Ship underwater maintenance waterproof bin
By designing a multi -functional underwater repair warehouse, the problem of low maintenance efficiency and waste of resources in the existing technology has been solved, and the accuracy and safety of the accurate adjustment and maintenance of the distance between the maintenance warehouse and the hull are realized.
Patent Information
- Application Number
- CN202411864453.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-18
- Publication Date
- 2025-01-21
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing ship underwater maintenance technology is difficult to respond quickly to complex environmental changes, and the connecting bin length of the mobile water barrier bin cannot be flexibly adjusted, resulting in low maintenance efficiency and waste of resources.
A designed underwater maintenance barrier including maintenance warehouse, connecting warehouse, drainage warehouse, regulating component, positioning component, seal component, hanging component, and fixed component. By regulating the length of the connection warehouse, the positioning component can be used to achieve precise positioning, the seal component guarantees the isolation effect, the hanging component improves the operating efficiency, and the fixed component ensures safety.
It achieves precise adjustment of the distance between the maintenance warehouse and the hull, ensuring the accuracy and safety of maintenance work, and improving operating efficiency and resource utilization.
Smart Images

Figure CN119329718A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of underwater ship maintenance, and in particular to a watertight compartment for underwater ship maintenance. Background Art
[0002] Underwater ship maintenance is essential to ensure the safe operation of ships. Ship maintenance has long been a key link in maritime transportation and marine engineering, especially when facing ocean-going ships and large ships exposed to seawater for a long time, wear and corrosion on the hull surface are often inevitable. In order to extend the service life of ships and maintain normal operations, efficient underwater maintenance methods have become an urgent need. In recent years, with the rapid development of the marine economy, higher requirements have been placed on the maintenance and overhaul technology of ships and their related facilities, which not only require high efficiency, but also need to be able to minimize the impact of maintenance activities on operations while ensuring operational safety.
[0003] The existing underwater ship maintenance technology mainly includes several common measures, such as direct water operation by divers, use of floating platforms, use of mobile watertight compartments or installation of fixed underwater work compartments for local isolation. Among them, although the manual maintenance method of divers is simple, it is not only labor-intensive but also faces high safety risks because the operators are directly exposed to the harsh environment. Although the use of temporary water platforms can improve the working environment to a certain extent, this method is often subject to the limitations of on-site conditions, and the construction time is long and the cost is high. For mobile watertight compartments, the length of the connecting compartment in the traditional watertight compartment design is usually preset in advance, and the distance between the maintenance compartment and the hull cannot be adjusted according to actual needs, resulting in the need to customize the connecting compartment before each maintenance, resulting in a waste of resources. In addition, there is also a dedicated workstation to complete the repair work in a specific area. Although this approach improves the safety and accuracy of the operation, it is limited by its own fixed position and is not flexible.
[0004] However, the above-mentioned methods generally have certain limitations. For example, temporary structures may not be able to respond quickly to changing sea conditions, resulting in extended construction periods and unnecessary expenses. For those relatively permanent facilities, the degree of support for ships of different sizes and shapes may be inconsistent due to their size design or location layout, which in turn affects the schedule and technical implementation of the entire maintenance project. In addition, no matter which type of method is used, when facing deeper waters or places with faster flow rates, how to ensure that external water flow interference can be effectively blocked while accurately locating the damaged parts becomes a thorny problem, which directly affects the quality and reliability of subsequent repair work. Especially for mobile watertight compartments, the problem that the connecting compartment cannot flexibly adjust the length makes it difficult for existing technologies to provide a solution that can adapt to a variety of ship types and quickly respond to complex environmental changes. Summary of the invention
[0005] In order to overcome the above technical problems, the present application provides a ship underwater maintenance watertight compartment.
[0006] The present application provides a ship underwater maintenance watertight compartment, which adopts the following technical solution: A ship's underwater maintenance watertight compartment, comprising a maintenance compartment, a connecting compartment, a drainage compartment, an adjusting assembly, a positioning assembly, a sealing assembly, a hoisting assembly and a fixing assembly; the connecting compartment is fixedly arranged on a side surface of one side of the maintenance compartment; the drainage compartment is fixedly arranged at the bottom of the maintenance compartment; the adjusting assembly is arranged in the connecting compartment, and is used to adjust the length of the connecting compartment, thereby adjusting the distance between the maintenance compartment and the hull; the positioning assembly is provided with four groups, which are respectively arranged at the top of the maintenance compartment, the two sides of the maintenance compartment and the bottom of the drainage compartment, and are located on the side close to the hull, and the positioning assembly is used to position the maintenance compartment and the position of the hull that needs to be repaired; the sealing assembly is provided in the connecting compartment, and is used to seal the connecting compartment; the hoisting assembly is provided at the top of the maintenance compartment, and is used to hoist the maintenance compartment; the fixing assembly is provided with two groups, which are respectively arranged at the top of the maintenance compartment and the bottom of the drainage compartment, and are used to fix the maintenance compartment to the hull.
[0007] By adopting the above technical scheme, the underwater maintenance watertight compartment of the ship can effectively carry out underwater maintenance operations, and the specific effects are as follows: by adjusting the length of the connecting compartment through the adjusting component, the distance between the maintenance compartment and the hull can be accurately adjusted; the positioning component accurately locates the position of the maintenance compartment and the hull that needs to be repaired, ensuring the accuracy of the maintenance work; the sealing component seals the connecting compartment to ensure the isolation effect of the operating area and prevent water from entering; the lifting component facilitates the rapid lifting of the maintenance compartment and improves the operating efficiency; the fixing component ensures the firm fixation of the maintenance compartment and the hull, ensuring safety during the maintenance process.
[0008] Optionally, the adjustment component includes a first telescopic rod and an adjustment warehouse; four first sliding grooves are opened on the inner side wall of the connecting warehouse, the length direction of the first sliding grooves is the same as the length direction of the connecting warehouse, and a first sliding block is slidably arranged in each of the first sliding grooves; the adjusting warehouse is coaxially arranged with the connecting warehouse, and the four first sliding blocks are fixedly connected to the outer side wall of the connecting warehouse; the first telescopic rod is an electric telescopic rod, the length direction of the first telescopic rod is parallel to the length direction of the first sliding groove, the fixed end of the first telescopic rod is fixedly arranged on the top surface of the adjusting warehouse, and the movable end of the first telescopic rod is fixedly connected to the adjusting warehouse.
[0009] By adopting the above technical solution, the length of the connection chamber can be effectively adjusted, thereby adjusting the distance between the maintenance chamber and the hull. Specifically, the adjustment chamber is driven to move by the telescopic movement of the first telescopic rod, so that the connection chamber can be adjusted between different lengths, ensuring that the watertight chamber can adapt to maintenance positions of different sizes, thereby improving the applicability and flexibility of the device.
[0010] Optionally, the sealing assembly includes a second telescopic rod, a fixed block and a sealing strip; a second slide groove is provided on the end surface of the adjusting chamber away from the maintenance chamber, the longitudinal cross-section of the second slide groove is annular, the axial direction of the second slide groove coincides with the axial direction of the adjusting chamber, and the depth direction of the second slide groove is parallel to its axial direction; the second telescopic rod is an electric telescopic rod and is provided with a plurality of them, and the plurality of second telescopic rods are all arranged in the second slide groove and are evenly distributed along the circumference of the second slide groove, the length direction of each second telescopic rod is parallel to the depth direction of the second slide groove, the fixed end of each second telescopic rod is fixedly connected to the bottom of the second slide groove, and the movable end of each second telescopic rod is fixedly connected to one of the fixed blocks; the sealing strip is made of elastic material and is annular, and the plurality of fixed blocks are fixedly connected to the sealing strip on the side away from the first telescopic rod.
[0011] By adopting the above technical solution, the efficiency of sealing the connection chamber can be improved. By setting a second slide groove on the end surface of the adjustment chamber away from the maintenance chamber, and setting a plurality of second telescopic rods in the slide groove, the fixed block can move in the second slide groove along with the telescopic action of the second telescopic rod. At the same time, an annular sealing strip made of elastic material is fixedly connected to these fixed blocks, and can be deformed when the second telescopic rod drives the fixed block to move. When the connection chamber is aligned with the position of the hull that needs to be repaired, the sealing strip can be made close to the hull by extending the second telescopic rod.
[0012] Optionally, the sealing assembly also includes a sealing chamber, a first sealing ring, a first sealing airbag and a first air pump; the sealing chamber is arranged on the inner side of several of the fixed blocks and fixedly connected to the inner side walls of several of the fixed blocks, the axial direction of the sealing chamber coincides with the axial direction of the adjusting chamber, and the side of the sealing chamber away from the maintenance chamber is fixedly connected to the sealing strip; the first sealing ring is annular, the axial direction of the first sealing ring coincides with the axial direction of the adjusting chamber, and the first sealing ring is fixedly connected to the side of the sealing chamber close to the maintenance chamber; the first sealing airbag is also annular, the first sealing airbag is also fixedly connected to the side of the sealing chamber close to the maintenance chamber, the axial direction of the first sealing airbag also coincides with the axial direction of the adjusting chamber, and the first sealing airbag is located between the first sealing ring and the inner side wall of the adjusting chamber; the first air pump is fixedly arranged on one side of the first sealing ring and is connected to the first sealing airbag.
[0013] By adopting the above technical solution, the adjustable length of the connecting chamber can be further increased, and the sealing performance of the connecting chamber can be improved. The setting of the sealing chamber enables the sealing chamber to extend the adjusting chamber under the action of the second telescopic rod and the fixed block; the setting of the first sealing ring and the first sealing airbag further enhances the sealing performance between the sealing chamber and the connecting chamber to prevent water intrusion. The first air pump can inflate the first sealing airbag, causing the first sealing airbag to expand and come into close contact with the inner wall of the adjusting chamber, so that the gap between the sealing chamber and the adjusting chamber is also sealed, which significantly improves the waterproof effect of the watertight chamber during underwater operation.
[0014] Optionally, the sealing assembly also includes a second sealing ring, a second sealing airbag and a second air pump; the second sealing ring is fixedly arranged on the end face of the regulating chamber away from the maintenance chamber, and the axial direction of the second sealing ring coincides with the axial direction of the regulating chamber; the second sealing airbag is also annular, and the second sealing airbag is also fixedly connected to the end face of the regulating chamber away from the maintenance chamber, and the axial direction of the second sealing airbag also coincides with the axial direction of the regulating chamber, and the second sealing airbag is located between the second sealing ring and the outer side wall of the regulating chamber; the second air pump is fixedly arranged in the side wall of the regulating chamber and is connected to the second sealing airbag.
[0015] By adopting the above technical solution, the second sealing ring, the second sealing airbag and the second air pump are used in combination to form a sealing structure at the end of the regulating chamber away from the maintenance chamber, effectively enhancing the sealing performance of the connecting chamber and ensuring the sealing reliability of the watertight chamber during underwater operations. The second sealing airbag expands after being inflated by the second air pump, blocking the gap between the regulating chamber and the connecting chamber, further improving the sealing effect, effectively preventing water from entering the interior of the connecting chamber, and ensuring the smooth progress of maintenance work.
[0016] Optionally, the positioning assembly includes a support block, a third telescopic rod, a positioning block and an adsorption block; there are four support blocks, which are respectively fixed on the top of the maintenance bin, on both sides of the maintenance bin and on the bottom of the drainage bin, and are arranged on a side close to the connecting bin; the third telescopic rod is an electric telescopic rod and there are also four of them, and the fixed end of each of the third telescopic rods is fixed on a side of the support block close to the maintenance bin, and the length direction of the third telescopic rod coincides with the axial direction of the connecting bin; there are also four positioning blocks, and each of the positioning blocks is fixedly connected to the movable end of one of the third telescopic rods; the adsorption blocks are made of ferromagnetic material and there are also four of them, and each of the adsorption blocks is fixedly connected to a side of the positioning block away from the third telescopic rod.
[0017] By adopting the above technical solution, the positioning assembly can effectively fix the position of the maintenance compartment. Specifically, the support blocks are distributed in different parts of the maintenance compartment. With the telescopic movement of the third telescopic rod, the positioning block can flexibly adjust its position, thereby driving the adsorption block made of strong magnetic material to adhere to the surface of the hull, so that the maintenance compartment can be initially positioned at the position required for repair.
[0018] Optionally, the positioning assembly also includes a vacuum suction cup and a vacuum pump; four vacuum pumps are provided, each of which is connected to a side of the positioning block away from the third telescopic rod; and each of the vacuum pumps is fixedly connected to a vacuum suction cup on one side of the positioning block away from the third telescopic rod.
[0019] By adopting the above technical solution, the vacuum suction cup and the vacuum pump are added to the positioning component, so that the positioning is more stable and reliable, and the stability of the whole device during underwater operation is enhanced.
[0020] Optionally, the vacuum pump and the positioning block are connected by a ball connection.
[0021] By adopting the above technical solution, the vacuum pump can be adjusted at multiple angles relative to the positioning block, ensuring effective positioning and stable adsorption in complex environments, and improving the positioning accuracy and reliability of the watertight compartment in different postures.
[0022] Optionally, the lifting assembly includes a lifting cable and a lifting ring, and the lifting cable and the lifting ring are both arranged at the top of the maintenance compartment; the fixing assembly includes a steel cable and a basket bolt, and two steel cables are provided, which are respectively arranged at the top of the maintenance compartment and the bottom of the drainage compartment, and each of the steel cables is provided with a basket bolt at one end close to the hull; one end of the steel cable located at the top of the maintenance compartment is fixedly connected to the maintenance compartment, and the other end is connected to the hull through the basket bolt; one end of the steel cable located at the bottom of the drainage compartment is fixedly connected to the drainage compartment, and the other end is connected to the hull through the basket bolt.
[0023] By adopting the above technical solution, the stable fixation and convenient lifting of the underwater maintenance watertight compartment of the ship can be achieved. Specifically, the lifting cable and lifting ring arranged on the top of the maintenance compartment enable the watertight compartment to be lifted into place conveniently and quickly. The combination of the steel cable and the basket bolt in the fixing assembly ensures the effective fixation of the maintenance compartment and the hull, especially the basket bolt can flexibly adjust the tension of the steel cable, thereby improving the stability and reliability of the entire watertight compartment.
[0024] Optionally, a water pipe and a ventilation pipe are provided between the connecting chamber and the drainage chamber; a water pump and a one-way water valve are provided on the water pipe, and an air valve is provided on the ventilation pipe; a drainage pipe is provided at the bottom of the drainage chamber, and a drainage valve is provided on the drainage pipe.
[0025] By adopting the above technical solution, a water pipe and a vent pipe are provided between the connection tank and the drainage tank, which can realize the effective management of water flow and gas during the maintenance process, ensuring the safe and stable working environment in the cabin. Specifically, the water pipe and the water pump can effectively transport the seawater in the connection tank to the drainage tank, the one-way water valve prevents water from flowing back, and the air valve on the vent pipe can exchange gas between the drainage tank and the connection tank. The drain pipe at the bottom of the drainage tank and the drain valve on it facilitate the timely removal of excess water to ensure the normal operation of the entire system.
[0026] In summary, the present application includes at least one of the following beneficial technical effects: Through the setting of the adjustment component, positioning component, sealing component, lifting component and fixing component, the adjustment component adjusts the length of the connection chamber to achieve the precise adjustment of the distance between the maintenance chamber and the hull; the positioning component accurately locates the position of the maintenance chamber and the hull that needs to be repaired, ensuring the accuracy of the maintenance work; the sealing component seals the connection chamber to ensure the isolation effect of the working area and prevent water from entering; the lifting component facilitates the rapid lifting of the maintenance chamber and improves the working efficiency; the fixing component ensures the stable fixation of the maintenance chamber and the hull, ensuring the safety during the maintenance process; By setting the first telescopic rod and the adjustment chamber, the length of the connection chamber can be effectively adjusted, thereby adjusting the distance between the maintenance chamber and the hull. Specifically, the adjustment chamber is moved by the telescopic movement of the first telescopic rod, so that the connection chamber can be adjusted between different lengths, ensuring that the watertight chamber can adapt to maintenance positions of different sizes, thereby improving the applicability and flexibility of the device. Through the provision of the sealing chamber, the first sealing ring and the first sealing airbag, the sealing chamber can extend the adjusting chamber under the action of the second telescopic rod and the fixed block; the provision of the first sealing ring and the first sealing airbag further enhances the sealing performance between the sealing chamber and the connecting chamber to prevent water intrusion. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application; Figure 2 yes Figure 1 A partial enlarged schematic diagram of part A; Figure 3 It is a schematic diagram of the cross-sectional structure of the connecting chamber, the adjusting chamber and the sealing chamber in the embodiment of the present application; Figure 4 It is a schematic diagram of the cross-sectional structure of the maintenance bin and the drainage bin in the embodiment of the present application.
[0028] Description of reference numerals: 1. maintenance compartment; 11. upper access door; 12. side access door; 2. connection compartment; 21. water pipe; 22. water pump; 23. one-way water valve; 24. ventilation pipe; 25. air valve; 26. first chute; 3. drainage compartment; 31. drainage pipe; 32. drainage valve; 4. adjustment assembly; 41. first telescopic rod; 42. adjustment compartment; 421. second chute; 43. first slider; 5. positioning assembly; 51. support block; 52. third telescopic rod; 53. Positioning block; 54. Adsorption block; 55. Vacuum suction cup; 56. Vacuum pump; 6. Sealing assembly; 61. Second telescopic rod; 62. Fixing block; 63. Sealing strip; 64. Sealing chamber; 65. First sealing ring; 66. First sealing airbag; 67. First air pump; 68. Second sealing ring; 69. Second sealing airbag; 60. Second air pump; 7. Lifting assembly; 71. Lifting cable; 72. Lifting ring; 8. Fixing assembly; 81. Steel cable; 82. Turnbuckle bolt. DETAILED DESCRIPTION
[0029] The following is combined with Figure 1-4 This application is described in further detail.
[0030] The present application embodiment discloses a ship underwater maintenance watertight compartment. Figure 1A ship underwater repair watertight compartment comprises a repair compartment 1, a connecting compartment 2, a drainage compartment 3, an adjusting component 4, a positioning component 5, a sealing component 6, a hoisting component 7 and a fixing component 8; the connecting compartment 2 is fixedly arranged on the side of one side of the repair compartment 1; the drainage compartment 3 is fixedly arranged at the bottom of the repair compartment 1; the adjusting component 4 is arranged in the connecting compartment 2, and is used to adjust the length of the connecting compartment 2, thereby adjusting the distance between the repair compartment 1 and the hull; the positioning component 5 is provided with four groups, which are respectively arranged at the top of the repair compartment 1, the two sides of the repair compartment 1 and the bottom of the drainage compartment 3, and are located on the side close to the hull, and the positioning component 5 is used to position the repair compartment 1 and the position of the hull that needs to be repaired; the sealing component 6 is arranged in the connecting compartment 2, and is used to seal the connecting compartment 2; the hoisting component 7 is arranged at the top of the repair compartment 1, and is used to hoist the repair compartment 1; the fixing component 8 is provided with two groups, which are respectively arranged at the top of the repair compartment 1 and the bottom of the drainage compartment 3, and are used to fix the repair compartment 1 to the hull.
[0031] The underwater maintenance bulkhead of the ship can effectively carry out underwater maintenance operations, and the specific effects are as follows: by adjusting the length of the connecting compartment 2 through the adjusting component 4, the distance between the maintenance compartment 1 and the hull is accurately adjusted; the positioning component 5 accurately positions the maintenance compartment 1 and the position of the hull that needs to be repaired, ensuring the accuracy of the maintenance work; the sealing component 6 seals the connecting compartment 2 to ensure the isolation effect of the operating area and prevent water from entering; the lifting component 7 facilitates the rapid lifting of the maintenance compartment 1 and improves the operating efficiency; the fixing component 8 ensures the firm fixation of the maintenance compartment 1 and the hull, ensuring safety during the maintenance process.
[0032] Reference Figure 1 The hoisting assembly 7 includes a hoisting cable 71 and a hoisting ring 72, both of which are arranged on the top of the repair cabin 1. When the watertight cabin is working, the repair cabin 1 is first hoisted by the hoisting cable 71 and the hoisting ring 72, and then put into the sea water and moved to a position close to the hull that needs to be repaired.
[0033] Reference Figure 1 and Figure 2The positioning assembly 5 includes a support block 51, a third telescopic rod 52, a positioning block 53 and an adsorption block 54; there are four support blocks 51, which are respectively fixedly arranged on the top of the maintenance bin 1, on both sides of the maintenance bin 1 and on the bottom of the drainage bin 3, and are arranged on a side close to the connection bin 2; the third telescopic rod 52 is an electric telescopic rod and there are also four of them, and the fixed end of each third telescopic rod 52 is fixedly arranged on a side of the support block 51 close to the maintenance bin 1, and the length direction of the third telescopic rod 52 coincides with the axial direction of the connection bin 2; there are also four positioning blocks 53, and each positioning block 53 is fixedly connected to the movable end of a third telescopic rod 52; there are four adsorption blocks 54 made of strong magnetic material and there are also four of them, and each adsorption block 54 is fixedly connected to a side of a positioning block 53 away from the third telescopic rod 52. The positioning assembly 5 can effectively fix the position of the maintenance compartment 1. Specifically, the support blocks 51 are distributed at different parts of the maintenance compartment 1. With the telescopic movement of the third telescopic rod 52, the positioning block 53 can flexibly adjust its position, thereby driving the adsorption block 54 made of strong magnetic material to adhere to the surface of the hull, so that the maintenance compartment 1 can be initially positioned at the position required for repair.
[0034] When positioning the repair warehouse 1, first move the repair warehouse 1 to the corresponding height of the position where the hull needs to be repaired through the lifting cable 71, and then start the extension of the third telescopic rod 52 to drive the positioning block 53 to move toward the direction close to the hull, so that the adsorption block 54 can be adsorbed on the hull, so that the repair warehouse 1 can be initially positioned at the position where the repair is required.
[0035] Reference Figure 1 and Figure 2 The positioning assembly 5 also includes a vacuum suction cup 55 and a vacuum pump 56; four vacuum pumps 56 are provided, each of which is connected to a side of a positioning block 53 away from the third telescopic rod 52; each vacuum pump 56 is fixedly connected to a vacuum suction cup 55 on one side away from the positioning block 53.
[0036] When the maintenance compartment 1 is initially positioned by the adsorption block 54, the vacuum suction cup 55 is also adsorbed onto the surface of the hull, and then the vacuum pump 56 is started to evacuate the vacuum suction cup 55 to enhance the stability of the initial positioning.
[0037] Reference Figure 1 and Figure 3The adjusting assembly 4 includes a first telescopic rod 41 and an adjusting bin 42; four first slide grooves 26 are provided on the inner wall of the connecting bin 2, and the length direction of the first slide grooves 26 is the same as the length direction of the connecting bin 2, and a first slider 43 is slidably arranged in each first slide groove 26; the adjusting bin 42 is coaxially arranged with the connecting bin 2, and the four first sliders 43 are fixedly connected to the outer wall of the connecting bin 2; the first telescopic rod 41 is an electric telescopic rod, and the length direction of the first telescopic rod 41 is parallel to the length direction of the first slide groove 26, the fixed end of the first telescopic rod 41 is fixedly arranged on the top surface of the adjusting bin 42, and the movable end of the first telescopic rod 41 is fixedly connected to the adjusting bin 42.
[0038] After the maintenance cabin 1 is initially positioned, the first telescopic rod 41 is started to extend, driving the adjustment cabin 42 to move, so that the adjustment cabin 42 moves to a position close to the hull.
[0039] Reference Figure 1 and Figure 3 The sealing assembly 6 includes a second sealing ring 68, a second sealing airbag 69 and a second air pump 60; the second sealing ring 68 is fixedly arranged on the end surface of the regulating chamber 42 away from the maintenance chamber 1, and the axial direction of the second sealing ring 68 coincides with the axial direction of the regulating chamber 42; the second sealing airbag 69 is also annular, and the second sealing airbag 69 is also fixedly connected to the end surface of the regulating chamber 42 away from the maintenance chamber 1, and the axial direction of the second sealing airbag 69 also coincides with the axial direction of the regulating chamber 42, and the second sealing airbag 69 is located between the second sealing ring 68 and the outer side wall of the regulating chamber 42; the second air pump 60 is fixedly arranged in the side wall of the regulating chamber 42 and is connected to the second sealing airbag 69. A sealing structure can be formed at the end of the regulating chamber 42 away from the maintenance chamber 1, which effectively enhances the sealing performance of the connecting chamber 2 and ensures the sealing reliability of the watertight chamber during underwater operation.
[0040] After the regulating chamber 42 is adjusted to a suitable position, the second air pump 60 is started to adjust the second sealing airbag 69 to an inflated state, so that a sealing structure is formed between the connecting chamber 2 and the regulating chamber 42 .
[0041] Reference Figure 1 and Figure 3The sealing assembly 6 also includes a second telescopic rod 61, a fixing block 62 and a sealing strip 63; a second slide groove 421 is provided on the end surface of the adjusting chamber 42 away from the maintenance chamber 1, and the longitudinal section of the second slide groove 421 is annular, the axial direction of the second slide groove 421 coincides with the axial direction of the adjusting chamber 42, and the depth direction of the second slide groove 421 is parallel to its axial direction; the second telescopic rod 61 is an electric telescopic rod and is provided with a plurality of them, and the plurality of second telescopic rods 61 are all arranged in the second slide groove 421 and are evenly distributed along the circumference of the second slide groove 421, the length direction of each second telescopic rod 61 is parallel to the depth direction of the second slide groove 421, the fixed end of each second telescopic rod 61 is fixedly connected to the bottom of the second slide groove 421, and the movable end of each second telescopic rod 61 is fixedly connected to a fixing block 62; the sealing strip 63 is made of elastic material and is annular, and the plurality of fixing blocks 62 are fixedly connected to the sealing strip 63 on the side away from the first telescopic rod 41.
[0042] After the position of the adjustment chamber 42 is adjusted and sealed, the second telescopic rod 61 is started to drive the fixing block 62 and the sealing strip 63 to move toward the hull, so that the sealing strip 63 can form a tight fit with the hull under the action of its own deformable material.
[0043] Reference Figure 1 and Figure 3 The sealing assembly 6 also includes a sealing chamber 64, a first sealing ring 65, a first sealing airbag 66 and a first air pump 67; the sealing chamber 64 is arranged on the inner side of the plurality of fixed blocks 62 and is fixedly connected to the inner side walls of the plurality of fixed blocks 62, the axial direction of the sealing chamber 64 coincides with the axial direction of the regulating chamber 42, and the side of the sealing chamber 64 away from the maintenance chamber 1 is fixedly connected to the sealing strip 63; the first sealing ring 65 is annular, the axial direction of the first sealing ring 65 coincides with the axial direction of the regulating chamber 42, and the first sealing ring 65 is fixedly connected to the side of the sealing chamber 64 close to the maintenance chamber 1; the first sealing airbag 66 is also annular, the first sealing airbag 66 is also fixedly connected to the side of the sealing chamber 64 close to the maintenance chamber 1, the axial direction of the first sealing airbag 66 also coincides with the axial direction of the regulating chamber 42, and the first sealing airbag 66 is located between the first sealing ring 65 and the inner side wall of the regulating chamber 42; the first air pump 67 is fixedly arranged on one side of the first sealing ring 65 and communicated with the first sealing airbag 66.
[0044] When the second telescopic rod 61 is extended, it drives the sealing strip 63 to move toward the hull, while driving the sealing chamber 64 to move toward the hull, which can further increase the length of the connecting chamber 2; when the sealing strip 63 is tightly fitted with the surface of the hull, the first air pump 67 is started to adjust the first sealing airbag 66 to an inflated state, so that a sealing structure is formed between the sealing chamber 64 and the adjusting chamber 42.
[0045] Reference Figure 1The fixing assembly 8 includes a steel cable 81 and a basket bolt 82. Two steel cables 81 are provided, which are respectively arranged at the top of the maintenance compartment 1 and the bottom of the drainage compartment 3. A basket bolt 82 is provided at the end of each steel cable 81 close to the hull; one end of the steel cable 81 located at the top of the maintenance compartment 1 is fixedly connected to the maintenance compartment 1, and the other end is connected to the hull through the basket bolt 82; one end of the steel cable 81 located at the bottom of the drainage compartment 3 is fixedly connected to the drainage compartment 3, and the other end is connected to the hull through the basket bolt 82. The lifting cable 71 and the lifting ring 72 arranged at the top of the maintenance compartment 1 enable the watertight compartment to be lifted into place conveniently and quickly. The combination of the steel cable 81 and the basket bolt 82 in the fixing assembly 8 ensures the effective fixation of the maintenance compartment 1 and the hull, especially the flexibly adjustable tension of the steel cable 81 through the basket bolt 82, thereby improving the stability and reliability of the entire watertight compartment.
[0046] After the connection chamber 2 is positioned and sealed, the watertight chamber is fixed by the steel cable 81, and the tension of the steel cable 81 is adjusted by the basket bolt 82 to ensure the stability and reliability of the entire watertight chamber.
[0047] Reference Figure 1 and Figure 4 A water pipe 21 and a vent pipe 24 are provided between the connection chamber 2 and the drainage chamber 3; a water pump 22 and a one-way water valve 23 are provided on the water pipe 21, and an air valve 25 is provided on the vent pipe 24; a drainage pipe 31 is provided at the bottom of the drainage chamber 3, and a drainage valve 32 is provided on the drainage pipe 31. The water pipe 21 and the water pump 22 can effectively transport the seawater in the connection chamber 2 to the drainage chamber 3, the one-way water valve 23 prevents water from flowing back, and the air valve 25 on the vent pipe 24 can exchange gas between the drainage chamber 3 and the connection chamber 2. The drainage pipe 31 at the bottom of the drainage chamber 3 and the drainage valve 32 thereon facilitate timely removal of excess water to ensure the normal operation of the entire system.
[0048] After the connection chamber 2 is positioned and sealed, the water pump 22 is started and the one-way water valve 23 and the air valve 25 are opened, so that the seawater in the connection chamber 2 flows into the drainage chamber 3 and the air in the drainage chamber 3 enters the connection chamber 2 .
[0049] Reference Figure 1 and Figure 4 An upper access door 11 is provided on the top of the maintenance chamber 1, and a side access door 12 is provided between the maintenance chamber 1 and the connection chamber 2. Before the maintenance chamber 1 is launched into the water, maintenance personnel can enter the maintenance chamber 1 through the upper access door 11. After the connection chamber 2 is positioned, sealed, fixed and drained, maintenance personnel can open the side access door 12 to enter the connection chamber 2 to repair the hull.
[0050] A controller is also provided in the maintenance chamber 1. The electrical control equipment of the overall watertight chamber includes a first telescopic rod 41, a second telescopic rod 61, a first air pump 67, a second air pump 60, a third telescopic rod 52, a vacuum pump 56, a water pump 22, a one-way water valve 23, an air valve 25 and a drain valve 32, all of which are electrically connected to the controller, and the start and shutdown of these electrical control equipment can be controlled by the controller.
[0051] The implementation principle of a ship underwater maintenance watertight compartment in the embodiment of the present application is: When the watertight compartment is working, the repair compartment 1 is first lifted by the lifting cable 71 and the lifting ring 72, and then put into the sea water and moved to a position close to the hull that needs to be repaired.
[0052] When positioning the repair chamber 1, the repair chamber 1 is first moved to the height corresponding to the position where the hull needs to be repaired through the suspension cable 71, and then the third telescopic rod 52 is started to extend, driving the positioning block 53 to move toward the direction close to the hull, so that the adsorption block 54 can be adsorbed on the hull, so that the repair chamber 1 can be initially positioned at the position where the repair needs to be repaired. When the repair chamber 1 is initially positioned by the adsorption block 54, the vacuum suction cup 55 is also adsorbed onto the surface of the hull, and then the vacuum pump 56 is started to evacuate the vacuum suction cup 55 to enhance the stability of the initial positioning.
[0053] After the maintenance cabin 1 is initially positioned, the first telescopic rod 41 is started to extend, driving the adjustment cabin 42 to move, so that the adjustment cabin 42 moves to a position close to the hull.
[0054] After the regulating chamber 42 is adjusted to a suitable position, the second air pump 60 is started to adjust the second sealing airbag 69 to an inflated state, so that a sealing structure is formed between the connecting chamber 2 and the regulating chamber 42 .
[0055] After adjusting and sealing the position of the adjustment chamber 42, the second telescopic rod 61 is started to drive the fixing block 62 and the sealing strip 63 to move toward the direction close to the hull, so that the sealing strip 63 can form a tight fit with the hull under the action of its own deformable material. When the second telescopic rod 61 is extended, it drives the sealing strip 63 to move toward the direction close to the hull, while driving the sealing chamber 64 to move toward the direction close to the hull, which can further increase the length of the connection chamber 2; when the sealing strip 63 is in close contact with the surface of the hull, the first air pump 67 is started to adjust the first sealing airbag 66 to the inflated state, so that a sealing structure is formed between the sealing chamber 64 and the adjustment chamber 42.
[0056] After the connection chamber 2 is positioned and sealed, the watertight chamber is fixed by the steel cable 81, and the tension of the steel cable 81 is adjusted by the basket bolt 82 to ensure the stability and reliability of the entire watertight chamber.
[0057] After the connection chamber 2 is positioned and sealed, the water pump 22 is started and the one-way water valve 23 and the air valve 25 are opened, so that the seawater in the connection chamber 2 flows into the drainage chamber 3 and the air in the drainage chamber 3 enters the connection chamber 2 .
[0058] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A ship underwater maintenance watertight compartment, characterized in that: The invention comprises a maintenance chamber (1), a connection chamber (2), a drainage chamber (3), an adjustment component (4), a positioning component (5), a sealing component (6), a lifting component (7) and a fixing component (8); the connection chamber (2) is fixedly arranged on a side surface of one side of the maintenance chamber (1); the drainage chamber (3) is fixedly arranged at the bottom of the maintenance chamber (1); the adjustment component (4) is arranged in the connection chamber (2) and is used to adjust the length of the connection chamber (2), thereby adjusting the distance between the maintenance chamber (1) and the hull; the positioning component (5) is provided with four groups, which are respectively arranged at the top, the bottom and the bottom of the maintenance chamber (1); The positioning assembly (5) is located on both sides of the maintenance chamber (1) and the bottom of the drainage chamber (3), and is located on the side close to the hull. The positioning assembly (5) is used to position the maintenance chamber (1) and the position of the hull that needs to be repaired; the sealing assembly (6) is arranged in the connecting chamber (2) and is used to seal the connecting chamber (2); the lifting assembly (7) is arranged on the top of the maintenance chamber (1) and is used to lift the maintenance chamber (1); the fixing assembly (8) is provided with two groups, which are respectively arranged on the top of the maintenance chamber (1) and the bottom of the drainage chamber (3) and are used to fix the maintenance chamber (1) and the hull.
2. The underwater maintenance watertight compartment for ships according to claim 1, characterized in that: The adjustment assembly (4) comprises a first telescopic rod (41) and an adjustment bin (42); four first slide grooves (26) are provided on the inner side wall of the connection bin (2); the length direction of the first slide grooves (26) is the same as the length direction of the connection bin (2); a first slider (43) is slidably arranged in each of the first slide grooves (26); the adjustment bin (42) is coaxially arranged with the connection bin (2); the four first sliders (43) are fixedly connected to the outer side wall of the connection bin (2); the first telescopic rod (41) is an electric telescopic rod; the length direction of the first telescopic rod (41) is parallel to the length direction of the first slide groove (26); the fixed end of the first telescopic rod (41) is fixedly arranged on the top surface of the adjustment bin (42); the movable end of the first telescopic rod (41) is fixedly connected to the adjustment bin (42).
3. The underwater maintenance watertight compartment for ships according to claim 2, characterized in that: The sealing assembly (6) comprises a second telescopic rod (61), a fixing block (62) and a sealing strip (63); a second slide groove (421) is provided on the end surface of the regulating chamber (42) away from the maintenance chamber (1); the longitudinal section of the second slide groove (421) is annular; the axial direction of the second slide groove (421) coincides with the axial direction of the regulating chamber (42); the depth direction of the second slide groove (421) is parallel to the axial direction; the second telescopic rod (61) is an electric telescopic rod and is provided in plurality; the plurality of second telescopic rods (61) are all arranged in the second slide groove (421); 21), and are evenly distributed along the circumference of the second slide groove (421), the length direction of each second telescopic rod (61) is parallel to the depth direction of the second slide groove (421), the fixed end of each second telescopic rod (61) is fixedly connected to the bottom of the second slide groove (421), and the movable end of each second telescopic rod (61) is fixedly connected to one of the fixing blocks (62); the sealing strip (63) is made of elastic material and is annular, and a plurality of the fixing blocks (62) are fixedly connected to the sealing strip (63) on one side away from the first telescopic rod (41).
4. The underwater maintenance watertight compartment for ships according to claim 3, characterized in that: The sealing assembly (6) further comprises a sealing chamber (64), a first sealing ring (65), a first sealing airbag (66) and a first air pump (67); the sealing chamber (64) is arranged on the inner side of a plurality of the fixing blocks (62) and is fixedly connected to the inner side walls of the plurality of the fixing blocks (62); the axial direction of the sealing chamber (64) coincides with the axial direction of the regulating chamber (42); the side of the sealing chamber (64) away from the maintenance chamber (1) is fixedly connected to the sealing strip (63); the first sealing ring (65) is annular; the axial direction of the first sealing ring (65) coincides with the axial direction of the regulating chamber (42); The first sealing ring (65) is fixedly connected to a side of the sealing chamber (64) close to the maintenance chamber (1); the first sealing airbag (66) is also ring-shaped, and is also fixedly connected to a side of the sealing chamber (64) close to the maintenance chamber (1); the axial direction of the first sealing airbag (66) also coincides with the axial direction of the regulating chamber (42), and the first sealing airbag (66) is located between the first sealing ring (65) and the inner side wall of the regulating chamber (42); the first air pump (67) is fixedly arranged on one side of the first sealing ring (65) and is connected to the first sealing airbag (66).
5. The underwater maintenance watertight compartment for ships according to claim 4, characterized in that: The sealing assembly (6) also includes a second sealing ring (68), a second sealing airbag (69) and a second air pump (60); the second sealing ring (68) is fixedly arranged on the end surface of the regulating chamber (42) away from the maintenance chamber (1), and the axial direction of the second sealing ring (68) coincides with the axial direction of the regulating chamber (42); the second sealing airbag (69) is also annular, and the second sealing airbag (69) is also fixedly connected to the end surface of the regulating chamber (42) away from the maintenance chamber (1), and the axial direction of the second sealing airbag (69) coincides with the axial direction of the regulating chamber (42), and the second sealing airbag (69) is located between the second sealing ring (68) and the outer side wall of the regulating chamber (42); the second air pump (60) is fixedly arranged in the side wall of the regulating chamber (42) and is connected to the second sealing airbag (69).
6. The underwater maintenance watertight compartment for ships according to claim 5, characterized in that: The positioning assembly (5) comprises a support block (51), a third telescopic rod (52), a positioning block (53) and an adsorption block (54); the support blocks (51) are provided with four, which are respectively fixedly arranged at the top of the maintenance bin (1), the two sides of the maintenance bin (1) and the bottom of the drainage bin (3), and are arranged at a side close to the connection bin (2); the third telescopic rod (52) is an electric telescopic rod and is also provided with four, the fixed end of each of the third telescopic rods (52) is fixedly arranged at a side of the support block (51) close to the maintenance bin (1), and the length direction of the third telescopic rod (52) coincides with the axial direction of the connection bin (2); the positioning blocks (53) are also provided with four, each of which is fixedly connected to a movable end of the third telescopic rod (52); the adsorption blocks (54) are made of strong magnetic material and are also provided with four, each of which is fixedly connected to a side of the positioning block (53) away from the third telescopic rod (52).
7. The underwater maintenance watertight compartment for ships according to claim 6, characterized in that: The positioning assembly (5) further comprises a vacuum suction cup (55) and a vacuum pump (56); four vacuum pumps (56) are provided, and each of the vacuum pumps (56) is connected to a side of the positioning block (53) away from the third telescopic rod (52); and each of the vacuum pumps (56) is fixedly connected to a vacuum suction cup (55) on a side away from the positioning block (53).
8. The underwater maintenance watertight compartment for ships according to claim 7, characterized in that: The vacuum pump (56) and the positioning block (53) are connected in a ball connection.
9. The underwater maintenance watertight compartment for ships according to claim 8, characterized in that: The hoisting assembly (7) comprises a hoisting cable (71) and a hoisting ring (72), and the hoisting cable (71) and the hoisting ring (72) are both arranged at the top of the maintenance chamber (1); the fixing assembly (8) comprises a steel cable (81) and a basket bolt (82), and two steel cables (81) are provided, which are respectively arranged at the top of the maintenance chamber (1) and the bottom of the drainage chamber (3), and each of the steel cables (81) is provided with a basket bolt (82) at one end close to the hull; one end of the steel cable (81) located at the top of the maintenance chamber (1) is fixedly connected to the maintenance chamber (1), and the other end is connected to the hull through the basket bolt (82); one end of the steel cable (81) located at the bottom of the drainage chamber (3) is fixedly connected to the drainage chamber (3), and the other end is connected to the hull through the basket bolt (82).
10. The underwater maintenance watertight compartment for ships according to claim 9, characterized in that: A water pipe (21) and a vent pipe (24) are provided between the connection chamber (2) and the drainage chamber (3); a water pump (22) and a one-way water valve (23) are provided on the water pipe (21), and an air valve (25) is provided on the vent pipe (24); a drainage pipe (31) is provided at the bottom of the drainage chamber (3), and a drainage valve (32) is provided on the drainage pipe (31).
Citation Information
Patent Citations
Underwater dry impermeable maintenance cabin for ship
CN102126545A
Underwater repairing method for left and right suction ports of trailing suction dredger
CN116142415A
Fixing equipment for underwater ship maintenance
CN116691963A
Magnetic type water floating conveying bin and receiving device thereof
CN209366388U
Water insulation device for underwater maintenance of ship body
CN213705739U