Graph database construction method for full life cycle management of construction land
Through graph database technology, the full life cycle management system for construction land is built, which solves the problems of dynamic data changes and complex relationship management in the existing technology, realizes the comprehensive, real-time and efficient management of construction land data, and improves the level and resources of urban land management. Configuration efficiency.
Patent Information
- Application Number
- CN202411106411.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2025-01-10
AI Technical Summary
The existing technology is difficult to effectively manage the entire life cycle of construction land, especially in terms of dynamic data changes and complex relationships, resulting in inefficient urban land management and unoptimized resource allocation.
Using the graph database construction method, by creating nodes and defining relationships, the storage, retrieval and analysis of the entire life cycle data of construction land is realized, and the flexible modeling and relationship analysis capabilities of graph databases are used to dynamically update nodes and relationships, and optimize storage and Query efficiency.
It has achieved comprehensive, real-time and efficient management of construction land data, improved the level of urban land management and government decision-making efficiency, provided a more intuitive and detailed data view, and improved the accuracy and efficiency of land resource allocation.
Smart Images

Figure CN119293290A_ABST
Abstract
Description
Technical Field
[0001] The invention discloses a graph database construction method for full life cycle management of construction land, belonging to the technical field of GIS data storage and retrieval. Background Art
[0002] In today's society, with the acceleration of urbanization and the increasing shortage of land resources, the full life cycle management of construction land has become an important issue in urban planning and management. Traditional land management methods often focus on the recording of static data and simple document management, lacking effective tracking and analysis of the dynamic changes in land and their correlations. However, in modern urban construction, the planning, land allocation, land storage, land supply and registration of construction land are closely linked throughout the life cycle, and each stage involves complex administrative procedures, laws and regulations, and market dynamics.
[0003] At the same time, with the rapid development of geographic information system (GIS) technology, GIS data storage and retrieval capabilities have been significantly improved, providing new technical means for the full life cycle management of construction land. As an emerging data model, graph databases provide strong support for the storage, query and analysis of complex data with their flexible data structure and powerful relationship network analysis capabilities. Using graph databases, construction land entities and their complex relationships can be intuitively represented, providing land managers with a more intuitive, comprehensive and real-time data view.
[0004] However, there is a lack of graph database construction methods specifically for the full life cycle management of construction land on the market. Most existing solutions still remain on the traditional database architecture, which is difficult to adapt to the dynamic characteristics and complex relationships of construction land data. Therefore, developing a graph database construction method that can fully cover the full life cycle management needs of construction land is of great significance for improving the level of urban land management, optimizing land resource allocation, and improving government decision-making efficiency.
[0005] In this context, the present invention proposes a method for constructing a graph database for the full life cycle management of construction land, aiming to achieve comprehensive, real-time and efficient management of the full life cycle data of construction land through the flexible modeling capabilities and complex relationship network analysis capabilities of the graph database, and provide strong support for urban planning and management. In order to solve the above problems, the applicant proposes a method for constructing a graph database for the full life cycle management of construction land. Summary of the invention
[0006] The purpose of the present invention is to provide a method for constructing a graph database for the full life cycle management of construction land, so as to solve the problems in the prior art.
[0007] To achieve the above object, the present invention provides the following technical solution: a method for constructing a graph database for full life cycle management of construction land, including but not limited to the following steps:
[0008] Constructing graph database nodes, which include construction land, development zone, approval document number, electronic supervision number, administrative division, construction land cycle, etc., which are used to express various entity objects in the full life cycle management of construction land;
[0009] Define the graph database node relationship, which includes but is not limited to the association between construction land and administrative divisions, development zones, approval document numbers, and electronic supervision numbers, as well as the conversion and dependency between various stages in the entire life cycle (such as planning, land approval, land storage, land supply, and registration);
[0010] By utilizing the modeling capabilities of the graph database, the nodes and their relationships are mapped into a graph structure to achieve full life cycle management of construction land, including data storage, retrieval, analysis and display.
[0011] Optionally, the process of creating the graph database node includes but is not limited to creating corresponding graph database nodes according to different stages of the life cycle of the construction land, administrative divisions, and types of construction land.
[0012] Optionally, the definition of the graph database node relationship includes but is not limited to taking the construction land as the central node and creating relationships between various nodes associated with it. These relationships cover all necessary and optional associations related to administrative divisions, development zones, approval document numbers, electronic supervision numbers, and full life cycle management.
[0013] Optionally, the life cycle of construction land includes but is not limited to planning, land allocation, land storage, land supply, registration and other stages. Corresponding graph database nodes are created in each stage, and these nodes are interconnected through a relationship network.
[0014] Optionally, the definition of the node relationship further includes attribute information of the connection between nodes, such as start time, end time, area, etc., to describe and distinguish the details of different stages and associations in detail.
[0015] Optionally, it also includes dynamically updating the graph database nodes and relationships when the life cycle of the construction land changes to reflect the latest life cycle status and related information while maintaining the accuracy and real-time nature of the graph database.
[0016] Optionally, the relational network analysis capabilities of graph databases can be used to efficiently retrieve and display data on construction land, including changes in its administrative divisions and development zones, as well as all key events and status throughout its life cycle.
[0017] Optionally, the graph database construction method also includes one or more optimization measures to improve the storage efficiency, query speed and data consistency of the graph database, including but not limited to index optimization, data partitioning, caching strategy, etc.
[0018] Beneficial effects: (1) The present invention adopts graph database technology to construct a construction land full life cycle management database, and stores, retrieves, analyzes and displays construction land data in the form of graph space; by modeling construction land, connecting the spatial position with the administrative division of construction land, and connecting the time period changes of the construction land throughout its life cycle, the integrated storage and application of construction land graphics and attribute information is realized, and a three-dimensional construction land data retrieval path is established between the construction land and GIS spatial position and the construction land throughout its life cycle;
[0019] (2) The present invention realizes an innovative way of querying and browsing surveying and mapping archives, which uses a graph database to create construction land nodes, establishes a graph network for all construction lands, and stores and presents them in an interface with construction land as the center;
[0020] (3) The present invention utilizes the graph database index-free adjacency technology to quickly and efficiently retrieve, query and display construction land data, thereby achieving the purpose of quickly, flexibly, accurately and intuitively displaying construction land data. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is the overall relationship diagram of the database of the present invention;
[0022] Figure 2 For the batch of the present invention, no relationship diagram is provided;
[0023] Figure 3 This is a land idleness relationship diagram of the present invention. DETAILED DESCRIPTION
[0024] The following describes the preferred embodiments of the present invention with reference to the drawings in the specification, so that the technical content is clearer and easier to understand. The present invention can be embodied in many different forms of embodiments, and the protection scope of the present invention is not limited to the embodiments mentioned in the text.
[0025] Example 1
[0026] The following describes the preferred embodiments of the present invention with reference to the drawings in the specification, so that the technical content is clearer and easier to understand. The present invention can be embodied in many different forms of embodiments, and the protection scope of the present invention is not limited to the embodiments mentioned in the text.
[0027] The present invention is described in detail below with reference to the accompanying drawings.
[0028] like Figure 1 As shown, the present invention mainly includes graph database nodes and graph database node relationships.
[0029] 1. Graph Database Node
[0030] Including construction land, development zones, approval document numbers, electronic supervision numbers, administrative divisions, and construction land cycle nodes.
[0031] The construction land attributes mentioned mainly include construction land code, administrative district code, prefecture-level city, city-county district, project name, approval document number, newly added construction land, agricultural land, total area, spatial location, land type, etc.;
[0032] The administrative division attributes mainly include administrative division name, administrative division code, etc.;
[0033] The construction land period attributes mainly include stage name, stage code, etc.;
[0034] The attributes of the approval document number mainly include approval document number, approval time, total project area, approval document number, approval date, approved area, reporting status, batch year, approved area, approved land supply area, approved unused land area, etc.;
[0035] The attributes of the electronic supervision number mainly include electronic supervision number, provincial use ID, idle base list ID, idle digestion list ID, provincial plot ID, departmental land supply ID, departmental plot ID, land location, plot number, etc.
[0036] 2. Graph Database Node Relationship
[0037] Including the node relationships of construction land-administrative division, construction land-development zone, construction land-approval document number, construction land-electronic supervision number, land approval-approval document number, land supply-electronic supervision number, land supply cancellation-land approval, land supply recovery-land approval, land transfer fee-failure to pay the land transfer fee on time, land delivery-failure to deliver the land on time, public notice board-failure to deliver the land on time, start of construction-failure to start construction on time, daily work-suspension of work, completion-failure to complete on time, land delivery-idle, start of construction-idle, daily work-idle, and completion-idle.
[0038] The construction land-administrative division attributes mainly include start time, end time, area, etc.
[0039] The attributes of the construction land-approval document number mainly include start time, end time, etc.
[0040] The attributes of the construction land-electronic supervision number mainly include start time, end time, etc.
[0041] The approval document number-electronic supervision number mainly includes the start time, end time, etc.
[0042] The present invention adopts graph database technology to construct a full life cycle management database for construction land, and stores, retrieves, analyzes and displays construction land data in the form of graph space; by modeling construction land, connecting the spatial position with the administrative division of construction land, and connecting the time period changes of the full life cycle of construction land, the integrated storage and application of construction land graphics and attribute information are realized, and a three-dimensional construction land data retrieval path is established between the construction land and GIS spatial position and the full life cycle of construction land; the graph database is used to create construction land nodes, and a graph network is established for all construction lands, which is stored and presented in an interface with construction land as the center; the graph database index-free adjacency technology is used to quickly and efficiently retrieve, query and display construction land data, so as to achieve the purpose of quickly, flexibly, accurately and intuitively reflecting construction land data.
[0043] The contents not described in detail in the specification of the present invention belong to the common knowledge of those skilled in the art.
[0044] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved.
[0045] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A method for constructing a graph database for full life cycle management of construction land, characterized in that: Including but not limited to the following steps: Constructing graph database nodes, which include construction land, development zone, approval document number, electronic supervision number, administrative division, construction land cycle, etc., which are used to express various entity objects in the full life cycle management of construction land; Define the graph database node relationship, which includes but is not limited to the association between construction land and administrative divisions, development zones, approval document numbers, and electronic supervision numbers, as well as the conversion and dependency between various stages in the entire life cycle (such as planning, land approval, land storage, land supply, and registration); By utilizing the modeling capabilities of the graph database, the nodes and their relationships are mapped into a graph structure to achieve full life cycle management of construction land, including data storage, retrieval, analysis and display.
2. The method according to claim 1, characterized in that: The process of creating the graph database node includes but is not limited to creating corresponding graph database nodes according to different life cycle stages of the construction land, administrative divisions, and types of the construction land.
3. The method according to claim 1, characterized in that The definition of the graph database node relationship includes but is not limited to creating relationships between various nodes associated with the construction land as the central node. These relationships cover all necessary and optional associations related to administrative divisions, development zones, approval document numbers, electronic supervision numbers, and full life cycle management.
4. The method according to claim 2, characterized in that: The life cycle of construction land includes but is not limited to planning, land allocation, land storage, land supply, registration and other stages. Corresponding graph database nodes are created in each stage, and these nodes are interconnected through a relational network.
5. The method according to claim 3, characterized in that: The definition of the node relationship further includes attribute information of the connection between nodes, such as start time, end time, area, etc., to describe and distinguish the details of different stages and associations in detail.
6. The method according to any one of claims 1 to 5, characterized in that: It also includes dynamically updating the graph database nodes and relationships when the life cycle of construction land changes to reflect the latest life cycle status and related information, while maintaining the accuracy and real-time nature of the graph database.
7. The method according to any one of claims 1 to 5, characterized in that: Utilize the relational network analysis capabilities of graph databases to efficiently retrieve and display data on construction land, including changes in its administrative divisions and development zones, as well as all key events and status throughout its life cycle.
8. The method according to any one of claims 1 to 7, characterized in that: The graph database construction method also includes one or more optimization measures to improve the storage efficiency, query speed and data consistency of the graph database, including but not limited to index optimization, data partitioning, and caching strategy.
Citation Information
Cited By
Land full life cycle management knowledge graph construction and reasoning method
CN120562542A