A high-efficiency water cooling system

By designing the cooling components and energy storage components of the high-efficiency water storage system, the problem of increasing temperature during the cooling water heat exchange is solved, and efficient air cooling and water re-cooling is achieved, saving resources and improving the overall efficiency of the system.

CN119268039BActive Publication Date: 2025-02-28SHENZHEN VICLAND SHENGSHI ENERGY SAVING TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411784350.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-06
Publication Date
2025-02-28
Estimated Expiration
2044-12-06

AI Technical Summary

Technical Problem

The existing high-efficiency water storage and cooling system causes the cooling water temperature to rise during the heat exchange between cooling water and air, reducing the overall cooling efficiency of the system.

Method used

An efficient water cooling system is designed, including cooling components and energy storage components. The cooling assembly cools the water through a refrigerator and stores it in the cooling water tank. When cooling air is needed, the water pump transports the cooling water into the housing for heat exchange with the air. The energy storage assembly realizes multi-stage cooling of cooling water through the design of heat exchange tanks and threaded pipes, and optimizes the reflow and re-cooling process of cooling water through the control of temperature sensors and drive motors.

Benefits of technology

It effectively reduces power consumption during peak periods, improves the overall refrigeration efficiency of the water storage and cooling system, saves resources, and during the night water storage and cooling process, water is made into ice through an ice machine, further improving the working efficiency and energy storage efficiency of heat exchange.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure FT_1
    Figure FT_1
  • Figure FT_2
    Figure FT_2
  • Figure FT_3
    Figure FT_3
Patent Text Reader

Abstract

The present invention discloses a high-efficiency water cold storage system, which relates to the field of cold storage technology, and includes a mounting plate, a cold storage component for cooling air is arranged on the top of the mounting plate, and an energy storage component for cooling water further is arranged near the center of the top of the mounting plate. In order to effectively reduce peak power consumption during hot summer weather, this high-efficiency water cold storage system cools the water source to the required temperature through the refrigeration machine body and stores it inside the cold storage water tank. When it is necessary to cool the outside air, the water pump is started to transport the cooling water to the inside of the shell, and at the same time, the external hot air is transported to the inside of multiple tube sheets to achieve heat exchange with the cooling water arranged outside, and then the cooling water controls the temperature of the hot air under the action of the temperature difference, saving resources.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cold storage, and in particular to a high-efficiency water cold storage system. Background Art

[0002] High-efficiency water-cooled storage devices are hot and cold water storage and regulation systems used in buildings, industrial facilities and other places. They are mainly used to improve energy efficiency and reduce energy consumption. High-efficiency water-cooled storage devices play many key roles in the air conditioning process. They can store cold energy at low loads and release cold energy at peak demand, thereby balancing the indoor cooling demand and avoiding uneven or uncomfortable temperatures caused by demand fluctuations. Water-cooled storage devices can be used as emergency cold sources to provide backup cooling capacity to ensure the continuous operation of the air conditioning system in the event of system failure or shutdown of the main refrigeration equipment.

[0003] In the existing, high-efficiency water-cooled storage system, during the heat exchange process with the air, the cooling water in the cold storage water tank flows directly through the air handling unit, and the low temperature of the cold water is transferred to the air through heat exchange, thereby reducing the air temperature and achieving air temperature regulation. In the process of cooling the air, the cooling water absorbs heat from the air during the heat exchange with the air, causing the temperature of the cooling water to increase. When the cooling water flows back to the cold storage water tank, it will again go through the heat exchange process, which will increase the temperature of other cooling water in the cold storage water tank, thereby further consuming resources and reducing the overall cooling efficiency of the system.

[0004] Therefore, a high-efficiency water cooling system is proposed to solve the above-mentioned problems. Summary of the invention

[0005] The object of the present invention is to provide a high-efficiency water cooling system to solve the problem in the background art that the heat exchange process of cooling water will cause the water temperature to rise and reduce the overall cooling efficiency of the system.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a high-efficiency water cold storage system, comprising a mounting plate, a cold storage component for cooling air is arranged on the top of the mounting plate, an energy storage component for cooling water again is arranged near the center of the top of the mounting plate, the energy storage component comprises a heat exchange tank and a fixing column, the outer surface of the fixing column is fixedly connected with a return pipe, a driving motor is fixedly installed on the top of the fixing column by screws, the output shaft of the driving motor is fixedly connected with a rotating shaft, a plurality of propulsion balls are fixedly arranged on the outer surface of the rotating shaft, a plurality of threaded tubes are fixedly sleeved inside the heat exchange tank, a plurality of threaded tubes are provided with positioning grooves near one end of the interior, two slide grooves are arranged on the inner walls of the plurality of positioning grooves, two corresponding slide grooves form a group, an arc-shaped inclined block is slidably connected between the inner walls of each group of the slide grooves, a plurality of telescopic tubes are fixedly installed on the outer surfaces of the arc-shaped inclined blocks, a plurality of springs are arranged on the outer surfaces of the plurality of telescopic tubes, a piston is fixedly connected to one end of the plurality of telescopic tubes, and a stop rod is fixed inside the plurality of threaded tubes.

[0007] Preferably, a mounting frame is fixedly connected to the top of the mounting plate, a storage tank is arranged at the top of the mounting frame near one side edge, an ice-making machine body for making ice from water is arranged at the top of the mounting frame near the other side edge, an input end of the ice-making machine body is fixedly connected to a guide pipe, an output end of the ice-making machine body is fixedly connected to a clearing pipe, an outer surface of the guide pipe is arranged with a solenoid valve, and a liquefaction tank is fixedly connected to the top of the mounting plate.

[0008] Preferably, one end of the guide pipe is fixedly passed through the interior of the storage tank, the bottom end of the clearing pipe is fixedly passed through the interior of the heat exchange tank, the bottom end of the fixed column is fixedly connected to the top of the liquefaction tank, and the bottom end of the rotating shaft movably passes through the interior of the fixed column to the bottom wall.

[0009] Preferably, one end of each of the threaded tubes is connected to the interior of the fixed column, one end of each of the threaded tubes is fixedly passed through the outside of the heat exchange tank and extends to the interior of the cold storage water tank, and one end of each of the springs is fixedly connected to the outer surfaces of each of the arc-shaped inclined blocks.

[0010] Preferably, the outer surfaces of the multiple arc-shaped inclined blocks are movable and penetrate into the interior of the fixed column, the other ends of the multiple springs are respectively fixedly connected to the outer surfaces of the multiple pistons, the multiple pistons are respectively arranged inside the multiple positioning grooves, and a temperature sensor is arranged on the outer surface of the reflux pipe.

[0011] Preferably, the cold storage assembly includes a water storage tank, the bottom of the water storage tank is fixedly connected to the top of the mounting plate, a refrigerator body is arranged on the top of the mounting plate near the rear surface, the input end of the refrigerator body is fixedly connected to a delivery pipe, the top end of the delivery pipe is fixedly passed through the interior of the water storage tank, and the output end of the refrigerator body is fixedly connected to an output pipe.

[0012] Preferably, a cold water tank is fixed to the top of the mounting plate by screws, one end of the output pipe passes through the interior of the cold water tank, a water pump is arranged on the top of the mounting plate, the input end of the water pump is fixedly connected to an inlet pipe, one end of the inlet pipe passes through the interior of the cold water tank, and the output end of the water pump is fixedly connected to an outlet pipe.

[0013] Preferably, a heat exchange assembly is arranged on the top of the mounting plate, and the heat exchange assembly includes a shell, the bottom of the shell is fixedly connected to the top of the mounting plate, one end of the lead-out pipe is fixedly passed through the interior of the shell, and one end of the return pipe is connected to the interior of the shell.

[0014] Preferably, positioning plates are fixedly installed inside the shell near both ends, a plurality of tube sheets are fixedly connected between the inner walls of the two positioning plates, and a plurality of baffles are sleeved between the outer surfaces of the plurality of tube sheets.

[0015] Preferably, the plurality of baffles are arranged inside the shell, the outer surface of the shell is fixedly connected to a first connecting pipe near the top, and the outer surface of the shell is fixedly connected to a second connecting pipe near the bottom.

[0016] Compared with the prior art, the present invention has the following beneficial effects:

[0017] 1. In high temperature weather in summer, in order to effectively reduce peak power consumption, the water source is cooled to the required temperature through the refrigeration machine body and stored in the cold water tank. When the outside air needs to be cooled, the water pump is started to transport the cooling water to the inside of the shell, and at the same time, the external hot air is transported to the inside of multiple tube sheets to achieve heat exchange with the cooling water set outside. Then, under the action of the temperature difference, the cooling water will control the temperature of the hot air, saving resources.

[0018] 2. When the cooling water enters the shell and realizes heat conversion with the air, the heated cooling water enters the fixed column through the return pipe, and the water temperature is detected by the temperature sensor. The cooling water is transported to the corresponding threaded pipe according to the water temperature. The cooling water is cooled to different degrees by the principle that threaded pipes of different lengths have different contact areas with the inner wall of the heat exchange tank, and then transported to the cold storage water tank, thus realizing efficient energy storage of the water cold storage system and solving the problem in the prior art that the water temperature will increase during the heat exchange of the cooling water, reducing the overall refrigeration efficiency of the system.

[0019] 3. During the nighttime water cooling process, the ice maker is started to make water into ice and store it in the storage bin at the center of the heat exchange tank, so as to prepare for the later treatment of the cooling water after heat exchange with the air. When the heat exchange between the ice inside and the water source in the threaded tube is completed, the liquefied water source can move downward through the filter plate under the action of its own gravity and enter the interior of the liquefaction tank, so that the temperature in the heat exchange tank can be kept stable within a certain range, thereby further improving the working efficiency of the heat exchange, and further improving the energy storage efficiency of the water cooling system. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a front perspective view of a high-efficiency water cooling storage system of the present invention;

[0021] Figure 2 A partial three-dimensional diagram of a cold storage component of a high-efficiency water cold storage system of the present invention;

[0022] Figure 3 A partially cutaway perspective view of a heat exchange component of a high-efficiency water storage cooling system of the present invention;

[0023] Figure 4 A partial three-dimensional diagram of a cold storage water tank of a high-efficiency cold water storage system of the present invention;

[0024] Figure 5 A partial three-dimensional diagram of a storage tank of a high-efficiency water cooling storage system of the present invention;

[0025] Figure 6 A three-dimensional diagram of a dredging pipe portion of a high-efficiency water cooling storage system of the present invention;

[0026] Figure 7 A three-dimensional diagram of a return pipe portion of a high-efficiency water cooling storage system of the present invention;

[0027] Figure 8 A partially cutaway perspective view of a fixed column of a high-efficiency water cooling storage system of the present invention;

[0028] Fig. 9 For the present invention Figure 8 Enlarged view of point A in the middle;

[0029] Fig.10 A three-dimensional diagram of the rotating shaft portion of a high-efficiency water cooling storage system of the present invention;

[0030] Fig.11 It is a partially cutaway stereoscopic view of a heat exchange tank of a high-efficiency water cooling storage system of the present invention.

[0031] In the figure:

[0032] 1. Mounting plate; 2. Cold storage assembly; 201. Water storage tank; 202. Refrigerator body; 203. Delivery pipe; 204. Output pipe; 205. Cold storage water tank; 206. Water pump; 207. Inlet pipe; 208. Outlet pipe; 3. Heat exchange assembly; 301. Shell; 302. Positioning plate; 303. Baffle; 304. Tube sheet; 305. First connecting pipe; 306. Second connecting pipe; 4. Energy storage assembly; 401. Mounting frame; 402. Storage tank; 403. Ice maker body; 404, guide pipe; 405, solenoid valve; 406, heat exchange tank; 407, dredging pipe; 408, return pipe; 409, fixing column; 410, driving motor; 411, rotating shaft; 412, propulsion ball; 413, threaded pipe; 414, positioning groove; 415, slide groove; 416, arc-shaped inclined block; 417, telescopic tube; 418, spring; 419, piston; 420, filter plate; 421, liquefied tank; 422, stop rod; 5, temperature sensor. DETAILED DESCRIPTION

[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0034] See also Figure 1-11The present invention provides a technical solution: a high-efficiency water cold storage system, wherein the cold storage component 2 includes a water storage tank 201, the bottom of the water storage tank 201 is fixedly connected to the top of the mounting plate 1, a refrigerator body 202 is arranged on the top of the mounting plate 1 near the rear surface, the input end of the refrigerator body 202 is fixedly connected with a delivery pipe 203, the top of the delivery pipe 203 is fixedly penetrated into the water storage tank 201, the output end of the refrigerator body 202 is fixedly connected with an output pipe 204, a cold storage water tank 205 is fixed on the top of the mounting plate 1 by screws, one end of the output pipe 204 penetrates into the cold storage water tank 205, a water pump 206 is arranged on the top of the mounting plate 1, the input end of the water pump 206 is fixedly connected with an introduction pipe 207, one end of the introduction pipe 207 penetrates into the cold storage water tank 205, and the water pump 206 is fixedly connected with an introduction pipe 207. The output end is fixedly connected with an outlet pipe 208, and a heat exchange component 3 is arranged on the top of the mounting plate 1. The heat exchange component 3 includes a shell 301. The bottom of the shell 301 is fixedly connected to the top of the mounting plate 1. One end of the outlet pipe 208 is fixedly passed through the interior of the shell 301, and one end of the return pipe 408 is connected to the interior of the shell 301. Positioning plates 302 are fixedly installed near both ends of the interior of the shell 301, and a plurality of tube sheets 304 are fixedly connected between the inner walls of the two positioning plates 302. A plurality of baffles 303 are sleeved between the outer surfaces of the plurality of tube sheets 304, and the plurality of baffles 303 are all arranged inside the shell 301. A first connecting pipe 305 is fixedly connected to the outer surface of the shell 301 near the top, and a second connecting pipe 306 is fixedly connected to the outer surface of the shell 301 near the bottom.

[0035] In this embodiment, in the hot summer weather, in order to effectively reduce the peak power consumption, the water chiller is operated during the period of low electricity price to store cold energy, thereby reducing the operating cost. When water cooling is needed to cool the hot air, a proper amount of pure water is first poured into the water storage tank 201 at night, and the refrigerator body 202 is started at the same time. The working principle of the refrigerator body 202 is mainly based on the refrigeration cycle, which uses the thermodynamic principle to transfer heat from the low temperature area to the high temperature area, thereby reducing the temperature of the target area, and opens the stop valve of the water storage tank 201 itself, so that the pure water in the water storage tank 201 enters the interior of the refrigerator body 202 through the delivery pipe 203, so that the water in the water storage tank 201 can enter the interior of the refrigerator body 202. When the chiller body 202 cools the water source to the required temperature, it is output through the output pipe 204 and enters the cold storage water tank 205 for storage, wherein the cold storage water tank 205 is composed of stainless steel, glass wool and galvanized steel plate. When it is necessary to cool the outside air, first connect the outside air inlet duct with the first connecting pipe 305, then connect the outside air outlet duct with the second connecting pipe 306, and start the water pump 206 at the same time. The water pump 206 is an existing mature technology and will not be introduced in detail here. The water pump 206 drives the cooled water source through the inlet pipe 207 into the outlet pipe 208, and finally enters the inside of the shell 301, and is combined with the following Figure 2-Figure 3 As shown, the lead-out pipe 208 is arranged at a position between the two positioning plates 302, so that the cooling water enters between the outer surfaces of the multiple tube sheets 304, and at the same time, the valve on the external air inlet pipe is opened, so that the gas enters the interior of the shell 301 along the first connecting pipe 305, and then enters the interior of the multiple tube sheets 304 through the small holes arranged on the surface of the positioning plate 302, and realizes heat exchange with the cooling water arranged on the outside, and then under the action of the temperature difference, the cooling water will control the temperature of the hot air. When the air is cooled to the required temperature, the valve on the external air inlet pipe is opened, so that the cooled gas is output along the second connecting pipe 306, thereby realizing the regulation of the air temperature and saving resources.

[0036] like Figure 1 and Figure 4-Figure 11 As shown, a mounting frame 401 is fixedly connected to the top of the mounting plate 1, a storage tank 402 is arranged near one side edge of the top of the mounting frame 401, an ice-making machine body 403 for making ice from water is arranged near the other side edge of the top of the mounting frame 401, an input end of the ice-making machine body 403 is fixedly connected to a guide pipe 404, an output end of the ice-making machine body 403 is fixedly connected to a clearing pipe 407, an outer surface of the guide pipe 404 is arranged with a solenoid valve 405, and a liquefaction tank 421 is fixedly connected to the top of the mounting plate 1.

[0037] In this embodiment, during the nighttime water cooling process, the solenoid valve 405 is opened to start the ice maker body 403, wherein the working principle of the ice maker body 403 is as follows: water flows into the ice mold, the refrigerant evaporates in the evaporator, and the water begins to freeze. When the ice cubes are formed to a certain thickness, the ice maker body 403 will automatically stop cooling and then move out through the dredging pipe 407, wherein the inner diameter of the dredging pipe 407 matches the size of the ice cubes, and the ice making process is completed, so that the water source in the storage tank 402 enters the interior of the ice maker body 403 through the guide pipe 404 for solidification treatment. After the solidification is completed, the water source enters the storage bin located at the center of the heat exchange tank 406 through the dredging pipe 407, so as to prepare for the later treatment of the cooling water after heat exchange with the air, wherein the material of the heat exchange tank 406 is the same as that of the cold storage water tank 205.

[0038] like Figure 1-Figure 11As shown, a high-efficiency water cooling system includes a mounting plate 1, a cooling assembly 2 for cooling air is arranged on the top of the mounting plate 1, an energy storage assembly 4 for cooling water is arranged near the center of the top of the mounting plate 1, and the energy storage assembly 4 includes a heat exchange tank 406 and a fixing column 409, the outer surface of the fixing column 409 is fixedly connected with a return pipe 408, the top of the fixing column 409 is fixedly installed with a driving motor 410 by screws, the output shaft of the driving motor 410 is fixedly connected with a rotating shaft 411, and the outer surface of the rotating shaft 411 is fixedly connected with a rotating shaft 411. There are a plurality of propulsion balls 412, a plurality of threaded tubes 413 are fixedly sleeved inside the heat exchange tank 406, a positioning groove 414 is provided near one end of the plurality of threaded tubes 413, the inner walls of the plurality of positioning grooves 414 are provided with two slide grooves 415, and the plurality of slide grooves 415 are each a group of two corresponding ones, and the inner walls of each group of slide grooves 415 are slidably connected with arc-shaped inclined blocks 416, the outer surfaces of the plurality of arc-shaped inclined blocks 416 are fixedly installed with telescopic tubes 417, and the outer surfaces of the plurality of telescopic tubes 417 are provided with springs 41 8. One end of the multiple telescopic tubes 417 is fixedly connected to the piston 419, and the inner part of the multiple threaded tubes 413 is fixed with the blocking rod 422. One end of the guide tube 404 is fixedly penetrated into the inner part of the storage tank 402, and the bottom end of the dredging tube 407 is fixedly penetrated into the inner part of the heat exchange tank 406. The bottom end of the fixed column 409 is fixedly connected to the top of the liquefied tank 421, and the bottom end of the rotating shaft 411 is movable to penetrate into the inner part of the fixed column 409 to the bottom wall. One end of the multiple threaded tubes 413 is connected to the inner part of the fixed column 409. One end of the threaded tube 413 is fixedly connected to the outside of the heat exchange tank 406 and extends to the inside of the cold water tank 205. One end of the multiple springs 418 is fixedly connected to the outer surface of the multiple arc-shaped inclined blocks 416 respectively. The outer surfaces of the multiple arc-shaped inclined blocks 416 are movably connected to the inside of the fixed column 409. The other ends of the multiple springs 418 are fixedly connected to the outer surfaces of the multiple pistons 419 respectively. The multiple pistons 419 are respectively arranged in the inside of the multiple positioning grooves 414. The temperature sensor 5 is arranged on the outer surface of the return pipe 408.

[0039] In this embodiment, after the cooling water enters the shell 301 and realizes heat conversion with the air, the cooling water temperature rises during the heat exchange process. The raised cooling water passes through the return pipe 408. At this time, the temperature sensor 5 is turned on to utilize the property that the current characteristics of the semiconductor material change with the temperature. When the temperature changes, the concentration of carriers also changes, thereby affecting the current flowing through the semiconductor. The sensor calculates the temperature by monitoring the current change and detects the temperature of the water source in the return pipe 408. When the cooling water temperature is too high, the signal is transmitted to the external control system. The cooling water enters the interior of the fixed column 409 through the return pipe 408, and the drive motor 410 is started by the external control system to drive the rotating shaft 411 to rotate. Figure 8As shown, the cross section of the rotating shaft 411 is T-shaped and matches the cross section of the bottom groove of the fixing column 409. The purpose is to limit the rotating shaft 411 while facilitating its rotation. The rotating shaft 411 drives multiple propulsion balls 412 to rotate, so that the propulsion ball 412 located at the bottom rotates to the connection between the threaded tube 413 and the fixing column 409 set at the bottom, wherein the outer surface of the propulsion ball 412 contacts the inner wall of the fixing column 409. When the propulsion ball 412 rotates to one end of the threaded tube 413, the arc-shaped inclined block 416 is squeezed and moves toward the inside of the positioning groove 414, wherein, as shown in FIG. Fig. 9 As shown, the cross section of the positioning groove 414 is in a "convex" shape. The movement of the arc-shaped inclined block 416 drives the telescopic tube 417 to move in the direction of the blocking rod 422, thereby driving the piston 419 to move toward the position of the blocking rod 422. When the piston 419 moves to a position where it is completely in contact with the blocking rod 422, the spring 418 is squeezed and shortened due to the continued squeezing of the propulsion ball 412 until the arc-shaped inclined block 416 is completely moved into the threaded tube 413. At this time, since the piston 419 moves to a position with a larger inner diameter in the positioning groove 414, a certain gap is generated between it and the inner wall of the positioning groove 414, so that the cooling water entering the fixing column 409 passes between the piston 419 and the positioning groove 414 and enters the fixing column 409. Fig.11 The interior of the longer threaded tube 413, since the contact area between the threaded tube 413 and the inner wall of the heat exchange tank 406 is larger, the contact area between the cooling water and the inner wall of the heat exchange tank 406 is increased, making the cooling efficiency greater. The cooled cooling water can flow back to the inside of the cold storage water tank 205 through the outlet position of the threaded tube 413, and the hot air can be cooled again. When the temperature sensor 5 detects that the temperature of the cooling water entering the return pipe 408 is reduced, the signal can be transmitted to the external control system. The threaded tube 413 matching the water temperature is connected with the fixed column 409 through the control system. The cooling water after the heat exchange treatment with the air is graded and then cooled, and then transported to the inside of the cold storage water tank 205, thereby realizing efficient energy storage of the water cold storage system, and solving the problem in the prior art that the water temperature will increase during the heat exchange process of the cooling water, reducing the overall cooling efficiency of the system.

[0040] like Figure 1-Figure 11As shown, a high-efficiency water storage cooling system includes a mounting plate 1, a cooling storage component 2 for cooling air is arranged on the top of the mounting plate 1, an energy storage component 4 for cooling water is arranged near the center of the top of the mounting plate 1, and the energy storage component 4 includes a heat exchange tank 406 and a fixing column 409, the outer surface of the fixing column 409 is fixedly connected with a return pipe 408, the top of the fixing column 409 is fixedly installed with a driving motor 410 by screws, the output shaft of the driving motor 410 is fixedly connected with a rotating shaft 411, and a plurality of propulsion balls 412 are fixed on the outer surface of the rotating shaft 411, and the inner surface of the heat exchange tank 406 is fixedly connected with a return pipe 408. A plurality of threaded tubes 413 are sleeved, and a positioning groove 414 is provided inside the plurality of threaded tubes 413 near one end, and two slide grooves 415 are provided on the inner walls of the plurality of positioning grooves 414, and each corresponding two of the plurality of slide grooves 415 form a group, and an arc-shaped inclined block 416 is slidably connected between the inner walls of each group of slide grooves 415, and telescopic tubes 417 are fixedly installed on the outer surfaces of the plurality of arc-shaped inclined blocks 416, and springs 418 are provided on the outer surfaces of the plurality of telescopic tubes 417, and pistons 419 are fixedly connected to one end of the plurality of telescopic tubes 417, and a blocking rod 422 is fixed inside the plurality of threaded tubes 413.

[0041] In this embodiment, in order to further maintain the cooling effect of the ice in the heat exchange tank 406, after the heat exchange between the ice inside it and the water source in the threaded tube 413 is completed, the liquefied water source can move downward through the filter plate 420 under the action of its own gravity and enter the interior of the liquefaction tank 421, so that the temperature in the heat exchange tank 406 can be kept stable within a certain range, thereby further improving the working efficiency of the heat exchange, and further improving the energy storage efficiency of the water cooling system.

[0042] The use method and working principle of this device: In the hot summer weather, in order to effectively reduce the peak power consumption, the chiller is often operated during the low electricity price period to store cold energy, thereby reducing the operating cost. When water cooling is needed to cool the hot air, at night, first pour a proper amount of pure water into the water tank 201, start the refrigerator body 202, and open the stop valve of the water tank 201 itself, so that the pure water in the water tank 201 enters the refrigerator body 202 through the delivery pipe 203 When the refrigerator body 202 cools the water source to the required temperature, it is output through the output pipe 204 and enters the cold storage water tank 205 for storage. When the outside air needs to be cooled, the outside air inlet pipe is first connected to the first connecting pipe 305, and then the outside air outlet pipe is connected to the second connecting pipe 306. At the same time, the water pump 206 is started. The water pump 206 drives the cooled water source to enter the outlet pipe 208 through the inlet pipe 207, and finally enters the inside of the shell 301, and combined with the following Figure 2 to Figure 3As shown, the outlet pipe 208 is arranged between the two positioning plates 302, so that the cooling water enters between the outer surfaces of the plurality of tube sheets 304, and at the same time, the valve on the external air inlet pipe is opened, so that the gas enters the interior of the shell 301 along the first connecting pipe 305, and then enters the interior of the plurality of tube sheets 304 through the small holes arranged on the surface of the positioning plate 302, and realizes heat exchange with the cooling water arranged outside, and then the cooling water controls the temperature of the hot air under the effect of the temperature difference, and when the air is cooled to the required temperature When the water is cooled, the valve on the external air inlet pipe is opened, so that the cooled gas is output along the second connecting pipe 306. During the water storage process at night, the solenoid valve 405 is opened to start the ice maker body 403, so that the water in the storage tank 402 enters the interior of the ice maker body 403 through the guide pipe 404 for solidification. The solidified water is put into the interior of the dredging pipe 407 through the automatic ice taking device of the ice maker body 403, and then enters the heat exchange tank 406 at the center through the dredging pipe 407. The heat exchange tank 406 is made of the same material as the cold storage water tank 205. When the cooling water enters the shell 301 and realizes heat conversion with the air, the temperature of the cooling water rises during the heat exchange process. The raised cooling water passes through the return pipe 408. At this time, the temperature sensor 5 is turned on to detect the temperature of the water source in the return pipe 408. When the cooling water temperature is too high, a signal is transmitted to the external control system. The cooling water passes through the return pipe 408. 08 enters the interior of the fixed column 409, starts the driving motor 410 through the external control system, drives the rotating shaft 411 to rotate, and the rotating shaft 411 drives the plurality of propulsion balls 412 to rotate, so that the propulsion ball 412 at the bottom rotates to the connection point between the threaded tube 413 and the fixed column 409, wherein the outer surface of the propulsion ball 412 contacts the inner wall of the fixed column 409, and when the propulsion ball 412 rotates to one end of the threaded tube 413, the arc-shaped inclined block 416 is squeezed and moves toward the inside of the positioning groove 414, as shown in FIG. Fig. 9 As shown, the cross section of the positioning groove 414 is in a "convex" shape. The movement of the arc-shaped inclined block 416 drives the telescopic tube 417 to move in the direction of the blocking rod 422, thereby driving the piston 419 to move toward the position of the blocking rod 422. When the piston 419 moves to a position where it is completely in contact with the blocking rod 422, the spring 418 is squeezed and shortened due to the continued squeezing of the propulsion ball 412 until the arc-shaped inclined block 416 is completely moved into the threaded tube 413. At this time, since the piston 419 moves to a position with a larger inner diameter in the positioning groove 414, a certain gap is generated between it and the inner wall of the positioning groove 414, so that the cooling water entering the fixing column 409 passes between the piston 419 and the positioning groove 414 and enters the fixing column 409. Fig.11The interior of the longer threaded tube 413, since the threaded tube 413 has a larger contact area with the inner wall of the heat exchange tank 406, the contact area between the cooling water and the inner wall of the heat exchange tank 406 is increased, making the cooling efficiency greater. The cooled cooling water can flow back to the inside of the cold storage water tank 205 through the outlet position of the threaded tube 413, and the hot air can be cooled again. When the temperature sensor 5 detects that the temperature of the cooling water entering the return pipe 408 is reduced, a signal can be transmitted to the external control system, and the threaded tube 413 matching the water temperature is connected to the fixed column 409 through the control system. By controlling the heat exchange between the cooling water and the air The treated cooling water is graded and cooled, and then transported to the interior of the cold water storage tank 205. In order to further maintain the cooling effect of the ice in the heat exchange tank 406, when the heat exchange between the ice inside it and the water source in the threaded tube 413 is completed, the liquefied water source can move downward through the filter plate 420 under the action of its own gravity and enter the interior of the liquefaction tank 421, so that the temperature in the heat exchange tank 406 can be kept stable within a certain range, wherein the external control system is electrically connected to the refrigerator body 202, the water pump 206, the ice maker body 403, the solenoid valve 405, the drive motor 410 and the temperature sensor 5.

[0043] The wiring diagram of the refrigerator body 202, the water pump 206, the ice maker body 403, the solenoid valve 405, the drive motor 410 and the temperature sensor 5 in the present invention is common knowledge in the art, and its working principle is a well-known technology. The model is selected according to the actual use, so the control method and wiring arrangement of the refrigerator body 202, the water pump 206, the ice maker body 403, the solenoid valve 405, the drive motor 410 and the temperature sensor 5 are no longer explained in detail.

[0044] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A high-efficiency water cold storage system, comprising a mounting plate (1), a cold storage component (2) for air cooling being arranged on the top of the mounting plate (1); Features: An energy storage component (4) for cooling water is arranged near the center of the top of the mounting plate (1), the energy storage component (4) comprising a heat exchange tank (406) and a fixing column (409), the outer surface of the fixing column (409) being fixedly connected to a return pipe (408), the top of the fixing column (409) being fixedly mounted with a drive motor (410) by means of screws, the output shaft of the drive motor (410) being fixedly connected to a rotating shaft (411), the outer surface of the rotating shaft (411) being fixed with a plurality of propulsion balls (412), the interior of the heat exchange tank (406) being fixedly sleeved with a plurality of threaded tubes (413), the plurality of threaded tubes (413) being arranged to rotate in a rotating manner. ) are provided with positioning grooves (414) near one end thereof, the inner walls of the plurality of positioning grooves (414) are provided with two slide grooves (415), the plurality of slide grooves (415) are grouped into two corresponding ones, an arc-shaped inclined block (416) is slidably connected between the inner walls of each group of the slide grooves (415), a telescopic tube (417) is fixedly mounted on the outer surfaces of the plurality of arc-shaped inclined blocks (416), a spring (418) is provided on the outer surfaces of the plurality of telescopic tubes (417), one end of the plurality of telescopic tubes (417) is fixedly connected with a piston (419), and a blocking rod (422) is fixedly mounted inside the plurality of threaded tubes (413); The top of the mounting plate (1) is fixedly connected to a mounting frame (401); a storage tank (402) is arranged near one side edge of the top of the mounting frame (401); an ice-making machine body (403) for making ice from water is arranged near the other side edge of the top of the mounting frame (401); an input end of the ice-making machine body (403) is fixedly connected to a guide pipe (404); an output end of the ice-making machine body (403) is fixedly connected to a dredging pipe (407); an electromagnetic valve (405) is arranged on the outer surface of the guide pipe (404); and a liquefaction tank (421) is fixedly connected to the top of the mounting plate (1); One end of the guide pipe (404) is fixedly inserted into the interior of the storage tank (402), the bottom end of the dredging pipe (407) is fixedly inserted into the interior of the heat exchange tank (406), the bottom end of the fixed column (409) is fixedly connected to the top of the liquefaction tank (421), and the bottom end of the rotating shaft (411) is movably inserted into the interior of the fixed column (409) to the bottom wall; One end of each of the plurality of threaded tubes (413) is connected to the interior of the fixing column (409), one end of each of the plurality of threaded tubes (413) is fixedly passed through the exterior of the heat exchange tank (406) and extends to the interior of the cold storage water tank (205), and one end of each of the plurality of springs (418) is fixedly connected to the outer surfaces of the plurality of arc-shaped inclined blocks (416); The outer surfaces of the plurality of arc-shaped inclined blocks (416) are movable and penetrate into the interior of the fixed column (409); the other ends of the plurality of springs (418) are respectively fixedly connected to the outer surfaces of the plurality of pistons (419); the plurality of pistons (419) are respectively arranged inside the plurality of positioning grooves (414); and a temperature sensor (5) is arranged on the outer surface of the reflux pipe (408).

2. The high-efficiency water cooling system according to claim 1 is characterized in that: The cold storage component (2) comprises a water storage tank (201), the bottom of the water storage tank (201) is fixedly connected to the top of the mounting plate (1), a refrigerator body (202) is arranged at the top of the mounting plate (1) near the rear surface, the input end of the refrigerator body (202) is fixedly connected to a delivery pipe (203), the top end of the delivery pipe (203) is fixedly penetrated into the interior of the water storage tank (201), and the output end of the refrigerator body (202) is fixedly connected to an output pipe (204).

3. The high-efficiency water cooling system according to claim 2 is characterized in that: A cold storage water tank (205) is fixed to the top of the mounting plate (1) by means of screws, one end of the output pipe (204) penetrates into the interior of the cold storage water tank (205), a water pump (206) is arranged on the top of the mounting plate (1), an input end of the water pump (206) is fixedly connected to an introduction pipe (207), one end of the introduction pipe (207) penetrates into the interior of the cold storage water tank (205), and an output end of the water pump (206) is fixedly connected to an outlet pipe (208).

4. The high-efficiency water cooling system according to claim 3 is characterized in that: A heat exchange component (3) is arranged on the top of the mounting plate (1), and the heat exchange component (3) comprises a shell (301), the bottom of the shell (301) is fixedly connected to the top of the mounting plate (1), one end of the lead-out pipe (208) is fixedly passed through the interior of the shell (301), and one end of the return pipe (408) is connected to the interior of the shell (301).

5. The high-efficiency water cooling system according to claim 4 is characterized in that: Positioning plates (302) are fixedly installed near both ends of the shell (301), a plurality of tube sheets (304) are fixedly connected between the inner walls of the two positioning plates (302), and a plurality of baffles (303) are sleeved between the outer surfaces of the plurality of tube sheets (304).

6. The high-efficiency water cooling system according to claim 5, characterized in that: The plurality of baffles (303) are arranged inside the shell (301); a first connecting pipe (305) is fixedly connected to the outer surface of the shell (301) near the top; and a second connecting pipe (306) is fixedly connected to the outer surface of the shell (301) near the bottom.

Citation Information

Patent Citations

  • Non-external-power unattended equipment room hybrid cooling system

    CN111237933A

  • Environment-friendly intelligent energy storage air conditioner

    CN115507476A