Glue supply structure for delaying powder sedimentation for LED packaging system
By designing the rubber supply structure of the push rod head with stirring blades in the LED packaging system, the powder settlement problem is solved, the optical performance consistency and finished product yield of the LED board are improved, and the powder inside the rubber is uniform distributed.
Patent Information
- Application Number
- CN202411575968.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-06
- Publication Date
- 2024-12-31
AI Technical Summary
During the LED packaging process, the powder is unevenly distributed in the glue due to physical stirring, which causes settlement when left in the hose, affecting the consistency of the optical performance and finished product yield of the LED sheet.
A rubber supply structure including a hose, a rubber outlet head, a hose sleeve and a push rod head is designed. The push rod head is equipped with a stirring blade structure, which is connected to the coupling tip through the rotation and thread of the push rod to drive the push rod head to the hose. Move and rotate in a straight line, and stir the blades mix the powder inside the glue with the glue to avoid settlement.
It effectively delays the settlement of powder, improves the consistency of optical performance and finished product yield of LED boards, and ensures the stability of optical performance of LED boards.
Smart Images

Figure CN119216174A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of LED packaging systems, and in particular to a glue supply structure for delaying powder sedimentation in LED packaging systems. Background Art
[0002] In the LED packaging process, basically, the appropriate adhesive is selected according to the functional requirements of the product, and then the packaging machine and the mold are controlled according to the condition parameter set in the stage process of the packaging machine function preset, and the adhesive is heat-sealed at the preset position of the board to complete the initial heat curing of the LED board packaging. Then, the colloid is matured by the aging process to show the optical performance of the LED workpiece. With the different requirements of LED optical performance, adding appropriate and appropriate amount of powder to the adhesive and then reasonably physically stirring it so that the powder is fully and evenly dispersed in the adhesive to ensure that the optical performance of the LED workpiece is stable and consistent between batches is a correct, reasonable and effective current method. In packaging practice, it is necessary to prepare enough adhesives with the same proportion of raw material components required for the same batch of boards at one time, in addition to stabilizing the optical performance of the workpiece In addition to performance, the consistency of the same product is also a concern. In the preparation of the adhesive for LED packaging, the manufacturer can often add an appropriate amount of adhesive additives or even powders that can meet the specific performance requirements according to the performance requirements of the demand side. Of course, the user also adjusts the adhesive composition and proportion due to the need for functional adjustment. However, the powder is fully stirred by physical means and dispersed or floated in the gaps between the molecular structure of the adhesive. It does not undergo a chemical cross-linking reaction with the adhesive or is bonded to the molecular structure of the adhesive. As a result, the adhesive is inevitably unevenly distributed due to stratification, suspension, sedimentation, etc. before waiting for the heat curing process in containers such as hoses. Although it may not be intuitively discovered by naked eyes, when the workpiece after heat curing is tested by instruments, the optical performance of the LED board is lost, and the yield and consistency of the finished product are low. Summary of the invention
[0003] The purpose of the present invention is to overcome the above technical deficiencies, propose a glue supply structure for delaying powder sedimentation for an LED packaging system, and solve the technical problems in the background technology.
[0004] In order to achieve the above-mentioned technical purpose, the technical solution of the present invention provides a glue supply structure for delaying powder sedimentation in an LED packaging system, including a hose, a glue outlet head connected to the hose is installed at one end of the hose, a hose sleeve is installed at the other end of the hose, a push rod is threadedly connected to the hose sleeve, one end of the push rod is arranged outside the hose, and a connecting pin is rotatably installed, the other end of the push rod is arranged inside the hose, and a push rod head is installed, the push rod head is slidably arranged inside the hose, and a stirring blade structure is provided on the push rod head.
[0005] Furthermore, a glue outlet is arranged at an angle on the head of the glue dispensing head.
[0006] Furthermore, a threaded hole is provided inside the hose sleeve, and an external thread is provided on the outer wall of the push rod. The push rod is threadedly connected to the threaded hole of the hose sleeve through the external thread.
[0007] Furthermore, the hose sleeve is arranged inside the other end of the hose, a first sealing ring is arranged on the outer wall of the hose sleeve, and the outer wall of the hose sleeve is sealed and connected to the inner wall of the other end of the hose through the first sealing ring.
[0008] Furthermore, a first flange is provided at the other end of the hose, and one end of the hose sleeve is arranged outside the hose and is provided with a second flange matching the first flange.
[0009] Furthermore, a clamping block is provided on the second flange side wall, and the clamping block is clamped on the first flange side wall.
[0010] Furthermore, a second sealing ring is provided on the outer wall of the push rod head, and the outer wall of the push rod head is slidably and sealingly connected to the inner wall of the hose through the second sealing ring.
[0011] Furthermore, the stirring blade structure includes a plurality of blades centered on the central axis of the push rod head and evenly arranged on a side of the push rod head away from the push rod.
[0012] The beneficial effects of the present invention include: the present invention provides a glue supply structure for delaying powder sedimentation for an LED packaging system; since the push rod and the connecting pin are rotatably connected, and the push rod and the hose sleeve are threadedly connected, the push rod will rotate while moving linearly; the push rod can drive the push rod head to move linearly and rotate inside the hose, and extrude the glue inside the hose through the glue outlet head; at the same time, the stirring blade structure on the push rod head can rotate with the push rod head to stir and mix the powder inside the glue with the glue, and avoid the sedimentation of the powder inside the glue, thereby avoiding the loss of optical efficiency of the LED board and improving the yield and consistency of the finished LED board. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of a glue supply structure for delaying powder sedimentation in an LED packaging system according to an embodiment of the present invention;
[0014] Figure 2 This is a disassembled diagram of a glue supply structure for delaying powder sedimentation in an LED packaging system according to an embodiment of the present invention;
[0015] Figure 3 This is a schematic diagram of the structure of a hose sleeve according to an embodiment of the present invention;
[0016] Figure 4 is a schematic structural diagram of a putter head according to an embodiment of the present invention;
[0017] Figure 5 This is a partial exploded view of a glue supply structure for delaying powder sedimentation in an LED packaging system according to an embodiment of the present invention;
[0018] In the figure: 1, hose; 11, first flange; 2, rubber outlet head; 3, hose sleeve; 31, threaded hole; 32, first sealing ring; 33, second flange; 331, block; 4, push rod; 5, connecting pin; 51, pin rod; 52, mounting sleeve; 53, bearing; 54, rotating shaft; 6, push rod head; 61, stirring blade structure; 62, second sealing ring. DETAILED DESCRIPTION
[0019] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0020] The embodiment of the present invention provides a glue supply structure for delaying powder sedimentation in an LED packaging system, such as Figure 1-2 As shown, it includes a hose 1, which is installed on a packaging machine. A glue outlet 2 connected to the hose 1 is installed at one end of the hose 1. The head of the glue outlet 2 is tilted to provide a glue outlet, which can facilitate the glue material to be extruded through the glue outlet 2, thereby facilitating the glue supply. A hose sleeve 3 is installed at the other end of the hose 1. A push rod 4 is threadedly connected to the hose sleeve 3. One end of the push rod 4 is arranged outside the hose 1 and a connecting pin 5 is rotatably installed. The connecting pin 5 can be connected to a glue supply power source when supplying glue to provide power for linear motion for the connecting pin 5. The glue supply power source is one of a cylinder, a hydraulic cylinder or an electric telescopic rod. The other end of the push rod 4 is arranged inside the hose 1 and a push rod head 6 is installed. The push rod head 6 is slidably arranged inside the hose 1, and a stirring blade is provided on the push rod head 6 The sheet structure 61, when supplying glue, can push the connecting tip 5 to move linearly through the glue supply power source, the connecting tip 5 can drive the push rod 4 to move linearly, because the push rod 4 and the connecting tip 5 are rotationally connected, and the push rod 4 and the hose sleeve 3 are threadedly connected, so the push rod 4 will also rotate while moving linearly, the push rod 4 can drive the push rod head 6 to move linearly and rotate inside the hose 1, and extrude the glue inside the hose 1 through the glue outlet head 2, and at the same time, the stirring blade structure 61 on the push rod head 6 can rotate with the push rod head 6, stir and mix the powder inside the glue with the glue, and avoid the sedimentation of the powder inside the glue, thereby avoiding the loss of optical efficiency of the LED board, and improving the yield and consistency of the finished LED board.
[0021] In this embodiment, Figure 3As shown, a threaded hole 31 is provided inside the hose sleeve 3, and an external thread is provided on the outer wall of the push rod 4. When the rotation angle of the push rod 4 is constant, the larger the pitch of the external thread, the larger the linear motion stroke of the push rod 4, and the smaller the pitch of the external thread, the smaller the linear motion stroke of the push rod 4. There is no limitation on the pitch of the external thread in this embodiment, and a suitable pitch can be selected according to different rubber materials and powders. The push rod 4 is threadedly connected to the threaded hole 31 of the hose sleeve 3 through the external thread.
[0022] In this embodiment, the hose sleeve 3 is arranged inside the other end of the hose 1, and the outer wall of the hose sleeve 3 is provided with a first sealing ring 32, which is a silicone ring. The outer wall of the hose sleeve 3 is sealed and connected with the inner wall of the other end of the hose 1 through the first sealing ring 32, so that the hose sleeve 3 seals the other end of the hose 1 to prevent the rubber material inside the hose 1 from overflowing. The other end of the hose 1 is provided with a first flange 11, and the first flange 11 is an elliptical structure. At the same time, the first flange 11 is integrally formed with the hose 1. One end of the hose sleeve 3 is arranged outside the hose 1, and is provided with a second flange 33 matching the first flange 11. The second flange 33 is an elliptical structure, and the second flange 33 is integrally formed with the hose sleeve 3. By arranging the second flange 33 at one end of the hose sleeve 3, it is convenient to hold the hose sleeve 3 when the hose sleeve 3 is installed inside the hose 1, so that the hose sleeve 3 can be conveniently installed inside the hose 1. At the same time, the second flange 33 can limit one end of the hose sleeve 3 outside the hose 1 when the hose sleeve 3 is installed inside the hose 1, so as to facilitate the removal of the hose sleeve 3 from the inside of the hose 1, so that the hose sleeve 3 can be conveniently disassembled and assembled, and the rubber material can be conveniently added to the inside of the hose 1.
[0023] In order to firmly fix the hose sleeve 3 inside the hose 1 and prevent the hose sleeve 3 from rotating inside the hose 1 when supplying glue, in this embodiment, a clamping block 34 is provided on the side wall of the second flange 33, and the clamping block 34 is integrally formed with the second flange 33. The clamping block 34 is clamped on the side wall of the first flange 11. At the same time, in this embodiment, the number of the clamping blocks 34 is two, and the two clamping blocks 34 are respectively clamped on the side walls at both ends of the first flange 11. The side walls of the clamping blocks 34 are arc-shaped structures that match the side walls of the first flange 11 to fix the second flange 33 on the first flange 11 to prevent the hose sleeve 3 from rotating inside the hose 1 when supplying glue, which is conducive to stable glue supply. At the same time, in order to make the hose sleeve 3 more firmly fixed inside the hose 1, the first flange 11 and the second flange 33 can be fixedly connected by bolts. At the same time, in this embodiment, the number of bolts is two, and they are fixedly connected at both ends of the first flange 11 and the second flange 33 respectively.
[0024] In this embodiment, Figure 4As shown, the outer wall of the push rod head 6 is provided with a second sealing ring 62, and the second sealing ring 62 is a silicone ring. The outer wall of the push rod head 6 is slidingly and sealedly connected to the inner wall of the hose 1 through the second sealing ring 62. The outer wall of the push rod head 6 is slidingly and sealedly connected to the inner wall of the hose 1 through the second sealing ring 62, which can help the push rod head 6 to extrude the rubber material inside the hose 1. It should be noted that a mounting hole is provided in the center of the push rod head 6, and one end of the push rod 4 located inside the hose 1 is fixed inside the mounting hole by bolts to connect the push rod head 6 with the push rod.
[0025] In this embodiment, the stirring blade structure 61 includes a plurality of blades centered on the central axis of the push rod head 6 and evenly arranged on the side of the push rod head 6 away from the push rod 4. At the same time, the blades and the push rod head 6 are integrally formed. It should be noted that the shape of the blades can be adjusted according to the viscosity of the glue and the properties and quality of the added powder. By adjusting the appropriate blade shape, the powder sedimentation can be effectively prevented. Therefore, any blade shape that can effectively prevent the powder sedimentation is within the protection scope of the invention.
[0026] In this embodiment, Figure 5 As shown, the connecting tip 5 includes a tip rod 51, a mounting sleeve 52 is vertically installed in the middle of the tip rod 51, a bearing 53 is installed inside the mounting sleeve 52, the bearing 52 is a ball bearing, and there are two bearings 52, which are respectively installed at the two ends inside the mounting sleeve 52, and the two bearings 52 are separated by a gasket. A rotating shaft 54 is rotatably installed inside the bearing 53, and one end of the rotating shaft 54 is connected to the end of the push rod 4 located outside the hose 1. The connecting tip 5 using the above design can be rotatably connected to the end of the push rod 4 located outside the hose 1. It should be noted that the tip rod 51 and the mounting sleeve 52 are connected by bolts.
[0027] Specific principle: when adding rubber material into the rubber hose 1, take out the rubber hose sleeve 3 from the rubber hose 1, take out the push rod head 6 from the rubber hose 1, and then add the rubber material into the rubber hose 1, when the rubber material is added, push the push rod head 6 into the rubber hose 1, and then install the rubber hose sleeve 3 in the rubber hose 1, and then the addition of the rubber material can be completed;
[0028] When supplying glue, the rubber tube 1 is installed on the packaging machine, and the connecting tip 5 is connected to the glue supply power source. The connecting tip 5 is pushed by the glue supply power source to move linearly, and the connecting tip 5 can drive the push rod 4 to move linearly. Since the push rod 4 and the connecting tip 5 are rotationally connected, and the push rod 4 and the rubber tube sleeve 3 are threadedly connected, the push rod will rotate while moving linearly. The push rod 4 can drive the push rod head 6 to move linearly and rotate inside the rubber tube 1, and extrude the glue inside the rubber tube 1 through the glue outlet head 2. At the same time, the stirring blade structure 61 on the push rod head 6 can rotate with the push rod head 6 to stir and mix the powder inside the glue material with the glue material to avoid the sedimentation of the powder inside the glue material, thereby avoiding the loss of optical efficiency of the LED board and improving the yield and consistency of the finished LED board.
[0029] The specific implementation of the present invention described above does not constitute a limitation on the protection scope of the present invention. Any other corresponding changes and modifications made based on the technical concept of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. A glue supply structure for delaying powder sedimentation for an LED packaging system, characterized in that: The invention comprises a rubber hose (1), wherein one end of the rubber hose (1) is provided with a rubber outlet head (2) connected to the rubber hose (1), and the other end of the rubber hose (1) is provided with a rubber hose sleeve (3), and a push rod (4) is threadedly connected to the rubber hose sleeve (3), and one end of the push rod (4) is arranged outside the rubber hose (1) and is rotatably provided with a connecting pin (5), and the other end of the push rod (4) is arranged inside the rubber hose (1) and is provided with a push rod head (6), and the push rod head (6) is slidably provided inside the rubber hose (1), and a stirring blade structure (61) is provided on the push rod head (6).
2. The glue supply structure for delaying powder sedimentation for LED packaging system according to claim 1, characterized in that: The head of the glue discharging head (2) is provided with a glue discharging port at an angle.
3. The glue supply structure for delaying powder sedimentation for LED packaging system according to claim 1, characterized in that: The hose sleeve (3) is provided with a threaded hole (31) inside, the outer wall of the push rod (4) is provided with an external thread, and the push rod (4) is threadedly connected to the threaded hole (31) of the hose sleeve (3) via the external thread.
4. The glue supply structure for delaying powder sedimentation for LED packaging system according to claim 1, characterized in that: The hose sleeve (3) is arranged inside the other end of the hose (1), and a first sealing ring (32) is provided on the outer wall of the hose sleeve (3). The outer wall of the hose sleeve (3) is sealedly connected to the inner wall of the other end of the hose (1) via the first sealing ring (32).
5. The glue supply structure for delaying powder sedimentation for LED packaging system according to claim 4, characterized in that: The other end of the rubber hose (1) is provided with a first flange (11), and one end of the rubber hose sleeve (3) is arranged outside the rubber hose (1) and is provided with a second flange (33) matching the first flange (11).
6. The glue supply structure for delaying powder sedimentation for LED packaging system according to claim 5, characterized in that: A clamping block (34) is provided on the side wall of the second flange (33), and the clamping block (34) is clamped on the side wall of the first flange (11).
7. The glue supply structure for delaying powder sedimentation for LED packaging system according to claim 1, characterized in that: The outer wall of the push rod head (6) is provided with a second sealing ring (62), and the outer wall of the push rod head (6) is connected to the inner wall of the rubber hose (1) in a sliding and sealing manner via the second sealing ring (62).
8. The glue supply structure for delaying powder sedimentation for LED packaging system according to claim 1, characterized in that: The stirring blade structure (61) comprises a plurality of blades centered on the central axis of the push rod head (6) and evenly arranged on a side of the push rod head (6) away from the push rod (4).
