Temporary fixing construction device for beam body installation and beam body construction method

By using the beam body to install temporary fixed construction devices during the installation of steel beams and using the frame body and connecting parts to support the steel beams, the problems of instability and low installation efficiency of lifting equipment are solved, construction efficiency and safety are improved, and the construction efficiency and safety are ensured. Steel beams are stable and precisely installed.

CN119266548APending Publication Date: 2025-01-07STATE NUCLEAR ELECTRIC POWER PLANNING DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411553067.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-01
Publication Date
2025-01-07

AI Technical Summary

Technical Problem

In steel structure construction, due to the instability and difficulty of lifting equipment during the installation process of steel beams, the installation efficiency is low and there is a large safety risk, and the stability and accuracy during the installation process cannot be effectively guaranteed.

Method used

The beam body is used to install a temporary fixed construction device, which includes a frame body and a connecting component. The beam body is supported on the structure through the first support part of the frame body, and is initially positioned and hoisted by lifting equipment, and then evacuated by lifting equipment. The frame body and the connecting parts fix the beam body to ensure its stability and accuracy.

Benefits of technology

It improves construction efficiency and safety, reduces the working hours of lifting equipment, ensures the stable installation and precise position of the beam body, and reduces safety risks during construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119266548A_ABST
    Figure CN119266548A_ABST
Patent Text Reader

Abstract

The invention belongs to a temporary fixing construction device for beam body installation and a beam body construction method. The temporary fixing construction device for beam body installation comprises a frame body and a connecting part, the frame body is provided with a first positioning part and a first supporting part, and the first positioning part is in a U-shaped groove shape; the connecting part is arranged at the notch of the first positioning part, the connecting part is detachably connected with the frame body, and a beam body is arranged at the first positioning part and fixed between the connecting part and the frame body; the first supporting part is used for abutting against a structure at a beam body installation station so that a beam body can be supported at the beam body installation station through the first supporting part. According to the invention, the frame body and the connecting part can be arranged on the beam body, and the beam body is supported on the structure at the beam body mounting station by using the first supporting part of the frame body, so that the working time of hoisting equipment is reduced, and the efficiency and safety of construction operation can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of beam installation construction, and in particular relates to a temporary fixing construction device for beam installation and a beam construction method. Background Art

[0002] In the related technology, during the construction of steel structures, the steel beams need to be temporarily fixed with the assistance of lifting equipment during the installation process until the node construction is completed. Not only does this waste the man-hours of the lifting equipment, but also due to the flexibility of the slings and the difficulty of operating the lifting equipment, it is difficult to ensure the stability and accuracy during the installation process. There are great safety risks in the construction process, and the installation efficiency is low. Summary of the invention

[0003] The present invention is based on the inventor's discovery and understanding of the following facts and problems:

[0004] The inventors realized that the steel beams need to be temporarily fixed during the installation process, and the temporary fixing measures are cancelled after the node construction is completed. The temporary fixing measures for the steel beam installation are different according to the different node types.

[0005] When a steel beam is connected to a steel column or a steel beam, the connection surface is not a smooth vertical surface, and the steel beam cannot be built by welding and installing angle steel. This situation is usually encountered when the stiffening plate of the steel beam is connected to the steel column or the steel beam is just connected to the steel beam. In the related technology, a lifting device is used to suspend the steel beam to be installed, and the lifting device is used to find the position and height, and then the connection node is constructed. After the node construction is completed, the suspension device is no longer under stress, the connection between the suspension device and the steel beam is removed, and the lifting device is removed, resulting in the lifting device being occupied for a long time, and it is difficult to ensure the stability and accuracy during the installation process.

[0006] In the related technology, scaffolding is also used to support the steel beams for construction, but the construction volume is large, the site occupies a large area, and is not conducive to the turnover of equipment.

[0007] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.

[0008] To this end, an embodiment of the present invention proposes a temporary fixing construction device for beam installation, which can improve the efficiency and safety of construction operations and reduce the operating hours of lifting equipment.

[0009] The embodiment of the present invention also provides a beam construction method.

[0010] The temporary fixing construction device for beam installation according to the embodiment of the present invention comprises:

[0011] A frame body, the frame body having a first positioning portion and a first supporting portion, the first positioning portion being in a U-shaped groove shape;

[0012] A connecting component, the connecting component is arranged at the notch of the first positioning portion, the connecting component is detachably connected to the frame, and the beam body is arranged at the first positioning portion and fixed between the connecting component and the frame;

[0013] The first supporting portion is used to abut against a structure at the beam installation station, so that the beam is supported at the beam installation station by the first supporting portion.

[0014] The temporary fixing construction device for beam installation in the embodiment of the present invention can arrange a frame and connecting parts on the beam, and use the first supporting part of the frame to support the beam on the structure at the beam installation station, thereby reducing the operating hours of the lifting equipment and improving the efficiency and safety of the construction work.

[0015] In some embodiments, the frame includes a crossbeam and two longitudinal beams, the two longitudinal beams are respectively arranged at both ends of the length direction of the crossbeam, the length direction of the longitudinal beam is orthogonal to the length direction of the crossbeam, and the first positioning portion is formed between the crossbeam and the two longitudinal beams;

[0016] The frame body further includes a support beam, which is connected to the cross beam and extends in a direction orthogonal to both the length direction of the cross beam and the length direction of the longitudinal beam to form the first support portion.

[0017] In some embodiments, the cross beam and the support beam are both H-shaped steel, and the longitudinal beam is H-shaped steel or channel steel;

[0018] And / or, the spacing distance between the two longitudinal beams is greater than the width of the beam body.

[0019] In some embodiments, the connecting component includes a top plate and two side plates, the two side plates are respectively arranged at two ends of the length direction of the top plate, and the two ends of the length direction of the side plates are orthogonal to the length direction of the top plate;

[0020] The top plate has a first abutting surface, and the side plate has a second abutting surface. The first abutting surface is arranged opposite to the bottom wall of the first positioning portion. The first abutting surface and the bottom wall of the first positioning portion are used to abut against the opposite side walls of the beam body respectively. The second abutting surfaces of the two side plates abut against the side walls of the first positioning portion.

[0021] In some embodiments, the top plate and the side plates are both channel steels;

[0022] And / or, a first groove is provided between the two side plates, and the first groove is located on a side of the top plate away from the first abutting surface.

[0023] In some embodiments, the lower end surface of the first supporting portion is a third abutting surface, and the third abutting surface is used to abut against a structure at the beam installation station, and the third abutting surface is flush with the bottom wall of the first positioning portion.

[0024] In some embodiments, the frame and the connecting components are both in two groups, and the frame and the connecting components are disposed at both ends of the beam body.

[0025] In some embodiments, a connecting piece is further included, and one of the side panel and the frame is provided with an elongated connecting hole, and the other is provided with a circular or elongated connecting hole, and the side panel and the frame are detachably and fixedly connected by the connecting piece arranged in the connecting hole.

[0026] The beam construction method of the embodiment of the present invention is used for installing the beam, and specifically comprises the following steps:

[0027] Carry out construction at the beam installation station and form a supporting structure;

[0028] Connecting the temporary fixing construction device for beam installation described in any of the above embodiments to the end of the beam;

[0029] The beam body is hoisted by a hoisting device, and the first supporting part of the beam body installation temporary fixing construction device at the end of the beam body is brought into contact with the supporting structure;

[0030] Remove the lifting equipment and connect the connection nodes at the ends of the beams;

[0031] After the installation of the beam is completed, remove the beam and install a temporary fixing construction device.

[0032] The beam construction method according to the embodiment of the present invention is used for disassembling the beam, and specifically comprises the following steps:

[0033] Connecting the temporary fixing construction device for installing the beam body described in any of the above embodiments to the end of the beam body, and making the first supporting part of the temporary fixing construction device for installing the beam body abut against the structure at the beam body installation station;

[0034] Remove the connection nodes at the ends of the beam to separate the beam from the structure at the beam installation station;

[0035] Lifting the beam body with a lifting device and placing it on the ground;

[0036] Remove the beam and install temporary fixing construction equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a structural schematic diagram of a temporary fixing construction device for beam installation according to an embodiment of the present invention.

[0038] Figure 2 It is a schematic diagram of the disassembled structure of the temporary fixing construction device for beam installation according to an embodiment of the present invention.

[0039] Figure 3 It is a schematic diagram of the installation state of the temporary fixing construction device for installing the beam body according to an embodiment of the present invention.

[0040] Figure 4 It is a disassembled schematic diagram of the installation state of the temporary fixing construction device for installing the beam body according to an embodiment of the present invention.

[0041] Reference numerals:

[0042] 1. frame; 11. cross beam; 12. longitudinal beam; 13. support beam; 131. third abutting surface; 14. first positioning portion;

[0043] 2. Connecting member; 21. Top plate; 22. Side plate; 23. First abutting surface; 24. Second abutting surface; 25. Connecting hole; 26. Connecting member;

[0044] 3. Beam body;

[0045] 4. Beam installation station. DETAILED DESCRIPTION

[0046] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.

[0047] like Figure 1-Figure 4 As shown, the temporary fixing construction device for beam installation of an embodiment of the present invention includes a frame 1 and a connecting component 2, the frame 1 has a first positioning portion 14 and a first supporting portion, the first positioning portion 14 is in the shape of a U-shaped groove; the connecting component 2 is arranged at the notch of the first positioning portion 14, the connecting component 2 and the frame 1 are detachably connected, the beam 3 is arranged at the first positioning portion 14, and is fixed between the connecting component 2 and the frame 1; the first supporting portion is used to abut against the structure at the beam installation station 4, so that the beam 3 is supported at the beam installation station 4 through the first supporting portion.

[0048] It should be understood that the connecting component 2 and the frame 1 are two components, which can be detachably connected together to facilitate assembly and installation on the beam 3. The first positioning portion 14 is in the shape of a U-shaped groove. During installation, the frame 1 is first placed across the beam 3 so that the beam 3 is located in the first positioning portion 14 for preliminary positioning. Then, the frame 1 and the beam 3 are connected as a whole through the connecting component 2 to stabilize the relative positions of the frame 1 and the beam 3. The first supporting portion is used to abut against the structure at the beam installation station 4. After the temporary fixing construction device for beam installation is assembled on the beam 3, the beam 3 is hoisted to the beam installation station 4 by a lifting device. Then, the beam 3 can be supported on the structure by the first supporting portion. At this time, there is no need to continuously lift the beam 3 with the help of the lifting device, and the working hours of the lifting device are no longer required, which greatly improves the turnover and application efficiency of the equipment of the construction length, and can more reasonably plan the project construction process and improve the construction progress.

[0049] After the first supporting portion of the embodiment of the present invention abuts against the structure, the position of the beam body 3 can be ensured to be relatively stable without shaking, which makes it easier to assemble the connection nodes and improves the assembly accuracy.

[0050] Therefore, the temporary fixing construction device for beam installation in the embodiment of the present invention can arrange the frame 1 and the connecting component 2 on the beam 3, and use the first supporting part of the frame 1 to support the beam 3 on the structure at the beam installation station 4, thereby reducing the operating hours of the lifting equipment and improving the efficiency and safety of the construction work.

[0051] In some embodiments, the frame 1 includes a crossbeam 11 and two longitudinal beams 12. The two longitudinal beams 12 are respectively arranged at both ends of the length direction of the crossbeam 11. The length direction of the longitudinal beam 12 is orthogonal to the length direction of the crossbeam 11. A first positioning portion 14 is formed between the crossbeam 11 and the two longitudinal beams 12.

[0052] The frame 1 further includes a support beam 13 , which is connected to the cross beam 11 and extends in a direction orthogonal to both the length direction of the cross beam 11 and the length direction of the longitudinal beam 12 to form a first support portion.

[0053] The cross beam 11 and the two longitudinal beams 12 form a U-shaped frame 1, the first positioning portion 14 is in the shape of a U-shaped groove, the beam body 3 is a horizontal beam, the cross beam 11 is arranged along the width direction of the beam body 3 and is located at the top of the beam body 3, the longitudinal beams 12 are arranged along the height direction of the beam body 3 and are located on both sides of the width direction of the beam body 3, and the connecting component 2 is located at the bottom of the beam body 3, which is used to connect the two longitudinal beams 12, so that the beam body 3 can be fixed in the first positioning portion 14 of the frame 1.

[0054] The support beam 13 is used to overlap with the structure, so the support beam 13 needs to extend outward for a certain distance. The extension direction of the support beam 13 in the embodiment of the present invention is the same as the length direction of the beam body 3. The support beam 13 extends in a direction orthogonal to the length direction of the cross beam 11 and the length direction of the longitudinal beam 12 (a direction parallel to the horizontal plane), so as to ensure that after the beam body 3 is hoisted into place, the support beam 13 can be overlapped with the structure, thereby supporting the entire beam body 3.

[0055] In some embodiments, the cross beam 11 and the support beam 13 are both H-shaped steels, and the longitudinal beam 12 is H-shaped steel or channel steel.

[0056] In order to ensure the structural stability of the frame 1, the cross beam 11 and the support beam 13 are both made of H-shaped steel, and the longitudinal beam 12 can be made of H-shaped steel or channel steel.

[0057] The cross beam 11 and the support beam 13 bear a large bending force, so the H-shaped steel can ensure sufficient rigidity to prevent its deformation, while the longitudinal beam 12 mainly bears the tensile force along its length direction, so channel steel can be used, and of course H-shaped steel can also be used.

[0058] Furthermore, the spacing distance between the two longitudinal beams 12 is greater than the width of the beam body 3 .

[0059] In the embodiment of the present invention, when fixing the beam body 3, the cross beam 11 and the connecting component 2 are used to support and limit the top and bottom of the beam body 3, that is, the relative position stability of the beam body 3 can be guaranteed. By constraining the spacing distance between the two longitudinal beams 12, the beam body 3 can be moved laterally between the two longitudinal beams 12, which is convenient for the installation between the frame 1 and the beam body 3. At the same time, according to the assembly requirements of the connection nodes of the beam body 3, the relative position between the frame 1 and the beam body 3 can be adjusted while ensuring the stability of the beam body 3, which has higher flexibility.

[0060] In some embodiments, the connecting component 2 includes a top plate 21 and two side plates 22 . The two side plates 22 are respectively arranged at two ends of the length direction of the top plate 21 , and the two ends of the length direction of the side plates 22 are orthogonal to the length direction of the top plate 21 .

[0061] The top plate 21 has a first abutting surface 23, and the side plate 22 has a second abutting surface 24. The first abutting surface 23 is arranged opposite to the bottom wall of the first positioning portion 14. The first abutting surface 23 and the bottom wall of the first positioning portion 14 are used to abut against the opposite side walls of the beam body 3 respectively. The second abutting surfaces 24 of the two side plates 22 abut against the side walls of the first positioning portion 14.

[0062] In the embodiment of the present invention, the connecting component 2 is located in the U-shaped groove of the first positioning portion 14, the two side panels 22 can be positioned in abutment with the side walls of the U-shaped groove, the top plate 21 can be arranged relative to the cross beam 11 to fix the beam body 3, and the side panels 22 also have the function of reinforcing the structure of the top plate 21. At the same time, there is sufficient operating space between the two side panels 22, which facilitates the connection between the connecting component 2 and the frame 1 and makes the operation more convenient.

[0063] Furthermore, the top plate 21 and the side plates 22 are both channel steels. While meeting the structural strength requirements, the embodiment of the present invention uses channel steels to facilitate assembly and disassembly of the connector 26 between the side plates 22 and the frame 1, thereby facilitating operation.

[0064] Furthermore, a first groove is defined between the two side plates 22 , and the first groove is located on a side of the top plate 21 away from the first abutting surface 23 .

[0065] That is to say, the U-shaped arrangement of the top plate 21 and the two side plates 22 can improve the structural stability. The two side plates 22 can increase the contact area with the frame 1, and improve the structural stability between the connecting component 2 and the frame 1. The first groove reserves an operating space for the disassembly between the connecting component 2 and the frame 1, which facilitates the disassembly and assembly of the connecting part 26 in the first groove.

[0066] When the structure abutting against the first support part is not aligned with the beam body 3 in the vertical direction, the position of the first support part may not be limited. However, when the structure abutting against the first support part is flush with the beam body 3 in the vertical direction, the first support part is limited to ensure that the connection node of the beam body 3 is accurately aligned after the first support part abuts against the structure, thereby improving the working efficiency.

[0067] Therefore, in the embodiment of the present invention, the lower end surface of the first supporting portion is the third abutting surface 131 , which is used to abut against the structure at the beam installation station 4 , and the third abutting surface 131 is flush with the bottom wall of the first positioning portion 14 .

[0068] The third abutting surface 131 not only plays a role of abutting against the structure for support, but also limits the position of the beam body 3 in the vertical direction, thereby improving the efficiency and accuracy of the installation of the beam body 3 .

[0069] Of course, when the third abutting surface 131 is not flush with the bottom wall of the first positioning portion 14 , the height can be adjusted by providing a pad, a jack or other equipment.

[0070] In some embodiments, the frame 1 and the connecting components 2 are each in two groups, and the frame 1 and the connecting components 2 are disposed at both ends of the beam 3 .

[0071] Both ends of the beam body 3 are provided with temporary fixing construction devices for beam body installation, so the beam body 3 can be supported on the structure at the beam body installation station 4 by two sets of temporary fixing construction devices for beam body installation.

[0072] In some embodiments, the temporary fixing construction device for installing the beam body also includes a connecting piece 26, one of the side panel 22 and the frame body 1 is provided with a long connecting hole 25, and the other is provided with a circular or long connecting hole 25, and the side panel 22 and the frame body 1 are detachably and fixedly connected by the connecting piece 26 arranged in the connecting hole 25.

[0073] By arranging the long strip-shaped connecting holes, the distance between the frame body 1 and the connecting component 2 can be adjusted according to the height of the beam body 3, thereby improving the scope of use. The connecting member 26 can be a connecting bolt and a connecting nut.

[0074] In the frame body 1 of the embodiment of the present invention, the cross beam 11 and the longitudinal beam 12 and the cross beam 11 and the supporting beam 13 are fixed by welding, and the top plate 21 and the side plate 22 in the connecting component 2 are also fixed by welding.

[0075] The beam body 3 in the embodiment of the present invention may be a steel beam or a non-steel structure beam body 3 .

[0076] The structure at the beam installation station 4 can be a structure such as a column or other stiffening rib plate on the beam 3 that has been installed and a connecting stand.

[0077] The beam construction method of the embodiment of the present invention is used for installing the beam, and specifically comprises the following steps:

[0078] S101. Carry out construction at the beam installation station and form a supporting structure.

[0079] Before installing the beam body, it is necessary to first construct the beam body installation station to ensure that the first supporting part of the temporary fixed construction device for installing the beam body has a force point.

[0080] S102, connect the temporary fixing construction device for beam installation of any of the above embodiments to the end of the beam. During installation, it can be assembled on the ground. If the beam is placed on the ground, the two ends of the beam can be lifted off the ground by lifting equipment and installed one by one.

[0081] S103, using a lifting device to hoist the beam body, and making the first supporting part of the beam body installation temporary fixing construction device at the end of the beam body abut against the supporting structure.

[0082] S104. Remove the lifting equipment and connect the connection nodes at the ends of the beam.

[0083] After the beam is hoisted into place, the beam is supported on the supporting structure at the beam installation station by a temporary fixing construction device for beam installation, and the connection node at the end of the beam is aligned with the known structure.

[0084] S105. After the beam body is installed, remove the beam body and install a temporary fixing construction device.

[0085] After the construction of the connecting nodes of the beam body is completed, the beam body can be supported on the known structure through the connecting nodes. At this time, the temporary fixed construction device installed on the beam body can be removed. When the weight of the temporary fixed construction device installed on the beam body is heavy, it can be disassembled with the help of lifting equipment or a small electric hoist.

[0086] The beam construction method according to the embodiment of the present invention is used for disassembling the beam, and specifically comprises the following steps:

[0087] S201, connecting the temporary fixing construction device for beam installation in any of the above embodiments to the end of the beam, and making the first supporting part of the temporary fixing construction device for beam installation abut against the structure at the beam installation station.

[0088] When dismantling the beam body, a temporary fixing construction device for beam body installation is installed on the beam body, and the first supporting part of the temporary fixing construction device for beam body installation is made to abut against a structure outside the beam body, so that the beam body can be supported by the temporary fixing construction device for beam body installation.

[0089] S202, removing the connection nodes at the ends of the beam body to separate the beam body from the structure at the beam body installation station.

[0090] After removing the connection nodes at the ends of the beam body, the beam body is separated from other structures, and the beam body is supported on other structures only by the first supporting part of the temporary fixing construction device installed on the beam body, and can be directly lifted by the lifting equipment.

[0091] S203, lifting the beam body by using a lifting device and placing it on the ground.

[0092] S204. Remove the beam and install temporary fixing construction equipment.

[0093] When removing the beam body to install a temporary fixed construction device, a base can be placed under the beam body, and then the connecting parts between the connecting parts and the frame body are removed, and finally the frame body and the connecting parts are separated from the beam body.

[0094] It should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0095] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0096] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0097] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0098] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0099] It is to be understood that the above embodiments are exemplary and are not to be construed as limiting the present invention. A person skilled in the art may change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A temporary fixing construction device for beam installation, characterized in that: include: A frame body, the frame body having a first positioning portion and a first supporting portion, the first positioning portion being in a U-shaped groove shape; A connecting component, the connecting component is arranged at the notch of the first positioning portion, the connecting component is detachably connected to the frame, and the beam body is arranged at the first positioning portion and fixed between the connecting component and the frame; The first supporting portion is used to abut against a structure at the beam installation station, so that the beam is supported at the beam installation station by the first supporting portion.

2. The temporary fixing construction device for beam installation according to claim 1 is characterized in that: The frame includes a crossbeam and two longitudinal beams, the two longitudinal beams are respectively arranged at two ends of the crossbeam in the length direction, the length direction of the longitudinal beam is orthogonal to the length direction of the crossbeam, and the first positioning portion is formed between the crossbeam and the two longitudinal beams; The frame body further includes a support beam, which is connected to the cross beam and extends in a direction orthogonal to both the length direction of the cross beam and the length direction of the longitudinal beam to form the first support portion.

3. The temporary fixing construction device for beam installation according to claim 2 is characterized in that: The cross beam and the support beam are both H-shaped steel, and the longitudinal beam is H-shaped steel or channel steel; And / or, the spacing distance between the two longitudinal beams is greater than the width of the beam body.

4. The temporary fixing construction device for beam installation according to any one of claims 1 to 3, characterized in that: The connecting component includes a top plate and two side plates, the two side plates are respectively arranged at two ends of the length direction of the top plate, and the two ends of the length direction of the side plates are orthogonal to the length direction of the top plate; The top plate has a first abutting surface, and the side plate has a second abutting surface. The first abutting surface is arranged opposite to the bottom wall of the first positioning portion. The first abutting surface and the bottom wall of the first positioning portion are used to abut against the opposite side walls of the beam body respectively. The second abutting surfaces of the two side plates abut against the side walls of the first positioning portion.

5. The temporary fixing construction device for beam installation according to claim 4 is characterized in that: The top plate and the side plates are both channel steels; And / or, a first groove is provided between the two side plates, and the first groove is located on a side of the top plate away from the first abutting surface.

6. The temporary fixing construction device for beam installation according to claim 4 is characterized in that: The lower end surface of the first supporting portion is a third abutting surface, and the third abutting surface is used to abut against a structure at the beam installation station, and the third abutting surface is flush with the bottom wall of the first positioning portion.

7. The temporary fixing construction device for beam installation according to claim 4 is characterized in that: The frame and the connecting components are both in two groups, and the frame and the connecting components are arranged at both ends of the beam body.

8. The temporary fixing construction device for beam installation according to claim 4 is characterized in that: It also includes a connecting piece, one of the side plate and the frame is provided with an elongated connecting hole, and the other is provided with a circular or elongated connecting hole, and the side plate and the frame are detachably and fixedly connected through the connecting piece arranged in the connecting hole.

9. A beam construction method, characterized in that: The installation of the beam body specifically includes the following steps: Carry out construction at the beam installation station and form a supporting structure; Connecting a temporary fixing construction device for beam installation as claimed in any one of claims 1 to 8 to the end of the beam; The beam body is hoisted by a hoisting device, and the first supporting part of the beam body installation temporary fixing construction device at the end of the beam body is brought into contact with the supporting structure; Remove the lifting equipment and connect the connection nodes at the ends of the beams; After the installation of the beam is completed, remove the beam and install a temporary fixing construction device.

10. A beam construction method, characterized in that: For disassembly of the beam body, specifically including the following steps: Connecting the temporary fixing construction device for beam installation as claimed in any one of claims 1 to 8 to the end of the beam, and making the first support part of the temporary fixing construction device for beam installation abut against the structure at the beam installation station; Remove the connection nodes at the ends of the beam to separate the beam from the structure at the beam installation station; Lifting the beam body with a lifting device and placing it on the ground; Remove the beam and install temporary fixed construction equipment.