Ammeter information storage method and device, processor and storage medium
By acquiring and storing the encoded and electrical energy data of the electricity meter, the problem of low storage efficiency of meter information is solved, automated processing is realized, and the accuracy and efficiency of data entry are improved.
Patent Information
- Application Number
- CN202411243981.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-12-24
AI Technical Summary
In the rotation of existing meters, the recording, sorting and checking of new and old meter data is complicated and inefficient, which is prone to manual entry errors, resulting in low storage efficiency of meter information.
By obtaining the encoded data of the electricity meter to be replaced, extracting the table address, and obtaining the electricity data based on the table address, automatic storage is realized to avoid manual entry errors.
It improves the efficiency of meter information storage, reduces manual operation errors, shortens data entry time, and ensures data accuracy.
Smart Images

Figure CN119179818A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of information storage, and in particular to a method, device, processor and storage medium for storing electric meter information. Background Art
[0002] At present, the large-scale meter rotation work of the power supply station includes three steps: installation and removal of old and new meters; recording, sorting and checking the data of old and new meters; and archiving the files of old and new meters through the system process. Among them, the installation and removal of old and new meters is that the construction personnel remove the old meters on site and then install the new meters; the recording, sorting and checking of the data of old and new meters is that when the on-site construction personnel replace the meters, they take photos and record the data of the new and old meters (asset number and power consumption of the new and old meters, asset number of the seal, etc.); after all the meters in a substation are constructed, all photos are sent to the background data clerk, who manually enters and organizes the data into the form according to the relevant data of the photos; finally, the staff of the power supply station check the organized form and correct the manually entered erroneous data; the system goes through the process to archive the files of old and new meters, which means that the staff of the power supply station will update the verified data of the old and new meters to the system and go through the process until it is archived. The work steps of "recording, sorting and checking the data of old and new meters" in the meter rotation work account for two-thirds of the entire meter rotation work content. Because it involves electricity data, storing meter information is the top priority to ensure the normal operation of the power supply station.
[0003] In the related technology, the current working method is usually manual sorting, which is not only cumbersome and time-consuming, but also has a high probability of errors in manual sorting and data entry. If the on-site construction personnel take unclear photos or take wrong data, they need to search for each meter in the pile and re-enter the data, which leads to low efficiency in meter rotation. Therefore, there is a technical problem of low efficiency in meter information storage.
[0004] With respect to the above-mentioned technical problem of low efficiency in storing electric meter information, no effective solution has been proposed so far. Summary of the invention
[0005] Embodiments of the present invention provide a method, device, processor and storage medium for storing electric meter information, so as to at least solve the technical problem of low efficiency in storing electric meter information.
[0006] According to one aspect of an embodiment of the present invention, a method for storing electric meter information is provided. The method may include: obtaining coded data of an electric meter to be replaced, wherein the coded data includes a table address of the electric meter to be replaced, and the table address is used to indicate the identity information of the electric meter to be replaced; extracting the table address of the electric meter to be replaced from the coded data; obtaining electric energy data of the electric meter to be replaced based on the table address, wherein the electric energy data is used to indicate the energy consumption of the electric meter to be replaced; and storing the coded data and the electric energy data.
[0007] Optionally, obtaining the coded data of the electric meter to be replaced includes: obtaining first barcode information corresponding to the electric meter to be replaced, wherein the first barcode information is used to identify the coded data of the electric meter to be replaced; and obtaining the coded data of the electric meter to be replaced based on the first barcode information.
[0008] Optionally, based on the meter address, acquiring the electric energy data of the electric meter to be replaced includes: establishing a communication connection with the electric meter to be replaced based on the meter address; and acquiring the electric energy data of the electric meter to be replaced in response to successful establishment of the communication connection.
[0009] Optionally, the method for storing electric meter information includes: in response to failure to obtain electric energy data of the electric meter to be replaced, controlling a recording device to take a photo of the electric energy data, and recording the obtained photo results.
[0010] Optionally, the method for storing electric meter information includes: obtaining a replacement status of an electric meter to be replaced, wherein the replacement status is used to indicate whether the electric meter to be replaced is in a replacement completed state or an replacement incomplete state; in response to the electric meter to be replaced being in a replacement completed state, obtaining replacement information of the replacement electric meter, wherein the replacement information is used to identify and track information of the replacement electric meter; and storing the replacement information of the replacement electric meter.
[0011] Optionally, in response to the electric meter to be replaced being in a replacement completed state, obtaining replacement information of the replacement electric meter includes: obtaining second barcode information of the replacement electric meter, wherein the second barcode information is used to identify the replacement information of the replacement electric meter; and obtaining replacement information of the replacement electric meter based on the second barcode information.
[0012] According to another aspect of an embodiment of the present invention, a device for storing electric meter information is also provided. The device may include: a first acquisition unit, used to acquire coded data of the electric meter to be replaced, wherein the coded data includes the table address of the electric meter to be replaced, and the table address is used to indicate the identity information of the electric meter to be replaced; an extraction unit, used to extract the table address of the electric meter to be replaced from the coded data; a second acquisition unit, used to acquire electric energy data of the electric meter to be replaced based on the table address, wherein the electric energy data is used to indicate the energy consumption of the electric meter to be replaced; and a storage unit, used to store the coded data and the electric energy data.
[0013] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided. The computer-readable storage medium includes a stored program, wherein when the program processor runs, the device where the storage medium is located is controlled to execute the method for storing electric meter information in the embodiment of the present invention.
[0014] According to another aspect of an embodiment of the present invention, a processor is further provided. The processor is used to run a program, wherein the method for storing electric meter information in an embodiment of the present invention is executed when the program is run.
[0015] According to another aspect of the embodiment of the present invention, a computer program product is provided, which includes computer instructions, and when the computer instructions are executed by a processor, the method for storing the electric meter information in the embodiment of the present invention is implemented.
[0016] In an embodiment of the present invention, the coded data of the meter to be replaced is obtained, wherein the coded data includes the table address of the meter to be replaced, and the table address is used to indicate the identity information of the meter to be replaced; the table address of the meter to be replaced is extracted from the coded data; based on the table address, the electric energy data of the meter to be replaced is obtained, wherein the electric energy data is used to indicate the energy consumption of the meter to be replaced; and the coded data and the electric energy data are stored. That is to say, the present invention obtains the coded data of the meter to be replaced, extracts the table address from the coded data, thereby obtaining the electric energy data of the meter to be replaced according to the table address, and then stores the coded data and the electric energy data of the meter to be replaced. Since the present invention can automatically obtain the coded data of the meter to be replaced, and process and store the coded data, the shortcomings of manual input that is prone to errors and time-consuming are avoided, and the purpose of correctly processing the coded data of the meter to be replaced is achieved, the technical problem of low efficiency in storing meter information is solved, and the technical effect of improving the efficiency in storing meter information is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0018] Figure 1 is a flow chart of a method for storing electric meter information according to an embodiment of the present invention;
[0019] Figure 2 is a schematic diagram of a portable electric meter rotation data recorder according to an embodiment of the present invention;
[0020] Figure 3 is a flow chart of a method for storing electric meter data based on a portable electric meter rotation data meter according to an embodiment of the present invention;
[0021] Figure 4 4 is a schematic diagram of a device for storing electric meter information according to an embodiment of the present invention. DETAILED DESCRIPTION
[0022] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0023] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, functional component or device that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, functional components or devices.
[0024] According to an embodiment of the present invention, an embodiment of a method for storing electric meter information is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0025] Figure 1 is a flow chart of a method for storing electric meter information according to an embodiment of the present invention. Figure 1 As shown, the method may include the following steps:
[0026] Step S101, obtaining the coding data of the electric meter to be replaced.
[0027] In the technical solution provided in the above step S101 of the present invention, the coded data includes the meter address of the meter to be replaced, and the meter address is used to indicate the location of the meter to be replaced. The coded data can also be called the meter asset number or asset number, and the meter to be replaced can also be called the old meter.
[0028] In this embodiment, the coded data of the electric meter to be replaced is obtained, for example, by scanning the asset number barcode on the electric meter to be replaced to obtain the coded data of the electric meter to be replaced. This is only an example and does not limit the specific method of obtaining the coded data of the electric meter to be replaced.
[0029] For example, first barcode information corresponding to the electric meter to be replaced is obtained, wherein the first barcode information is used to identify the coded data of the electric meter to be replaced; and the coded data of the electric meter to be replaced is obtained by scanning the first barcode information.
[0030] Optionally, by obtaining the coding data of the meter to be replaced, the meter can be managed and tracked through the meter coding data, and the usage and status of each meter can be understood to facilitate maintenance and monitoring. At the same time, the meter coding data can reduce the possibility of human operational errors and improve the accuracy and reliability of replacing meters.
[0031] Step S102, extracting the meter address of the electric meter to be replaced from the coded data.
[0032] In the technical solution provided in the above step S102 of the present invention, after the coded data of the electric meter to be replaced is acquired in step S101, the meter address of the electric meter to be replaced is extracted from the coded data.
[0033] In this embodiment, the meter address of the electric meter to be replaced is extracted from the coded data. For example, part of the coded data is intercepted to form the meter address, which is only an example and does not limit the specific method of extracting the meter address of the electric meter to be replaced.
[0034] For example, the meter asset number is automatically identified based on the meter asset number and the following 12 digits are truncated to form the meter address.
[0035] Optionally, extracting the meter address of the meter to be replaced can help the power company locate the meter to be replaced more quickly, thereby improving the efficiency of replacing the meter. At the same time, it can reduce manual operation errors, avoid replacing the wrong meter, and improve the accuracy of replacement.
[0036] Step S103, based on the meter address, obtaining the electric energy data of the electric meter to be replaced.
[0037] In the technical solution provided in the above step S103 of the present invention, the electric energy data is used to indicate the energy consumption of the electric meter to be replaced, and the electric energy data can also be referred to as in-meter data.
[0038] In this embodiment, after the meter address of the electric meter to be replaced is extracted in step S102, the electric energy data of the electric meter to be replaced is obtained according to the meter address.
[0039] Optionally, the electric energy data may at least include: forward active power, reverse active power, forward reactive power, reverse reactive power, cover opening record and other data.
[0040] Optionally, a communication connection is established with the electric meter to be replaced according to the meter address; when the communication connection is successfully established, it means that the electric meter to be replaced can be remotely monitored and managed, based on which the electric energy data of the electric meter to be replaced can be obtained. The communication connection can also be called communication binding.
[0041] For example, the meter address is used to communicate with the meter to be replaced, and then infrared communication is used to read the data in the meter to be replaced.
[0042] Step S104, storing the coding data and the electric energy data.
[0043] In the technical solution provided in the above step S104 of the present invention, after the electric energy data of the electric meter to be replaced is acquired in step S103, the coding data and the electric energy data are stored.
[0044] In this embodiment, the coding data and the electric energy data are stored. For example, the coding data and the electric energy data can be stored in an Excel spreadsheet, which is only an illustrative example and does not limit the specific method of storing the coding data and the electric energy data.
[0045] Optionally, by storing the coding data and the electric energy data, the data can be sorted, thus avoiding the problem of low efficiency of manual entry and sorting.
[0046] It should be noted that the above embodiment can be executed by a storage device for electric meter information.
[0047] In the above steps S101 to S104 of the present invention, the coded data of the meter to be replaced is obtained, wherein the coded data includes the table address of the meter to be replaced, and the table address is used to indicate the identity information of the meter to be replaced; the table address of the meter to be replaced is extracted from the coded data; based on the table address, the electric energy data of the meter to be replaced is obtained, wherein the electric energy data is used to indicate the energy consumption of the meter to be replaced; and the coded data and the electric energy data are stored. That is to say, the present invention obtains the coded data of the meter to be replaced, extracts the table address from the coded data, thereby obtaining the electric energy data of the meter to be replaced according to the table address, and then stores the coded data and the electric energy data of the meter to be replaced. Since the present invention can automatically obtain the coded data of the meter to be replaced, and process and store the coded data, the shortcomings of manual input that is prone to error and time-consuming are avoided, and the purpose of correctly processing the coded data of the meter to be replaced is achieved, the technical problem of low efficiency in storing meter information is solved, and the technical effect of improving the efficiency in storing meter information is achieved.
[0048] The above method of this embodiment is further introduced below.
[0049] As an optional implementation method, obtaining the coded data of the electric meter to be replaced includes: obtaining first barcode information corresponding to the electric meter to be replaced, wherein the first barcode information is used to identify the coded data of the electric meter to be replaced; based on the first barcode information, obtaining the coded data of the electric meter to be replaced.
[0050] In this embodiment, the first barcode information corresponding to the electric meter to be replaced is obtained, and the encoding data of the electric meter to be replaced is obtained according to the first barcode information. The first barcode information may be the asset number barcode of the old electric meter.
[0051] Optionally, the first barcode information corresponding to the meter to be replaced is obtained, and the coding data of the meter to be replaced is obtained based on the first barcode information, so as to ensure that the correct meter is selected when replacing the meter, thereby avoiding installation problems or inaccurate data caused by incorrect selection.
[0052] As an optional implementation method, obtaining electric energy data of the electric meter to be replaced based on the meter address includes: establishing a communication connection with the electric meter to be replaced based on the meter address; and obtaining electric energy data of the electric meter to be replaced in response to successful establishment of the communication connection.
[0053] In this embodiment, a communication connection is established with the electric meter to be replaced according to the meter address; when the communication connection is successfully established, the electric energy data of the electric meter to be replaced is obtained.
[0054] For example, the modulation and demodulation module in the infrared communication module converts the digital signal of the data to be collected into a transmission signal form, sends it through the infrared transmitting tube to establish communication with the old meter, and then obtains the transmission signal returned by the meter through the infrared receiving tube.
[0055] Optionally, the electric energy data of the electric meter to be replaced can be obtained to record the user's current power consumption for subsequent system data entry, and the cover opening record can determine whether the user is currently stealing electricity.
[0056] As an optional embodiment, the method for storing electric meter information further includes: in response to a failure in obtaining electric energy data of the electric meter to be replaced, controlling a recording device to take a photo of the electric energy data and recording the obtained photo results.
[0057] In this embodiment, when the electric energy data of the electric meter to be replaced fails to be obtained, the recording device is controlled to take a photo of the electric energy data and record the obtained photo result.
[0058] For example, when the electric energy data of the electric meter to be replaced is read as empty or missing, the data can be recorded by taking a photo through the camera function of the handheld device (recorder).
[0059] Optionally, by taking photos to record electric energy data, the accuracy of data collection can be ensured, and the problem of no backup records in special circumstances can be avoided. At the same time, the photo records can truly reflect the meter data information to ensure that the data source has a basis.
[0060] As an optional implementation manner, the method for storing electric meter information also includes: obtaining a replacement status of the electric meter to be replaced, wherein the replacement status is used to indicate whether the electric meter to be replaced is in a replacement completed state or an replacement incomplete state; in response to the electric meter to be replaced being in a replacement completed state, obtaining replacement information of the replacement electric meter, wherein the replacement information is used to identify and track information of the replacement electric meter; and storing the replacement information of the replacement electric meter.
[0061] In this embodiment, the replacement status of the electric meter to be replaced is obtained; when the electric meter to be replaced is in the replacement completion state, the replacement information of the replacement electric meter is obtained; and the replacement information of the replacement electric meter is stored. The replacement electric meter may also be referred to as a new electric meter.
[0062] For example, during an on-site meter replacement operation, the old meter is removed and replaced with a new meter. After the new meter is installed, the asset number barcode of the new meter is scanned to collect the asset number data of the new meter and store the asset number data of the new meter.
[0063] Optionally, by obtaining the replacement status and replacement information of the electric meter to be replaced, the replacement work can be arranged more quickly and the electric meter information can be updated in time. At the same time, it can facilitate the management personnel to monitor and count, and improve the management efficiency and data analysis capabilities.
[0064] As an optional implementation method, in response to the electric meter to be replaced being in a replacement completed state, replacement information of the replacement electric meter is obtained, including: obtaining second barcode information of the replacement electric meter, wherein the second barcode information is used to identify the replacement information of the replacement electric meter; based on the second barcode information, obtaining replacement information of the replacement electric meter.
[0065] In this embodiment, the second barcode information of the replacement electric meter is obtained, and the replacement information of the replacement electric meter is obtained according to the second barcode information, wherein the second barcode information may be the asset number barcode of the new electric meter.
[0066] For example, the barcodes of old and new electricity meters, electricity meter modules, seals, etc. are scanned and identified through the barcode scanning module in the handheld terminal.
[0067] Optionally, replacing the meter can ensure the meter's accuracy and stability, and avoid inaccurate electricity calculations or malfunctions caused by old meters. New meters usually have higher energy efficiency and lower energy consumption, which can effectively save electricity costs. At the same time, new meters usually have stronger data collection and monitoring capabilities, and can achieve remote monitoring and management, making it easier for users to understand electricity usage and optimize electricity plans.
[0068] It should be noted that the above embodiment can be executed by a storage device for electric meter information.
[0069] In this embodiment, the coded data of the meter to be replaced is obtained, wherein the coded data includes the table address of the meter to be replaced, and the table address is used to indicate the identity information of the meter to be replaced; the table address of the meter to be replaced is extracted from the coded data; based on the table address, the electric energy data of the meter to be replaced is obtained, wherein the electric energy data is used to indicate the energy consumption of the meter to be replaced; and the coded data and the electric energy data are stored. That is to say, the present invention obtains the coded data of the meter to be replaced, extracts the table address from the coded data, thereby obtaining the electric energy data of the meter to be replaced according to the table address, and then stores the coded data and the electric energy data of the meter to be replaced. Since the present invention can automatically obtain the coded data of the meter to be replaced, and process and store the coded data, the shortcomings of manual input that is prone to errors and time-consuming are avoided, and the purpose of correctly processing the coded data of the meter to be replaced is achieved, the technical problem of low efficiency in storing meter information is solved, and the technical effect of improving the efficiency in storing meter information is achieved.
[0070] The technical solution of the embodiment of the present invention is illustrated below in conjunction with preferred implementation modes.
[0071] At present, the large-scale meter rotation work of the power supply station includes three steps: installation and removal of old and new meters; recording, sorting and checking the data of old and new meters; and archiving the files of old and new meters through the system process. Among them, the installation and removal of old and new meters is that the construction personnel remove the old meters on site and then install the new meters; the recording, sorting and checking of the data of old and new meters is that when the on-site construction personnel replace the meters, they take photos and record the data of the new and old meters (asset number and power consumption of the new and old meters, asset number of the seal, etc.); after all the meters in a substation are constructed, all photos are sent to the background data clerk, who manually enters and organizes the data into the form according to the relevant data of the photos; finally, the staff of the power supply station check the organized form and correct the manually entered erroneous data; the system goes through the process to archive the files of old and new meters, which means that the staff of the power supply station will update the verified data of the old and new meters to the system and go through the process until it is archived. The work steps of "recording, sorting and checking the data of old and new meters" in the meter rotation work account for two-thirds of the entire meter rotation work content. Because it involves electricity data, this step is also the top priority.
[0072] In the related art, the current working method is usually manual sorting, which is not only cumbersome and time-consuming, but also has a high probability of errors in manual sorting and data entry. If the on-site construction personnel take unclear photos or take the wrong data, they need to search for each meter in the pile and re-enter the data, which leads to low efficiency in meter rotation. Therefore, there is a technical problem of low efficiency in storing meter information. In view of the above-mentioned technical problem of low efficiency in storing meter information, no effective solution has been proposed yet.
[0073] However, an embodiment of the present invention proposes a method for storing meter data based on a portable meter rotation data meter, which collects the asset number data of the old meter by scanning the asset number barcode of the old meter, intercepts the asset number data to obtain the meter address, communicates and binds with the meter through the meter address, and then uses infrared communication to read the data in the old meter. If the reading is successful, the data in the meter is recorded. If the reading fails, the data is photographed and recorded through the camera function of a handheld device (recorder). After the recording is completed and the new meter is installed, the asset number barcode of the new meter is scanned to collect the asset number data of the meter; the barcodes sealed on the meter and the meter box are recorded by scanning the barcodes, which solves the technical problem of low meter information storage efficiency and achieves the technical effect of improving meter information storage efficiency.
[0074] The embodiments of the present invention are further described below.
[0075] Figure 2 2 is a schematic diagram of a portable meter rotation data recorder according to an embodiment of the present invention. The portable meter rotation data recorder includes: an infrared communication module 201 and a handheld terminal 202 .
[0076] In this embodiment, the infrared communication module 201 includes: an infrared transmitting tube 2011, a modulation and demodulation module 2012, an infrared receiving tube 2013 and a Universal Serial Bus (USB) transceiver 2014. The modulation and demodulation module 2012 can be a 38kHz modulation and demodulation module.
[0077] Optionally, the handheld terminal 202 includes: a code scanning module 2021, a camera module 2022, a central processing unit 2023, a communication module 2024, a display screen 2025 and a lithium battery 2026.
[0078] Optionally, the handheld terminal 202 can be an Android handheld terminal, the camera module 2022 can be a 13-megapixel camera module, the communication module 2024 can be a wireless (Wireless Fidelity, abbreviated as WIFI) Bluetooth communication module, the central processor 2023 can be an eight-core 2.0GHz central processor, and the lithium battery 2026 can be a 5200mAh lithium battery 10.
[0079] Optionally, the modem module 2012 in the infrared communication module 201 converts the digital signal of the data to be collected into a transmission signal form, sends it through the infrared transmitting tube 2011 to establish communication with the old meter, and then obtains the meter return transmission signal through the infrared receiving tube 2013.
[0080] Optionally, the modem module 2012 restores the returned transmission signal to the original digital signal, and finally transmits it to the handheld terminal 202 via the USB transceiver 2014 .
[0081] Optionally, the barcode scanning module 2021 in the handheld terminal 202 is used to scan and identify the barcodes of the old and new meters, meter modules, seals, etc. The camera module 2022 is used to take photos and record the data when reading the meter data fails. The communication module 2024 is used to transfer files or upgrade system functions. The central processor 2023 is used to process data obtained by other modules. The display screen 2025 is used to display the recorder operation interface and perform touch operations. The lithium battery 2026 is used to power the recorder.
[0082] Optionally, the infrared transmitting tube can emit infrared signals for data transmission and remote control in infrared communication systems. The infrared transmitting tube can be used as the transmitting part of an infrared sensor to detect information such as the existence, position and movement of an object. The infrared transmitting tube can emit infrared radiation and is used in infrared heating equipment, such as infrared ovens, infrared hot plates, etc. The infrared transmitting tube can be used in infrared thermal imaging equipment to convert the thermal radiation on the surface of an object into a visual image for thermal imaging detection and observation.
[0083] Alternatively, a USB transceiver is a device that converts a USB interface to another type of interface, or vice versa. It can be used to connect different types of devices, such as connecting a USB device to a device without a USB interface, or connecting another type of device to a device with a USB interface. USB transceivers are often used to expand the connection options of a device, providing more flexibility and convenience.
[0084] Figure 3The present invention is a flowchart of a method for storing meter data based on a portable meter rotation data meter according to an embodiment of the present invention. The storage method comprises the following steps:
[0085] Step S301, scanning the asset number barcode of the old electricity meter.
[0086] In this embodiment, the asset number barcode of the old electricity meter is scanned to collect the asset number data of the electricity meter.
[0087] Step S302, whether the code scanning is successful.
[0088] In this embodiment, it is determined whether the code scanning is successful. If the code scanning is successful, step S304 is executed; if the code scanning is unsuccessful, step S303 is executed.
[0089] Step S303, manually input or modify the old meter asset number.
[0090] In this embodiment, when the code scanning fails, the asset number of the old meter can be manually input or modified to make it consistent with that registered on the target meter.
[0091] Optionally, manually entering or modifying the asset number can avoid delays in work progress due to failed code scanning, ensure the smooth progress of the work, ensure that the asset number of the meter is consistent with the registered on the target meter, and avoid inaccurate information due to scanning errors. Manually entering or modifying the asset number can save time in re-scanning the code and improve work efficiency, especially in complex scanning environments or unstable scanning equipment. Manually entering or modifying the asset number is relatively simple and convenient, does not require scanning equipment, and is suitable for emergency handling in various situations.
[0092] Step S304, automatically identifying and acquiring the table address.
[0093] In this embodiment, when the code is scanned successfully or the manual input and modification are completed, the meter asset number is automatically identified and the following 12 digits are intercepted to form the meter address.
[0094] Step S305, reading the data in the old electricity meter.
[0095] In this embodiment, the communication binding with the electric meter is performed through the meter address, and then the data in the old electric meter is read by using infrared communication.
[0096] For example, to bind the meter to the electric meter through the meter address, you can follow the steps below: Determine the meter address of the electric meter: Each electric meter has a unique meter address, and the general meter address can be obtained based on the last 12 digits of the meter asset number. Use appropriate communication equipment: Select appropriate communication equipment according to the communication protocol of the electric meter, such as using an RS485 communication module or a wireless communication module. Bind the table address to the electric meter: Set the meter address of the electric meter on the communication device, and ensure that the communication device can correctly identify the electric meter. Test the communication connection: Test whether the communication connection is successful by sending query instructions or reading the meter data to ensure that the communication device can communicate with the electric meter normally. Through the above steps, the communication binding between the meter address and the electric meter can be achieved, ensuring that the meter data can be accurately transmitted and collected.
[0097] Optionally, the data in the table obtained include: forward active power, reverse active power, forward reactive power, reverse reactive power, and cover opening record.
[0098] Optionally, positive active power means that the electric energy recorded by the electric energy meter is a positive value, indicating active electric energy consumed by the user.
[0099] Optionally, reverse active power refers to that the electric energy recorded by the electric energy meter is a negative value, indicating active electric energy transmitted by the user to the power grid.
[0100] Optionally, positive reactive power refers to that the reactive power recorded by the electric energy meter is a positive value, indicating reactive electric energy consumed by the user.
[0101] Optionally, reverse reactive power refers to reactive power recorded by the electric energy meter as a negative value, indicating reactive electric energy transmitted by the user to the power grid.
[0102] Optionally, the cover opening record refers to the cover opening event recorded by the electric energy meter, indicating that the electric energy meter is illegally opened or damaged. This situation usually causes the electric energy meter to stop measuring or measure abnormally, and further judgment is required according to the actual situation.
[0103] Step S306, whether the reading is successful.
[0104] In this embodiment, it is determined whether the data is read and collected successfully. If successful, step S308 is executed; if unsuccessful, step S307 is executed.
[0105] Step S307, taking photos and recording data.
[0106] In this embodiment, when the read collected data is empty or missing, the data can be photographed and recorded through the camera function of the handheld device (recorder).
[0107] Optionally, taking photos can be used as a supplement to the data to ensure the completeness and accuracy of the data and avoid missing or erroneous data due to incomplete or erroneous collection. At the same time, the data recorded by taking photos can be viewed and reviewed at any time, which is convenient for researchers or staff to analyze and verify the data. Taking photos as a backup measure can ensure that the data is recorded truthfully and without omissions when special circumstances occur.
[0108] Step S308, remove the old meter and replace it with a new one.
[0109] In this embodiment, after the data is recorded, the electricity meter can be replaced on site by removing the old electricity meter and replacing it with a new one.
[0110] Step S309, scan the new meter asset number barcode.
[0111] In this embodiment, after the new electricity meter is installed, the asset number barcode of the new electricity meter is scanned to collect the asset number data of the electricity meter.
[0112] Step S310, scanning multiple seal barcodes.
[0113] In this embodiment, the barcodes stamped on the electric meter and meter box are recorded by scanning the barcodes.
[0114] Step S311, export data.
[0115] In this embodiment, after all the electric meters in the substation area have completed the rotation, an Excel spreadsheet containing the data of all the electric meters in the substation area is exported and handed over to the back-end personnel to follow the process and archive the work order.
[0116] Optionally, the present invention records meter data by scanning codes, infrared communication, etc., and after traditional construction workers take photos on site, data personnel manually enter and organize meter data based on the photos. It can also automatically organize and generate data Excel tables, which is convenient for power supply station employees to directly use and file through the process, avoiding the shortcomings of manual entry that is prone to errors and time-consuming, improving the overall efficiency of rotation work, helping power supply stations to complete rotation tasks faster, and at the same time better reducing the impact of rotation work on the automatic meter reading rate.
[0117] In this embodiment, the asset number barcode of the old electricity meter is scanned to collect the asset number data of the electricity meter, the asset number data is intercepted to obtain the meter address, and the meter address is used to communicate and bind with the electricity meter. Then, infrared communication is used to read the data in the old electricity meter. If the reading is successful, the data in the meter is recorded. If the reading fails, the data is photographed and recorded through the camera function of the handheld device (recorder). After the recording is completed and the new electricity meter is installed, the asset number barcode of the new electricity meter is scanned to collect the asset number data of the electricity meter. The barcodes sealed on the electricity meter and the meter box are recorded by scanning the barcodes, which solves the technical problem of low meter information storage efficiency and achieves the technical effect of improving meter information storage efficiency.
[0118] According to an embodiment of the present invention, a device for storing electric meter information is also provided. It should be noted that the device for storing electric meter information can be used to execute the method for storing electric meter information in embodiment 1.
[0119] Figure 4 Schematic diagram of a device for storing electric meter information according to an embodiment of the present invention. Figure 4 As shown, the storage device 400 for the electric meter information may include: a first acquisition unit 401 , an extraction unit 402 , a second acquisition unit 403 and a storage unit 404 .
[0120] The first acquisition unit 401 is used to acquire the coded data of the electric meter to be replaced, wherein the coded data includes the meter address of the electric meter to be replaced, and the meter address is used to indicate the identity information of the electric meter to be replaced.
[0121] The extraction unit 402 is used to extract the meter address of the electric meter to be replaced from the encoded data.
[0122] The second acquisition unit 403 is used to acquire the electric energy data of the electric meter to be replaced based on the meter address, wherein the electric energy data is used to indicate the energy consumption of the electric meter to be replaced.
[0123] The storage unit 404 is used to store the coding data and the electric energy data.
[0124] Optionally, the first acquisition unit 401 may include: a first acquisition module, used to acquire first barcode information corresponding to the electric meter to be replaced, wherein the first barcode information is used to identify the coded data of the electric meter to be replaced; a second acquisition module, used to acquire the coded data of the electric meter to be replaced based on the first barcode information.
[0125] Optionally, the second acquisition unit 403 may include: an establishment module, configured to establish a communication connection with the electric meter to be replaced based on the meter address; and a third acquisition module, configured to acquire electric energy data of the electric meter to be replaced in response to successful establishment of the communication connection.
[0126] Optionally, the storage device 400 for the electric meter information may further include: a control unit for controlling the recording device to take a photo of the electric energy data in response to a failure in obtaining the electric energy data of the electric meter to be replaced, and recording the obtained photo results.
[0127] Optionally, the storage device 400 for the electric meter information may further include: a third acquisition unit, used to acquire the replacement status of the electric meter to be replaced, wherein the replacement status is used to indicate that the electric meter to be replaced is in a replacement completed state or an replacement incomplete state; a fourth acquisition unit, used to acquire replacement information of the replacement electric meter in response to the electric meter to be replaced being in a replacement completed state, wherein the replacement information is used to identify and track information of the replacement electric meter; and a second storage unit, used to store the replacement information of the replacement electric meter.
[0128] Optionally, the fourth acquisition unit may include: a fourth acquisition module, used to acquire second barcode information of replacing the electric meter, wherein the second barcode information is used to identify replacement information of replacing the electric meter; a fifth acquisition module, used to acquire replacement information of replacing the electric meter based on the second barcode information.
[0129] In this embodiment, the coded data of the meter to be replaced is obtained, wherein the coded data includes the table address of the meter to be replaced, and the table address is used to indicate the identity information of the meter to be replaced; the table address of the meter to be replaced is extracted from the coded data; based on the table address, the electric energy data of the meter to be replaced is obtained, wherein the electric energy data is used to indicate the energy consumption of the meter to be replaced; and the coded data and the electric energy data are stored. That is to say, the present invention obtains the coded data of the meter to be replaced, extracts the table address from the coded data, thereby obtaining the electric energy data of the meter to be replaced according to the table address, and then stores the coded data and the electric energy data of the meter to be replaced. Since the present invention can automatically obtain the coded data of the meter to be replaced, and process and store the coded data, the shortcomings of manual input that is prone to errors and time-consuming are avoided, and the purpose of correctly processing the coded data of the meter to be replaced is achieved, the technical problem of low efficiency in storing meter information is solved, and the technical effect of improving the efficiency in storing meter information is achieved.
[0130] According to an embodiment of the present invention, a computer-readable storage medium is further provided. The storage medium includes a stored program, wherein the program executes the method for storing the electric meter information in Embodiment 1.
[0131] According to an embodiment of the present invention, a processor is further provided. The processor is used to run a program. When the program is run, the method for storing the electric meter information in Embodiment 1 is executed.
[0132] According to an embodiment of the present invention, a computer program product is further provided. The computer program product includes computer instructions. When the computer instructions are executed by a processor, the method for storing the electric meter information in Embodiment 1 is implemented.
[0133] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0134] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0135] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0136] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed over multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0137] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0138] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent functional component, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software functional component, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the methods of each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, disk or optical disk, etc., which can store program codes.
[0139] The above are only preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for storing electric meter information, characterized in that: include: Acquire coded data of the electric meter to be replaced, wherein the coded data includes a meter address of the electric meter to be replaced, and the meter address is used to indicate identity information of the electric meter to be replaced; Extracting the meter address of the electric meter to be replaced from the coded data; Based on the meter address, acquiring electric energy data of the electric meter to be replaced, wherein the electric energy data is used to indicate energy consumption of the electric meter to be replaced; The encoded data and the electric energy data are stored.
2. The method according to claim 1, characterized in that Get the coded data of the meter to be replaced, including: Acquire first barcode information corresponding to the electric meter to be replaced, wherein the first barcode information is used to identify the coding data of the electric meter to be replaced; Based on the first barcode information, the coded data of the electric meter to be replaced is obtained.
3. The method according to claim 1, characterized in that Based on the meter address, acquiring the electric energy data of the electric meter to be replaced includes: Establishing a communication connection with the electric meter to be replaced based on the meter address; In response to the communication connection being successfully established, the electric energy data of the electric meter to be replaced is obtained.
4. The method according to claim 1, characterized in that The method further comprises: In response to failure in acquiring the electric energy data of the electric meter to be replaced, controlling a recording device to take a photo of the electric energy data and recording the obtained photo result.
5. The method according to claim 1, characterized in that The method further comprises: Acquire a replacement status of the electric meter to be replaced, wherein the replacement status is used to indicate whether the electric meter to be replaced is in a replacement completed state or a replacement incomplete state; In response to the electric meter to be replaced being in the replacement completed state, obtaining replacement information of the replacement electric meter, wherein the replacement information is used to identify and track information of the replacement electric meter; The replacement information of the replacement electric meter is stored.
6. The method according to claim 5, characterized in that In response to the to-be-replaced electric meter being in the replacement completed state, obtaining replacement information of the replacement electric meter includes: Acquire second barcode information of the replacement electric meter, wherein the second barcode information is used to identify replacement information of the replacement electric meter; Based on the second barcode information, the replacement information of the replaced electric meter is acquired.
7. A storage device for electric meter information, characterized in that: include: A first acquisition unit, configured to acquire coded data of the electric meter to be replaced, wherein the coded data includes a meter address of the electric meter to be replaced, and the meter address is used to indicate identity information of the electric meter to be replaced; An extraction unit, used for extracting the meter address of the electric meter to be replaced from the coded data; a second acquisition unit, configured to acquire electric energy data of the electric meter to be replaced based on the meter address, wherein the electric energy data is used to indicate energy consumption of the electric meter to be replaced; A storage unit is used to store the coded data and the electric energy data.
8. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein when the program is executed by a processor, the device where the storage medium is located is controlled to execute the method according to any one of claims 1 to 6.
9. A processor, characterized in that: The processor is used to run a program, wherein the program executes the method according to any one of claims 1 to 6 when running.
10. A computer program product, characterized in that The computer program product comprises computer instructions, which implement the method according to any one of claims 1 to 6 when executed by a processor.
Citation Information
Patent Citations
Information maintaining method and device for use in replacement of electric energy meter
CN110058067A
One-button electric energy meter assembling, disassembling and replacing method
CN113298269A
Transformer platform district electric energy information scanning device
CN204706175U
Transformer station electric energy meter address information acquisition device
CN209132778U
Cited By
Ammeter operation management method and system, medium and electronic equipment
CN114925952A