are stored in the memory and configured to be executed by the processor to implement the method for changing the time limit of the waybill.

[0073] On the other hand, the present application also provides a computer-readable storage medium on which a computer program is stored, and the computer program is loaded by a processor to execute the steps in the method for changing the time limit of the waybill.

[0074] This application obtains the time-limit change instruction and time-limit change type of the target waybill; based on the time-limit change instruction, determines whether the target waybill meets the time-limit change requirements of the time-limit change type; if the target waybill meets the time-limit change requirements of the time-limit change type, generates an interception instruction and sends the interception instruction to the target route; obtains interception feedback information from the target route, and determines whether the target waybill is successfully intercepted based on the interception feedback information; if the interception is successful, the time limit of the target waybill is changed. This achieves providing users with a service for changing the time limit of a target waybill during transportation, meeting users' time limit change needs and reducing user customer complaints. BRIEF DESCRIPTION OF THE DRAWINGS

[0075] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.

[0076] Figure 1 This is a schematic diagram of a scenario of a waybill time limit change system provided in an embodiment of the present application;

[0077] Figure 2 It is a flowchart of an embodiment of a method for changing the time limit of a waybill provided in an embodiment of the present application;

[0078] Figure 3 It is a schematic diagram of the structure of an embodiment of a waybill validity change device provided in an embodiment of the present application;

[0079] Figure 4 It is a schematic diagram of the structure of an embodiment of a computer device provided in the embodiments of the present application. DETAILED DESCRIPTION

[0080] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of this application.

[0081] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the said features. In the description of the present application, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.

[0082] In this application, the word "exemplary" is used to mean "used as an example, illustration, or description." Any embodiment described in this application as "exemplary" is not necessarily to be construed as being preferred or advantageous over other embodiments. The following description is given to enable any technician in the field to implement and use the present application. In the following description, details are listed for the purpose of explanation. It should be understood that a person of ordinary skill in the art can recognize that the present application can be implemented without using these specific details. In other instances, well-known structures and processes will not be elaborated in detail to avoid obscuring the description of the present application with unnecessary details. Therefore, the present application is not intended to be limited to the embodiments shown, but is consistent with the widest scope consistent with the principles and features disclosed in the present application.

[0083] The embodiments of the present application provide a method, apparatus, computer device and readable storage medium for changing the validity period of a waybill, which are described in detail below.

[0084] like Figure 1 As shown, Figure 1 1 is a schematic diagram of a scenario of a waybill time limit change system provided in an embodiment of the present application. The waybill time limit change system may include a computer device 100, in which a waybill time limit change device is integrated, such as Figure 1 A computer device 100 in FIG.

[0085] In the embodiment of the present application, the computer device 100 is mainly used to obtain the time limit change instruction and time limit change type of the target waybill; based on the time limit change instruction, determine whether the target waybill meets the time limit change requirements of the time limit change type; if the target waybill meets the time limit change requirements of the time limit change type, generate an interception instruction and send the interception instruction to the target route; obtain interception feedback information from the target route, and determine whether the target waybill is successfully intercepted based on the interception feedback information; if the interception is successful, perform a time limit change on the target waybill.

[0086] In the embodiment of the present application, the computer device 100 may be a terminal or a server. When the computer device 100 is a server, it may be an independent server, or a server network or server cluster composed of servers. For example, the computer device 100 described in the embodiment of the present application includes but is not limited to a computer, a network host, a single network server, a plurality of network server sets or a cloud server constructed by a plurality of servers. The cloud server is constructed by a large number of computers or network servers based on cloud computing.

[0087] It is understandable that when the computer device 100 in the embodiment of the present application is a terminal, the terminal used may be a device including both receiving and transmitting hardware, that is, a device having receiving and transmitting hardware capable of performing two-way communication on a two-way communication link. Such a device may include: a cellular or other communication device having a single-line display or a multi-line display or a cellular or other communication device without a multi-line display. The specific computer device 100 may be a desktop terminal or a mobile terminal, and the computer device 100 may also be one of a mobile phone, a tablet computer, a laptop computer, a medical auxiliary instrument, etc.

[0088] Those skilled in the art will understand that Figure 1 The application environment shown in the figure is only one application scenario of the present application solution, and is not intended to limit the application scenario of the present application solution. Other application environments may also include Figure 1 More or less computer equipment as shown in Figure 1 Only one computer device is shown in the figure. It can be understood that the waybill time limit change system can also include one or more other computer devices, which are not limited here.

[0089] In addition, if Figure 1 As shown, the waybill time limit change system may further include a memory 200 for storing data, such as storing the time limit change instruction and waybill time limit change data of the target waybill, such as the waybill time limit change data when the waybill time limit change system is running.

[0090] It should be noted that Figure 1 The scenario diagram of the waybill time limit change system shown is merely an example. The waybill time limit change system and scenario described in the embodiment of the present application are intended to more clearly illustrate the technical solution of the embodiment of the present application, and do not constitute a limitation on the technical solution provided in the embodiment of the present application. A person of ordinary skill in the art can appreciate that with the evolution of the waybill time limit change system and the emergence of new business scenarios, the technical solution provided in the embodiment of the present application is equally applicable to similar technical problems.

[0091] Next, the method for changing the time limit of a waybill provided in an embodiment of the present application is introduced.

[0092] In the embodiment of the method for changing the validity period of a waybill of the present application embodiment, a waybill validity period change device is used as an execution subject. For the sake of simplicity and ease of description, the execution subject will be omitted in the subsequent method embodiments. The waybill validity period change device is applied to a computer device. The method includes: obtaining a validity period change instruction and a validity period change type of a target waybill; based on the validity period change instruction, determining whether the target waybill meets the validity period change requirements of the validity period change type; if the target waybill meets the validity period change requirements of the validity period change type, generating an interception instruction and sending the interception instruction to a target route; obtaining interception feedback information from the target route, and determining whether the target waybill is successfully intercepted based on the interception feedback information; if the interception is successful, performing a validity period change on the target waybill.

[0093] See also Figures 2 to 4 , Figure 2 This is a flow chart of an embodiment of a method for changing the time limit of a waybill provided in an embodiment of the present application. The method for changing the time limit of a waybill includes steps 201 to step:

[0094] 201. Obtain the time limit change instruction and time limit change type of the target waybill;

[0095] Among them, the waybill can refer to the document issued by the transport company or freight forwarding company for each piece of transported goods, also known as the bill of lading, bill of lading or delivery note. It usually includes detailed information such as the name, quantity, consignee, consignor, delivery address, delivery address, transportation method, and cost of the goods. In the process of cargo transportation, the waybill is a very important document. It records the source and destination of the goods and helps to ensure the safety and accurate delivery of the goods to the destination. In addition, it is also a legal document required for the shipper and the transport company to confirm the handover of the goods.

[0096] Among them, the types of time limit changes at least include the time limit changes of the waybill at the place of departure and the time limit changes of the waybill at the place of destination. Furthermore, the types of time limit changes may also include the time limit changes of the waybill under some special circumstances, such as the time limit change of the waybill with extremely efficient delivery in one hour. Specifically, the time limit change of the waybill at the place of departure refers to the time limit change request of the waybill proposed by the target user before the target waybill is issued by the logistics company or the carrier; the time limit change of the waybill at the destination refers to the time limit change request of the waybill proposed by the target user after the target waybill has been issued and has arrived at the transfer station at the destination; extremely efficient delivery in one hour is an express service standard, which is usually used for logistics distribution services on e-commerce platforms. The service requires merchants to specify the delivery time of the goods in the order (usually within one hour after the order is placed), and forces the distribution company to deliver the goods to the recipient within the specified time.

[0097] In this embodiment, the target waybill is a waybill for which there is a need to change the time limit of the waybill. The user corresponding to the target waybill is the target user, who can be the consignor or the consignee. When the target user needs to change the time limit of the target waybill, he can operate on the corresponding platform and send the time limit change information about the target waybill. The time limit change information may include time limit change instructions, time limit change type and other information. After the target user performs the time limit change operation of the waybill, the waybill time limit change system will receive the time limit change instruction and time limit change type of the target waybill.

[0098] 202. Based on the time limit change instruction, determine whether the target waybill meets the time limit change requirements of the time limit change type;

[0099] In this embodiment, the time limit change requirement of the time limit change type refers to the time limit change requirement preset for different time limit change types, and the requirement can be set and adjusted according to the specific circumstances of the time limit change type. For example, for the time limit change type of the origin waybill mentioned above, since the time limit change for the origin waybill is mainly to change its long-distance transportation method, such as changing the original land transportation to air transportation, and the air transportation has more stringent requirements for the target waybill, its corresponding time limit change requirement includes at least the basic product information in the waybill information (such as whether it is an electronic product, electronic products cannot be loaded on the plane), product weight (if shipping overweight occurs), etc. At the same time, it is necessary to ensure that the status of the routing information of the target waybill is still at the origin and has not been loaded.

[0100] Exemplarily, in some embodiments of the present application, it can be achieved through the following specific implementation methods: based on the time limit change instruction, obtaining the first routing information of the target waybill; obtaining the time limit achievement prediction result of the target waybill; based on the first routing information and the time limit achievement prediction result, determining whether the target waybill meets the time limit change requirements of the time limit change type.

[0101] Among them, the first routing information refers to the relevant information such as the location and time of the goods recorded at each key node in the process of transporting the goods from the starting point to the destination. For example, it includes information on important locations such as the starting point, transfer point, transit station, and end point, as well as the timestamps of the arrival, departure, or next action of the goods. These routing information can be updated in real time, which can help the shipper or consignee understand the flow and current status of the goods, so as to prepare for receiving or adjust the transportation plan. At the same time, for logistics carriers, it is also an important basis for managing and controlling possible problems, improving operational efficiency, and optimizing supply chain management. Specifically, the first routing information of the target waybill can be obtained from the preset logistics waybill management system through the waybill time change system.

[0102] The prediction result of the timeliness achievement of the target waybill is obtained by performing a prediction analysis on the timeliness achievement of the target waybill by a preset timeliness achievement prediction system to obtain a first time parameter.

[0103] The above-mentioned "determining whether the target waybill meets the timeliness change requirements of the timeliness change type based on the first routing information and the timeliness achievement prediction result" may specifically include: determining, based on the first routing information and a preset timeliness analysis interface, the second time parameter used to complete the transportation of the target waybill after the timeliness change of the waybill starting from the first routing information; then comparing the first time parameter with the second time parameter, if the second time parameter is less than or equal to the first time parameter, determining that the target waybill meets the timeliness change requirements of the timeliness change type, otherwise, determining that the target waybill does not meet the timeliness change requirements of the timeliness change type.

[0104] 203. If the target waybill meets the time limit change requirement of the time limit change type, an interception instruction is generated and sent to the target route;

[0105] Among them, the target route refers to the current route location of the target waybill. After the interception instruction is sent to the target route, the node corresponding to the target route will generate interception feedback information, which may include interception success or interception failure.

[0106] 204. Obtain interception feedback information from the target route, and determine whether the target waybill is successfully intercepted according to the interception feedback information;

[0107] Specifically, after obtaining the interception feedback information from the target route, the system will identify and analyze the interception feedback information to determine the interception status of the target waybill.

[0108] 205. If the interception is successful, the time limit of the target waybill will be changed.

[0109] Exemplarily, in some embodiments of the present application, it can be achieved through the following specific implementation methods: obtaining the waybill information of the target waybill; determining the change strategy based on the waybill information and the time limit change type; and making a time limit change to the target waybill based on the change strategy.

[0110] The change strategy is determined by the waybill information and the time change type. The waybill information may include the basic properties of the goods (such as product category (fragile or crushable), weight, and volume). However, the overall strategy is to change the original time requirement to the time requirement that best meets the current user needs. For example, the original time requirement is the normal time requirement (three days), while the current time requirement is the high time requirement (one day).

[0111] Among them, for the change of the time limit of the waybill at the origin, the change strategy can at least include improving the transportation mode before loading, during loading and after loading. Before loading refers to the transportation mode of the goods delivered by the courier to the transfer station, during loading refers to the transportation mode of the goods by land transportation (truck or train) or air transportation, and after loading refers to the transportation mode after the goods arrive at the transfer station at the destination; similarly, for the change of the time limit of the waybill at the destination, only the transportation mode after loading can be adjusted. Specifically, the change of transportation mode can include express delivery in the same city (i.e. changing to another fast carpooling mode) and direct delivery by special car (i.e. changing to another fast special car delivery mode).

[0112] This application obtains the time-limit change instruction and time-limit change type of the target waybill; based on the time-limit change instruction, determines whether the target waybill meets the time-limit change requirements of the time-limit change type; if the target waybill meets the time-limit change requirements of the time-limit change type, generates an interception instruction and sends the interception instruction to the target route; obtains interception feedback information from the target route, and determines whether the target waybill is successfully intercepted based on the interception feedback information; if the interception is successful, the time limit of the target waybill is changed. This achieves providing users with a service for changing the time limit of a target waybill during transportation, meeting users' time limit change needs and reducing user customer complaints.

[0113] In order to provide more accurate services to target users in need, in some embodiments of the present application, before obtaining the time limit change instruction and time limit change type of the target waybill, the method also includes the following scheme: obtaining the waybill information of the target waybill; based on the waybill information, determining the user portrait information corresponding to the target waybill; determining whether the user portrait information meets the recommended requirements for the time limit change; if the user portrait information meets the recommended requirements for the time limit change, generating time limit change recommendation information; and sending the time limit change recommendation information to the user terminal of the user corresponding to the user portrait information.

[0114] During the process of the target user changing the time limit of the target waybill, the time limit change of the waybill fails due to various reasons. In order to ensure that the user has real-time knowledge of the time limit change of the waybill and reduce customer complaints, in some embodiments of the present application, after determining whether the target waybill meets the time limit change requirements of the time limit change type based on the time limit change instruction, the method also includes: if the target waybill does not meet the time limit change requirements of the time limit change type, generating upgrade failure feedback information; the upgrade failure feedback information is sent to the user terminal of the user corresponding to the target waybill.

[0115] In some embodiments of the present application, the method also includes: obtaining a time limit change cancellation instruction for the target waybill; based on the time limit change cancellation instruction, obtaining the transportation status information of the target waybill; based on the transportation status, determining whether the target waybill meets the time limit change cancellation requirements; if so, generating a time limit change cancellation instruction, generating cancellation success feedback information, and sending the cancellation success feedback information to the user terminal of the user corresponding to the target waybill; if not, generating cancellation failure feedback information, and sending the cancellation failure feedback information to the user terminal of the user corresponding to the target waybill.

[0116] In some embodiments of the present application, the method further includes: calculating the time limit change fee after the time limit of the target waybill is changed; and sending the time limit change fee to a user terminal of a user corresponding to the target waybill.

[0117] In order to better implement the waybill time limit change method in the embodiment of the present application, on the basis of the waybill time limit change method, the embodiment of the present application also provides a waybill time limit change device, such as Figure 3 As shown, the waybill time limit changing device 300 includes:

[0118] The first acquisition unit 301 is used to acquire the time limit change instruction and time limit change type of the target waybill;

[0119] A first determining unit 302 is used to determine whether the target waybill meets the timeliness change requirement of the timeliness change type based on the timeliness change instruction;

[0120] The first generating unit 303 and the first sending unit 304 are configured to generate an interception instruction if the target waybill meets the time limit change requirement of the time limit change type, and send the interception instruction to the target route;

[0121] The second acquisition unit 305 and the second determination unit 306 are configured to acquire interception feedback information from the target route, and determine whether the target waybill is successfully intercepted according to the interception feedback information;

[0122] The first time-limit changing unit 307 is used to change the time limit of the target waybill if the interception is successful.

[0123] In some embodiments of the present application, before obtaining the time limit change instruction and time limit change type of the target waybill, the device is further used to:

[0124] Obtaining waybill information of the target waybill;

[0125] Based on the waybill information, determining user portrait information corresponding to the target waybill;

[0126] Determine whether the user profile information meets the recommended requirements for timeliness change;

[0127] If the user portrait information meets the recommendation requirements for timeliness change, then generate timeliness change recommendation information;

[0128] The timeliness change recommendation information is sent to the user terminal of the user corresponding to the user portrait information.

[0129] In some embodiments of the present application, the first determining unit 302 is specifically configured to:

[0130] Based on the time limit change instruction, obtaining first routing information of the target waybill;

[0131] Obtaining a prediction result of the timeliness of the target waybill;

[0132] Based on the first routing information and the timeliness achievement prediction result, determine whether the target waybill meets the timeliness change requirements of the timeliness change type.

[0133] In some embodiments of the present application, the device is also used for:

[0134] Obtaining a time limit change cancellation instruction for the target waybill;

[0135] Based on the time limit change cancellation instruction, obtaining the transportation status information of the target waybill;

[0136] Based on the transportation status, determining whether the target waybill meets the time limit change cancellation requirement;

[0137] If yes, a cancellation time limit change instruction is generated, and cancellation success feedback information is generated, and the cancellation success feedback information is sent to the user terminal of the user corresponding to the target waybill;

[0138] If not, cancellation failure feedback information is generated, and the cancellation failure feedback information is sent to the user terminal of the user corresponding to the target waybill.

[0139] In some embodiments of the present application, the first timeliness changing unit 307 is specifically used to:

[0140] Obtaining waybill information of the target waybill;

[0141] Determine a change strategy based on the waybill information and the time limit change type;

[0142] Based on the change strategy, the time limit of the target waybill is changed.

[0143] In some embodiments of the present application, after determining whether the target waybill meets the timeliness change requirement of the timeliness change type based on the timeliness change instruction, the device is further used to:

[0144] If the target waybill does not meet the time limit change requirements of the time limit change type, an upgrade failure feedback message is generated;

[0145] The upgrade failure feedback information is sent to a user terminal of a user corresponding to the target waybill.

[0146] In some embodiments of the present application, the device is also used for:

[0147] Calculate the time limit change fee after the time limit of the target waybill is changed;

[0148] The time limit change fee is sent to the user terminal of the user corresponding to the target waybill.

[0149] This application uses a first acquisition unit 301 to acquire the time-limit change instruction and time-limit change type of the target waybill; a first determination unit 302 to determine whether the target waybill meets the time-limit change requirements of the time-limit change type based on the time-limit change instruction; a first generation unit 303 and a first sending unit 304 to generate an interception instruction if the target waybill meets the time-limit change requirements of the time-limit change type, and send the interception instruction to the target route; a second acquisition unit 305 and a second determination unit 306 to acquire interception feedback information from the target route, and determine whether the target waybill is successfully intercepted according to the interception feedback information; a first time-limit change unit 307 to perform time-limit change on the target waybill if the interception is successful. This achieves a service for users to change the time limit of a target waybill during transportation, meet users' time limit change needs, and reduce user customer complaints.

[0150] In addition to the above-mentioned method and device for changing the time limit of a waybill, the embodiment of the present application further provides a computer device, which integrates any one of the waybill time limit changing devices provided in the embodiment of the present application, and the computer device includes:

[0151] one or more processors;

[0152] Memory; and

[0153] One or more applications, wherein the one or more applications are stored in the memory and are configured to be executed by the processor to perform the operations of any of the methods described in any of the embodiments of the above-mentioned waybill time limit change method.

[0154] The present application also provides a computer device that integrates any of the waybill validity change devices provided in the present application. Figure 4 As shown, it shows a schematic diagram of the structure of the computer device involved in the embodiment of the present application, specifically:

[0155] The computer device may include components such as a processor 401 with one or more processing cores, a storage unit 402 with one or more computer-readable storage media, a power supply 403, and an input unit 404. Those skilled in the art will appreciate that Figure 4 The computer device structure shown in the figure does not constitute a limitation on the computer device, and may include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently. Among them:

[0156] The processor 401 is the control center of the computer device. It uses various interfaces and lines to connect various parts of the entire computer device. By running or executing software programs and / or modules stored in the storage unit 402 and calling data stored in the storage unit 402, it executes various functions of the computer device and processes data, thereby monitoring the computer device as a whole. Optionally, the processor 401 may include one or more processing cores; preferably, the processor 401 may integrate an application processor and a modem processor, wherein the application processor mainly processes the operating system, user interface, and application programs, and the modem processor mainly processes wireless communications. It is understandable that the above-mentioned modem processor may not be integrated into the processor 401.

[0157] The storage unit 402 can be used to store software programs and modules. The processor 401 executes various functional applications and data processing by running the software programs and modules stored in the storage unit 402. The storage unit 402 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data created according to the use of the computer device, etc. In addition, the storage unit 402 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other volatile solid-state storage devices. Accordingly, the storage unit 402 may also include a memory controller to provide the processor 401 with access to the storage unit 402.

[0158] The computer device also includes a power supply 403 for supplying power to various components. Preferably, the power supply 403 can be logically connected to the processor 401 through a power management system, so as to manage charging, discharging, and power consumption through the power management system. The power supply 403 can also include any components such as one or more DC or AC power supplies, recharging systems, power failure detection circuits, power converters or inverters, and power status indicators.

[0159] The computer device may further include an input unit 404, which may be used to receive input digital or character information and generate keyboard, mouse, joystick, optical or trackball signal input related to user settings and function control.

[0160] Although not shown, the computer device may also include a display unit, etc., which will not be described in detail here. Specifically, in the embodiment of the present application, the processor 401 in the computer device will load the executable file corresponding to the process of one or more application programs into the storage unit 402 according to the following instructions, and the processor 401 will run the application program stored in the storage unit 402, thereby realizing various functions, as follows:

[0161] Obtain the time-limit change instruction and time-limit change type of the target waybill; based on the time-limit change instruction, determine whether the target waybill meets the time-limit change requirements of the time-limit change type; if the target waybill meets the time-limit change requirements of the time-limit change type, generate an interception instruction, and send the interception instruction to the target route; obtain interception feedback information from the target route, and determine whether the target waybill is successfully intercepted based on the interception feedback information; if the interception is successful, perform a time limit change on the target waybill.

[0162] This application obtains the time-limit change instruction and time-limit change type of the target waybill; based on the time-limit change instruction, determines whether the target waybill meets the time-limit change requirements of the time-limit change type; if the target waybill meets the time-limit change requirements of the time-limit change type, generates an interception instruction and sends the interception instruction to the target route; obtains interception feedback information from the target route, and determines whether the target waybill is successfully intercepted based on the interception feedback information; if the interception is successful, the time limit of the target waybill is changed. This achieves providing users with a service for changing the time limit of a target waybill during transportation, meeting users' time limit change needs and reducing user customer complaints.

[0163] To this end, an embodiment of the present application provides a computer-readable storage medium, which may include: a read-only memory (ROM), a random access memory (RAM), a disk or an optical disk, etc. The computer-readable storage medium stores a plurality of instructions, which can be loaded by a processor to execute the steps in any one of the methods for changing the time limit of a waybill provided in the embodiment of the present application. For example, the instruction may execute the following steps:

[0164] Obtain the time-limit change instruction and time-limit change type of the target waybill; based on the time-limit change instruction, determine whether the target waybill meets the time-limit change requirements of the time-limit change type; if the target waybill meets the time-limit change requirements of the time-limit change type, generate an interception instruction, and send the interception instruction to the target route; obtain interception feedback information from the target route, and determine whether the target waybill is successfully intercepted based on the interception feedback information; if the interception is successful, perform a time limit change on the target waybill.

[0165] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0166] The above is a detailed introduction to a method, device, computer equipment and readable storage medium for changing the time limit of a waybill provided in an embodiment of the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method of the present application and its core idea; at the same time, for technical personnel in this field, according to the idea of ​​the present application, there will be changes in the specific implementation method and scope of application. In summary, the content of this specification should not be understood as a limitation on the present application.

Claims

1. A method for changing the time limit of a waybill, characterized in that: The method comprises: Obtain the time limit change instruction and time limit change type of the target waybill; Based on the time limit change instruction, determining whether the target waybill meets the time limit change requirement of the time limit change type; If the target waybill meets the time limit change requirements of the time limit change type, an interception instruction is generated and sent to the target route; Obtaining interception feedback information from the target route, and determining whether the target waybill is successfully intercepted according to the interception feedback information; If the interception is successful, the validity period of the target waybill will be changed.

2. The method for changing the time limit of a waybill according to claim 1, characterized in that: Before obtaining the time limit change instruction and time limit change type of the target waybill, the method further includes: Obtaining waybill information of the target waybill; Based on the waybill information, determining user portrait information corresponding to the target waybill; Determine whether the user profile information meets the recommended requirements for timeliness change; If the user portrait information meets the recommendation requirements for timeliness change, then generate timeliness change recommendation information; The timeliness change recommendation information is sent to the user terminal of the user corresponding to the user portrait information.

3. The method for changing the time limit of a waybill according to claim 1, characterized in that: The determining, based on the time limit change instruction, whether the target waybill meets the time limit change requirement of the time limit change type includes: Based on the time limit change instruction, obtaining first routing information of the target waybill; Obtaining a prediction result of the timeliness of the target waybill; Based on the first routing information and the timeliness achievement prediction result, determine whether the target waybill meets the timeliness change requirements of the timeliness change type.

4. The method for changing the time limit of a waybill according to claim 1, characterized in that: The method further comprises: Obtaining a time limit change cancellation instruction for the target waybill; Based on the time limit change cancellation instruction, obtaining the transportation status information of the target waybill; Based on the transportation status, determining whether the target waybill meets the time limit change cancellation requirement; If yes, a cancellation time limit change instruction is generated, and cancellation success feedback information is generated, and the cancellation success feedback information is sent to the user terminal of the user corresponding to the target waybill; If not, cancellation failure feedback information is generated, and the cancellation failure feedback information is sent to the user terminal of the user corresponding to the target waybill.

5. The method for changing the time limit of a waybill according to claim 1, characterized in that: The changing of the time limit of the target waybill includes: Obtaining waybill information of the target waybill; Determine a change strategy based on the waybill information and the time limit change type; Based on the change strategy, the time limit of the target waybill is changed.

6. The method for changing the time limit of a waybill according to claim 1, characterized in that: After determining whether the target waybill meets the timeliness change requirement of the timeliness change type based on the timeliness change instruction, the method further includes: If the target waybill does not meet the time limit change requirements of the time limit change type, an upgrade failure feedback message is generated; The upgrade failure feedback information is sent to a user terminal of a user corresponding to the target waybill.

7. The method for changing the time limit of a waybill according to claim 1, characterized in that: The method further comprises: Calculate the time limit change fee after the time limit of the target waybill is changed; The time limit change fee is sent to the user terminal of the user corresponding to the target waybill.

8. A device for changing the time limit of a waybill, characterized in that: The device comprises: A first acquisition unit is used to acquire a time limit change instruction and a time limit change type of a target waybill; A first determining unit, configured to determine whether the target waybill meets the timeliness change requirement of the timeliness change type based on the timeliness change instruction; A first generating unit and a first sending unit, configured to generate an interception instruction if the target waybill meets the time limit change requirement of the time limit change type, and send the interception instruction to the target route; A second acquisition unit and a second determination unit, configured to acquire interception feedback information from the target route, and determine whether the target waybill is successfully intercepted according to the interception feedback information; The first time-limit changing unit is used to change the time limit of the target waybill if the interception is successful.

9. A computer device, characterized in that: The computer device comprises: one or more processors; Memory; and One or more applications, wherein the one or more applications are stored in the memory and configured to be executed by the processor to implement the method for changing the time limit of a waybill according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and the computer program is loaded by a processor to execute the steps in the method for changing the time limit of a waybill as described in any one of claims 1 to 7.