Pay-off device for communication optical cable construction

By designing a wiring release device for subway tunnels, the hydraulic cylinder drives the movement of the lifting plate and cable support shaft, the simultaneous outlet of multiple coiled cables is solved, and the cables are improved Laying efficiency and speed.

CN119190955APending Publication Date: 2024-12-27CRSC RESEARCH & DESIGN INSTITUTE GROUP CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411228303.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-12-27

AI Technical Summary

Technical Problem

When laying cables and optical cables in subway tunnels, the existing technology requires manpower to outgo, which is slow and can only lay one cable at a time, resulting in a long laying cycle.

Method used

A wiring arrangement for communication optical cable construction is designed, including limiting slide rails, hoisting components, support blocks, lifting plates, cable support shafts and positioning wheels, and the lifting plates and cable support shafts are driven up and down through hydraulic cylinders. , realize the simultaneous outlet of multi-rolled cables, and use sliding rollers and traction devices to increase the outlet speed.

Benefits of technology

The simultaneous outgoing of multi-rolled cables or optical cables is realized, which greatly improves the efficiency of laying cables in the tunnel and has a fast outgoing speed. It is suitable for coils of different diameters and simplifies the laying process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119190955A_ABST
    Figure CN119190955A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of cable construction equipment, and discloses a pay-off device for communication optical cable construction. The pay-off device comprises a limiting sliding rail, a jacking assembly, a supporting block, a lifting plate, a cable supporting shaft, a cable containing plate and a positioning wheel. The two limiting sliding rails are fixed to the two sides of the bottom of the cable containing plate, the inner wall of each limiting sliding rail is movably connected with a plurality of sliding rolling wheels, the two jacking assemblies are arranged on the two sides of the top of the cable containing plate, supporting blocks are fixedly arranged on the tops of the two jacking assemblies, and a lifting plate is fixedly arranged on the top of each supporting block. The number of the cable supporting shafts is multiple, and the multiple cable supporting shafts are movably connected with the two lifting plates. The top of the cable placing plate is provided with cable guiding ports with the same number as the cable supporting shafts, each cable guiding port is internally provided with a positioning wheel, and each positioning wheel is provided with a cable passing groove in the circumferential direction. According to the tunnel cable laying device, multiple cable coils can be led out at the same time, all cables in a tunnel are laid at a time, and the laying efficiency of the tunnel cables is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of cable construction equipment, and in particular relates to a wire-laying device for communication optical cable construction. Background Art

[0002] Subway is a fast, high-capacity, electric-powered rail transit system built in cities. Trains run on fully enclosed lines. Lines in the central urban area are basically set up in underground tunnels, where cables, optical cables and other cables need to be laid for communication, daily maintenance equipment and emergency equipment.

[0003] However, during the process of laying cables in tunnels, manpower is needed to lay the cables. During the laying process, manpower is needed to rotate the cables to make them come out. Not only is the cable laying speed slow, but only one cable can be laid at a time. Laying a large number of cables in the tunnel requires multiple laying operations, and the cable laying cycle is long. Summary of the invention

[0004] In view of the above problems, the present invention provides a communication optical cable construction laying device, which adopts the following technical solutions:

[0005] A laying-out device for communication optical cable construction, comprising a limit slide rail, a lifting assembly, a support block, a lifting plate, a cable support shaft, a cable placement plate and a positioning wheel;

[0006] Wherein, the two limiting slide rails are fixed on both sides of the bottom of the cable placement plate, the inner wall of each limiting slide rail is movably connected with a plurality of sliding rollers, the two lifting assemblies are arranged on both sides of the top of the cable placement plate, the tops of the two lifting assemblies are fixed with the support blocks, the tops of each support block are fixed with the lifting plate, a plurality of cable support shafts are arranged, and the plurality of cable support shafts are movably connected with the two lifting plates;

[0007] The top of the cable placement plate is provided with wire openings having the same number as the cable support shafts, each of the wire openings is provided with a positioning wheel, and each of the positioning wheels is provided with a wire passing groove along the circumferential direction.

[0008] Furthermore, the wire-releasing device also includes a bearing ring, and a plurality of through holes are correspondingly arranged on the two lifting plates. The inner wall of each through hole is fixedly provided with the bearing ring, and both ends of each cable support shaft are respectively supported on the bearing rings of the two lifting plates.

[0009] Furthermore, fixing plates are fixedly provided on the inner walls on both sides of the wire opening, and the positioning wheel is movably connected to the two fixing plates.

[0010] Furthermore, the two lifting plates are parallel to each other, lifting rods are fixed at both ends of the bottom of the two lifting plates, and vertical lifting sleeves are fixed at the four corners of the top of the cable placement plate, and the outer wall of the lifting rod is slidably connected to the inner wall of the lifting sleeve.

[0011] Furthermore, the wire-releasing device also includes a limit plate and a spiral pin assembly, the limit plate is sleeved on the outer wall of one end of the cable support shaft, the cable support shaft is provided with a penetrating plug hole at a position away from the limit plate, the spiral pin assembly includes a pin and a nut, one end of the pin is provided with an external thread, and one end of the pin passes through the plug hole and is threadedly connected to the nut.

[0012] Furthermore, the wire-releasing device also includes a traction plate and a traction rod, the traction plate is fixedly arranged at one end of the cable placement plate, the top end of the traction plate is fixedly provided with the traction rod pointing vertically upward, a positioning hole is opened on the top of the traction rod, and a corresponding fixing pin is arranged in the positioning hole.

[0013] Furthermore, the wire-releasing device also includes a push rod assembly, and the push rod assembly is arranged at an end of the cable placement plate away from the traction plate.

[0014] Furthermore, the push rod assembly includes two support rods and a handle, and the handle is fixedly connected to the cable placement plate through the two support rods, and the two support rods form a certain angle with the cable placement plate.

[0015] Furthermore, the plurality of sliding rollers are distributed at equal distances.

[0016] Furthermore, the plurality of wire openings are arranged at a top middle position of the cable placement plate and are distributed at equal distances.

[0017] Beneficial effects of the present invention:

[0018] 1. The present invention is provided with a plurality of cable support shafts on the top of the cable placement plate. The plurality of cable support shafts are driven up and down by two lifting components to be suitable for cables and optical cable reels of different diameters. Multiple cable support shafts can be placed on multiple cable reels and optical cable reels at the same time. The wire-releasing device of the present invention can be moved to simultaneously discharge multiple cable reels and optical cable reels, and all cables in the tunnel can be laid at one time, which greatly improves the laying efficiency of tunnel cables.

[0019] 2. The present invention uses sliding rollers provided in the limiting slide rails on both sides of the bottom of the cable placement plate to move the wire-releasing device of the present invention on the track in the tunnel, and the cable is discharged from the top of the cable placement plate at a fast discharge speed.

[0020] Other features and advantages of the present invention will be described in the following description, and partly become obvious from the description, or be understood by implementing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures pointed out in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0022] Figure 1 The three-dimensional structure of a communication optical cable construction laying device according to an embodiment of the present invention is shown;

[0023] Figure 2 The bottom view structure of the communication optical cable construction pay-out device according to an embodiment of the present invention is shown;

[0024] Figure 3 A schematic diagram of the installation of a jacking assembly and a support block according to an embodiment of the present invention is shown;

[0025] Figure 4 A schematic diagram of installing a lifting plate and a lifting rod according to an embodiment of the present invention is shown;

[0026] Figure 5 A schematic structural diagram of a cable support shaft according to an embodiment of the present invention is shown;

[0027] Figure 6 A structural schematic diagram of a spiral pin assembly according to an embodiment of the present invention is shown.

[0028] In the figure: 1. Limiting slide rail; 2. Sliding roller; 3. Wire port; 4. Fixed plate; 5. Positioning wheel; 6. Lifting assembly; 7. Support block; 8. Lifting plate; 9. Through hole; 10. Bearing ring; 11. Lifting rod; 12. Lifting sleeve; 13. Cable support shaft; 14. Limiting plate; 15. Plug hole; 16. Screw pin assembly; 17. Pulling plate; 18. Pulling rod; 19. Positioning hole; 20. Push rod assembly; 21. Cable placement plate. DETAILED DESCRIPTION

[0029] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] It should be noted that the terms "first", "second" etc. in the present application are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged in appropriate circumstances, so that the embodiments of the present application described here. In the present application, the orientation or positional relationship indicated by the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inside", "outside", "middle", "vertical", "horizontal", "lateral", "longitudinal" etc. are based on the orientation or positional relationship shown in the accompanying drawings.

[0031] The present invention provides a wire-laying device for communication optical cable construction, which can automatically lay out wires and can lay out wires for multiple coils of cables at the same time, so that all cables in a tunnel can be laid at one time, greatly improving the laying efficiency of tunnel cables.

[0032] like Figure 1 , Figure 2 and Figure 3 As shown, a laying-out device for communication optical cable construction includes a limiting slide rail 1, a lifting assembly 6, a support block 7, a lifting plate 8, a bearing ring 10, a cable support shaft 13 and a cable placement plate 21.

[0033] Among them, the two limiting slide rails 1 are fixed to the two sides of the bottom of the cable placement plate 21 by welding, and the inner wall of each limiting slide rail 1 is movably connected with a plurality of sliding rollers 2 through a rotating shaft, and the plurality of sliding rollers 2 are distributed at equal distances.

[0034] The cable-releasing device of the present invention is moved on the track in the tunnel by means of the sliding rollers 2 provided in the limiting slide rails 1 on both sides of the bottom of the cable placement plate 21, and the cable is discharged from the top of the cable placement plate 21 at a fast discharge speed.

[0035] like Figure 3 As shown, two jacking assemblies 6 are vertically arranged on both sides of the top of the cable placement plate 21 and are located directly above the limit slide rail 1. Support blocks 7 are fixedly arranged on the top of the two jacking assemblies 6, and a lifting plate 8 is fixedly arranged on the top of each support block 7.

[0036] For example, the jacking component 6 can adopt a hydraulic cylinder, the piston rod of the hydraulic cylinder is fixedly connected to the lifting plate 8 through the support block 7, and the lifting plate 8 is driven up and down by the piston rod of the hydraulic cylinder. The hydraulic cylinder is used as the jacking component 6, which has a simple structure, large output, stable and reliable performance, smooth movement, and a self-locking function, and is easy to use and maintain.

[0037] like Figure 1 As shown, a plurality of cable support shafts 13 are provided, and the cable support shafts 13 are used to support the cable coils, and the plurality of cable support shafts 13 are all movably connected to the two lifting plates 8 .

[0038] like Figure 4 As shown, for example, a plurality of through holes 9 are correspondingly provided on the two lifting plates 8, and the plurality of through holes 9 are arranged at equal distances. A bearing ring 10 is fixedly provided on the inner wall of each through hole 9, and both ends of each cable support shaft 13 are respectively supported on the bearing rings 10 of the two lifting plates 8.

[0039] For example, three cable support shafts 13 can be provided, and three through holes 9 are correspondingly provided on each lifting plate 8 . A bearing ring 10 is provided in each through hole 9 , and both ends of each cable support shaft 13 are supported on two bearing rings 10 .

[0040] like Figure 1 As shown, for example, the two lifting plates 8 are parallel to each other, and the two lifting assemblies 6 rise and fall synchronously to push the cable support shaft 13 on the lifting plates 8 to move up and down, so that it can be suitable for wire coils of different diameters. Lifting rods 11 are fixed at both ends of the bottom of the two lifting plates 8, and vertical lifting sleeves 12 are fixed at the four corners of the top of the cable placement plate 21. The outer wall of the lifting rod 11 is slidably connected to the inner wall of the lifting sleeve 12.

[0041] like Figure 2 and Figure 3 As shown, for example, the laying-out device for communication optical cable construction also includes a fixing plate 4 and a positioning wheel 5.

[0042] Among them, a plurality of wire openings 3 are arranged in the middle position of the top of the cable placement plate 21, the number of the wire openings 3 is equal to the number of the cable support shafts 13, and the plurality of wire openings 3 are distributed at equal distances, and a fixing plate 4 is fixedly arranged on the inner walls on both sides of the wire openings 3, and a positioning wheel 5 is arranged in each wire opening 3, and the positioning wheel 5 is movably connected to the two fixing plates 4 through a rotating shaft, and each positioning wheel 5 is provided with a wire passing groove along the circumference, and the cable is positioned through the wire passing groove.

[0043] like Figure 5 and Figure 6 As shown, for example, the laying-out device for communication optical cable construction also includes a limiting plate 14 and a spiral pin assembly 16 .

[0044] Among them, the limiting plate 14 is sleeved on the outer wall of one end of the cable support shaft 13, and the cable support shaft 13 is provided with a penetrating plug hole 15 at a position away from the limiting plate 14. The spiral pin assembly 16 includes a pin and a nut. One end of the pin is provided with an external thread, and one end of the pin passes through the plug hole 15 and is threadedly connected with the nut. The limiting plate 14 and the spiral pin assembly 16 inserted in the plug hole 15 can prevent the cable support shaft 13 from falling off on the two bearing rings 10.

[0045] The laid coils of cables, optical cables, etc. are placed on the top of the cable placement plate 21, and the cable support shaft 13 passes through the coils of cables, optical cables, etc. The output shafts of the two jacking components 6 are extended and retracted to make the through holes 9 of the two lifting plates 8 aligned with the two sides of the cable support shaft 13 respectively. The two ends of the cable support shaft 13 are inserted into the bearing ring 10, and the height of the two lifting plates 8 is raised by the output extension of the jacking component 6 to support the coils, and one end of the multiple coils of cable are respectively passed through the wire port 3 and the wire groove of the positioning wheel 5 into the bottom of the cable placement plate 21. By moving the pay-off device of the present invention, multiple coils of cable can be discharged at the same time, and all cables in the tunnel can be laid at one time, which greatly improves the laying efficiency of the tunnel cables.

[0046] like Figure 3 As shown, for example, the wire-laying device for communication optical cable construction also includes a traction plate 17 , a traction rod 18 and a push rod assembly 20 .

[0047] Among them, the traction plate 17 is fixedly set at one end of the cable placement plate 21, and a vertically upward traction rod 18 is fixedly set at one end of the top of the traction plate 17. A positioning hole 19 is opened on the top of the traction rod 18, and a matching fixing pin is arranged in the positioning hole 19. The traction rod 18 is used to conveniently connect the present invention with the traction device in the subway track, and the traction device is used to conveniently drive the present invention to move quickly on the subway track.

[0048] For example, the traction plate 17 can be integrally formed with the cable placement plate 21, or connected to the cable placement plate 21 by welding. For example, the traction plate 17 includes a trapezoidal connection portion and a square support portion, one end of the square support portion is fixedly connected to one end of the cable placement plate 21 through the trapezoidal connection portion, the corners of the square support portion are chamfered to avoid scratching the cable or the operator, an internal threaded hole is provided on the square support portion, one end of the traction rod 18 is provided with an external thread, and the external thread of the traction rod 18 is threadedly connected to the internal threaded hole on the square support portion, so as to achieve a fixed connection between the traction plate 17 and the traction rod 18.

[0049] The push rod assembly 20 is arranged at one end of the cable placement plate 21 away from the traction plate 17, and the push rod assembly 20 facilitates the present invention to move on the track in the tunnel.

[0050] For example, the push rod assembly 20 includes two support rods and a handle, and the handle is fixedly connected to the cable placement plate 21 through the two support rods. For example, the two support rods and the cable placement plate 21 form a certain angle, so that a certain distance is left between the handle and the cable placement plate 21, which is convenient for the operator to push the wire-releasing device to move on the track through the handle.

[0051] When in use, the present invention is first moved into a subway tunnel, and the two limiting slide rails 1 at the bottom of the cable placement plate 21 are inserted into the subway track. The sliding rollers 2 installed on the inner walls of the two limiting slide rails 1 roll on the subway track, which facilitates the movement of the present invention in the subway tunnel.

[0052] At this time, the cable, optical cable and other wire reels that need to be laid are moved to the top of the cable placement plate 21, and the cable support shaft 13 passes through the cable, optical cable and other wire reels. The output shafts of the two jacking components 6 are extended and retracted to make the through holes 9 of the two lifting plates 8 aligned with the two sides of the cable support shaft 13 respectively, and then the pin of the spiral pin assembly 16 is inserted into the plug hole 15 of the cable support shaft 13. The limit plate 14 on one side of the cable support shaft 13 and the spiral pin assembly 16 on the plug hole 15 can prevent the cable support shaft 13 from falling off the bearing ring 10. The height of the two lifting plates 8 is raised by extending the output of the jacking component 6. The two lifting plates 8 drive the wire reels to rise through the cable support shaft 13 to prop up the wire reels.

[0053] Pull out one end of the cable, optical cable and other wire reels, and insert one end of the cable, optical cable and other wire reels into the bottom of the cable placement plate 21 through the wire opening 3 and the wire groove of the positioning wheel 5 respectively, and then fix one end of the cable, optical cable and other wire reels at the specified position. At this time, the sliding roller 2 in the two limiting slide rails 1 provided at the bottom of the cable placement plate 21 moves on the subway track, and one end of the cable, optical cable and other wire reels is fixed. The cable, optical cable and other wire reels on the cable support shaft 13 are supported on the top of the cable placement plate 21 by the lifting rod 11. The cable support shaft 13 rotates in the positioning hole 19 through the bearing ring 10. The cable, optical cable and other wire reels rotate, and the cables and optical cables can be quickly released simultaneously in the subway tunnel.

[0054] The traction device in the subway track, such as a rail car, is connected to the traction rod 18, and the rail car is used to drive the present invention to move quickly on the subway track to achieve rapid wire release. The push rod assembly 20 can also be used to push the present invention to move in the subway tunnel.

[0055] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein; and these modifications or substitutions do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A laying-out device for communication optical cable construction, characterized in that: It comprises a limiting slide rail (1), a lifting assembly (6), a support block (7), a lifting plate (8), a cable support shaft (13), a cable placement plate (21) and a positioning wheel (5); Wherein, the two limiting slide rails (1) are fixed on both sides of the bottom of the cable placement plate (21), the inner wall of each limiting slide rail (1) is movably connected with a plurality of sliding rollers (2), the two lifting assemblies (6) are arranged on both sides of the top of the cable placement plate (21), the top of the two lifting assemblies (6) are fixedly provided with the support blocks (7), the top of each support block (7) is fixedly provided with the lifting plate (8), a plurality of cable support shafts (13) are arranged, and the plurality of cable support shafts (13) are movably connected with the two lifting plates (8); The top of the cable placement plate (21) is provided with wire openings (3) having the same number as the cable support shaft (13), each of the wire openings (3) is provided with a positioning wheel (5), and each of the positioning wheels (5) is provided with a wire passing groove along the circumferential direction.

2. The communication optical cable construction laying device according to claim 1, characterized in that: The wire-releasing device further comprises a bearing ring (10), a plurality of through holes (9) are correspondingly arranged on the two lifting plates (8), the inner wall of each through hole (9) is fixedly provided with the bearing ring (10), and both ends of each cable support shaft (13) are respectively supported on the bearing rings (10) of the two lifting plates (8).

3. The communication optical cable construction laying device according to claim 1, characterized in that: The inner walls on both sides of the wire opening (3) are fixedly provided with fixing plates (4), and the positioning wheel (5) is movably connected to the two fixing plates (4).

4. The communication optical cable construction laying device according to claim 1, characterized in that: The two lifting plates (8) are parallel to each other, and lifting rods (11) are fixedly provided at both ends of the bottom of the two lifting plates (8). Vertically upward lifting sleeves (12) are fixedly provided at the four corners of the top of the cable placement plate (21), and the outer wall of the lifting rod (11) is slidably connected to the inner wall of the lifting sleeve (12).

5. The communication optical cable construction laying device according to claim 1, characterized in that: The wire-releasing device further comprises a limit plate (14) and a spiral pin assembly (16), wherein the limit plate (14) is sleeved on the outer wall of one end of the cable support shaft (13), and the cable support shaft (13) is provided with a through insertion hole (15) at a position away from the limit plate (14), and the spiral pin assembly (16) comprises a pin and a nut, wherein one end of the pin is provided with an external thread, and one end of the pin passes through the insertion hole (15) and is threadedly connected to the nut.

6. The communication optical cable construction laying device according to any one of claims 1 to 5, characterized in that: The wire-releasing device further comprises a traction plate (17) and a traction rod (18), wherein the traction plate (17) is fixedly arranged at one end of the cable placement plate (21), and the top end of the traction plate (17) is fixedly provided with the traction rod (18) extending vertically upward, and a positioning hole (19) is provided at the top of the traction rod (18), and a matching fixing pin is arranged in the positioning hole (19).

7. The communication optical cable construction laying device according to any one of claims 1 to 5, characterized in that: The wire-releasing device further comprises a push rod assembly (20), wherein the push rod assembly (20) is arranged at one end of the cable placement plate (21) away from the traction plate (17).

8. The communication optical cable construction laying device according to claim 7, characterized in that: The push rod assembly (20) comprises two support rods and a handle, wherein the handle is fixedly connected to the cable placement plate (21) via the two support rods, and the two support rods form a certain angle with the cable placement plate (21).

9. The communication optical cable construction laying device according to claim 1, characterized in that: The plurality of sliding rollers (2) are distributed at equal distances.

10. The communication optical cable construction laying device according to claim 1, characterized in that: The plurality of wire openings (3) are arranged at the middle of the top of the cable placement plate (21) and are distributed at equal distances.

Citation Information

Patent Citations

  • Integrated cable tray feeding and transferring tool

    CN108820996A

  • Cable laying and moving device for railway

    CN113896028A

  • Laying device for cable in cable trench

    CN116914640A

  • A cable conductor paying out machine for track construction

    CN206705374U

  • Special bracket for cable laying

    CN221587576U