Metro room position design method and system based on mechanical simulation system

Through the design method based on the mechanical simulation system, the rail transit subway room location layout solution is automatically generated, which solves the problems of time-consuming and cumbersome design process and lacks flexibility, and achieves the effect of quickly finding the optimal solution and improving design adaptability.

CN119293921AActive Publication Date: 2025-01-10CHINA RAILWAY DESIGN GRP CO LTD

Patent Information

Application Number
CN202411437134.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-15
Publication Date
2025-01-10
Estimated Expiration
2044-10-15

AI Technical Summary

Technical Problem

In traditional rail transit design, the design process of subway room locations is time-consuming and cumbersome, and lacks flexibility, resulting in waste of resources and prolonged design cycles, making it difficult to quickly adapt to changes in demand.

Method used

The design method based on the mechanical simulation system is adopted, by obtaining the connection relationship between subway station rooms, determining the topological relationship, setting the constraints of proxy points, building a mechanical simulation system, and automatically generating multiple layout plans to quickly find the optimal solution.

Benefits of technology

It greatly shortens the design cycle, improves the adaptability of the design scheme, can quickly generate multiple layout schemes, find the optimal solution, and provide stored data to support subsequent maintenance and transformation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119293921A_ABST
    Figure CN119293921A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of civil engineering, and discloses a metro room position design method and system based on a mechanical simulation system, and the method comprises the steps: obtaining the connection relation between metro station rooms, and determining the topological relation between the metro station rooms according to the connection relation; determining an agent point of each subway station room, setting a constraint condition of each agent point according to the topological relation, and constructing a mechanical simulation system; wherein the room agent point is a central point of each subway station room; and operating the mechanical simulation system to obtain the final position coordinates of each agent point. According to the method, a plurality of layout schemes can be automatically and quickly generated, so that the optimal solution is quickly found, and the design period is greatly shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of civil engineering, and in particular to a subway room position design method and system based on a mechanical simulation system. Background Art

[0002] With the acceleration of China's urbanization process, rail transit construction has become one of the key factors in promoting urban development and improving the quality of life of residents. From the development of a single line to a grid layout, rail transit has not only improved the traffic conditions in the city, but also promoted the development of the regional economy and social progress. In this context, the application of artificial intelligence technology has brought revolutionary changes to the design and operation of rail transit.

[0003] In traditional rail transit design, the traditional manual design process requires designers to repeatedly adjust the position of each room based on experience and specifications. This process can be very time-consuming and tedious. Designers need to deal with a large amount of data and complex engineering problems, which often involves repetitive labor, such as drawing, proofreading, and updating, which are time-consuming and prone to errors. In addition, due to the lack of flexibility of the traditional design process, it is difficult for design drawings to adapt to changing needs, resulting in a waste of resources.

[0004] Therefore, there is an urgent need for a subway room location design method and system based on a mechanical simulation system, which can automatically and quickly generate multiple layout plans, so as to quickly find the optimal solution and greatly shorten the design cycle. Summary of the invention

[0005] In order to solve the above technical problems, the present invention provides a subway room location design method and system based on a mechanical simulation system, which can automatically and quickly generate multiple layout plans, thereby quickly finding the optimal solution and greatly shortening the design cycle.

[0006] The present invention provides a subway room location design method based on a mechanical simulation system, comprising the following steps: S1. Obtain the connection relationship between the rooms in the subway station, and determine the topological relationship between the rooms in the subway station according to the connection relationship; S2. Determine the proxy points of each subway station room, set the constraints of each proxy point according to the topological relationship, and build a mechanical simulation system; where the proxy point of the room is the center point of each subway station room; S3. Run the mechanical simulation system to obtain the final position coordinates of each proxy point.

[0007] Furthermore, in S1, obtaining the connection relationship between the rooms in the subway station includes: S11. Determine the preliminary connection relationship between the rooms in the subway station based on expert experience; S12. According to the subway station design specification and the known subway station design drawings, the preliminary connection relationship is completed to obtain the completed connection relationship between the subway station rooms; S13. Obtain connection relationships between rooms in the subway station according to the preliminary connection relationships and the completed connection relationships; wherein the connection relationships include adjacent, non-adjacent, and unknown.

[0008] Furthermore, in S1, determining the topological relationship between the rooms in the subway station according to the connection relationship includes: S14, using the adjacency matrix L to represent the topological relationship between the rooms in the subway station; Among them, the adjacency matrix L={n xy}, x represents a subway station room of type x, y represents a subway station room of type y, n xy Indicates the connection relationship between subway station rooms of type x and subway station rooms of type y.

[0009] Furthermore, in S14, the adjacency matrix L is used to represent the topological relationship between the rooms in the subway station, including: S141. If, according to the connection relationship, the connection relationship between the subway station room of type x and the subway station room of type y is adjacent, and the topological relationship between the subway station room of type x and the subway station room of type y is adjacent, then n xy =1; S142. If, according to the connection relationship, the connection relationship between the subway station room of type x and the subway station room of type y is not adjacent, then the topological relationship between the subway station room of type x and the subway station room of type y is not adjacent, then n xy =0; S143. If the connection relationship between the room at the subway station of type x and the room at the subway station of type y is unknown according to the connection relationship, then calculate and determine n by sampling from the probability distribution of the connection relationship between the room at the subway station of type x and the room at the subway station of type y. xy The value of .

[0010] Furthermore, in S2, the proxy points of each subway station room are determined, and the constraints of each proxy point are set according to the topological relationship, including: S21, determining the proxy point of each subway station room and the area of ​​each subway station room, taking the proxy point as the center of the circle, and representing the subway station room with circles of different radii according to the area; S22, setting the spring force between each proxy point according to the topological relationship; S23, setting a collision force between each proxy point and the boundary of the subway station, so that each proxy point moves inside the boundary of the subway station; S24. Setting collision forces between proxy points so that circles to which proxy points belong do not overlap.

[0011] Furthermore, in S2, before constructing the mechanical simulation system, it also includes: Set the parameters of each proxy point and system parameters; The parameters of each proxy point include mass, initial velocity, initial position, and movement direction, and the system parameters include system initial energy and system damping.

[0012] The present invention also provides a subway room location design system based on a mechanical simulation system, which is used to execute any of the above-mentioned subway room location design methods based on a mechanical simulation system, and the system includes the following modules: A connection relationship determination module is used to obtain the connection relationship between the rooms in the subway station and determine the topological relationship between the rooms in the subway station according to the connection relationship; The mechanical system construction module is connected to the connection relationship determination module, and is used to determine the proxy points of each subway station room, set the constraint conditions of each proxy point according to the topological relationship, and construct a mechanical simulation system; wherein the proxy point of the room is the center point of each subway station room; The output module is connected with the mechanical system building module and is used to run the mechanical simulation system to obtain the final position coordinates of each proxy point.

[0013] The embodiments of the present invention have the following technical effects: The present invention determines the connection relationship between the rooms in the subway station, and constructs a mechanical simulation system according to the connection relationship between the rooms in the subway station. The final position coordinates of each proxy point are obtained through the mechanical simulation system, and multiple layout plans can be automatically and quickly generated, so as to quickly find the optimal solution, which greatly shortens the design cycle. In addition, the data output by the mechanical simulation system can be stored, providing important reference information for subsequent maintenance and renovation work. In addition, when project requirements change, the subway room location design method based on the mechanical simulation system can also quickly recalculate and provide new layout plans, which facilitates the modification of room location layout and improves the adaptability of the design plan. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0015] Figure 1 is a flow chart of a subway room location design method based on a mechanical simulation system provided by an embodiment of the present invention; Figure 2is a schematic diagram of a topological relationship between rooms in a subway station provided by an embodiment of the present invention; Figure 3 is a schematic diagram of an adjacency matrix provided by an embodiment of the present invention; Figure 4 is a schematic diagram of a spring force constraint between proxy points provided by an embodiment of the present invention; Figure 5 is a schematic diagram of a collision force constraint between proxy points provided by an embodiment of the present invention; Figure 6 is a schematic diagram of the movement of proxy points in a mechanical simulation system provided by an embodiment of the present invention; Figure 7 is a heat map of the final position coordinates of each proxy point provided by an embodiment of the present invention; Figure 8 It is a structural schematic diagram of a subway room location design system based on a mechanical simulation system provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0016] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.

[0017] The present invention proposes a subway room location design method based on a mechanical simulation system. Figure 1 is a flow chart of a subway room location design method based on a mechanical simulation system provided by an embodiment of the present invention, see Figure 1 , specifically including: S1. Obtain the connection relationship between the rooms in the subway station, and determine the topological relationship between the rooms in the subway station according to the connection relationship.

[0018] S11. Determine the preliminary connection relationship between the rooms in the subway station based on expert experience.

[0019] S12. According to the subway station design specifications and the known subway station design drawings, the preliminary connection relationship is completed to obtain the completed connection relationship between the subway station rooms.

[0020] S13. Obtain the connection relationship between the rooms in the subway station according to the preliminary connection relationship and the completed connection relationship.

[0021] The connection relationships include adjacent, non-adjacent and unknown.

[0022] Specifically, the preliminary connection relationship between the rooms in the subway station is determined based on expert experience, and the preliminary connection relationship given by the expert experience shall prevail. For the connection relationship not given by the expert, the preliminary connection relationship is completed according to the subway station design specification and the known subway station design drawings to obtain the connection relationship between the rooms in the subway station. When there is a conflict between the connection relationship in the subway station design specification and the known subway station design drawings and the connection relationship given by expert experience, the connection relationship given by expert experience shall prevail. For the connection relationship not given by expert experience and subway station design specifications, since in the known subway design drawings, the connection relationship between the subway station room of type x and the subway station room of type y may be different in different drawings, therefore, the situation where the connection relationship between the subway station rooms cannot be determined is defined as an unknown connection relationship.

[0023] S14. Use the adjacency matrix L to represent the topological relationship between the rooms in the subway station.

[0024] Specifically, Figure 2 is a schematic diagram of a topological relationship between rooms in a subway station provided by an embodiment of the present invention. Figure 3 is a schematic diagram of an adjacency matrix provided by an embodiment of the present invention, see Figure 2 and Figure 3 : Adjacency matrix L = {n xy}, where x represents a subway station room of type x, y represents a subway station room of type y, and n xy Indicates the connection relationship between subway station rooms of type x and subway station rooms of type y.

[0025] S141. If, according to the connection relationship, the connection relationship between the subway station room of type x and the subway station room of type y is adjacent, and the topological relationship between the subway station room of type x and the subway station room of type y is adjacent, then n xy =1; S142. If, according to the connection relationship, the connection relationship between the subway station room of type x and the subway station room of type y is not adjacent, then the topological relationship between the subway station room of type x and the subway station room of type y is not adjacent, then n xy =0; S143. If the connection relationship between the room at the subway station of type x and the room at the subway station of type y is unknown according to the connection relationship, then calculate and determine n by sampling from the probability distribution of the connection relationship between the room at the subway station of type x and the room at the subway station of type y. xy The value of .

[0026] Specifically, n is determined by sampling and calculating in the probability distribution of the connection relationship between the subway station room of type x and the subway station room of type y.xy The probability distribution is expressed as N(μ,σ), μ represents the expected value, which can be given by expert experience or obtained from drawings, σ represents the standard deviation, and n xy Any number between 0 and 1.

[0027] S2. Determine the proxy points of each subway station room, set the constraints of each proxy point according to the topological relationship, and build a mechanical simulation system.

[0028] S21. Determine the proxy point of each subway station room and the area of ​​each subway station room, and use circles of different radii to represent the subway station rooms according to the area, taking the proxy point as the center of the circle.

[0029] Among them, the proxy point of the room is the center point of each subway station room, and the area of ​​each subway station room can be determined according to the design specifications.

[0030] S22. Setting the spring force between the proxy points according to the topological relationship.

[0031] Specifically, Figure 4 is a schematic diagram of a spring force constraint between proxy points provided by an embodiment of the present invention, see Figure 4 , for two adjacent subway station rooms, each is subject to the spring force applied by the other, for two non-adjacent subway station rooms, there is no spring force between them, and the closer the distance between the two adjacent subway station rooms, the stronger the spring force applied to each other. For example, for the i-th proxy point S i , which is related to the proxy point S j and proxy point S k are adjacent, then for the proxy point S i , which is affected by the proxy point S j Applied spring force F ij And the agent point S k Applied spring force F ik The resultant force F 合 , for the proxy point S k , which is only related to the proxy point S i Adjacent, then for the proxy point S k , which is only affected by the proxy point S i Applied spring force F ki .

[0032] S23. Setting a collision force between each proxy point and the boundary of the subway station so that each proxy point moves within the boundary of the subway station.

[0033] The subway station boundary is the boundary of the area where the subway station room layout needs to be designed.

[0034] S24. Setting collision forces between proxy points so that circles to which proxy points belong do not overlap.

[0035] Specifically, Figure 5 is a schematic diagram of a collision force constraint between proxy points provided by an embodiment of the present invention, see Figure 5 , using circles to represent the area of ​​each subway station room. Since the areas of each subway station room cannot overlap, it is necessary to make the proxy point S i The circle and the proxy point S j The circles they belong to cannot overlap, so the collision force needs to be set so that the proxy point S i The circle and the proxy point S j When the circles they belong to come into contact, a collision force is generated, thereby moving the proxy point S i The circle and the proxy point S j The circle to which it belongs bounces away, thus avoiding the proxy point S i The circle and the proxy point S j The circles overlap.

[0036] Furthermore, before constructing the mechanical simulation system, it also includes: setting parameters of each proxy point and system parameters.

[0037] Among them, the parameters of each proxy point include mass, initial velocity, initial position, movement direction, etc., and the system parameters include system initial energy and system damping, etc.

[0038] For example, the mass of each proxy point can be set to 1, the initial velocity of each proxy point can be determined by looking up a table based on different room types, and the initial position and movement direction of each proxy point can be set based on actual conditions. The initial energy of the system can be calculated based on the mass and initial velocity of each proxy point, and the calculation formula is as follows: ; Where E represents the initial energy of the system, i represents the i-th proxy point, l represents the total number of proxy points, and m i represents the quality of the i-th proxy point, v i Represents the initial velocity of the ith proxy point. The system damping can be set according to the actual situation. For example, it can be set to 0.2. The system damping affects the convergence speed of the mechanical simulation system. The larger the system damping, the faster the convergence speed of the mechanical simulation system.

[0039] S3. Run the mechanical simulation system to obtain the final position coordinates of each proxy point.

[0040] Specifically, Figure 6 is a schematic diagram of the movement of proxy points in a mechanical simulation system provided by an embodiment of the present invention, Figure 7 is a heat map of the final position coordinates of each proxy point provided by an embodiment of the present invention, see Figure 6 and Figure 7 , run the mechanical simulation system, obtain the final position coordinates of each proxy point, and import the final position coordinates of each proxy point into Excel for storage.

[0041] Furthermore, each time the above method is executed once, a set of layout solutions can be obtained. By repeatedly executing the above steps, multiple sets of layout solutions can be obtained. Based on the multiple sets of layout solutions, unreasonable solutions can be eliminated and the optimal solution can be screened out.

[0042] The present invention determines the connection relationship between the rooms in the subway station, and constructs a mechanical simulation system according to the connection relationship between the rooms in the subway station. The final position coordinates of each proxy point are obtained through the mechanical simulation system, and multiple layout plans can be automatically and quickly generated, so as to quickly find the optimal solution, which greatly shortens the design cycle. In addition, the data output by the mechanical simulation system can be stored, providing important reference information for subsequent maintenance and renovation work. In addition, when project requirements change, the subway room location design method based on the mechanical simulation system can also quickly recalculate and provide new layout plans, which facilitates the modification of room location layout and improves the adaptability of the design plan.

[0043] Figure 8 is a schematic diagram of the structure of a subway room location design system based on a mechanical simulation system provided by an embodiment of the present invention, and the system is used to execute a subway room location design method based on a mechanical simulation system described in the above embodiment, such as Figure 8 As shown, the system includes the following modules: A connection relationship determination module is used to obtain the connection relationship between the rooms in the subway station and determine the topological relationship between the rooms in the subway station according to the connection relationship; The mechanical system construction module is connected to the connection relationship determination module, and is used to determine the proxy points of each subway station room, set the constraint conditions of each proxy point according to the topological relationship, and construct a mechanical simulation system; wherein the proxy point of the room is the center point of each subway station room; The output module is connected with the mechanical system building module and is used to run the mechanical simulation system to obtain the final position coordinates of each proxy point.

[0044] It should be noted that the terms used in the present invention are only for describing specific embodiments, rather than limiting the scope of the present application. As shown in the present specification, unless the context clearly indicates an exception, the words "one", "a", "a kind of" and / or "the" do not specifically refer to the singular, but may also include the plural. The terms "include", "comprise" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method or device. In the absence of more restrictions, the elements defined by the sentence "include one..." do not exclude the presence of other identical elements in the process, method or device including the elements.

[0045] It should also be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. Unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0046] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the technical solutions of the embodiments of the present invention.

Claims

1. A subway room location design method based on a mechanical simulation system, characterized in that: The steps include: S1. Obtain the connection relationship between the rooms in the subway station, and determine the topological relationship between the rooms in the subway station according to the connection relationship; S2. Determine the proxy point of each subway station room, set the constraint conditions of each proxy point according to the topological relationship, and build a mechanical simulation system; wherein the proxy point of the room is the center point of each subway station room; S3. Run the mechanical simulation system to obtain the final position coordinates of each proxy point.

2. The method for designing the location of a subway room based on a mechanical simulation system according to claim 1, characterized in that: In S1, obtaining the connection relationship between the rooms in the subway station includes: S11, determining the preliminary connection relationship between the rooms in the subway station based on expert experience; S12, completing the preliminary connection relationship according to the subway station design specification and the known subway station design drawings to obtain the completed connection relationship between the subway station rooms; S13. Obtain a connection relationship between rooms in the subway station according to the preliminary connection relationship and the completed connection relationship; wherein the connection relationship includes adjacent, non-adjacent and unknown.

3. The method for designing the location of a subway room based on a mechanical simulation system according to claim 2, characterized in that: In S1, determining the topological relationship between the rooms in the subway station according to the connection relationship includes: S14, using the adjacency matrix L to represent the topological relationship between the rooms in the subway station; Among them, the adjacency matrix L={n xy }, x represents a subway station room of type x, y represents a subway station room of type y, n xy Indicates the connection relationship between subway station rooms of type x and subway station rooms of type y.

4. The method for designing the location of a subway room based on a mechanical simulation system according to claim 3, characterized in that: In S14, the adjacency matrix L is used to represent the topological relationship between the rooms in the subway station, including: S141. If, according to the connection relationship, the connection relationship between the subway station room of type x and the subway station room of type y is adjacent, and the topological relationship between the subway station room of type x and the subway station room of type y is adjacent, then n xy =1; S142. If, according to the connection relationship, the connection relationship between the subway station room of type x and the subway station room of type y is not adjacent, and the topological relationship between the subway station room of type x and the subway station room of type y is not adjacent, then n xy =0; S143. If the connection relationship between the room at the subway station of type x and the room at the subway station of type y is unknown according to the connection relationship, then calculate and determine n by sampling from the probability distribution of the connection relationship between the room at the subway station of type x and the room at the subway station of type y. xy The value of .

5. The method for designing the location of a subway room based on a mechanical simulation system according to claim 1, characterized in that: In S2, determining the proxy points of each subway station room, and setting the constraint conditions of each proxy point according to the topological relationship include: S21, determining the proxy point of each subway station room and the area of ​​each subway station room, taking the proxy point as the center of the circle, and representing the subway station room with circles of different radii according to the area; S22, setting the spring force between each proxy point according to the topological relationship; S23, setting a collision force between each proxy point and the boundary of the subway station, so that each proxy point moves inside the boundary of the subway station; S24. Setting collision forces between proxy points so that circles to which proxy points belong do not overlap.

6. The method for designing the location of a subway room based on a mechanical simulation system according to claim 5, characterized in that: In the S2, before constructing the mechanical simulation system, it also includes: Set the parameters of each proxy point and system parameters; The parameters of each proxy point include mass, initial velocity, initial position, and movement direction, and the system parameters include system initial energy and system damping.

7. A subway room location design system based on a mechanical simulation system, used to implement a subway room location design method based on a mechanical simulation system as described in any one of claims 1 to 6, characterized in that: The system includes the following modules: A connection relationship determination module, used to obtain the connection relationship between the rooms in the subway station, and determine the topological relationship between the rooms in the subway station according to the connection relationship; A mechanical system construction module is connected to the connection relationship determination module, and is used to determine the proxy points of each subway station room, set the constraint conditions of each proxy point according to the topological relationship, and construct a mechanical simulation system; wherein the proxy point of the room is the center point of each subway station room; The output module is connected to the mechanical system construction module and is used to run the mechanical simulation system to obtain the final position coordinates of each proxy point.

Citation Information

Patent Citations

  • Automatic generation method for metro station three-dimensional building model

    CN108228986A

  • Association relation graph drawing method based on force-oriented algorithm model

    CN113721894A

  • Automatic construction method of rail transit station space three-dimensional model based on GIS data

    CN113989456A

  • Line tidal current diagram plant station layout generation method and system based on force steering algorithm

    CN115203868A

  • Force-oriented graph layout method and device, electronic equipment and storage medium

    CN117493637A

Cited By

  • Rail transit underground station environment control room design method based on equipment layout

    CN120180780A

  • Design method of environmental control room in underground rail transit station based on equipment layout

    CN120180780B

  • Subway room layout intelligent design method based on Stable Diffusion

    CN120930230A

  • A subway room layout intelligent design method based on stable diffusion

    CN120930230B