Treatment method and drainage device for water leakage between all-casing secant piles of subway station

By setting up drainage pipes and sponge collection devices between the piles and piles in the subway station, the problem of difficult to detect and completely plug leakage between piles is solved, and rapid and thorough leakage drainage is achieved, reducing construction costs and Construction period.

CN119195190APending Publication Date: 2024-12-27CHINA RAILWAY NO 10 ENG GRP NO 1 ENG CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411411786.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-11
Publication Date
2024-12-27

AI Technical Summary

Technical Problem

During the construction of full casing choke piles at the subway station, leakage between piles is difficult to detect and completely plug, resulting in low construction efficiency and high cost.

Method used

By vertically setting up PVC drainage pipes on the inner side of the leaking piles and setting up horizontal drainage grooves on the upper and lower parts of it, filling up sponges to collect leakage, using the entire sponge block and collection tube to achieve leakage drainage and discharge, avoiding Look for leaks and plugging them directly.

Benefits of technology

It realizes that water leakage between piles can be completely collected and drained without finding leakage points, reducing manpower and material consumption, shortening construction period and saving costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119195190A_ABST
    Figure CN119195190A_ABST
Patent Text Reader

Abstract

The invention discloses a treatment method and a drainage device for water leakage between all-casing secant piles of a subway station. The treatment method for the inter-pile leakage water comprises the steps that after the water leakage piles are found, a drainage pipe made of PVC is vertically arranged in inner side pile seams of the water leakage piles, and a plurality of drainage holes are formed in a pipe body of the drainage pipe; secondly, horizontally-arranged drainage grooves are formed in the middle and the bottom of the pile seam through rapid leaking stoppage linings respectively, drainage pipes are wrapped in the drainage grooves, the drainage grooves are connected with the pile bodies on the two sides in a sealed mode, and the drainage grooves are filled with broken sponges so that leakage water between the piles can be effectively collected; covering a whole sponge block on the outer side of the drainage tube along the height direction of the drainage tube, and fixing the whole sponge block on the pile body by using a long nail; the bottom of the drainage tube is connected with a collecting tube; and inter-pile leakage water enters the drainage pipe through the drainage holes in the drainage pipe and is drained and discharged through the collecting pipe. Leakage water between the piles can be drained under the condition that leakage points are not directly found, construction is simple, and follow-up construction is not affected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for treating water leakage between piles of full-tube bite piles in a subway station, belonging to the technical field of subway construction. The invention also relates to a drainage device for water leakage between piles of full-tube bite piles in a subway station. Background Art

[0002] In the construction of urban rail transit projects, most subway stations are located in busy areas of the city. Construction in busy areas is inevitably restricted by the site and road traffic. In order to reduce the impact of construction on the surrounding environment, the construction of subway stations with full-tube bite piles has become more common and the technology has become more mature. Full-tube bite piles are a kind of foundation pit retaining structure, which is composed of an unreinforced super-slow-setting concrete pile (A pile) and a reinforced concrete pile (B pile) arranged at intervals. By forming a mutual bite arrangement between the piles, a good anti-seepage and retaining effect is achieved. During the construction process, the construction sequence and timing of piles A and B are crucial to prevent leakage between piles. When leakage occurs between piles, the conventional method is to find the leakage point and then plug it. Because the leakage point between piles is hidden and difficult to be found, the conventional plugging method is easy to be incomplete, and often there is a situation where one side is plugged and the other side leaks, which makes it difficult to plug the leakage and wastes a lot of manpower and material resources. In addition, the conventional plugging method cannot achieve rapid plugging operations, which affects subsequent construction. Summary of the invention

[0003] In view of the above-mentioned defects existing in the prior art, the present invention provides a method for treating the leakage water between two whole piles without finding the leakage point or plugging the leakage point.

[0004] The present invention is realized through the following technical scheme: a method for treating water leakage between piles of full-pipe bite piles in a subway station, characterized in that: after a leaking pile is found, a drainage pipe made of PVC material is vertically arranged in the inner pile seam of the leaking pile, a plurality of drainage holes are arranged on the pipe body of the drainage pipe, and then a horizontally arranged drainage groove is respectively arranged in the middle and bottom of the pile seam with a quick leak-stopping spirit and the drainage pipe is wrapped in the drainage groove, the drainage groove is sealed and connected to the pile bodies on both sides, the drainage groove is filled with crushed sponge to effectively collect the water leakage between the piles, and then a whole sponge block is covered on the outside of the drainage pipe along its height direction, and it is fixed to the pile body with a long nail; a collecting pipe is connected to the bottom of the drainage pipe; the water leakage between the piles enters the drainage pipe through the drainage holes on the drainage pipe and is drained out through the collecting pipe.

[0005] In the present invention, two drainage grooves divide the pile joint into two parts, the middle drainage groove is used to collect the leakage water in the upper part of the piles, and the bottom drainage groove is used to collect the leakage water in the middle and lower parts of the piles. The leakage water between the piles and the leakage water collected in the drainage groove can enter the drainage pipe through the drainage holes on the drainage pipe, and be discharged through the collection pipe connected to the drainage pipe at the bottom. The whole sponge block arranged outside the drainage pipe can absorb the leakage water itself on the one hand, which is convenient for collecting the leakage water between the piles. On the other hand, it can prevent the external concrete from clogging the drainage hole, thereby ensuring the drainage effect. The method of the present invention can effectively collect the leakage water between the piles without affecting the subsequent construction.

[0006] Furthermore, the distance between the drainage trough at the bottom and the bottom of the pile is 1 m.

[0007] Furthermore, to ensure the drainage effect, the diameter of the drainage hole of the drainage tube is 10 mm.

[0008] The present invention also provides a leakage drainage device between piles of a full-sleeve interlocking pile in a subway station, which is characterized in that it includes a drainage pipe, a drainage groove, and a collecting pipe. The drainage pipe is vertically arranged in the pile gap on the inner side of the leaking piles and is arranged to pass through the pile gap up and down. A plurality of drainage holes are arranged on the pipe body of the drainage pipe. The collecting pipe is connected to the lower end of the drainage pipe. A horizontally arranged drainage groove is respectively arranged in the middle and bottom of the pile gap. The drainage groove is sealed and connected to the pile body surfaces on both sides, and the drainage groove at least extends to a position tangent to the outer diameters of the two pile bodies. A plurality of broken sponge blocks are arranged in the drainage groove. The drainage pipe passes through the drainage groove and a sealing arrangement is arranged between the two. The outer side of the drainage pipe is covered with a whole sponge block along its height direction.

[0009] Furthermore, the diameter of the drainage hole of the drainage tube is 10 mm.

[0010] Furthermore, the distance between the drainage trough at the bottom and the bottom of the pile is 1 m.

[0011] The beneficial effects of the present invention are as follows: the present invention can effectively collect and drain the seepage water between the piles, and can drain the seepage water between two whole piles without directly finding the leakage point, without affecting the subsequent construction, greatly reducing the consumption of manpower and material resources, and can save a lot of construction costs. Moreover, the present invention has thorough drainage, and can effectively overcome the problems of difficult and incomplete plugging in conventional plugging methods. The present invention can conveniently and quickly use conventional materials to solve the problem of seepage water between piles under the premise of digging and draining, with fast construction speed, reduced construction period, and saved construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 is a plan view schematic diagram of the present invention in a specific embodiment;

[0013] Figure 2is a cross-sectional schematic diagram of the present invention in a specific embodiment;

[0014] In the figure, 1. drainage tube; 2. whole sponge block; 3. drainage trough; 4. pile body; 5. drainage hole; 6. collection tube. DETAILED DESCRIPTION

[0015] The present invention will be further described below by way of non-limiting embodiments and in conjunction with the accompanying drawings:

[0016] The following explanation is based on the use of full-casing interlocking piles in subway stations with a pile length of 18m and a pile diameter of 1m.

[0017] As shown in the attached drawings, a method for treating water leakage between piles of full-pipe interlocking piles in a subway station is provided. The method uses a drainage device to collect the water leakage between the piles and drain it out. The drainage device used is: including a drainage pipe 1, a drainage groove 3, and a collecting pipe 6. The drainage pipe 3 is a PVC pipe with a diameter of 25 mm. The drainage pipe 3 is vertically arranged in the pile gap on the inner side of the leaking pile and is arranged through the pile gap from top to bottom. The body of the drainage pipe 1 is provided with a plurality of drainage holes 5, and the diameter of the drainage hole 5 is 10 mm. The collecting pipe 6 is connected to the lower end of the drainage pipe 3. The drainage groove 3 is respectively arranged in the middle and bottom of the pile gap. The drainage groove 3 is arranged horizontally, and the drainage groove 3 is sealed and connected to the surface of the pile body 4 on both sides to collect the water leakage between the piles. To ensure the collection of the leakage water, the drainage groove 3 at least extends to a position tangent to the outer diameter of the two pile bodies. The drainage groove is an oval groove with a length of 40 cm and a height of 30 cm. The drainage groove 3 is filled with a number of broken sponge blocks to ensure the effective collection of water leakage between the piles. The drainage pipe 1 passes through the drainage groove 3 and the two are sealed. The outer side of the drainage pipe 1 is covered along its height direction with a whole sponge block 2 with a length of 17 m, a width of 0.4 m, and a thickness of 0.1 m.

[0018] The specific method of treating the leakage water between piles by using the above drainage device is:

[0019] After finding the leaking pile, the whole drainage pipe 1 is vertically set in the inner pile seam of the leaking pile, and then a drainage groove 3 is set in the middle and bottom of the pile seam respectively with quick leak-proof spirit and the drainage pipe 1 is wrapped in the drainage groove 3. The drainage groove 3 is sealed and connected with the pile bodies on both sides. The drainage groove at the bottom is 1m away from the bottom of the pile. The drainage groove 3 is filled with broken sponges to effectively collect the leaking water between the piles, and then a whole sponge block 2 with a length of 17m×width of 0.4m×thickness of 0.1m is covered on the drainage pipe 1 outside, and it is fixed on the pile body 4 with long nails every two meters. Finally, the collection pipe 6 is connected with a three-way joint at the bottom of the drainage pipe 1. In order to ensure the drainage effect of the three-way drainage pipe, the leak-proof spirit can be wrapped outside the three-way joint. The present invention can effectively collect the leakage water between piles through the larger drainage groove 3. The leakage water between piles enters the drainage pipe 1 through the drainage holes on the drainage pipe 1 and is drained out through the collection pipe 6. The leakage water between piles can be drained out at any time without affecting subsequent construction.

[0020] The quick leak-proof plugging agent used in the present invention is a waterproof leak-proof plugging material that can quickly solidify and harden. It is a prior art and can be purchased. The present invention uses the quick leak-proof plugging agent to quickly and reliably form the required drainage groove at the pile joint, and the construction is convenient and fast.

[0021] The method of the present invention is used to treat water leakage between piles of full-casing interlocking piles. There is no need to find the leakage points between the piles or to plug the leaks. The leakage water between the piles can be collected and drained out at any time through the drainage device, which does not affect the subsequent construction. The water leakage problem between the piles can be solved conveniently and quickly using conventional materials under the premise of digging and draining. The method effectively solves the problems of difficulty in plugging leaks, incomplete plugging, and large use of manpower and material resources in conventional plugging methods. The present invention adopts a drainage device to collect and drain the leakage water between the piles. The drainage is thorough, which can greatly reduce manpower and material resources and save a lot of construction costs.

[0022] The other parts of this embodiment are all prior art and will not be described in detail here.

Claims

1. A method for treating water leakage between full-casing interlocking piles in a subway station, characterized by: finding After the leaking pile is repaired, a drainage pipe (1) made of PVC material is vertically arranged in the inner pile gap of the leaking pile, and a plurality of drainage holes are arranged on the pipe body of the drainage pipe (1). Then, a horizontally arranged drainage groove (3) is respectively arranged in the middle and bottom of the pile gap using a quick leak-stopping agent, and the drainage pipe (1) is wrapped in the drainage groove (3). The drainage groove (3) is sealed and connected to the pile bodies on both sides. The drainage groove (3) is filled with broken sponges to effectively collect the leaking water between the piles. Then, a whole sponge block is covered on the outside of the drainage pipe (1) along its height direction, and is fixed to the pile body with long nails; a collecting pipe (6) is connected to the bottom of the drainage pipe (1); the leaking water between the piles enters the drainage pipe (1) through the drainage holes on the drainage pipe (1) and is drained out through the collecting pipe (6).

2. The method for treating water leakage between full-casing interlocking piles in a subway station according to claim 1 is characterized by: The distance between the drainage trough (3) at the bottom and the bottom of the pile is 1m.

3. The method for treating water leakage between full-casing interlocking piles in a subway station according to claim 1 or 2, characterized in that: The diameter of the drainage hole of the drainage tube is 10 mm.

4. A leakage drainage device between full-tube bite piles in a subway station, characterized by: The invention comprises a drainage pipe (1), a drainage groove (3) and a collecting pipe (6). The drainage pipe (3) is vertically arranged in the pile gap between the leaking piles and is arranged to pass through the pile gap from top to bottom. A plurality of drainage holes are arranged on the pipe body of the drainage pipe (1). The collecting pipe (6) is connected to the lower end of the drainage pipe (3). A horizontally arranged drainage groove (3) is respectively arranged in the middle and bottom of the pile gap. The drainage groove (3) is sealed and connected to the pile body surfaces on both sides, and the drainage groove (3) at least extends to a position tangent to the outer diameters of the two pile bodies. A plurality of broken sponge blocks are arranged in the drainage groove (3). The drainage pipe (1) passes through the drainage groove (3) and a sealing arrangement is arranged between the two. The outer side of the drainage pipe (1) is covered with a whole sponge block along its height direction.

5. The leakage drainage device between piles of the subway station full-pipe bite pile according to claim 4 is characterized by: The diameter of the drainage hole of the drainage tube is 10 mm.

6. The seepage drainage device between piles of the subway station full-pipe bite pile according to claim 4 or 5, characterized in that: The distance between the drainage trough (3) at the bottom and the bottom of the pile is 1m.