Method for installing marine energy-saving guide wheel and stern ball casting on flat ground

By adopting the flat installation method of the guide wheel and stern ball casting in ship energy-saving technology, the problem of difficulty in ensuring the installation and positioning accuracy of the guide wheel is solved, the high-altitude cutting work is reduced, the accuracy and safety are improved, and it is suitable for various ships.

CN119348784APending Publication Date: 2025-01-24CHINA SHIPBUILDING (TIANJIN) SHIPBUILDING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411588210.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-08
Publication Date
2025-01-24

Smart Images

  • Figure CN119348784A_ABST
    Figure CN119348784A_ABST
Patent Text Reader

Abstract

The invention relates to a method for installing a marine energy-saving guide wheel and a stern ball casting on the flat ground, which comprises the following steps of: respectively carrying out original data acquisition on the stern casting and the guide wheel by using a total station, carrying out simulation analysis by using Block software, and calculating the clear amount of the guide vane according to the simulation data of the contact surface of the stern ball casting and the guide wheel guide vane, carrying out under-tire pre-cleaning on the guide wheel guide vane; the stern ball casting is independently subjected to tire raising on the ground; the guide wheel and the stern ball casting are preassembled, and the stern end face of the guide wheel in the preassembled state is about 4.5 m; part of guide vanes of the guide wheel are supported by supporting columns, and the supporting columns need to be vertically arranged; after the guide wheel is preassembled, the guide wheel and the stern ball casting are welded; hoisting the stern ball casting and the guide wheel assembly; the operation danger coefficient caused by high-altitude operation is reduced, and the hook occupying time of hoisting construction of a large crane is shortened.
Need to check novelty before this filing date? Find Prior Art