Risk map drawing method and device based on security risk evaluation model
Through an automated method based on the security risk assessment model, the problems of low efficiency and poor accuracy of risk map mapping are solved, efficient and accurate risk map generation and risk assessment are achieved, and intuitive risk display and resolution strategies are provided.
Patent Information
- Application Number
- CN202411242640.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-12-27
AI Technical Summary
In the prior art, the drawing efficiency of risk maps is low and data omissions are prone to occur, resulting in inaccurate risk maps.
Using an automated method based on the security risk assessment model, automatic mapping is obtained by obtaining the information, original information and risk assessment results of the mapping requirements, screening actual data with high current potential, and stacking and correcting environmental influencing factors when necessary to generate accurate Risk map.
It improves the efficiency and accuracy of risk map drawing, ensures the accuracy of data processing and the reliability of risk assessment, and provides intuitive risk display and resolution strategies.
Smart Images

Figure CN119205974A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of data processing, and in particular to a method and device for drawing a risk map based on a security risk assessment model. Background Art
[0002] A risk map is a graphic technology that represents identified risk information and can more intuitively show the development trend of risks.
[0003] In the related technology, it is necessary to manually determine the risk level of each area according to the mapping regulations and reference data, and then draw and produce the risk map. In this process, the amount of reference data that needs to be manually analyzed and processed is large, and then the map needs to be manually drawn, which is inefficient and prone to errors in the analysis of reference data, resulting in inaccurate risk maps. Summary of the invention
[0004] In order to improve the efficiency and accuracy of risk map drawing, the present application provides a risk map drawing method and device based on a security risk assessment model.
[0005] In the first aspect, the present application provides a risk map drawing method based on a security risk assessment model using the following technical solutions: A risk map drawing method based on a safety risk assessment model, comprising: Obtain mapping requirements information; Acquiring original information based on the mapping requirement information; Inputting the original information into a security risk assessment model; Obtaining a first risk assessment result output by the security risk assessment model; A mapping operation is performed based on the mapping requirement information, the original information and the first risk assessment result.
[0006] By adopting the above technical solution, the electronic device obtains the mapping requirement information, and then obtains the original information based on the mapping requirement information. The electronic device can automatically obtain the relevant original information based on the mapping requirement, and input the original information into the safety risk assessment model to obtain the first risk assessment result. Thereafter, the electronic device performs mapping operations based on the mapping requirement information, the original information and the first risk assessment result, thereby achieving the purpose of automatically producing the risk map, being able to accurately process the data to obtain a more accurate risk map, and being able to improve the efficiency of drawing the risk map compared to manual drawing.
[0007] Optionally, inputting the original information into a security risk assessment model includes: The original information includes a plurality of sub-information, each of which includes at least one set of actual data; Acquire corresponding currentness based on the actual data; Determining whether the currentness is greater than a first threshold; If the timeliness is greater than the first threshold, obtaining the number of the actual data whose timeliness is greater than the first threshold; determining whether the number is greater than one; If the number is greater than one, obtaining the actual data with the greatest timeliness, and using the obtained actual data as the first actual data; The first actual data is input into a security risk assessment model.
[0008] By adopting the above technical solution, inputting the original information into the security risk assessment model also includes: the original information includes multiple sub-information, each sub-information includes at least one set of actual data, the electronic device obtains the corresponding currentness based on the actual data, and then determines whether the currentness is greater than the first threshold, that is, determines whether the currentness meets the requirements. If the currentness is greater than the first threshold, the electronic device obtains the number of actual data whose currentness is greater than the first threshold, and the actual data judged here belong to the same seed information, and then the electronic device determines whether the number is greater than one, that is, determines whether the number of actual data that meets the requirements is greater than one. If the number is greater than one, the electronic device obtains the actual data with the largest currentness, and takes this actual data as the first actual data, and inputs the first actual data into the security risk assessment model. Actual data with high currentness is screened, so that a more accurate risk assessment result can be obtained after passing through the security risk assessment model, so that the risk map can be more accurate.
[0009] Optionally, before performing the mapping operation based on the mapping requirement information, the original information and the first risk assessment result, the method further includes: Acquire spatial information based on the original information; Determine whether the spatial information is overlapped; If the spatial information is layered, a mapping operation is performed on each layer of the spatial information, and each layer is marked based on the first risk assessment result.
[0010] By adopting the above technical solution, before the mapping operation is performed, the electronic device obtains spatial information based on the original information, and then determines whether the spatial information is overlapped. The risk map is a two-dimensional image. If the spatial information is overlapped, the mapping operation is performed on the spatial information of each layer respectively, and each layer is marked based on the first risk assessment result. The risk situation of each layer is shown, so that when viewing the risk map, the personnel can clearly understand the risk situation of each layer.
[0011] Optionally, before mapping the spatial information of each layer and marking each layer based on the first risk assessment result, the method further includes: Acquire corresponding association information based on the spatial information; Inputting the spatial information and the corresponding associated information into the security risk assessment model; Obtaining a second risk assessment result output by the security risk assessment model; The first risk assessment result corresponding to the stacked spatial information is corrected based on the second risk assessment result.
[0012] By adopting the above technical solution, before marking each layer based on the first risk assessment result, the electronic device obtains the corresponding associated information based on the spatial information, and then the electronic device inputs the spatial information and the corresponding associated information into the security risk assessment, so that the electronic device obtains the second risk assessment result output by the security risk assessment model, and then corrects the first risk assessment result corresponding to the stacked spatial information based on the second risk assessment result. Because the spatial information is stacked, there may be a certain influence between the layers, that is, the corresponding associated information is obtained, and then the risk assessment is performed based on the spatial information and the associated information, so as to obtain a more accurate second risk assessment result, and then the first risk assessment result is corrected, and the risk assessment is performed and corrected based on the mutual influence to obtain a more accurate risk assessment result.
[0013] Optionally, after obtaining the second risk assessment result output by the security risk assessment model, the method further includes: Obtaining environmental impact factors based on the second risk assessment results; Determine the environmental impact level based on the environmental impact factors; If the environmental impact level is the first level, marking the environmental impact factor; Acquire a solution strategy based on the marked environmental impact factors; Output the solution strategy.
[0014] By adopting the above technical solution, after obtaining the second risk assessment result, the electronic device obtains the environmental impact factor based on the second risk assessment result, and determines the environmental impact level based on the environmental impact factor. If the environmental impact level is the first level, it means that the environmental impact is large at this time. At this time, the environmental impact factor is marked, and a solution strategy is obtained based on the marked environmental impact factor, and the solution strategy is output. The corresponding solution strategy is obtained based on the environmental impact factor, so that personnel can intuitively obtain the solution, improve the reaction speed and be prepared for the response.
[0015] Optionally, the mapping operation is performed on the spatial information of each layer, and each layer is marked based on the first risk assessment result, including: Establishing a three-dimensional model based on the stacked spatial information; Marking is performed based on the first risk assessment result and the three-dimensional model.
[0016] By adopting the above technical solution, a three-dimensional model is established based on spatial information, and marking is performed based on the first risk assessment result and the three-dimensional model. By displaying the three-dimensional model and then marking it, the risks in the space can be viewed more intuitively.
[0017] Optionally, the method further includes: Filtering the special area information database based on the original information; Determining whether the special area information database includes the original information; If the original information is included, the original information included in the special area information library is marked so that it can be marked when the mapping operation is performed.
[0018] By adopting the above technical solution, the special area information database is screened based on the original information to determine whether the special area information database includes the original information, that is, to determine whether the location, building, etc. corresponding to the original information is a special area. If the original information is included, it indicates that this is a special area, so it is marked and annotated during the mapping operation to facilitate personnel to quickly find the special area.
[0019] In the second aspect, the energy consumption prediction device provided by the present application adopts the following technical solution: A risk map drawing device based on a safety risk assessment model, comprising: A first acquisition module is used to acquire mapping requirement information; A second acquisition module, used for acquiring original information based on the mapping requirement information; An input module, used to input the original information into a security risk assessment model; A third acquisition module is used to obtain a first risk assessment result output by the security risk assessment model; A mapping operation module is used to perform a mapping operation based on the mapping requirement information, the original information and the first risk assessment result.
[0020] In a third aspect, the present application provides an electronic device that adopts the following technical solution: An electronic device comprises a processor, wherein the processor is coupled to a memory; the processor is used to execute a computer program stored in the memory so that the electronic device executes a risk map drawing method based on a security risk assessment model as described in the first aspect.
[0021] In a fourth aspect, the present application provides a computer-readable storage medium that adopts the following technical solution: A computer-readable storage medium includes a computer program or instructions. When the computer program or instructions are executed on a computer, the computer is caused to execute a risk map drawing method based on a security risk assessment model as described in the first aspect. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a flow chart of a risk map drawing method based on a security risk assessment model in an embodiment of the present application.
[0023] Figure 2 It is a block diagram of a risk map drawing device based on a security risk assessment model in an embodiment of the present application.
[0024] Figure 3 It is a block diagram of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION
[0025] This specific embodiment is merely an explanation of the present application and is not a limitation of the present application. Technical users in this field can make non-creative modifications to the present embodiment as needed after reading this specification. However, as long as it is within the scope of the claims of the present application, it is protected by the patent law.
[0026] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technical users in the field without creative work are within the scope of protection of this application.
[0027] In addition, the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article, unless otherwise specified, generally means that the associated objects before and after are in an "or" relationship.
[0028] The embodiment of the present application discloses a risk map drawing method based on a security risk assessment model. The risk map drawing method based on a security risk assessment model can be executed by an electronic device. The electronic device can be a server or a terminal device, wherein the server can be an independent physical server, a server cluster or a distributed system composed of multiple physical servers, or a cloud server providing cloud computing services. The terminal device can be a smart phone, a tablet computer, a desktop computer, etc., but is not limited thereto.
[0029] The present application embodiment discloses a risk map drawing method based on a security risk assessment model. Figure 1 ,A risk map drawing method based on a safety risk assessment model includes the main process described as follows (S100~S500): Step S100, obtaining drawing requirement information; Step S200, obtaining original information based on mapping requirement information; Step S300, inputting the original information into the security risk assessment model; Step S400, obtaining a first risk assessment result output by a security risk assessment model; Step S500: performing a mapping operation based on mapping requirement information, original information and a first risk assessment result.
[0030] The electronic device obtains mapping requirement information, and then obtains original information based on the mapping requirement information, the original information including building information, landform information, soil information, hydrological information, climate information, etc., and inputs the original information into the safety risk assessment model, so that the electronic device can obtain the first risk assessment result output by the safety risk assessment model. That is, the safety risk assessment model performs risk assessment based on the original information, thereby outputting the first risk assessment result corresponding to the original information, and finally the electronic device performs mapping operation based on the mapping requirement information, the original information and the first risk assessment result, thereby obtaining a risk map.
[0031] Specifically, inputting the original information into the security risk assessment model includes: the original information includes multiple sub-information, each sub-information includes at least one set of actual data; obtaining the corresponding timeliness based on the actual data; judging whether the timeliness is greater than a first threshold; if the timeliness is greater than the first threshold, obtaining the number of actual data whose timeliness is greater than the first threshold; judging whether the number is greater than one; if the number is greater than one, obtaining the actual data with the largest timeliness, and using the obtained actual data as the first actual data; inputting the first actual data into the security risk assessment model. If the number is one, obtaining the actual data whose timeliness is greater than the first threshold, using the actual data as the first actual data, and inputting the first actual data into the security risk assessment model.
[0032] Specifically, the original information includes multiple sub-information, and the sub-information is the above-mentioned building information, landform information, hydrological information, etc. At the same time, each sub-information includes at least one set of actual data. Taking building information as an example, there may be a certain period of time for storing combustibles and a certain period of time for storing non-combustibles. The actual data included in the sub-information may have certain changes, so the sub-information includes at least one set of actual data. Based on the actual data, the corresponding currentness is obtained, and then it is determined whether the currentness is greater than the first threshold. If the currentness is greater than the first threshold, the number of actual data whose currentness is greater than the first threshold is obtained. Here, the judgment of whether the currentness is greater than the first threshold is based on the actual data in the same sub-information. Then it is determined whether the number is greater than one. If the number is greater than one, the actual data with the largest currentness is obtained, and the actual data with the largest currentness obtained is used as the first actual data. After that, the first actual data is input into the safety risk assessment model to obtain the first risk safety assessment result.
[0033] As an optional implementation manner of an embodiment of the present application, before performing a mapping operation based on mapping requirement information, original information and a first risk assessment result, it also includes: acquiring spatial information based on the original information; determining whether there is any overlap in the spatial information; if there is any overlap in the spatial information, performing a mapping operation on each layer of spatial information, and marking each layer based on the first risk assessment result.
[0034] Before performing the mapping operation, it is necessary to obtain spatial information based on the original information, and then the electronic device determines whether the spatial information is overlapped. If the spatial information is overlapped, the electronic device performs a mapping operation on each layer of spatial information and marks each layer based on the first risk assessment result.
[0035] For the description of overlapping distance, for a building, if there are multiple floors, its spatial information is overlapping. Each floor of the building has different uses and different risks, so each floor needs to be marked separately. Overlapping can also be when a subway tunnel passes through a mountain, a city, or a river, which is also overlapping in spatial information.
[0036] Specifically, mapping operations are performed on each layer of spatial information, and each layer is marked based on the first risk assessment result, including: establishing a three-dimensional model based on the stacked spatial information; and marking based on the first risk assessment result and the three-dimensional model.
[0037] The electronic device builds a three-dimensional model based on the stacked spatial information, and marks it based on the first risk assessment result and the three-dimensional model. By building a three-dimensional model, a detailed display is made, and then the risk situation therein is marked based on the first risk assessment result, which can more comprehensively display the risk situation and facilitate personnel to understand.
[0038] As an optional implementation of an embodiment of the present application, before mapping each layer of spatial information and marking each layer based on the first risk assessment result, it also includes: obtaining corresponding associated information based on the spatial information; inputting the spatial information and the corresponding associated information into a security risk assessment model; obtaining a second risk assessment result output by the security risk assessment model; and correcting the first risk assessment result corresponding to the stacked spatial information based on the second risk assessment result.
[0039] Before representing each layer, it also includes obtaining corresponding associated information based on the spatial information, inputting the associated information corresponding to the spatial information into a security risk assessment model, and then the electronic device obtains a second risk assessment result output by the security risk assessment model, and the electronic device corrects the first risk assessment result corresponding to the stacked spatial information based on the second risk assessment result.
[0040] Because there is a stacking relationship, in addition to the risks of each layer, there is also an influence relationship between layers. Therefore, the associated information page needs to be input into the security risk assessment model to obtain a second risk assessment result, thereby correcting the first risk assessment result corresponding to the stacking space information.
[0041] For example, in a building, if the risk of fire in the middle floor is higher, the risk of the corresponding high-rise floors will also increase accordingly, because when a fire occurs in the middle floor, the fire spreads mainly upward, resulting in an increase in the risk of the high-rise floors with lower risks. In contrast, in another building, if the risk of fire in the middle floor is lower, the risk of the high-rise floors will not increase, and the risk of the high-rise floors will remain the same.
[0042] Or, in a warehouse, there are people working on the lower floors, and there are equipment on the upper floors that need to use some harmful gases. The density of the harmful gases is less than that of air. As an optional implementation of an embodiment of the present application, after obtaining the security risk assessment model and outputting the second risk assessment result, it also includes: obtaining environmental impact factors based on the second risk assessment result; judging the environmental impact level based on the environmental impact factors; if the environmental impact level is the first level, marking the environmental impact factors; obtaining a solution strategy based on the marked environmental impact factors; and outputting the solution strategy.
[0043] After obtaining the second risk assessment result, the electronic device obtains the environmental impact factors based on the second risk assessment result. A plurality of environmental impact levels are preset in the electronic device, and different environmental impact factors correspond to different environmental impact levels. Therefore, the electronic device determines the environmental impact level based on the environmental impact factors. If the environmental impact level is the first level, the electronic device marks the environmental impact factors, obtains a solution strategy based on the marked environmental impact factors, and outputs the solution strategy at the same time.
[0044] Taking the above-mentioned harmful gases as an example, when the harmful gases leak, the flow direction of the harmful gases is greatly affected by the wind. In the preset environmental impact level, the environmental impact level corresponding to the wind factor is the first level, so it will be marked at this time, and then because it is greatly affected by the wind, a solution strategy is obtained based on this situation. The electronic device can obtain the location of the harmful gas, obtain the wind direction changes in different periods based on this location, and draw a wind rose diagram based on the wind direction changes in different periods, and output the wind rose diagram corresponding to different periods, so that when the harmful gas leaks, the on-site personnel can quickly determine the upwind direction according to the period and the corresponding wind rose diagram, and evacuate quickly to reduce the possibility of injury. The personnel's workstation can also be obtained accordingly, and a reasonable location can be calculated for storing gas masks or other effective protective devices.
[0045] As an optional implementation of the embodiment of the present application, the special area information library is filtered based on the original information; it is determined whether the special area information library includes the original information; if it includes the original information, the original information included in the special area information library is marked so that it can be marked when performing mapping operations.
[0046] The electronic device screens the special area information library based on the original information to determine whether the special area information library includes the original information. For the factory area, fire hydrants and the like are special areas. If the original information is included, it indicates that this is a special area, so the original information is marked, and then the electronic device also marks it when performing mapping operations, so that personnel can quickly find special areas when viewing risk maps.
[0047] Figure 2 A structural block diagram of a risk map drawing device 600 based on a security risk assessment model provided in an embodiment of the present application is shown in FIG. Figure 2 As shown, the risk map drawing device 600 based on the security risk assessment model includes: The first acquisition module 601 is used to acquire mapping requirement information; The second acquisition module 602 is used to acquire original information based on the mapping requirement information; Input module 603, used to input original information into the security risk assessment model; The third acquisition module 604 is used to obtain the first risk assessment result output by the security risk assessment model; The mapping operation module 605 is used to perform mapping operations based on the mapping requirement information, the original information and the first risk assessment result.
[0048] Specifically, the input module 603 includes: The first acquisition submodule is used for original information including multiple sub-information, each sub-information including at least one set of actual data; based on the actual data, corresponding currentness is acquired; A first judgment submodule is used to judge whether the timeliness is greater than a first threshold; if the timeliness is greater than the first threshold, the number of actual data whose timeliness is greater than the first threshold is obtained; The second judgment submodule is used to judge whether the number is greater than one; if the number is greater than one, the actual data with the greatest currentness is obtained, and the obtained actual data is used as the first actual data; the first actual data is input into the security risk assessment model.
[0049] In this optional embodiment, the risk map drawing device 600 based on the security risk assessment model further includes: A second acquisition submodule is used to acquire spatial information based on the original information before performing a mapping operation based on the mapping requirement information, the original information and the first risk assessment result; The third judgment submodule is used to judge whether there is overlap in the spatial information; if there is overlap in the spatial information, a mapping operation is performed on each layer of spatial information, and each layer is marked based on the first risk assessment result.
[0050] In this optional embodiment, the risk map drawing device 600 based on the security risk assessment model further includes: A third acquisition submodule is used to obtain corresponding associated information based on the spatial information before performing a mapping operation on each layer of spatial information and marking each layer based on the first risk assessment result; A first input submodule, used to input spatial information and corresponding associated information into a security risk assessment model; A fourth acquisition submodule is used to obtain a second risk assessment result output by the security risk assessment model; The first correction submodule is used to correct the first risk assessment result corresponding to the stacked spatial information based on the second risk assessment result.
[0051] In this optional embodiment, the risk map drawing device 600 based on the security risk assessment model further includes: A fifth acquisition submodule, configured to acquire environmental influencing factors based on the second risk assessment result after the second risk assessment result is output by the security risk assessment model; The fourth judgment submodule is used to judge the environmental impact level based on the environmental impact factor; if the environmental impact level is the first level, the environmental impact factor is marked; A sixth acquisition submodule is used to acquire a solution strategy based on the marked environmental influencing factors; The first output submodule is used to output a solution strategy.
[0052] In this optional embodiment, the risk map drawing device 600 based on the security risk assessment model further includes: A first establishment submodule is used for mapping each layer of spatial information, marking each layer based on the first risk assessment result, and establishing a three-dimensional model based on the stacked spatial information; The first marking submodule is used to perform marking based on the first risk assessment result and the three-dimensional model.
[0053] In this optional embodiment, the risk map drawing device 600 based on the security risk assessment model further includes: A first screening submodule, used for screening the special area information library based on the original information; A fifth judgment submodule, used to judge whether the special area information database includes original information; If the original information is included, the original information included in the special area information library will be marked so that it can be marked when the mapping operation is performed.
[0054] Figure 3 The electronic device 700 is a block diagram of a structure of an electronic device 700 provided in an embodiment of the present application. The electronic device 700 may be a mobile phone, a tablet computer, a PC, a server, etc. Figure 3 As shown, the electronic device 700 includes a memory 701, a processor 702 and a communication bus 703; the memory and the processor 702 are connected via the communication bus 703. The memory 701 stores a computer program that can be loaded by the processor 702 and executes the risk map drawing method based on the security risk assessment model provided in the above embodiment.
[0055] The memory 701 may be used to store instructions, programs, codes, code sets or instruction sets. The memory 701 may include a program storage area and a managed data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function, and instructions for implementing the risk map drawing method based on a security risk assessment model provided in the above embodiment, etc.; the managed data storage area may store managed data involved in the risk map drawing method based on a security risk assessment model provided in the above embodiment, etc.
[0056] The processor 702 may include one or more processing cores. The processor 702 calls the managed data stored in the memory 701 by running or executing the instructions, programs, code sets or instruction sets stored in the memory 701, performs various functions of the present application and processes the managed data. The processor 702 may be at least one of an application-specific integrated circuit (ASIC), a digital signal processor (DSP), a digital signal processing device (DSPD), a programmable logic device (PLD), a field programmable gate array (FPGA), a central processing unit (CPU), a controller, a microcontroller and a microprocessor. It is understandable that for different devices, the electronic device used to implement the above-mentioned processor 702 function can also be other, and the embodiment of the present application is not specifically limited.
[0057] The communication bus 703 may include a path to transmit information between the above components. The communication bus 703 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus. The communication bus 703 may be divided into an address bus, a managed data bus, a control bus, etc. For ease of representation, Figure 3 Only one double arrow is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0058] An embodiment of the present application provides a computer storage medium storing a computer program that can be loaded by a processor and execute a risk map drawing method based on a security risk assessment model as provided in the above embodiment.
[0059] In this embodiment, the computer storage medium may be a tangible device that holds and stores instructions used by the instruction execution device. The computer storage medium may be, but is not limited to, an electrical storage device, a magnetic storage device, an optical storage device, an electromagnetic storage device, a semiconductor storage device, or any combination thereof. Specifically, the computer storage medium may be a portable computer disk, a hard disk, a USB flash drive, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a podium random access memory (SRAM), a portable compact disk read-only memory (CD-ROM), a digital versatile disk (DVD), a memory stick, a floppy disk, an optical disk, a magnetic disk, a mechanical encoding device, and any combination thereof.
[0060] The terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not expressly listed, or also includes elements inherent to such process, method, article, or apparatus.
Claims
1. A risk map drawing method based on a security risk assessment model, characterized in that: include: Obtain mapping requirements information; Acquiring original information based on the mapping requirement information; Inputting the original information into a security risk assessment model; Obtaining a first risk assessment result output by the security risk assessment model; A mapping operation is performed based on the mapping requirement information, the original information and the first risk assessment result.
2. The method according to claim 1, characterized in that The step of inputting the original information into a security risk assessment model comprises: The original information includes a plurality of sub-information, each of which includes at least one set of actual data; Acquire corresponding currentness based on the actual data; Determining whether the currentness is greater than a first threshold; If the timeliness is greater than the first threshold, obtaining the number of the actual data whose timeliness is greater than the first threshold; determining whether the number is greater than one; If the number is greater than one, obtaining the actual data with the greatest timeliness, and using the obtained actual data as the first actual data; The first actual data is input into a security risk assessment model.
3. The method according to claim 1, characterized in that Before the mapping operation is performed based on the mapping requirement information, the original information and the first risk assessment result, the method further includes: Acquire spatial information based on the original information; Determine whether the spatial information is overlapped; If the spatial information is layered, a mapping operation is performed on each layer of the spatial information, and each layer is marked based on the first risk assessment result.
4. The method according to claim 3, characterized in that Before mapping the spatial information of each layer and marking each layer based on the first risk assessment result, the method further includes: Acquire corresponding association information based on the spatial information; Inputting the spatial information and the corresponding associated information into the security risk assessment model; Obtaining a second risk assessment result output by the security risk assessment model; The first risk assessment result corresponding to the stacked spatial information is corrected based on the second risk assessment result.
5. The method according to claim 4, characterized in that After obtaining the second risk assessment result output by the security risk assessment model, the method further includes: Obtaining environmental impact factors based on the second risk assessment results; Determine the environmental impact level based on the environmental impact factors; If the environmental impact level is the first level, marking the environmental impact factor; Acquire a solution strategy based on the marked environmental impact factors; Output the solution strategy.
6. The method according to claim 3, characterized in that The spatial information of each layer is mapped, and each layer is marked based on the first risk assessment result, including: Establishing a three-dimensional model based on the stacked spatial information; Marking is performed based on the first risk assessment result and the three-dimensional model.
7. The method according to claim 1, characterized in that The method further comprises: Filtering the special area information database based on the original information; Determining whether the special area information database includes the original information; If the original information is included, the original information included in the special area information library is marked so that it can be marked when the mapping operation is performed.
8. A risk map drawing device based on a security risk assessment model, characterized in that: include: A first acquisition module is used to acquire mapping requirement information; A second acquisition module, used for acquiring original information based on the mapping requirement information; An input module, used to input the original information into a security risk assessment model; A third acquisition module is used to obtain a first risk assessment result output by the security risk assessment model; A mapping operation module is used to perform a mapping operation based on the mapping requirement information, the original information and the first risk assessment result.
9. An electronic device, characterized in that: It includes a processor coupled to a memory; the processor is used to execute a computer program stored in the memory so that the electronic device executes a risk map drawing method based on a security risk assessment model as described in any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: It includes a computer program or instruction, which, when executed on a computer, enables the computer to execute a risk map drawing method based on a security risk assessment model as described in any one of claims 1 to 7.