Vegetable greenhouse water and fertilizer irrigation equipment and vegetable greenhouse water and fertilizer irrigation system

By designing vegetable greenhouse water and fertilizer irrigation equipment that includes a buffer cavity, floating parts and dredging components, the problem of clogging of the nozzle drain port is solved, and the normal outflow of water and fertilizer and uniform irrigation of crops are achieved.

CN119344063AActive Publication Date: 2025-01-24SHANGHAI RUNCHEN AGRICULTURAL DEVELOPMENT CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411615288.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-13
Publication Date
2025-01-24
Estimated Expiration
2044-11-13

AI Technical Summary

Technical Problem

When using water and fertilizer irrigation equipment, the drain outlet at the sprinkler head is easily blocked due to the accumulation of dry fertilizer, resulting in a decrease in the flow of water and fertilizer, affecting the uniform irrigation of crops.

Method used

A water and fertilizer irrigation equipment for vegetable greenhouses is designed, including connecting pipes, irrigation heads, floating parts and dredging components. The buffer cavity inside the watering head is connected to the drain port, and the floating member moves in the direction of gravity under the action of the water and fertilizer solution, driving the dredge component through the drain port to clear the clogged fertilizer.

Benefits of technology

By regularly cleaning up the duct mouth, water and fertilizer can flow normally, avoiding the problem of reduced traffic caused by blockage, and uniform irrigation of the crop.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119344063A_ABST
    Figure CN119344063A_ABST
Patent Text Reader

Abstract

The invention relates to vegetable greenhouse water and fertilizer irrigation equipment and a vegetable greenhouse water and fertilizer irrigation system, and belongs to the field of irrigation equipment. The water and fertilizer irrigation equipment for the vegetable greenhouse comprises a connecting pipe, an irrigation head, a floating piece and a dredging assembly. One end of the connecting pipe is connected with a water-fertilizer source; a buffer cavity with a liquid outlet is formed in the irrigation head; the floating piece is arranged in the buffer cavity; the dredging assembly is arranged below the liquid outlet and connected with the floating part, and the floating part is driven by the water fertilizer to be away from the liquid outlet in the gravity direction so as to drive part of the dredging assembly to enter the buffer cavity through the liquid outlet in the gravity direction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of irrigation equipment, and in particular relates to vegetable greenhouse water and fertilizer irrigation equipment and a vegetable greenhouse water and fertilizer irrigation system. Background Art

[0002] Water-fertilizer is an agricultural technology that combines water and fertilizer, and is usually used for irrigation and fertilization at the same time. The composition of water-fertilizer can be adjusted according to different needs and crop types, but usually includes nitrogen sources (urea, ammonium nitrate, etc.), phosphorus sources (potassium dihydrogen phosphate, monoammonium phosphate, etc.), potassium sources (potassium sulfate, potassium chloride, etc.), trace elements (iron, zinc, copper, manganese, boron, etc.) and organic substances (humic acid, amino acids, etc.). Therefore, long-term use can easily cause dried fertilizers to accumulate at the drainage port of the sprinkler. In order to ensure that the fertilizer is evenly distributed and effectively absorbed by the plants, it is usually necessary to use drip irrigation, sprinkler irrigation, etc. Precision irrigation leads to a small flow of water and fertilizer at the sprinkler during the use of water-fertilizer, and long-term use can easily cause the drainage port to be blocked. Summary of the invention

[0003] In view of the above problems, an embodiment of the present application provides a vegetable greenhouse water and fertilizer irrigation equipment and a vegetable greenhouse water and fertilizer irrigation system, which can regularly clean the blocked drainage outlet.

[0004] In the first aspect, the embodiment of the present application provides a vegetable greenhouse water and fertilizer irrigation device including a connecting pipe, a watering head, a floating member and a dredging assembly. One end of the connecting pipe is connected to a water and fertilizer source; a buffer cavity with a drainage port is formed inside the watering head; the floating member is arranged in the buffer cavity; the dredging assembly is arranged below the drainage port and connected to the floating member, and the floating member is driven by the water and fertilizer to move away from the drainage port in the direction of gravity, so as to drive part of the dredging assembly to enter the buffer cavity through the drainage port in the direction of gravity.

[0005] Specifically, during normal use, the buffer chamber buffers the water-fertilizer solution discharged from the connecting pipe to reduce the flow rate of the water-fertilizer solution, thereby allowing the water-fertilizer solution to accurately drip or sprinkle irrigate the crops through the discharge port.

[0006] When the dried fertilizer blocks the drainage port, the liquid level of the water-fertilizer solution in the buffer cavity rises, thereby driving the floating member to move away from the drainage port, and then the floating member overcomes the gravity of the dredging component, driving the dredging component to move toward the drainage port, and then the dredging component penetrates the dried fertilizer and dredges the drainage port, so that the water-fertilizer can flow out of the drainage port normally, and then the liquid level in the buffer cavity drops, and then the floating member moves toward the drainage port to reset, and the dredging component resets under the action of gravity. In this way, the blocked drainage port can be cleaned regularly.

[0007] In some embodiments, the vegetable greenhouse water and fertilizer irrigation equipment also includes a mounting plate and a driving member, the mounting plate is arranged below the irrigation head and is located on one side of the drainage port in the first direction, the dredging component can be slidably arranged on the mounting plate along the gravity direction, and the first direction is perpendicular to the gravity direction; the driving member is in a bent shape, and the driving member includes a driving part extending along the gravity direction and an abutting part extending along the second direction, the driving member can be slidably arranged on the mounting plate along the gravity direction, the driving member is connected to the floating member, and the abutting part abuts against the dredging component along the gravity direction to drive the dredging component to move toward the drainage port, and the first direction, the second direction and the gravity direction are perpendicular to each other.

[0008] In some embodiments, the mounting plate has a slide groove on the side facing the driving member, and the slide groove has a first section extending along the second direction; the clearing component includes a slider arranged in the slide groove; the driving part has a first guide surface on the side facing the clearing component in the second direction, and the first guide surface moves relative to the clearing component along the gravity direction to guide the clearing component to move along the first section and make the clearing component directly below the drain port.

[0009] In some embodiments, the clearing component also includes a mounting sleeve and a rotating shaft, the slider is arranged on the outside of the mounting sleeve; the middle part of the rotating shaft can be slidably inserted in the mounting sleeve along the direction of gravity, and the abutment portion abuts against one end of the rotating shaft away from the drain port to drive the other end of the rotating shaft to enter the drain port.

[0010] In some embodiments, the side of the mounting sleeve facing the driving portion in the second direction has a second guide surface corresponding to the first guide surface.

[0011] In some embodiments, the mounting sleeve is a hollow structure with an opening, and the opening is arranged on the side of the mounting sleeve facing the drain port; the dredging component also includes an elastic membrane, which is arranged outside the rotating shaft and covers the opening.

[0012] In some embodiments, a spiral groove is provided on the outer periphery of the rotating shaft; the clearing component also includes a boss and a spiral blade; the boss protrudes from the inner wall of the mounting sleeve and is located in the spiral groove; the spiral blade is wound around one end of the rotating shaft away from the abutment portion in the direction of gravity.

[0013] In some embodiments, the slide groove has a second section connected to the first section, the second section extends along the gravity direction and is bent with the first section, and the second section is located between the first section and the drain port along the gravity direction; the first section includes a first sub-section and a second sub-section, and the second sub-section is located between the first sub-section and the second section along the second direction: the first guide surface includes a first sub-guide surface and a second sub-guide surface, and the second sub-guide surface is located between the first sub-guide surface and the abutting portion along the gravity direction, the first sub-guide surface is used to guide the dredging component to move along the first sub-section to the second sub-section before the abutting portion abuts against the rotating shaft, and the second sub-guide surface is used to guide the dredging component to move along the second sub-section to the second section after the abutting portion abuts against the rotating shaft.

[0014] In some embodiments, the clearing component also includes a first connecting rope; a through hole is opened at the first end of the first sub-segment away from the second sub-segment and penetrates the mounting plate along the second direction, the first connecting rope is passed through the through hole, and the two ends of the first connecting rope are respectively connected to the driving member and the slider.

[0015] In a second aspect, an embodiment of the present application provides a vegetable greenhouse water and fertilizer irrigation system, comprising the vegetable greenhouse water and fertilizer irrigation equipment and a driving mechanism as described in any of the above embodiments; the driving mechanism is configured to drive the vegetable greenhouse water and fertilizer irrigation equipment to move in a horizontal direction. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 A schematic diagram of the structure of a vegetable greenhouse water and fertilizer irrigation device provided by an embodiment of the present invention;

[0018] Figure 2 A schematic diagram of the structure of a mounting plate provided in an embodiment of the present invention;

[0019] Figure 3 A schematic diagram of the structure of the installation sleeve provided in an embodiment of the present invention;

[0020] Figure 4 A schematic diagram of the structure of a rotating shaft provided in an embodiment of the present invention;

[0021] Figure 5 A schematic diagram of the structure of a driving member provided by an embodiment of the present invention;

[0022] Figure 6 A schematic diagram of the structure of the dredging assembly provided in an embodiment of the present invention when the dredging assembly is not in contact with the first sub-guide surface;

[0023] Figure 7 A schematic diagram of the structure of the dredging assembly provided in an embodiment of the present invention after sliding along the first sub-guide surface;

[0024] Figure 8 A schematic diagram of the structure of the dredging assembly provided in an embodiment of the present invention when the dredging assembly is not in contact with the second sub-guide surface;

[0025] Fig. 9 A schematic diagram of the structure of the dredging assembly provided in an embodiment of the present invention after sliding along the second sub-guide surface;

[0026] Fig.10 A schematic diagram of the structure of the elastic membrane of the dredging assembly provided in an embodiment of the present invention after elastic restoration.

[0027] In the figure:

[0028] 1-connecting pipe; 2-irrigation head; 21-partition plate; 211-buffer chamber; 211A-first sub-chamber; 211B-second sub-chamber; 212-drainage port; 3-floating member; 31-second connecting rope; 4-dredging assembly; 41-installation sleeve; 411-installation hole; 412-opening; 413-second guide surface; 42-rotating shaft; 421-spiral groove; 422-card groove; 43-slider; 44-elastic membrane; 45-boss; 4 6-spiral blade; 5-mounting plate; 51-slide groove; 511-first section; 5111-first sub-section; 5112-second sub-section; 512-second section; 52-through hole; 6-driving member; 61-driving part; 611-first guide surface; 611A-first sub-guide surface; 611B-second sub-guide surface; 62-abutment part; 63-mounting part; 7-first connecting rope; X-gravity direction; Y-first direction; Z-second direction. DETAILED DESCRIPTION

[0029] The embodiments of the present application are described in detail below with reference to the accompanying drawings.

[0030] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0031] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0032] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0033] Water-fertilizer is an agricultural technology that combines water and fertilizer, and is usually used for irrigation and fertilization at the same time. The composition of water-fertilizer can be adjusted according to different needs and crop types, but usually includes nitrogen sources (urea, ammonium nitrate, etc.), phosphorus sources (potassium dihydrogen phosphate, monoammonium phosphate, etc.), potassium sources (potassium sulfate, potassium chloride, etc.), trace elements (iron, zinc, copper, manganese, boron, etc.) and organic matter (humic acid, amino acids, etc.). Therefore, long-term use can easily cause dried fertilizer to accumulate at the drainage port of the sprinkler. In order to ensure that the fertilizer is evenly distributed and effectively absorbed by the plants, it is usually necessary to use drip irrigation, sprinkler irrigation and other precise irrigation. As a result, the flow rate of water and fertilizer at the sprinkler during the use of water-fertilizer will not be large, and long-term use can easily cause the drainage port to be blocked.

[0034] In order to solve the above technical problems, refer to Figure 1-Figure 10 The embodiment of the present application provides a vegetable greenhouse water and fertilizer irrigation device including a connecting pipe 1, a watering head 2, a floating member 3 and a dredging component 4. One end of the connecting pipe 1 is connected to a water and fertilizer source; a buffer cavity 211 having a liquid discharge port 212 is formed inside the watering head 2; the floating member 3 is disposed in the buffer cavity 211; the dredging component 4 is disposed below the liquid discharge port 212 and connected to the floating member 3. The floating member 3 is driven by the water and fertilizer to move away from the liquid discharge port 212 along the gravity direction X, so as to drive part of the dredging component 4 to enter the buffer cavity 211 through the liquid discharge port 212 along the gravity direction X.

[0035] The connecting pipe 1 may be a corrugated pipe, so that when the watering head 2 moves, it can be extended or shortened to adapt to the distance between the watering head 2 and the water fertilizer source. The water fertilizer source may be a tank with a liquid pump, and the water fertilizer liquid is stored in the tank.

[0036] In some embodiments, the floating member 3 is a floating ball with a hollow structure. The vegetable greenhouse water and fertilizer irrigation equipment may further include a guide rod, one end of which is connected to the floating member 3, and the other end of which passes through the irrigation head 2 along the gravity direction X and is connected to the dredging component 4. So that the floating member 3 can drive the dredging component 4 to move along the gravity direction X, it can be understood that the guide rod and the irrigation head 2 are sealed by a sealing member.

[0037] In some embodiments, a partition 21 extending along the gravity direction X is disposed inside the buffer chamber 211, and the partition 21 is used to separate the buffer chamber 211 into a first sub-chamber 211A and a second sub-chamber 211B arranged along the second direction Z and interconnected, wherein the drain port 212 is connected to the first sub-chamber 211A, and the float 3 is disposed in the second sub-chamber 211B.

[0038] Specifically, during normal use, the buffer chamber 211 buffers the water-fertilizer solution discharged from the connecting pipe 1 to reduce the flow rate of the water-fertilizer solution, thereby allowing the water-fertilizer solution to accurately drip or sprinkle irrigate the crops through the discharge port 212 .

[0039] When the dried fertilizer blocks the drain port 212, the liquid level of the water-fertilizer solution in the buffer chamber 211 rises, thereby driving the floating member 3 to move away from the drain port 212, and then the floating member 3 overcomes the gravity of the dredging component 4, driving the dredging component 4 to move toward the drain port 212, and then the dredging component 4 penetrates the dried fertilizer and dredges the drain port 212, so that the water-fertilizer can flow out of the drain port 212 normally, and then the liquid level in the buffer chamber 211 is lowered, and then the floating member 3 moves toward the drain port 212 to reset, and the dredging component 4 resets under the action of gravity. In this way, the blocked drain port 212 can be cleaned regularly.

[0040] According to some embodiments of the present application, the vegetable greenhouse water and fertilizer irrigation equipment also includes a mounting plate 5 and a driving member 6. The mounting plate 5 is arranged below the irrigation head 2 and is located on one side of the drainage port 212 in the first direction Y. The dredging component 4 can be slidably arranged on the mounting plate 5 along the gravity direction X. The first direction Y is perpendicular to the gravity direction X. The driving member 6 is bent, and the driving member 6 includes a driving portion 61 extending along the gravity direction X and an abutting portion 62 extending along the second direction Z. The driving member 6 can be slidably arranged on the mounting plate 5 along the gravity direction X. The driving member 6 is connected to the floating member 3, and the abutting portion 62 abuts against the dredging component 4 along the gravity direction X to drive the dredging component 4 to move toward the direction close to the drainage port 212. The first direction Y, the second direction Z and the gravity direction X are perpendicular to each other.

[0041] In some embodiments, the driving member 6 can be slidably disposed on the mounting plate 5 via a guide rail or other structure, and can move along the gravity direction X relative to the mounting plate 5 .

[0042] In some embodiments, the driving member 6 is connected to the floating member 3 located in the buffer cavity 211 through the second connecting rope 31. The second connecting rope 31 can be a nylon rope, one end of the second connecting rope 31 is connected to the driving member 6, and the other end of the second connecting rope 31 passes through the wall of the buffer cavity 211 and is connected to the floating member 3. It can be understood that the gap between the second connecting rope 31 and the wall of the buffer cavity 211 is sealed by a sealing member.

[0043] In the above technical solution, the driving member 6 and the dredging component 4 are slidably installed below the drain port 212 through the mounting plate 5, so that the dredging component 4 and the floating member 3 are connected through the driving member 6, and the structure is simple and easy to implement.

[0044] According to some embodiments of the present application, the side of the mounting plate 5 facing the driving member 6 has a slide groove 51, and the slide groove 51 has a first section 511 extending along the second direction Z; the clearing component 4 includes a slider 43 arranged in the slide groove 51; the driving part 61 is provided with a first guide surface 611 on the side facing the clearing component 4 in the second direction Z, and the first guide surface 611 moves relative to the clearing component 4 along the gravity direction X to guide the clearing component 4 to move along the first section 511 and make the clearing component 4 directly below the drain port 212.

[0045] It can be understood that the slide groove 51 can be a dovetail groove, and the slider 43 can be a dovetail block adapted to the dovetail groove.

[0046] Specifically, when the dried fertilizer does not block the drain outlet 212 , the dredging component 4 is located on one side of the drain outlet 212 in the second direction Z, thereby reducing the risk of the dredging component 4 interfering with the water fertilizer solution flowing out of the drain outlet 212 .

[0047] When the dried fertilizer blocks the drain port 212, the liquid level of the water-fertilizer solution in the buffer chamber 211 rises, thereby driving the floating member 3 to move away from the drain port 212, so that the floating member 3 overcomes the gravity of the driving member 6, driving the driving member 6 to approach the drain port 212 along the gravity direction X, and then the first guide surface 611 moves relative to the dredging component 4 along the gravity direction X to guide the dredging component 4 to move along the first section 511, so that the dredging component 4 is located directly below the drain port 212. Then, the abutting portion 62 abuts against the dredging component 4 to drive the dredging component 4 to penetrate the dried fertilizer and dredge the drain port 212, so that the water-fertilizer can flow out of the drain port 212 normally.

[0048] According to some embodiments of the present application, the clearing component 4 also includes a mounting sleeve 41 and a rotating shaft 42, and a slider 43 is arranged on the outside of the mounting sleeve 41; the middle part of the rotating shaft 42 can be slidably inserted in the mounting sleeve 41 along the gravity direction X, and the abutment portion 62 abuts against one end of the rotating shaft 42 away from the drain port 212 to drive the other end of the rotating shaft 42 to enter the drain port 212.

[0049] Exemplarily, the mounting sleeve 41 has a mounting hole 411 for the rotating shaft 42 to pass through, and the axial direction of the mounting hole 411 is parallel to the gravity direction X.

[0050] In the above technical solution, by setting the clearing component 4 as a split structure of the mounting sleeve 41 and the rotating shaft 42, it is satisfied that while the first guide surface 611 can guide the clearing component 4 to move along the first section 511, the abutment portion 62 can drive part of the clearing component 4 to be inserted into the drain port 212 along the gravity direction X. The structure is simple and easy to implement.

[0051] According to some embodiments of the present application, the installation sleeve 41 has a second guide surface 413 corresponding to the first guide surface 611 on a side facing the driving portion 61 in the second direction Z.

[0052] In the above technical solution, the mounting sleeve 41 has a second guide surface 413 corresponding to the first guide surface 611 on the side facing the driving part 61 in the second direction Z, so that the mounting sleeve 41 is in surface contact with the first guide surface 611, thereby reducing the wear of the mounting sleeve 41 when the mounting sleeve 41 slides relative to the first guide surface 611, thereby extending the service life of the device.

[0053] According to some embodiments of the present application, the mounting sleeve 41 is a hollow structure having an opening 412 , and the opening 412 is arranged on the side of the mounting sleeve 41 facing the drain port 212 ; the clearing component 4 also includes an elastic membrane 44 , which is sleeved on the outside of the rotating shaft 42 and covers the opening 412 .

[0054] The elastic membrane 44 may be a rubber membrane. In some embodiments, a slot may be provided on the outer periphery of the rotating shaft 42, and a portion of the elastic membrane 44 is sleeved outside the rotating shaft 42 and is clamped in the slot 422, and the outer periphery of the elastic membrane 44 is connected to the mounting sleeve 41 by hot melt.

[0055] In the above technical solution, the mounting sleeve 41 is a hollow structure with an opening 412, thereby reducing the overall weight of the dredging assembly 4, so that the driving part 61 can more easily drive the dredging assembly 4 to move. The elastic membrane 44 is sleeved outside the rotating shaft 42 and covers the opening 412. On the one hand, the rotating shaft 42 and the mounting sleeve 41 are elastically connected through the elastic membrane 44, so that after the abutting part 62 no longer abuts against the rotating shaft 42, the elastic membrane 44 can elastically recover to drive the rotating shaft 42 and the mounting sleeve 41 to move toward each other, so that one of the rotating shaft 42 and the mounting sleeve 41 is reset relative to the other.

[0056] According to some embodiments of the present application, a spiral groove 421 is provided on the outer periphery of the rotating shaft 42; the clearing component 4 also includes a boss 45 and a spiral blade 46; the boss 45 protrudes from the inner wall of the mounting sleeve 41 and is located in the spiral groove 421; the spiral blade 46 is wound around one end of the rotating shaft 42 away from the abutment portion 62 in the gravity direction X.

[0057] Specifically, when one of the rotating shaft 42 and the mounting sleeve 41 moves relative to the other in the gravity direction X, the boss 45 will slide relative to the spiral groove 421, thereby driving the rotating shaft 42 and the spiral blade 46 outside the rotating shaft 42 to rotate, thereby facilitating the rotating shaft 42 to penetrate the dried fertilizer and clear the drainage port 212.

[0058] According to some embodiments of the present application, the chute 51 has a second section 512 connected to the first section 511, the second section 512 extends along the gravity direction X, and is bent with the first section 511, along the gravity direction X, the second section 512 is located between the first section 511 and the drain port 212; the first section 511 includes a first subsection 5111 and a second subsection 5112, along the second direction Z, the second subsection 5112 is located between the first subsection 5111 and the second section 512: the first guide surface includes a first subsection Surface 611A and the second sub-guide surface 611B are located along the gravity direction X, and the second sub-guide surface 611B is located between the first sub-guide surface 611A and the abutment portion 62. The first sub-guide surface 611A is used to guide the dredging component 4 to move along the first sub-segment 5111 to the second sub-segment 5112 before the abutment portion 62 abuts against the rotating shaft 42. The second sub-guide surface 611B is used to guide the dredging component 4 to move along the second sub-segment 5112 to the second segment 512 after the abutment portion 62 abuts against the rotating shaft 42.

[0059] Specifically, when the dried fertilizer blocks the drain port 212, the liquid level of the water fertilizer solution in the buffer chamber 211 rises, thereby driving the floating member 3 to move away from the drain port 212, thereby causing the floating member 3 to overcome the gravity of the driving member 6, driving the driving member 6 to approach the drain port 212 along the gravity direction X, thereby causing the first sub-guide surface 611A to move relative to the dredging component 4 along the gravity direction X, so as to guide the dredging component 4 to move along the first sub-segment 5111, so that the rotating shaft 42 is located directly below the drain port 212. Subsequently, the abutting portion 62 abuts against the rotating shaft 42, and since the slider 43 is in the second sub-segment 5112 at this time, the mounting sleeve 41 cannot move along the gravity direction X, thereby causing the rotating shaft 42 to move relative to the mounting sleeve 41 along the gravity direction X and approach the drain port 212, and at this time, the boss 45 slides relative to the spiral groove 421, so that the rotating shaft 42 rotates, so that the rotating shaft 42 can penetrate the dried fertilizer and the elastic membrane 44 is stretched. Then, the second sub-guide surface 611B moves relative to the dredging component 4 along the gravity direction X, so that the slider 43 slides from the second sub-section 5112 into the second section 512, so that the slider 43 of the mounting sleeve 41 can move along the gravity direction X. At this time, the elastic membrane 44 is reset to drive the mounting sleeve 41 to move along the gravity direction X toward the rotating shaft 42, so that the boss 45 slides relative to the spiral groove 421, so that the rotating shaft 42 rotates, and then drives the spiral blade 46 to rotate to drive the dried fertilizer to leave the drain port 212.

[0060] According to some embodiments of the present application, the clearing component 4 also includes a first connecting rope 7; a through hole 52 is provided at the first end of the first sub-segment 5111 away from the second sub-segment 5112, which penetrates the mounting plate 5 along the second direction Z, and the first connecting rope 7 is passed through the through hole 52, and the two ends of the first connecting rope 7 are respectively connected to the driving member 6 and the slider 43.

[0061] Specifically, when the driving member 6 approaches the drain port 212 along the gravity direction X, the first connecting rope 7 is not tightened to facilitate the movement of the slider 43 from the first sub-segment 5111 to the second sub-segment 5112 and the second segment 512; when the driving member 6 moves away from the drain port 212 along the gravity direction X, the first connecting rope 7 is tightened to drive the slider 43 to move from the second segment 512 to the second sub-segment 5112 and the first sub-segment 5111.

[0062] An embodiment of the present application provides a vegetable greenhouse water and fertilizer irrigation system, comprising the vegetable greenhouse water and fertilizer irrigation equipment and a driving mechanism of any of the above embodiments; the driving mechanism is configured to drive the vegetable greenhouse water and fertilizer irrigation equipment to move in a horizontal direction.

[0063] It should be noted that the driving mechanism may be a traveling mechanism arranged in the greenhouse.

[0064] To sum up, the embodiment of the present application provides a vegetable greenhouse water and fertilizer irrigation equipment. When in normal use, the buffer chamber 211 buffers the water and fertilizer solution discharged from the connecting pipe 1 to reduce the flow rate of the water and fertilizer solution, thereby allowing the water and fertilizer solution to accurately drip or sprinkle the crops through the discharge port 212.

[0065] When the dried fertilizer blocks the drain port 212, the liquid level of the water fertilizer solution in the buffer chamber 211 rises, thereby driving the floating member 3 to move away from the drain port 212, so that the floating member 3 overcomes the gravity of the driving member 6 and drives the driving member 6 to approach the drain port 212 along the gravity direction X, so that the first sub-guide surface 611A moves relative to the dredging component 4 along the gravity direction X, so as to guide the dredging component 4 to move along the first sub-section 5111, so that the rotating shaft 42 is located directly below the drain port 212. Then, the abutting portion 62 abuts against the rotating shaft 42, and since the slider 43 is in the second sub-section 5112 at this time, the installation sleeve 41 cannot move along the gravity direction X, so that the rotating shaft 42 moves relative to the installation sleeve 41 along the gravity direction X and approaches the drain port 212, and at this time, the boss 45 slides relative to the spiral groove 421, so that the rotating shaft 42 rotates, so that the rotating shaft 42 penetrates the dried fertilizer and the elastic membrane 44 is stretched. Then, the second sub-guide surface 611B moves relative to the dredging component 4 along the gravity direction X, so that the slider 43 slides from the second sub-section 5112 into the second section 512, so that the slider 43 of the mounting sleeve 41 can move along the gravity direction X. At this time, the elastic membrane 44 is reset to drive the mounting sleeve 41 to move along the gravity direction X toward the rotating shaft 42, so that the boss 45 slides relative to the spiral groove 421, so that the rotating shaft 42 rotates, and then drives the spiral blade 46 to rotate to drive the dried fertilizer to leave the drain port 212. So that the water fertilizer can flow out of the drain port 212 normally, and then the liquid level in the buffer chamber 211 is lowered, and then the floating member 3 moves toward the drain port 212 to reset, so that the driving member 6 is reset along the gravity direction X, so that the abutting portion 62 is no longer abutted with the rotating shaft 42, and then the slider 43 moves along the second section 512 toward the first section 511, and at the same time the first connecting rope 7 is tightened to drive the slider 43 to move toward the first subsection 5111. In this way, the dredging component 4 avoids the water fertilizer solution flowing out of the drain port 212.

[0066] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application may be combined with each other.

[0067] The above embodiments are only used to illustrate the technical solution of the present application and are not used to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A vegetable greenhouse water and fertilizer irrigation equipment, characterized in that: include: A connecting pipe, one end of which is connected to a water and fertilizer source; The pouring head has a buffer cavity with a liquid discharge port formed therein; A floating member, disposed in the buffer cavity; The dredging component is arranged below the drainage port and connected to the floating member. The floating member is driven by the water fertilizer to move away from the drainage port along the direction of gravity to drive part of the dredging component to enter the buffer chamber through the drainage port along the direction of gravity.

2. A vegetable greenhouse water and fertilizer irrigation equipment according to claim 1, characterized in that: The vegetable greenhouse water and fertilizer irrigation equipment also includes: A mounting plate is disposed below the watering head and is located on one side of the drain port in a first direction, and the dredging component is slidably disposed on the mounting plate along the direction of gravity, wherein the first direction is perpendicular to the direction of gravity; The driving member is in a bent shape, and includes a driving portion extending along the gravity direction and an abutment portion extending along the second direction. The driving member can be slidably arranged on the mounting plate along the gravity direction. The driving member is connected to the floating member, and the abutment portion abuts against the dredging component along the gravity direction to drive the dredging component to move toward the direction close to the drainage port. The first direction, the second direction and the gravity direction are perpendicular to each other.

3. A vegetable greenhouse water and fertilizer irrigation equipment according to claim 2, characterized in that: The mounting plate has a slide groove on one side facing the driving member, and the slide groove has a first section extending along the second direction; The dredging assembly includes a slider disposed in the chute; The driving part is provided with a first guide surface on the side facing the dredging component in the second direction, and the first guide surface moves relative to the dredging component along the gravity direction to guide the dredging component to move along the first section and make the dredging component directly below the drainage port.

4. A vegetable greenhouse water and fertilizer irrigation equipment according to claim 3, characterized in that: The dredging component also includes: A mounting sleeve, wherein the slider is arranged outside the mounting sleeve; The middle part of the rotating shaft can be inserted into the installation sleeve slidably along the gravity direction, and the abutting part abuts against one end of the rotating shaft away from the drainage port to drive the other end of the rotating shaft to enter the drainage port.

5. A vegetable greenhouse water and fertilizer irrigation equipment according to claim 4, characterized in that: The installation sleeve has a second guide surface corresponding to the first guide surface on a side facing the driving part in the second direction.

6. A vegetable greenhouse water and fertilizer irrigation equipment according to claim 4, characterized in that: The mounting sleeve is a hollow structure with an opening, and the opening is arranged on a side of the mounting sleeve facing the liquid discharge port; The dredging component also includes an elastic membrane, which is sleeved outside the rotating shaft and covers the opening.

7. A vegetable greenhouse water and fertilizer irrigation equipment according to claim 6, characterized in that: The outer circumference of the rotating shaft is provided with a spiral groove; The dredging assembly further comprises a boss, which protrudes from the inner wall of the mounting sleeve and is located in the spiral groove; The spiral blade is wound around one end of the rotating shaft away from the abutting portion in the gravity direction.

8. The vegetable greenhouse water and fertilizer irrigation equipment according to claim 7, characterized in that: The slide groove has a second section connected to the first section, the second section extends along the gravity direction and is bent with the first section, and along the gravity direction, the second section is located between the first section and the liquid discharge port; The first segment includes a first subsegment and a second subsegment, and along the second direction, the second subsegment is located between the first subsegment and the second segment: The first guide surface includes a first sub-guide surface and a second sub-guide surface. Along the gravity direction, the second sub-guide surface is located between the first sub-guide surface and the abutment portion. The first sub-guide surface is used to guide the dredging component to move along the first sub-segment to the second sub-segment before the abutment portion abuts the rotating shaft. The second sub-guide surface is used to guide the dredging component to move along the second sub-segment to the second segment after the abutment portion abuts the rotating shaft.

9. The vegetable greenhouse water and fertilizer irrigation equipment according to claim 8, characterized in that: The dredging component also includes: A first connecting rope, wherein a through hole penetrating the mounting plate along a second direction is formed at a first end of the first sub-segment away from the second sub-segment, the first connecting rope is passed through the through hole, and two ends of the first connecting rope are respectively connected to the driving member and the slider.

10. A vegetable greenhouse water and fertilizer irrigation system, characterized in that: include: The vegetable greenhouse water and fertilizer irrigation equipment according to any one of claims 1 to 9; The driving mechanism is configured to drive the vegetable greenhouse water and fertilizer irrigation equipment to move in a horizontal direction.

Citation Information

Patent Citations

  • Drainage groove for water conservancy project

    CN113235718A

  • Drip irrigation device for pineapple planting

    CN214126350U

  • Drip irrigation structure with self-cleaning function

    CN220088178U

  • Sewage discharge inlet structure

    CN221988240U

  • AU720665B3