A signal transmission call system for boiler water vapor monitoring

By designing a signal transmission call system including a monitoring bearing mechanism, a water vapor trigger mechanism, a closed pressure relief mechanism and a collection and delivery mechanism, the problem of insufficient independence and detection accuracy of boiler water vapor monitoring in the prior art is solved, and automated monitoring and real-time control of boiler water vapor are realized.

CN119289350BActive Publication Date: 2025-02-28ANHUI SPECIAL EQUIP INSPECTION INST
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411803046.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-10
Publication Date
2025-02-28
Estimated Expiration
2044-12-10

AI Technical Summary

Technical Problem

The existing boiler water vapor monitoring technology cannot achieve the interconnection between boiler monitoring and water vapor detection, resulting in the boiler pressure relief process and the water vapor detection process being independent of the water vapor detection process, the detection data is not accurate, and real-time feedback and accurate detection cannot be achieved through the joint application of multiple sensors.

Method used

A signal transmission call system is designed, including a monitoring bearer mechanism, a water vapor trigger mechanism, a closed pressure relief mechanism and a collection and delivery mechanism. Through the collaborative work of these institutions, real-time monitoring and automated control of boiler water vapor is achieved, ensuring the accuracy and real-time nature of water vapor detection.

Benefits of technology

It realizes automatic control of boiler water vapor monitoring, improves detection accuracy and real-time performance, and ensures timely feedback and management of boiler operating conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The present invention discloses a signal transmission call system for boiler water vapor monitoring, and relates to the technical field of water vapor monitoring. In the present invention, pressure sensors are installed at both ends of the first arc-shaped channel, a pressure sensor is installed inside the radial installation groove, a movable pressure relief pipe is installed on one side of the radial pressure relief groove, and a second arc-shaped channel coaxial with the monitoring bearing ring is arranged on one side of the movable pressure relief pipe. A missing gear and a switching pusher are fixed on the side surface of the power output shaft, and the switching pusher slides inside the second arc-shaped channel. A collection and transportation component is installed on one side of the power output shaft, and the water vapor condensate is transported to various detection equipment through the collection and transportation component for detection and analysis of conductivity, pH value, ammonia nitrogen and total nitrogen. In the present invention, after the pressure relief is completed, the vertical blocking rod returns to the initial position, and the condensate in the liquid storage cylinder is dispersed by various detection connectors to flow into various detection equipment for detection, thereby realizing the automatic real-time collection and detection of condensate during the pressure relief process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of water vapor monitoring, and in particular relates to a signal transmission calling system for boiler water vapor monitoring. Background Art

[0002] Boilers are widely used in various fields such as power plants. Boiler users should regularly test and analyze the water vapor quality in order to analyze and judge the overall working condition of the boiler. This requires the collection of water vapor during the use of the boiler. The general method is to directly collect the boiler water produced by the boiler for testing and analysis. The main test indicators include conductivity, pH value, ammonia nitrogen and total nitrogen.

[0003] In the prior art, boiler cooling water is generally collected directly from the condensate pool, and then the collected boiler cooling water is transported to the detection equipment to complete the detection and analysis of various indicators. In order to more directly and accurately reflect the quality of boiler water vapor, it is necessary to collect cooling water for detection at regular intervals. The collected cooling water all comes from the condensate pool.

[0004] However, the above boiler water vapor monitoring process cannot realize the mutual linkage between boiler monitoring and water vapor detection, resulting in the boiler pressure relief process and the boiler water vapor detection process being completely independent, and directly collecting cooling water from the condensate pool easily leads to low accuracy of detection data, and it is impossible to realize the water vapor detection process in the process of completing the boiler water vapor pressure early warning control through the joint application of multiple sensors, which is not conducive to real-time feedback of the boiler's operating status. To this end, we provide a signal transmission call system for boiler water vapor monitoring to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to provide a signal transmission call system for boiler water vapor monitoring, which solves the problems in the above-mentioned background technology through the specific structural design of the monitoring bearing mechanism, water vapor triggering mechanism, closed pressure relief mechanism and collection and transportation mechanism.

[0006] In order to solve the above technical problems, the present invention is achieved through the following technical solutions:

[0007] The present invention is a signal transmission call system for boiler water vapor monitoring, comprising a monitoring bearing mechanism, the monitoring bearing mechanism comprising a monitoring bearing ring, a first arc-shaped channel coaxial with the monitoring bearing ring is provided on the circumferential side of the monitoring bearing ring, a first pressure sensor is installed at the lower end of the first arc-shaped channel, and a second pressure sensor is installed at the upper end of the first arc-shaped channel; a water vapor trigger mechanism, the water vapor trigger mechanism is fixedly installed on one side of the monitoring bearing ring, the water vapor trigger mechanism comprises an elastically resettable trigger part, an axially extending water vapor pressure relief hole is provided on the surface of the trigger part; a closed pressure relief mechanism, the closed pressure relief mechanism is slidably arranged inside the first arc-shaped channel and the two are coaxially arranged, the closed pressure relief mechanism comprises a radial mounting groove and a radial pressure relief groove, the radial mounting groove is arranged above the radial pressure relief groove and both are radially arranged toward the monitoring bearing ring, a third pressure sensor is installed inside the radial mounting groove, and the A radially movable pressure relief pipe is installed on one side of the radial pressure relief groove, the movable pressure relief pipe is connected to the radial pressure relief groove and the two are coaxially arranged, and a second arc channel coaxial with the monitoring load-bearing ring is arranged on one side of the movable pressure relief pipe; and a collection and conveying mechanism, the collection and conveying mechanism is fixedly installed inside the monitoring load-bearing ring, the collection and conveying mechanism includes a power output shaft coaxial with the monitoring load-bearing ring, and the circumferential side surfaces of the power output shaft are respectively fixedly provided with missing gears and switching pushers, and the switching pushers are slidably fitted inside the second arc channel, and a collection and conveying component is installed on one side of the power output shaft, and the collected water vapor condensate is conveyed to each detection equipment through the collection and conveying component, and the detection equipment is used to detect various indicators of water vapor respectively, and the water vapor detection indicators include conductivity, pH value, ammonia nitrogen and total nitrogen, one side of the collection and conveying component is used to connect with the movable pressure relief pipe, and the other side of the collection and conveying component is used to connect with the detection equipment;

[0008] A first meshing portion that can be elastically reset is arranged below the missing gear, and a reverse thrust rod is fixedly arranged at one end of the first meshing portion, which slides through the monitoring bearing ring and extends to the inside of the water vapor trigger mechanism, and the reverse thrust rod is used to realize the horizontal reciprocating movement of the trigger portion; the trigger portion is pressed against the third pressure sensor by the action of the boiler water vapor, and when the pressure value monitored by the third pressure sensor reaches the set high pressure value, the controller receives the pressure signal and controls the first alarm to sound an alarm, and the control terminal receives the alarm signal and sends a pressure relief command to the controller, and drives the reverse thrust rod to push the trigger portion through the rotation of the missing gear. When the trigger portion is out of the radial mounting groove, By switching the pushing member to push the closed pressure relief mechanism, the radial pressure relief groove is aligned with the trigger part, and the movable pressure relief pipe is controlled to move to achieve plug-in connection with the collection and transportation component. The water vapor released from the pressure relief is discharged into the collection and transportation component through the water vapor pressure relief hole to achieve condensation. When the pressure value monitored by the third pressure sensor reaches the set low pressure value, the controller receives the pressure signal and controls the first alarm to sound the alarm again. The control terminal receives the alarm signal and sends a blocking instruction to the controller. By switching the reverse rotation of the pushing member, the radial installation groove is aligned with the trigger part, and the trigger part is reinserted into the radial installation groove to achieve blocking of the water vapor pressure relief hole.

[0009] The present invention is further configured such that the monitoring bearing mechanism also includes a monitoring bearing frame, the monitoring bearing ring is fixedly arranged inside the monitoring bearing frame, a first mounting opening is opened at the top of the monitoring bearing ring, a second mounting opening is opened at the bottom of the monitoring bearing ring, two extension mounting seats are fixedly arranged on the outer wall of the monitoring bearing ring, the first pressure sensor and the second pressure sensor are respectively installed on the corresponding extension mounting seats, and a first guide rod is fixedly arranged on the inner wall of the monitoring bearing ring.

[0010] The present invention is further configured such that the water vapor trigger mechanism also includes a water vapor guide pipe fixedly mounted on the monitoring support frame, the water vapor guide pipe fixedly mounted on the boiler exhaust pipe, the water vapor guide pipe is symmetrically and fixedly provided with hollow mounting parts connected thereto on the circumferential side surfaces, a piston plate is slidably provided between the two hollow mounting parts, a first elastic part connected to the piston plate is provided inside the hollow mounting part, the trigger part is fixedly provided on a side of the piston plate away from the first elastic part, the water vapor pressure relief hole passes through the piston plate, and one side of the curved surface of the hollow mounting part is attached to the outer wall of the monitoring support ring.

[0011] The present invention is further configured such that the closed pressure relief mechanism also includes an arc-shaped sealing plate slidably arranged inside the first arc-shaped channel, the curved end of the water vapor diversion pipe is fitted on the outer wall of the arc-shaped sealing plate, the peripheral side surfaces of the arc-shaped sealing plate are respectively fixedly provided with a first inner extension seat and a second inner extension seat, the radial mounting groove is provided on the first inner extension seat, the radial pressure relief groove is provided on the second inner extension seat, one side of the first inner extension seat is connected with an arc-shaped mounting plate through a support frame, the second arc-shaped channel is provided on the peripheral side surface of the arc-shaped mounting plate, and an orifice sealing plug adapted to the water vapor pressure relief hole is fixedly provided inside the radial mounting groove.

[0012] The present invention is further configured as follows: both ends of the arc-shaped sealing plate are fixedly provided with an extended trigger plate, a magnetic generating seat is fixedly installed on the surface of the second inner extension seat, a fixed pressure relief pipe connected with the radial pressure relief groove is fixedly provided on the surface of the magnetic generating seat, the movable pressure relief pipe is slidably sleeved on the fixed pressure relief pipe, a magnetic ring is slidably sleeved on the fixed pressure relief pipe, the electromagnet installed on the magnetic generating seat and the permanent magnet installed on the magnetic ring magnetically repel each other, a first moving rod is slidably provided on the ear seat fixed on the peripheral side of the fixed pressure relief pipe, one end of the first moving rod is fixed on the magnetic ring, and a connecting disk fixed at the other end of the first moving rod is connected to the corresponding ear seat by a second elastic member.

[0013] The present invention is further configured such that the movable pressure relief tube is connected to the magnetic ring by an axial fixing rod, a support ring is fixedly provided on the peripheral side of the movable pressure relief tube, an axial sealing strip is fixedly provided on one side of the support ring, an open / close control ball is rotatably installed inside the movable pressure relief tube, an open / close gear is installed on the end of the driving shaft fixed on the open / close control ball, and the curved end of the axial sealing strip is fitted on the peripheral side of the driving shaft.

[0014] The present invention is further configured as follows: a horizontal support seat is installed at the center position of the monitoring support ring, the horizontal support seat and the monitoring support ring are connected by a fixed plate, the power output shaft is rotatably arranged on the monitoring support frame, the output end of the power motor installed on the monitoring support frame is connected to the power output shaft, and the power output shaft is rotatably arranged inside the horizontal support seat; the collection and transportation assembly includes a liquid storage cylinder fixedly installed on the horizontal support seat, a refrigeration cylinder coaxial with the liquid storage cylinder is fixedly installed inside the first mounting port, a spiral condenser tube connected to the liquid storage cylinder is arranged inside the refrigeration tube, and the upper port of the spiral condenser tube passes through the refrigeration tube.

[0015] The present invention is further configured as follows: two vertical mounting plates are symmetrically fixedly arranged on the top of the horizontal support seat, a second guide rod is fixedly arranged between the vertical mounting plates, the output end of the telescopic cylinder mounted on one of the vertical mounting plates is connected to a second meshing portion, the second meshing portion is used to drive the rotation of the opening and closing gear, the second meshing portion is slidably sleeved on the second guide rod, the peripheral side surface of the liquid storage cylinder is connected to a water vapor input pipe located below the second meshing portion, and one end of the water vapor input pipe is provided with an inlet channel adapted to the axial sealing strip.

[0016] The present invention is further configured such that a movable plate slidably sleeved on the first guide rod is fixedly provided at the other end of the first meshing portion, a second movable rod slidably matched with a monitoring supporting ring is fixedly provided on one side of the movable plate, a connecting disk fixed at the end of the second movable rod is connected to the monitoring supporting ring by a third elastic member, a first conveying pipe connected thereto is fixedly provided at the bottom of the liquid storage cylinder, a second conveying pipe is connected thereto on the peripheral side of the first conveying pipe, a third conveying pipe connected thereto is fixedly provided at one end of the second conveying pipe, and a plurality of detection connectors are installed on the peripheral side of the third conveying pipe; a third meshing portion is slidably provided on the inner wall of the monitoring supporting frame, a lifting gear meshing with the third meshing portion is fixedly provided on the peripheral side of the power output shaft, a vertical blocking rod is slidably provided inside the first conveying pipe, and the vertical blocking rod is fixedly connected to the third meshing portion.

[0017] The present invention has the following beneficial effects:

[0018] 1. The present invention uses the action of boiler water vapor to make the trigger part press against the third pressure sensor. When the pressure value monitored by the third pressure sensor reaches the set high pressure value, the controller receives the pressure signal and controls the first alarm to sound an alarm. The control terminal receives the alarm signal and sends a pressure relief command to the controller. The reverse push rod is driven to push the trigger part by the rotation of the missing gear. When the trigger part is separated from the radial mounting groove, the radial pressure relief groove is aligned with the trigger part by the pushing action of the switching pusher on the closed pressure relief mechanism. The movable pressure relief pipe is controlled to move to achieve plug-in connection with the collection and conveying component. The water vapor released from the pressure relief is discharged into the collection and conveying component through the water vapor pressure relief hole to achieve condensation. When the pressure value monitored by the third pressure sensor reaches the set low pressure value, the controller receives the pressure signal and controls the first alarm to sound an alarm again. The control terminal receives the alarm signal and sends a blocking command to the controller. The radial mounting groove is aligned with the trigger part by the reverse rotation of the switching pusher. The trigger part is reinserted into the radial mounting groove to achieve blocking of the water vapor pressure relief hole, thereby achieving automatic control of boiler water vapor monitoring.

[0019] 2. In the present invention, when the movable pressure relief pipe moves to align with the water vapor diversion pipe, the electromagnet is energized to generate magnetic repulsion force on the magnetic ring, so that the magnetic ring slides along the fixed pressure relief pipe, and the first moving rod that moves synchronously with the magnetic ring drives the second elastic member to be stretched, thereby driving the movable pressure relief pipe to move along the fixed pressure relief pipe toward the axial direction of the monitoring bearing ring until the driving shaft on the opening and closing control ball slides into the inside of the introduction channel and fits on the inner end of the introduction channel. At this time, one end of the movable pressure relief pipe is horizontally inserted into the water vapor input pipe, and the axial sealing strip just fits in the inside of the introduction channel. The support ring It just presses tightly against the end of the water vapor input pipe, and the magnetic ring presses against the fourth pressure sensor on the ear seat, and then the second meshing part is driven to slide along the second guide rod through the telescopic cylinder, and the opening and closing gear is driven to rotate 90° under the action of the second meshing part. At this time, the opening and closing control ball releases the blockage of the open end of the movable pressure relief pipe, and then the water vapor in the water vapor diversion pipe enters the fixed pressure relief pipe through the radial pressure relief groove, and then enters the water vapor input pipe through the movable pressure relief pipe, and finally flows upward from the liquid storage tube into the spiral condenser tube for condensation, and the generated condensed water flows back to the liquid storage tube along the spiral condenser tube for storage.

[0020] 3. In the process of controlling the missing gear to rotate clockwise, the lifting gear that rotates synchronously with the missing gear drives the third meshing part to move upward, and the vertical blocking rod is driven to slide upward along the first delivery pipe through the upwardly moved third meshing part. During the pressure relief process, the first delivery pipe can be blocked by the vertical blocking rod, so that the liquid storage tube and the second delivery pipe are in an isolated state. After the pressure relief is completed, the entire closed pressure relief mechanism is controlled to rotate counterclockwise back to the initial position. At this time, the upper end of the vertical blocking rod moves down again to a position close to the bottom of the second delivery pipe. Subsequently, the condensed water in the liquid storage tube passes through the first delivery pipe and the second delivery pipe in turn and flows into the third delivery pipe, and then flows into various detection devices through various detection connectors for detection. In this way, the automatic real-time collection and detection of condensed water is achieved during the pressure relief process, thereby improving the accuracy of boiler water vapor detection.

[0021] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0023] Figure 1 The schematic diagram is a structural diagram of a signal transmission call system for boiler water vapor monitoring.

[0024] Figure 2 for Figure 1 The structural front view.

[0025] Figure 3 for Figure 1 Schematic diagram of part of the structure.

[0026] Figure 4 It is a schematic diagram of the structure of the monitoring bearing mechanism in the present invention.

[0027] Figure 5 It is a schematic structural diagram of the water vapor trigger mechanism in the present invention.

[0028] Figure 6 It is a structural cross-sectional view of the water vapor trigger mechanism in the present invention.

[0029] Figure 7 It is a structural schematic diagram of the closed pressure relief mechanism in the present invention.

[0030] Figure 8 for Figure 7 A magnified view of the local structure at point A.

[0031] Fig. 9 for Figure 7 Rear view of the structure.

[0032] Fig.10 for Figure 7 Side view of the structure.

[0033] Fig.11 It is a structural schematic diagram of the collection and conveying mechanism in the present invention.

[0034] Fig.12 for Fig.11 A magnified view of the local structure at point B in the middle.

[0035] Fig.13 for Fig.11 The structural front view.

[0036] Fig.14 This is a control diagram of the signal transmission call system for boiler water vapor monitoring in the present invention.

[0037] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0038] 1-monitoring bearing mechanism, 101-monitoring bearing ring, 102-first arc channel, 103-first pressure sensor, 104-second pressure sensor, 105-monitoring bearing frame, 106-first mounting port, 107-second mounting port, 108-extension mounting seat, 109-first guide rod, 2-water vapor triggering mechanism, 201-triggering part, 202-water vapor pressure relief hole, 203-water vapor diversion pipeline, 204-hollow mounting part, 205-piston plate, 206-first Elastic member, 207-through-port, 3-sealed pressure relief mechanism, 301-radial mounting groove, 302-radial pressure relief groove, 303-third pressure sensor, 304-active pressure relief pipe, 305-second arc-shaped channel, 306-arc-shaped blocking plate, 307-first inner extension seat, 308-second inner extension seat, 309-support frame, 310-arc-shaped mounting plate, 311-orifice sealing plug, 312-extension trigger plate, 313-magnetic generating seat, 314-fixed pressure relief pipe, 315- Magnetic ring, 316-electromagnet, 317-first moving rod, 318-second elastic member, 319-axial fixing rod, 320-support ring, 321-axial sealing strip, 322-opening and closing control ball, 323-opening and closing gear, 4-collection and conveying mechanism, 401-power output shaft, 402-missing gear, 403-switching pusher, 404-first meshing part, 405-reverse push rod, 406-horizontal support seat, 407-fixing plate, 408-liquid storage cylinder, 409-refrigeration Cylinder, 410-spiral condenser, 411-vertical mounting plate, 412-second guide rod, 413-telescopic cylinder, 414-second meshing part, 415-water vapor input pipe, 416-introduction channel, 417-moving plate, 418-second moving rod, 419-third elastic member, 420-first delivery pipe, 421-second delivery pipe, 422-third delivery pipe, 423-detection connector, 424-third meshing part, 425-lifting gear, 426-vertical blocking rod. DETAILED DESCRIPTION

[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] For specific embodiment 1, please refer to Figure 1-14The present invention is a signal transmission call system for boiler water vapor monitoring, comprising a monitoring bearing mechanism 1, a water vapor trigger mechanism 2, a closed pressure relief mechanism 3 and a collection and transportation mechanism 4; the monitoring bearing mechanism 1 comprises a monitoring bearing ring 101, a first arc-shaped channel 102 coaxial with the monitoring bearing ring 101 is provided on the side surface thereof, a first pressure sensor 103 is installed at the lower end of the first arc-shaped channel 102, and a second pressure sensor 104 is installed at the upper end of the first arc-shaped channel 102; the water vapor trigger mechanism 2 is fixedly installed on one side of the monitoring bearing ring 101, the water vapor trigger mechanism 2 comprises a trigger part 201 which can be elastically reset, and an axially extending water vapor pressure relief hole 202 is provided on the surface of the trigger part 201; the closed pressure relief mechanism 3 is slidably arranged on the first arc-shaped channel 102; Inside the channel 102, the two are coaxially arranged, the closed pressure relief mechanism 3 includes a radial installation groove 301 and a radial pressure relief groove 302, the radial installation groove 301 is arranged above the radial pressure relief groove 302, and both are arranged radially toward the monitoring bearing ring 101, a third pressure sensor 303 is installed inside the radial installation groove 301 (the first pressure sensor 103, the second pressure sensor 104 and the third pressure sensor 303 are used in coordination to realize water vapor detection and early warning in the boiler), a radially movable pressure relief pipe 304 is installed on one side of the radial pressure relief groove 302, the movable pressure relief pipe 304 is connected to the radial pressure relief groove 302, and the two are coaxially arranged, and a second arc-shaped channel 305 coaxial with the monitoring bearing ring 101 is arranged on one side of the movable pressure relief pipe 304;

[0041] The collecting and conveying mechanism 4 is fixedly installed inside the monitoring bearing ring 101. The collecting and conveying mechanism 4 includes a power output shaft 401 coaxial with the monitoring bearing ring 101. The side surfaces of the power output shaft 401 are fixedly provided with a missing gear 402 and a switching pusher 403. The switching pusher 403 is slidably fitted inside the second arc-shaped channel 305. A collecting and conveying assembly is installed on one side of the power output shaft 401 (the collected water vapor condensate is transported to various detection devices through the collecting and conveying assembly, and the detection devices are used to detect various indicators of water vapor, and the water vapor detection indicators include conductivity, pH value, ammonia nitrogen and total nitrogen). One side of the collecting and conveying assembly is used to connect with the movable pressure relief pipe 304, and the other side of the collecting and conveying assembly is used to connect with the detection device; a first meshing portion 404 that can be elastically reset is provided below the missing gear 402, and a reverse thrust rod 405 that slides through the monitoring bearing ring 101 and extends to the inside of the water vapor trigger mechanism 2 is fixedly provided at one end of the first meshing portion 404, and the reverse thrust rod 405 is used to realize the horizontal reciprocating motion of the trigger portion 201;

[0042] The trigger part 201 is pressed against the third pressure sensor 303 by the action of boiler water vapor. When the pressure value monitored by the third pressure sensor 303 reaches the set high pressure value, the controller receives the pressure signal and controls the first alarm to sound an alarm. The control terminal receives the alarm signal and sends a pressure relief command to the controller. The reverse thrust rod 405 is driven to push the trigger part 201 by the rotation of the missing gear 402. When the trigger part 201 is separated from the radial mounting groove 301, the radial pressure relief groove 302 is aligned with the trigger part 201 by the pushing action of the switching pusher 403 on the closed pressure relief mechanism 3, and the activity is controlled. The pressure relief pipe 304 moves to achieve plug-in connection with the collection and transportation component, and the water vapor released from the pressure relief pipe is discharged into the collection and transportation component through the water vapor pressure relief hole 202 to achieve condensation. When the pressure value monitored by the third pressure sensor 303 reaches the set low pressure value, the controller receives the pressure signal and controls the first alarm to sound the alarm again. The control terminal receives the alarm signal and sends a blocking instruction to the controller. By switching the reverse rotation of the push member 403, the radial mounting groove 301 is aligned with the trigger part 201, and the trigger part 201 is reinserted into the radial mounting groove 301 to achieve the blocking of the water vapor pressure relief hole 202.

[0043] In this embodiment of the present invention, the monitoring bearing mechanism 1 also includes a monitoring bearing frame 105, a monitoring bearing ring 101 is fixedly arranged inside the monitoring bearing frame 105, a first mounting opening 106 is opened at the top of the monitoring bearing ring 101, a second mounting opening 107 is opened at the bottom of the monitoring bearing ring 101, two extension mounting seats 108 are fixedly arranged on the outer wall of the monitoring bearing ring 101, the first pressure sensor 103 and the second pressure sensor 104 are respectively installed on the corresponding extension mounting seats 108, and a first guide rod 109 is fixedly arranged on the inner wall of the monitoring bearing ring 101. Its specific structure is as follows: Figure 4 As shown;

[0044] The water vapor trigger mechanism 2 also includes a water vapor guide pipe 203 fixedly mounted on the monitoring carrier frame 105, the water vapor guide pipe 203 is fixedly mounted on the boiler exhaust pipe, and hollow mounting parts 204 connected thereto are symmetrically fixedly arranged on the circumferential side of the water vapor guide pipe 203, a piston plate 205 is slidably arranged between the two hollow mounting parts 204, a first elastic member 206 connected to the piston plate 205 is arranged inside the hollow mounting part 204, the trigger part 201 is fixedly arranged on the side of the piston plate 205 away from the first elastic member 206, the water vapor pressure relief hole 202 penetrates the piston plate 205, and one side of the curved surface of the hollow mounting part 204 is attached to the outer wall of the monitoring carrier ring 101, and its specific structure is as follows Figure 5 and Figure 6As shown, when the water vapor pressure in the boiler gradually increases, the squeezing force of the trigger unit 201 on the third pressure sensor 303 will gradually increase. In the present application, the pressure range set by the controller includes a low pressure value and a high pressure value, both of which can trigger the first alarm to sound an alarm.

[0045] In this embodiment of the present invention, the closed pressure relief mechanism 3 also includes an arc-shaped sealing plate 306 slidably arranged inside the first arc-shaped channel 102, and the curved end of the water vapor guide pipe 203 is fitted on the outer wall of the arc-shaped sealing plate 306 (so that the end of the water vapor guide pipe 203 can be sealed by the arc-shaped sealing plate 306), and the first inner extension seat 307 and the second inner extension seat 308 are fixedly arranged on the side surface of the arc-shaped sealing plate 306, the radial installation groove 301 is opened on the first inner extension seat 307, and the radial pressure relief groove 302 is opened on the first inner extension seat 307. On the second inner extension seat 308, one side of the first inner extension seat 307 is connected to an arc-shaped mounting plate 310 through a support frame 309, and the second arc-shaped channel 305 is opened on the side surface of the arc-shaped mounting plate 310. A hole sealing plug 311 adapted to the water vapor pressure relief hole 202 is fixedly arranged inside the radial mounting groove 301. When the trigger part 201 is matched to the inside of the radial mounting groove 301, the hole sealing plug 311 is inserted into the corresponding water vapor pressure relief hole 202, so that each water vapor pressure relief hole 202 on the trigger part 201 can be sealed.

[0046] In this embodiment of the present invention, both ends of the arc-shaped blocking plate 306 are fixedly provided with an extension trigger plate 312, a magnetic generating seat 313 is fixedly installed on the surface of the second inner extension seat 308 (the second inner extension seat 308 can be made of heat-insulating material), and a fixed pressure relief pipe 314 connected to the radial pressure relief groove 302 is fixedly provided on the surface of the magnetic generating seat 313 (to ensure that the water vapor in the water vapor guide pipe 203 can enter the fixed pressure relief pipe 314 through the radial pressure relief groove 302), and the movable pressure relief pipe 304 is slidably sleeved on the fixed pressure relief pipe 314. 4, a magnetic ring 315 is slidably sleeved on the fixed pressure relief pipe 314, the electromagnet 316 installed on the magnetic generating seat 313 and the permanent magnet installed on the magnetic ring 315 magnetically repel each other, a first moving rod 317 is slidably provided on the ear seat fixed on the side surface of the fixed pressure relief pipe 314, one end of the first moving rod 317 is fixed on the magnetic ring 315, and the connecting disk fixed at the other end of the first moving rod 317 is connected to the corresponding ear seat through a second elastic member 318, and a fourth pressure sensor is installed on the surface of the ear seat on the fixed pressure relief pipe 314.

[0047] In this embodiment of the present invention, the movable pressure relief pipe 304 is connected to the magnetic ring 315 through an axial fixing rod 319, a support ring 320 is fixedly provided on the peripheral side of the movable pressure relief pipe 304, an axial sealing strip 321 is fixedly provided on one side of the support ring 320, an opening and closing control ball 322 is rotatably installed inside the movable pressure relief pipe 304 (the open end of the movable pressure relief pipe 304 in the initial state is blocked by the opening and closing control ball 322), an opening and closing gear 323 is installed on the end of the driving shaft fixed on the opening and closing control ball 322, and the curved end of the axial sealing strip 321 is fitted on the peripheral side of the driving shaft. When the movable pressure relief pipe 304 moves to the opposite side, the opening and closing gear 323 is installed on the end of the driving shaft fixed on the opening and closing control ball 322. When the quasi-water vapor diversion pipe 203 is in contact with the electromagnet 316, a magnetic repulsion force is generated on the magnetic ring 315 by controlling the electromagnet 316 to be energized, so that the magnetic ring 315 can slide along the fixed pressure relief pipe 314, and the first moving rod 317 that moves synchronously with the magnetic ring 315 drives the second elastic member 318 to be stretched, thereby driving the movable pressure relief pipe 304 to move along the fixed pressure relief pipe 314 toward the axial direction of the monitoring support ring 101, and when the control electromagnet 316 is powered off and demagnetized, the elastic restoring force of the second elastic member 318 can be used to make the movable pressure relief pipe 304 slide back to the initial position along the fixed pressure relief pipe 314.

[0048] Specific embodiment 2, on the basis of specific embodiment 1, a horizontal support seat 406 is installed at the center position of the monitoring support ring 101, the horizontal support seat 406 and the monitoring support ring 101 are connected by a fixed plate 407, the power output shaft 401 is rotatably set on the monitoring support frame 105, the output end of the power motor installed on the monitoring support frame 105 is connected to the power output shaft 401, and the power output shaft 401 is rotatably set inside the horizontal support seat 406; the collection and transportation component includes a liquid storage cylinder 408 fixedly installed on the horizontal support seat 406, a refrigeration cylinder 409 coaxial with the liquid storage cylinder 408 is fixedly installed inside the first installation port 106, a spiral condenser 410 connected to the liquid storage cylinder 408 is arranged inside the refrigeration cylinder 409, the upper port of the spiral condenser 410 passes through the refrigeration cylinder 409, and a refrigeration element is installed inside the refrigeration cylinder 409 for cooling the spiral condenser 410 therein.

[0049] In this embodiment of the present invention, two vertical mounting plates 411 are symmetrically fixedly arranged on the top of the horizontal support seat 406, and a second guide rod 412 is fixedly arranged between the vertical mounting plates 411. The output end of the telescopic cylinder 413 installed on one of the vertical mounting plates 411 is connected to a second meshing portion 414, and the second meshing portion 414 is used to drive the rotation of the opening and closing gear 323. The second meshing portion 414 is slidably sleeved on the second guide rod 412, and the side surface of the liquid storage cylinder 408 is connected to a water vapor input pipe 415 located below the second meshing portion 414. , an inlet channel 416 adapted to the axial sealing strip 321 is provided at one end of the water vapor input pipe 415; when the movable pressure relief pipe 304 moves to align with the water vapor guide pipe 203, the electromagnet 316 is energized to generate a magnetic repulsive force on the magnetic ring 315, so that the magnetic ring 315 slides along the fixed pressure relief pipe 314, and the first moving rod 317 that moves synchronously with the magnetic ring 315 drives the second elastic member 318 to be stretched, thereby driving the movable pressure relief pipe 304 along the fixed pressure relief pipe 314 to the monitoring bearing ring 101 axis. The movable pressure relief pipe 304 is inserted horizontally into the water vapor input pipe 415, and the axial sealing strip 321 is just loosely fitted in the introduction channel 416. The support ring 320 is just tightly pressed against the end of the water vapor input pipe 415, and the magnetic ring 315 is pressed against the fourth pressure sensor on the ear seat. Then, the second meshing portion 414 is driven along the second guide rod 414 by the telescopic cylinder 413. 2 slides, and under the action of the second meshing portion 414, the on-off gear 323 is driven to rotate 90°. At this time, the on-off control ball 322 releases the blockage of the open end of the movable pressure relief pipe 304, and then the water vapor in the water vapor guide pipe 203 enters the fixed pressure relief pipe 314 through the radial pressure relief groove 302, and then enters the water vapor input pipe 415 from the movable pressure relief pipe 304, and finally flows upward from the liquid storage cylinder 408 into the spiral condensation pipe 410 for condensation, and the generated condensed water flows back to the liquid storage cylinder 408 along the spiral condensation pipe 410 for storage.

[0050] In this embodiment of the present invention, a moving plate 417 slidably sleeved on the first guide rod 109 is fixedly provided at the other end of the first meshing portion 404, and a second moving rod 418 slidably matched with the monitoring carrier ring 101 is fixedly provided on one side of the moving plate 417. The connecting disk fixed at the end of the second moving rod 418 is connected to the monitoring carrier ring 101 through a third elastic member 419. The third elastic member 419 is in a natural state in the initial state, and the reverse thrust rod 405 is horizontally inserted into the penetration port 207 on the hollow mounting portion 204 and fits with the piston plate 205. The trigger portion 201 fits inside the radial mounting groove 301, and the orifice sealing plug 3 11 is inserted into the corresponding water vapor pressure relief hole 202, so that the water vapor pressure relief holes 202 on the trigger part 201 are blocked, and a first delivery pipe 420 connected to the bottom of the liquid storage cylinder 408 is fixedly provided, and a second delivery pipe 421 is connected to the side surface of the first delivery pipe 420, and a third delivery pipe 422 connected to the second delivery pipe 421 is fixedly provided at one end, and a plurality of detection connectors 423 are installed on the side surface of the third delivery pipe 422. By setting a plurality of detection connectors 423, each detection connector 423 can be connected to different detection devices through a hose, so that the detection of different components in water vapor can be realized at the same time.

[0051] In this embodiment of the present invention, a third meshing portion 424 is slidably provided on the inner wall of the monitoring support frame 105, a lifting gear 425 meshing with the third meshing portion 424 is fixedly installed on the side surface of the power output shaft 401, and a vertical blocking rod 426 is slidably provided inside the first conveying pipe 420, and the vertical blocking rod 426 is fixedly connected to the third meshing portion 424. The position of the vertical blocking rod 426 in the initial state is as shown in FIG. Fig.13 As shown, the upper end of the vertical blocking rod 426 is close to the bottom of the second delivery pipe 421. In the process of controlling the missing gear 402 to rotate clockwise, the lifting gear 425 that rotates synchronously with the missing gear 402 drives the third meshing portion 424 to move upward, and the vertical blocking rod 426 is driven to slide upward along the first delivery pipe 420 through the upwardly moved third meshing portion 424. In the process of depressurization, the first delivery pipe 420 can be blocked by the vertical blocking rod 426, so that the liquid storage cylinder 408 and the second delivery pipe 421 are in an isolated state. After the pressure relief, the entire closed pressure relief mechanism 3 is controlled to rotate counterclockwise back to the initial position. At this time, the upper end of the vertical blocking rod 426 moves down again to a position close to the bottom of the second delivery pipe 421, and then the condensed water in the liquid storage cylinder 408 passes through the first delivery pipe 420 and the second delivery pipe 421 in turn and flows into the third delivery pipe 422, and then flows into various detection devices through various detection connectors 423 for detection, thereby realizing automatic real-time collection and detection of condensed water during the pressure relief process, thereby improving the accuracy of boiler water vapor detection.

[0052] The specific working process of the present application is as follows: when the pressure value monitored by the third pressure sensor 303 reaches the set high pressure value, the controller receives the pressure signal and controls the first alarm to sound an alarm, the control terminal receives the alarm signal and sends a pressure relief instruction to the controller, and the controller controls the power motor to start and drive the power output shaft 401 to rotate clockwise (such as Figure 2As shown in the figure, the first meshing portion 404 is driven to move to the left side by the rotation of the missing gear 402 and the third elastic member 419 is compressed. In this process, the piston plate 205 is pushed by the reverse push rod 405 to compress the first elastic member 206. The triggering portion 201 that moves synchronously with the piston plate 205 gradually moves to the outside of the radial mounting groove 301. When the triggering portion 201 just leaves the radial mounting groove 301, the switching pusher 403 that rotates clockwise just fits the top of the second arc-shaped channel 305. As the missing gear 402 continues to rotate clockwise, the triggering portion 201 continues to move and compress the first elastic member 206. Under the thrust of the switching pusher 403, the entire closed pressure relief mechanism 3 continues to rotate clockwise, so that the radial mounting groove 301 is opened. 01 is misaligned with the trigger part 201. When the missing gear 402 is disengaged from the first meshing part 404, the elastic restoring force of the first elastic member 206 makes the trigger part 201 tightly abut against the outer wall of the arc-shaped blocking plate 306, and the elastic restoring force of the third elastic member 419 makes the first meshing part 404 move to the right to complete the reset. When the missing gear 402 is meshed with the first meshing part 404 again, it continues to drive the first meshing part 404 to move to the left and compress the third elastic member 419. During this process, the movement of the reverse push rod 405 does not continue to push the piston plate 205 (that is, the reciprocating motion of the reverse push rod 405 at this time does not contact the piston plate 205). When the radial pressure relief groove 302 is aligned with the trigger part 201 (the water vapor pressure relief hole 202 is located on the inner side of the radial pressure relief groove 302, and the trigger part 201 still rests on the outer wall of the arc-shaped blocking plate 306), the second pressure sensor 104 monitors the pressure signal and sends the pressure signal to the controller, the controller controls the second alarm to sound an alarm, the control terminal receives the alarm signal and sends a command to the controller, at this time the controller controls the electromagnet 316 to be energized to generate a magnetic repulsive force on the magnetic ring 315, until the driving shaft on the open and close control ball 322 slides into the inside of the introduction channel 416 and fits on the inner end of the introduction channel 416, at this time, one end of the movable pressure relief pipe 304 is horizontally inserted into the water vapor input pipe 415, the axial sealing strip 321 just fits in the introduction channel 416 with a gap, and the support ring 320 just presses tightly At the end of the water vapor input pipe 415, the magnetic ring 315 is pressed against the fourth pressure sensor on the ear seat. The fourth pressure sensor detects the pressure signal and sends the pressure signal to the controller. The controller controls the third alarm to sound an alarm. The control terminal receives the alarm signal and sends a command to the controller. At this time, the controller controls the telescopic cylinder 413 to start, and drives the second meshing part 414 to slide along the second guide rod 412 through the telescopic cylinder 413. Under the action of the second meshing part 414, the opening and closing gear 323 is driven to rotate 90°. At this time, the opening and closing control ball 322 releases the blockage of the open end of the movable pressure relief pipe 304, and then the water vapor entering the water vapor guide pipe 203 from the boiler enters the radial pressure relief groove 302 through the water vapor pressure relief hole 202.Then it enters the fixed pressure relief pipe 314 through the radial pressure relief groove 302, and then enters the water vapor input pipe 415 through the movable pressure relief pipe 304, and finally flows upward from the liquid storage cylinder 408 into the spiral condensation pipe 410 for condensation. The generated condensed water flows back to the liquid storage cylinder 408 along the spiral condensation pipe 410 for storage;

[0053] When the pressure value monitored by the third pressure sensor 303 reaches the set low pressure value, the controller receives the pressure signal and controls the first alarm to sound the alarm again. The control terminal receives the alarm signal and sends a blocking instruction to the controller. The controller controls the telescopic cylinder 413 to start again, and drives the second meshing part 414 to complete the reset through the telescopic cylinder 413. Under the action of the second meshing part 414, the through-and-close gear 323 is driven to rotate 90° in the opposite direction. At this time, the through-and-close control ball 322 blocks the open end of the movable pressure relief pipe 304 again (the second meshing part 414 and the through-and-close gear 323 are in a separated state). Then the controller controls the electromagnet 316 to cut off the power and demagnetize to release the magnetic repulsive force on the magnetic ring 315, so that the movable pressure relief pipe 304 is separated from the water vapor input pipe 415 and returns to the initial position. Then the controller controls the power motor to run in the reverse direction to make the power output shaft 401 rotate counterclockwise. During the counterclockwise rotation of the switching pusher 403, the entire closed The pressure relief mechanism 3 gradually slides downward along the second arc-shaped channel 305 under the action of its own gravity until the closed pressure relief mechanism 3 returns to the initial position, that is, the radial mounting groove 301 is realigned with the trigger part 201, and the trigger part 201 is reinserted into the radial mounting groove 301 under the action of the elastic restoring force of the first elastic member 206, and the trigger part 201 is reinserted into the radial mounting groove 301 to achieve the sealing of the water vapor pressure relief hole 202. At this time, the orifice sealing plug 311 is reinserted into the corresponding water vapor pressure relief hole 202, so that the sealing of each water vapor pressure relief hole 202 on the trigger part 201 is achieved again. At this time, the first pressure sensor 103 monitors the pressure from the extension trigger plate 312, and the controller receives the pressure signal and controls the fourth alarm to sound an alarm. The control terminal receives the alarm signal and sends an instruction to the controller, and the controller controls the power motor to stop running. In this way, the above-mentioned control process can be used to achieve automatic control during the use of the boiler.

[0054] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0055] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A signal transmission call system for boiler water vapor monitoring, characterized in that: include: A monitoring bearing mechanism (1), the monitoring bearing mechanism (1) comprising a monitoring bearing ring (101), a first arc-shaped channel (102) being provided on a circumferential side surface of the monitoring bearing ring (101), a first pressure sensor (103) and a second pressure sensor (104) being respectively installed at two ends of the first arc-shaped channel (102); A water vapor trigger mechanism (2), the water vapor trigger mechanism (2) comprising a trigger portion (201), a water vapor pressure relief hole (202) being provided on a surface of the trigger portion (201); A sealed pressure relief mechanism (3), the sealed pressure relief mechanism (3) comprising a radial mounting groove (301) and a radial pressure relief groove (302), a third pressure sensor (303) being mounted inside the radial mounting groove (301), a movable pressure relief pipe (304) being mounted on one side of the radial pressure relief groove (302), and a second arc-shaped channel (305) being arranged on one side of the movable pressure relief pipe (304); and A collection and conveying mechanism (4), the collection and conveying mechanism (4) comprising a power output shaft (401), a switching pusher (403) on the power output shaft (401) sliding inside the second arc-shaped channel (305), a collection and conveying assembly being installed on one side of the power output shaft (401); a first meshing portion (404) being arranged below the missing gear (402) on the power output shaft (401), a reverse thrust rod (405) being arranged at one end of the first meshing portion (404) for realizing reciprocating motion of the trigger portion (201); The monitoring bearing mechanism (1) also includes a monitoring bearing frame (105), a horizontal support seat (406) is installed at the center position of the monitoring bearing ring (101), the collection and transportation assembly includes a liquid storage cylinder (408) fixedly installed on the horizontal support seat (406), a first transportation pipe (420) connected to the liquid storage cylinder (408) is fixedly arranged at the bottom, a third meshing portion (424) is slidably arranged on the inner wall of the monitoring bearing frame (105), a lifting gear (425) meshing with the third meshing portion (424) is fixedly installed on the peripheral side of the power output shaft (401), a vertical blocking rod (426) is slidably arranged inside the first transportation pipe (420), and the vertical blocking rod (426) is fixedly connected to the third meshing portion (424); The monitoring support ring (101) is provided with a first installation opening (106) at the top, and the water vapor trigger mechanism (2) further comprises a water vapor guide pipe (203) fixedly mounted on the monitoring support frame (105); The sealed pressure relief mechanism (3) further comprises an arc-shaped sealing plate (306) slidably arranged inside the first arc-shaped channel (102); the curved surface end of the water vapor guide pipe (203) is fitted on the outer wall of the arc-shaped sealing plate (306); the first inner extension seat (307) and the second inner extension seat (308) are respectively fixedly arranged on the peripheral side of the arc-shaped sealing plate (306); the radial mounting groove (301) is arranged on the first inner extension seat (307); the radial pressure relief groove (302) is arranged on the second inner extension seat (308); one side of the first inner extension seat (307) is connected to the arc-shaped mounting plate (310) via a support frame (309); the second arc-shaped channel (305) is arranged on the peripheral side of the arc-shaped mounting plate (310); and an orifice sealing plug (311) adapted to the water vapor pressure relief hole (202) is fixedly arranged inside the radial mounting groove (301); Both ends of the arc-shaped blocking plate (306) are fixedly provided with an extended trigger plate (312); a magnetic generating seat (313) is fixedly installed on the surface of the second inner extension seat (308); a fixed pressure relief pipe (314) connected to the radial pressure relief groove (302) is fixedly provided on the surface of the magnetic generating seat (313); the movable pressure relief pipe (304) is slidably sleeved on the fixed pressure relief pipe (314); and a magnetic ring is slidably sleeved on the fixed pressure relief pipe (314). (315), the electromagnet (316) installed on the magnetic force generating seat (313) and the permanent magnet installed on the magnetic ring (315) magnetically repel each other, a first moving rod (317) is slidably arranged on the ear seat fixed on the peripheral side of the fixed pressure relief pipe (314), one end of the first moving rod (317) is fixed on the magnetic ring (315), and the connecting disk fixed on the other end of the first moving rod (317) is connected to the corresponding ear seat via a second elastic member (318); The movable pressure relief pipe (304) is connected to the magnetic ring (315) via an axial fixing rod (319); a support ring (320) is fixedly provided on the peripheral side of the movable pressure relief pipe (304); an axial sealing strip (321) is fixedly provided on one side of the support ring (320); an opening and closing control ball (322) is rotatably installed inside the movable pressure relief pipe (304); an opening and closing gear (323) is installed on the end of the drive shaft fixed to the opening and closing control ball (322); and the curved end of the axial sealing strip (321) is fitted on the peripheral side of the drive shaft; A refrigeration cylinder (409) coaxial with the liquid storage cylinder (408) is fixedly installed inside the first installation opening (106), a spiral condenser tube (410) connected to the liquid storage cylinder (408) is arranged inside the refrigeration cylinder (409), and an upper end of the spiral condenser tube (410) passes through the refrigeration cylinder (409); Two vertical mounting plates (411) are symmetrically fixedly arranged on the top of the horizontal support seat (406), and a second guide rod (412) is fixedly arranged between the vertical mounting plates (411). The output end of a telescopic cylinder (413) mounted on one of the vertical mounting plates (411) is connected to a second meshing portion (414), and the second meshing portion (414) is used to drive the rotation of the opening and closing gear (323). The second meshing portion (414) is slidably sleeved on the second guide rod (412). A water vapor input pipe (415) located below the second meshing portion (414) is connected to the side surface of the liquid storage cylinder (408), and one end of the water vapor input pipe (415) is provided with an inlet channel (416) adapted to the axial sealing strip (321).

2. A signal transmission and calling system for boiler water vapor monitoring according to claim 1, characterized in that: The monitoring support ring (101) is fixedly arranged inside the monitoring support frame (105); a second mounting opening (107) is provided at the bottom of the monitoring support ring (101); two extension mounting seats (108) are fixedly arranged on the outer wall of the monitoring support ring (101); the first pressure sensor (103) and the second pressure sensor (104) are respectively mounted on the corresponding extension mounting seats (108); and a first guide rod (109) is fixedly arranged on the inner wall of the monitoring support ring (101).

3. A signal transmission call system for boiler water vapor monitoring according to claim 2, characterized in that: The water vapor guide pipe (203) is fixedly mounted on the boiler exhaust pipe, and hollow mounting parts (204) in communication with the water vapor guide pipe (203) are symmetrically fixedly mounted on the lateral surface of the water vapor guide pipe (203), a piston plate (205) is slidably mounted between the two hollow mounting parts (204), a first elastic part (206) connected to the piston plate (205) is arranged inside the hollow mounting part (204), the trigger part (201) is fixedly mounted on a side of the piston plate (205) away from the first elastic part (206), the water vapor pressure relief hole (202) penetrates the piston plate (205), and a curved side of the hollow mounting part (204) is attached to the outer wall of the monitoring bearing ring (101).

4. A signal transmission and calling system for boiler water vapor monitoring according to claim 3, characterized in that: The horizontal support seat (406) is connected to the monitoring support ring (101) via a fixing plate (407); the power output shaft (401) is rotatably arranged on the monitoring support frame (105); the output end of the power motor installed on the monitoring support frame (105) is connected to the power output shaft (401); and the power output shaft (401) is rotatably arranged inside the horizontal support seat (406).

5. A signal transmission and calling system for boiler water vapor monitoring according to claim 4, characterized in that: A movable plate (417) slidably mounted on the first guide rod (109) is fixedly provided at the other end of the first meshing portion (404); a second movable rod (418) slidably engaged with the monitoring support ring (101) is fixedly provided on one side of the movable plate (417); a connecting plate fixed at the end of the second movable rod (418) is connected to the monitoring support ring (101) via a third elastic member (419); a second conveying tube (421) is connected to the side surface of the first conveying tube (420); a third conveying tube (422) connected thereto is fixedly provided at one end of the second conveying tube (421); and a plurality of detection connectors (423) are installed on the side surface of the third conveying tube (422).

Citation Information

Patent Citations

  • Cooler for sampling water vapor of dry quenching boiler

    CN116592661A

  • Boiler water field detection connecting device

    CN217979304U