Building steel structure
By using quick splicing mechanisms and shock-absorbing support components in the building steel structure, the problem of bolts falling off when the building steel structure vibrates is solved, the connection firmness and earthquake resistance are improved, the service life is extended, and safety hazards are reduced.
Patent Information
- Application Number
- CN202411834698.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-13
- Publication Date
- 2025-01-24
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure CN119352644A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building steel structures, and in particular to a building steel structure. Background Art
[0002] Steel structure building is a new type of building system, which breaks through the industry boundaries between real estate, construction and metallurgy, and integrates them into a new industrial system. This is the steel structure building system that is generally favored by industry insiders. Compared with traditional concrete buildings, steel structure buildings use steel plates or steel sections instead of reinforced concrete, which has higher strength and better earthquake resistance.
[0003] At present, in the prior art, steel structures are applied to buildings. Since the steel structures are relatively hard and most of the steel structures are spliced together by bolts during the splicing process, when the building steel structures are subjected to vibrations, the bolts are easily vibrated and fall off from the threaded holes. The falling off of the bolts will lead to unstable connection of the steel structure. If the bolts are not maintained in time, the building steel structure will collapse or be damaged, which poses a great safety hazard. Therefore, the present invention proposes a building steel structure. Summary of the invention
[0004] The purpose of the present invention is to solve the shortcomings existing in the prior art that, due to the high hardness of steel structures and the fact that most of the steel structures are spliced together by bolts during the splicing process, when the building steel structure is subjected to vibration, the bolts are easily vibrated and fall off from the threaded holes, and the falling off of the bolts will cause the connection of the steel structure to be unstable, resulting in the collapse or damage of the building steel structure, which poses a great safety hazard.
[0005] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a building steel structure, including a Z-axis steel structure component, the two sides of the Z-axis steel structure component are plug-connected with X-axis steel structure components, each of the X-axis steel structure components is provided with a quick splicing mechanism on both sides, and the two X-axis steel structure components are installed on both sides of the Z-axis steel structure component through the quick splicing mechanism, and the quick splicing mechanism includes a shock-absorbing support component, and the shock-absorbing support component can play a shock-absorbing support role for the X-axis steel structure component; the Z-axis steel structure component includes a building steel column, a casting hole is provided in the middle of the building steel column, and the middle of both sides of the building steel column are fixedly connected with a side fixing seat, and each of the side fixing seats is fixedly connected with a steel connecting sheet metal; the X-axis steel structure component includes two building steel beams, each of the building steel beams is fixedly connected with a matching plug plate on the inner side, and the two matching plug plates are plug-connected together, and one end of each building steel beam is fixedly connected with a thickened steel connector, and each of the thickened steel connectors is provided with a matching hole, and each matching hole corresponds to a threaded hole.
[0006] In at least some embodiments, threaded holes are provided at the four corners of the outer surface of the steel connecting sheet metal, a reinforcing core is fixedly connected to the inner wall of the casting hole, a protruding steel plate is fixedly connected to the middle of the front surface of the building steel column, and protruding blocks are fixedly connected to the four corners of the building steel column, and each of the matching holes and threaded holes is matched with a No. 1 splicing bolt.
[0007] In at least some embodiments, the quick splicing mechanism includes a side limit plate, which is coupled to a protruding block, one end of the side limit plate is fixedly connected to a rotating part, the rotating part is rotatably installed on one side of a building steel beam, the other end of the side limit plate is provided with a slot, the slot is coupled to both sides of the protruding steel plate, and a limiting hole is provided on the side of the side limit plate close to the rotating part.
[0008] In at least some embodiments, a No. 1 fixing seat is fixedly connected to one side of the side limit plate surface near the limit hole, a No. 1 connecting plate is rotatably installed in the No. 1 fixing seat, a No. 2 connecting plate is rotatably installed at one end of the No. 1 connecting plate, slide grooves are provided on both sides of the No. 2 connecting plate, side slide rails are installed in the slide grooves, and the side slide rails are fixedly connected to one side surface of the building steel beam.
[0009] In at least some embodiments, a tooth plate is fixedly connected to one side of the No. 2 connecting plate, a transmission gear is meshingly connected to one side of the tooth plate, a central axis is fixedly connected to the center of the transmission gear, the central axis is rotatably installed on the surface of one side of the building steel beam, a T-shaped connector is fixedly connected to one side of the transmission gear, and a push handle is fixedly connected to the lower end of the T-shaped connector.
[0010] In at least some embodiments, a connecting rod is rotatably installed on the upper end of the T-shaped connecting member, one end of the connecting rod is fixedly connected to a rotating handle, the lower surface of each connecting rod is fixedly connected to an upper splicing plate, the lower surface of each upper splicing plate is fixedly connected to an upper clamping plate, a reinforcement plate is arranged above each upper splicing plate, and the reinforcement plate and the two upper splicing plates are installed together by No. 2 splicing bolts.
[0011] In at least some embodiments, the shock-absorbing support assembly includes a No. 2 fixing seat, which is fixedly connected to the middle part of the surface of one side of the side limit plate, and a mounting rod is fixedly connected to one side of the No. 2 fixing seat, and telescopic rods are telescopically installed on the upper and lower ends of the mounting rod, and a rubber buffer block is fixedly connected to one end of the inner side of each telescopic rod, and a connecting plate is fixedly connected to the inner side of each rubber buffer block, and the connecting plate is located inside the mounting rod, and a support spring is fixedly connected between the upper and lower connecting plates.
[0012] In at least some embodiments, one end of the outer side of each telescopic rod is fixedly connected to a limiting block, each of the limiting blocks is located below the No. 1 splicing bolt, a limiting plate is arranged above the limiting block, a limiting groove is arranged on the lower surface of the limiting plate, the limiting block is installed in the limiting groove, a clamping block is fixedly connected to the upper surface of the limiting plate, a matching groove is arranged at the lower end of the No. 1 splicing bolt, and the clamping block is installed in the matching groove.
[0013] Compared with the prior art, the advantages and positive effects of the present invention are: In the present invention, since there are two construction steel beams and matching plug plates, the two are spliced together by a reinforcement plate and No. 2 splicing bolts, and then the thickened steel connecting piece at one end of the construction steel beam is inserted into the steel connecting sheet metal, the preliminary installation of the construction steel beam and the construction steel column is realized, and then the side limit plate can be driven to rotate with the rotating part as the center by using the push handle. The side limit plate can firmly connect the construction steel beam and the construction steel column together and limit the two, which is convenient for subsequent concrete pouring. At the same time, the installation steps are convenient and simple, which shortens the steel structure installation time and improves construction efficiency. In the present invention, concrete can be added into the inner core of the steel column reinforcement through the pouring hole, and can also be added between the matching plug plates. After the concrete is dried, the steel column and the steel beam can form a whole, thereby strengthening the support of the steel column and the steel beam. In addition, since the steel column and the steel beam are spliced by No. 1 splicing bolts, the No. 1 splicing bolts can be supported by the shock-absorbing support assembly during the installation of the side limit plate to prevent the No. 1 splicing bolts from rotating due to the influence of vibration force. The vibration force can be buffered by the rubber buffer block and the support spring, thereby improving the firmness of the steel column and the steel beam, and making them have excellent earthquake resistance, thereby extending the service life of the steel structure and improving safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 The present invention provides an overall three-dimensional schematic diagram of a building steel structure; Figure 2 The present invention proposes a structural schematic stereogram of a Z-axis steel structure component in a building steel structure; Figure 3 The present invention provides a schematic three-dimensional diagram of the cross-sectional structure of a Z-axis steel structure component in a building steel structure; Figure 4 The present invention proposes a schematic three-dimensional diagram of a combined explosion structure of a Z-axis steel structure component and an X-axis steel structure component in a building steel structure; Figure 5 The present invention proposes a schematic three-dimensional diagram of the combined structure of an X-axis steel structure component and a quick splicing mechanism in a building steel structure; Figure 6The present invention provides a schematic three-dimensional diagram of the overall structure of a quick splicing mechanism in a building steel structure; Figure 7 The present invention provides a three-dimensional diagram showing the detailed structure of a side limit plate in a building steel structure; Figure 8 The present invention provides a schematic three-dimensional diagram of the local structure of a quick splicing mechanism in a building steel structure; Fig. 9 The present invention provides a schematic three-dimensional diagram of a connecting rod, a reinforcing plate and an upper clamping plate structure in a building steel structure; Fig.10 The present invention provides a schematic three-dimensional diagram of the cross-sectional structure of a shock-absorbing support component of a building steel structure; Fig.11 The present invention provides a schematic three-dimensional diagram of the cross-sectional structure of a No. 1 splicing bolt in a building steel structure.
[0015] Legend: 100, Z-axis steel structural member; 200, X-axis steel structural member; 300, quick splicing mechanism; 101, building steel column; 102, reinforced inner core; 103, side fixing seat; 104, steel connecting sheet metal; 105, threaded hole; 106, protruding block; 107, casting hole; 108, protruding steel plate; 109, No. 1 splicing bolt; 201, building steel beam; 202, matching plug plate; 203, thickened steel connector; 204, matching hole; 301, side limit plate; 302, rotating member; 303, slot; 304, shock-absorbing support assembly; 305, center axis; 306, connecting rod; 307, rotating handle hand; 308, limit hole; 309, No. 1 connecting plate; 310, No. 1 fixing seat; 311, side slide rail; 312, No. 2 connecting plate; 313, slide groove; 314, tooth plate; 315, T-shaped connector; 316, upper splicing plate; 317, upper clamping plate; 318, reinforcement plate; 319, No. 2 splicing bolt; 320, push handle; 321, transmission gear; 401, No. 2 fixing seat; 402, mounting rod; 403, telescopic rod; 404, rubber buffer block; 405, connecting plate; 406, support spring; 407, matching groove; 408, limit block; 409, limit groove; 410, limit plate; 411, clamping block. DETAILED DESCRIPTION
[0016] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0017] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.
[0018] In the prior art, when steel structures are applied to buildings, the steel structures are connected together using a variety of steel structure splicing methods such as straight-line splicing, cross splicing, and T-shaped splicing. The strong hardness of the steel structure leads to strong conductivity of the steel structure, and most of the steel structures are spliced together by bolts during the splicing process. This causes the vibration force to be transmitted to the bolts when the building steel structure is vibrated, which can easily cause the bolts to fall off from the threaded holes due to vibration. The falling of the bolts will cause the steel structure connection to be unstable, and if the bolts are not maintained in time, the building steel structure will collapse or be damaged, which poses a great safety hazard to the building steel structure.
[0019] To this end, the purpose of the present invention is at least to splice two building steel beams 201 together through a quick splicing mechanism 300, and firmly connect the two together through a No. 2 splicing bolt 319, and then drive the building steel beam 201 to insert into the steel connecting sheet metal 104, and then use a No. 1 splicing bolt 109 to firmly connect the two building steel beams 201 and the building steel column 101 together. Compared with the traditional method, this steel structure installation method is faster and shortens the steel structure installation time, thereby improving construction efficiency. The shock-absorbing support component 304 can be used for one The No. 1 splicing bolt 109 is used to support and prevent it from rotating, which not only strengthens the connection firmness of the No. 1 splicing bolt 109, but also makes the connection between the building steel beam 201 and the building steel column 101 have a certain degree of earthquake resistance, so that the steel structure has better practicality. During the construction process, concrete can be added into the pouring hole 107 and between the two matching plug plates 202. The concrete can strengthen the connectivity and integrity between the building steel column 101 and the building steel beam 201. Compared with traditional steel structures, it is more firm and has earthquake resistance.
[0020] Embodiment, according to Figure 1-Figure 7 ,like Figure 1 As shown, a building steel structure provided by an embodiment of the present invention includes a Z-axis steel structure member 100, and the two sides of the Z-axis steel structure member 100 are plug-connected with X-axis steel structure members 200, and each of the two sides of the X-axis steel structure member 200 is provided with a quick splicing mechanism 300, and the two X-axis steel structure members 200 are installed on the two sides of the Z-axis steel structure member 100 through the quick splicing mechanism 300, and the quick splicing mechanism 300 includes a shock-absorbing support assembly 304, and the shock-absorbing support assembly 304 can play a shock-absorbing support role for the X-axis steel structure member 200; like Figure 2-Figure 4As shown, the Z-axis steel structure component 100 includes a building steel column 101, a casting hole 107 is provided in the middle of the building steel column 101, and a side fixing seat 103 is fixedly connected to the middle of both sides of the building steel column 101, and each of the side fixing seats 103 is fixedly connected to a steel connecting sheet metal 104; the X-axis steel structure component 200 includes two building steel beams 201, each of the building steel beams 201 is fixedly connected to a matching plug plate 202 on the inner side, and the two matching plug plates 202 are plugged together, and each of the building steel beams 201 is fixedly connected to a thickened steel connector 203 at one end, and each of the thickened steel connectors 203 is provided with a matching hole 204, and each of the matching holes 204 corresponds to the threaded hole 105; In this embodiment, since two construction steel beams 201 and matching plug plates 202 are provided, the two construction steel beams 201 and matching plug plates 202 are spliced together by a quick splicing mechanism 300, and then concrete can be filled between the two matching plug plates 202. When the concrete is dry, it will form a whole, thereby strengthening the support of the construction steel beam 201, and the installation steps are simple and quick.
[0021] like Figure 4 As shown, threaded holes 105 are provided at the four corners of the outer surface of each of the steel connection sheet metals 104, the inner wall of the casting hole 107 is fixedly connected with a reinforcing inner core 102, the middle of the front surface of the building steel column 101 is fixedly connected with a protruding steel plate 108, and the four corners of the building steel column 101 are fixedly connected with a protruding block 106, and each of the matching holes 204 and the threaded holes 105 are matched with a No. 1 splicing bolt 109; In this embodiment, a casting hole 107 and a reinforced core 102 are fixedly connected through the inner wall of the building steel column 101, and concrete can be added into the building steel column 101 through the casting hole 107 to strengthen the support of the building steel column 101, and the building steel beam 201 is fixed to the steel connecting sheet metal 104 by a No. 1 splicing bolt 109. After fixation, the shock-absorbing support assembly 304 can be used to support the building steel column 101 and the building steel beam 201 to strengthen the firmness between the two.
[0022] like Figure 6-Figure 9As shown, the quick splicing mechanism 300 includes a side limit plate 301, the side limit plate 301 and the protruding block 106 are connected together, one end of the side limit plate 301 is fixedly connected to a rotating member 302, the rotating member 302 is rotatably installed on one side of the building steel beam 201, and the other end of the side limit plate 301 is provided with a slot 303, the slot 303 is connected to both sides of the protruding steel plate 108, and the side limit plate 301 is close to the rotating member 30 A limiting hole 308 is provided on one side of the side limiting plate 301, and a first fixing seat 310 is fixedly connected to the side of the side limiting plate 301 near the limiting hole 308. A first connecting plate 309 is rotatably installed in the first fixing seat 310, and a second connecting plate 312 is rotatably installed at one end of the first connecting plate 309. Slide grooves 313 are provided on both sides of the second connecting plate 312, and a side slide rail 311 is installed in the slide groove 313. The side slide rail 311 is fixedly connected to the building On one side surface of the steel beam 201, one side of the second connecting plate 312 is fixedly connected with a tooth plate 314, one side of the tooth plate 314 is meshedly connected with a transmission gear 321, and the center of the transmission gear 321 is fixedly connected with a central shaft 305, and the central shaft 305 is rotatably installed on the surface of one side of the building steel beam 201, and one side of the transmission gear 321 is fixedly connected with a T-shaped connecting piece 315, and the lower end of the T-shaped connecting piece 315 is fixedly connected with a push handle 320, and the upper end of the T-shaped connecting piece 315 is rotatably installed with a connecting rod 306, and one end of the connecting rod 306 is fixedly connected with a rotating handle 307, and each of the connecting rods 306 is fixedly connected with an upper splicing plate 316 on the lower surface, and each of the upper splicing plates 316 is fixedly connected with an upper clamping plate 317 on the lower surface, and a reinforcing plate 318 is arranged above each of the upper splicing plates 316, and the reinforcing plate 318 and the two upper splicing plates 316 are installed together by No. 2 splicing bolts 319; In this embodiment, first hold the push handle 320 and rotate it. Since the push handle 320 is fixedly sleeved on the central shaft 305 through the T-shaped connecting piece 315 and the transmission gear 321, and the central shaft 305 is rotatably installed on one side of the building steel beam 201, the T-shaped connecting piece 315 and the transmission gear 321 can be driven to rotate around the central shaft 305. The transmission gear 321 is connected to the toothed plate 314 on one side of the second connecting plate 312 through the engagement of the teeth, so as to push the second connecting plate 31 2 moves horizontally along the side slide rail 311. When the push handle 320 and the T-shaped connecting piece 315 are in close contact with the surface of one side of the building steel beam 201, since one end of the second connecting plate 312 is connected to the surface of one side of the side limit plate 301 through the first connecting plate 309 and the first fixing seat 310, the side limit plate 301 can be pushed to rotate around the rotating piece 302, and the side limit plate 301 will move toward the building steel beam 201, and the side limit plate 301 will clamp the building steel column 101. The protruding block 106, and because a slot 303 is provided at one end of the side limit plate 301, the slot 303 will be connected to the edge of the protruding steel plate 108, and the side limit plate 301 can strengthen the connectivity between the building steel column 101 and the building steel beam 201, and then the rotating handle 307 is pressed down to make the rotating handle 307 and the connecting rod 306 rotate around the T-shaped connecting piece 315. Since the upper splicing plate 316 is fixedly connected to the lower surface of the connecting rod 306, the upper splicing plate 316 is fixedly connected to the lower surface of the upper splicing plate 316. An upper clamping plate 317 is fixedly connected to the surface, and the upper clamping plate 317 will be clamped at the edge of the building steel beam 201. Then the reinforcement plate 318 is connected to the upper splicing plate 316 through the No. 2 splicing bolts 319. The two building steel beams 201 can be spliced together to complete the splicing of the building steel beams 201 and the building steel columns 101. This splicing method is faster and simpler than the traditional one, and it strengthens the firmness between the two to prevent deviation during the installation of the steel structure.
[0023] like Figure 10-11As shown, the shock-absorbing support assembly 304 includes a No. 2 fixing seat 401, which is fixedly connected to the middle part of the surface of one side of the side limiting plate 301, and a mounting rod 402 is fixedly connected to one side of the No. 2 fixing seat 401, and telescopic rods 403 are telescopically installed at the upper and lower ends of the mounting rod 402, and a rubber buffer block 404 is fixedly connected to one end of the inner side of each telescopic rod 403, and a connecting plate 405 is fixedly connected to the inner side of each rubber buffer block 404, and the connecting plate 405 is located inside the mounting rod 402, and the connecting plates 405 above and below A support spring 406 is fixedly connected between them, one end of the outer side of each telescopic rod 403 is fixedly connected to a limit block 408, each limit block 408 is located below the No. 1 splicing bolt 109, a limit plate 410 is arranged above the limit block 408, a limit groove 409 is arranged on the lower surface of the limit plate 410, the limit block 408 is installed in the limit groove 409, a clamping block 411 is fixedly connected to the upper surface of the limit plate 410, a matching groove 407 is arranged at the lower end of the No. 1 splicing bolt 109, and the clamping block 411 is installed in the matching groove 407; In this embodiment, when the splicing of the building steel beam 201 and the building steel column 101 is completed, since the installation rod 402 is connected to one end of the No. 2 fixing seat 401, and the No. 2 fixing seat 401 is fixedly connected to the side surface of the side limit plate 301, the installation rod 402 and the No. 2 fixing seat 401 will move with the side limit plate 301, wherein the installation rod 402 will move between the upper and lower No. 1 splicing bolts 109, and a matching groove 407 is provided at the lower end of the No. 1 splicing bolt 109, and a clamping block 411 is connected to the matching groove 407, and the lower surface of the clamping block 411 is fixedly connected to the limiting disk 410, and the limiting groove 409 is provided on the lower surface of the limiting disk 410, and the upper and lower ends of the installation rod 402 are supported by The spring 406 is installed with two connecting plates 405, and the surface of the connecting plate 405 is fixedly connected with a rubber buffer block 404, and the surface of the rubber buffer block 404 is fixedly connected with a telescopic rod 403, which can support the telescopic rod 403 to be telescoped along the two ends of the installation rod 402. Since the telescopic rod 403 is fixedly connected to the limit block 408, the limit block 408 can be inserted into the limit groove 409 to prevent the No. 1 splicing bolt 109 from rotating due to the influence of vibration force, and the vibration force can be buffered by the rubber buffer block 404 and the supporting spring 406, thereby improving the firmness of the building steel column 101 and the building steel beam 201, and making them have excellent earthquake resistance, thereby extending the service life of the steel structure and improving safety.
[0024] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A building steel structure, comprising a Z-axis steel structure member (100), characterized in that: The Z-axis steel structure component (100) is plug-connected with the X-axis steel structure component (200) on both sides, each of the X-axis steel structure components (200) is provided with a quick splicing mechanism (300) on both sides, and the two X-axis steel structure components (200) are installed on both sides of the Z-axis steel structure component (100) through the quick splicing mechanism (300), and the quick splicing mechanism (300) includes a shock-absorbing support component (304), and the shock-absorbing support component (304) can play a shock-absorbing support role for the X-axis steel structure component (200); The Z-axis steel structure component (100) comprises a building steel column (101), a casting hole (107) is provided in the middle of the building steel column (101), side fixing seats (103) are fixedly connected to the middle of both sides of the building steel column (101), and each side fixing seat (103) is fixedly connected to a steel connecting sheet metal (104); The X-axis steel structural member (200) comprises two construction steel beams (201), each of the construction steel beams (201) having a matching plug plate (202) fixedly connected to its inner side, the two matching plug plates (202) being plugged together, and each of the construction steel beams (201) having one end fixedly connected to a thickened steel connector (203), each of the thickened steel connectors (203) being provided with a matching hole (204), and each of the matching holes (204) corresponding to a threaded hole (105).
2. A building steel structure according to claim 1, characterized in that: Each of the steel connecting sheet metals (104) is provided with threaded holes (105) at the four corners of the outer surface, the inner wall of the casting hole (107) is fixedly connected with a reinforcing inner core (102), the middle of the front surface of the building steel column (101) is fixedly connected with a protruding steel plate (108), and the four corners of the building steel column (101) are fixedly connected with protruding clamping blocks (106), and each of the matching holes (204) and the threaded holes (105) is matched with a No. 1 splicing bolt (109) to be installed.
3. A building steel structure according to claim 2, characterized in that: The quick splicing mechanism (300) comprises a side limit plate (301), the side limit plate (301) and the protruding block (106) are connected together in a cooperative manner, one end of the side limit plate (301) is fixedly connected to a rotating member (302), the rotating member (302) is rotatably mounted on one side of a building steel beam (201), the other end of the side limit plate (301) is provided with a clamping groove (303), the clamping groove (303) is connected to both sides of the protruding steel plate (108), and a limiting hole (308) is provided on the side of the side limit plate (301) close to the rotating member (302).
4. A building steel structure according to claim 3, characterized in that: A first fixing seat (310) is fixedly connected to one side of the side limiting plate (301) near the limiting hole (308), a first connecting plate (309) is rotatably mounted in the first fixing seat (310), a second connecting plate (312) is rotatably mounted on one end of the first connecting plate (309), sliding grooves (313) are arranged on both sides of the second connecting plate (312), a side sliding rail (311) is mounted in the sliding groove (313), and the side sliding rail (311) is fixedly connected to a side surface of the building steel beam (201).
5. A building steel structure according to claim 4, characterized in that: One side of the second connecting plate (312) is fixedly connected to a toothed plate (314), one side of the toothed plate (314) is meshingly connected to a transmission gear (321), a center shaft (305) is fixedly connected to the center of the transmission gear (321), the center shaft (305) is rotatably mounted on a surface of one side of the building steel beam (201), one side of the transmission gear (321) is fixedly connected to a T-shaped connecting piece (315), and a push handle (320) is fixedly connected to the lower end of the T-shaped connecting piece (315).
6. A building steel structure according to claim 5, characterized in that: A connecting rod (306) is rotatably mounted on the upper end of the T-shaped connecting member (315); one end of the connecting rod (306) is fixedly connected to a rotating handle (307); an upper splicing plate (316) is fixedly connected to the lower surface of each connecting rod (306); an upper clamping plate (317) is fixedly connected to the lower surface of each upper splicing plate (316); a reinforcing plate (318) is arranged above each upper splicing plate (316); the reinforcing plate (318) and the two upper splicing plates (316) are mounted together by a No. 2 splicing bolt (319).
7. A building steel structure according to claim 1, characterized in that: The shock-absorbing support assembly (304) comprises a No. 2 fixing seat (401), the No. 2 fixing seat (401) being fixedly connected to the middle part of the surface of one side of the side limit plate (301), a mounting rod (402) being fixedly connected to one side of the No. 2 fixing seat (401), a telescopic rod (403) being telescopically mounted on the upper and lower ends of the mounting rod (402), a rubber buffer block (404) being fixedly connected to one end of the inner side of each of the telescopic rods (403), a connecting plate (405) being fixedly connected to the inner side of each of the rubber buffer blocks (404), the connecting plate (405) being located inside the mounting rod (402), and a supporting spring (406) being fixedly connected between the upper and lower connecting plates (405).
8. A building steel structure according to claim 7, characterized in that: One end of the outer side of each telescopic rod (403) is fixedly connected to a limit block (408), each limit block (408) is located below a No. 1 splicing bolt (109), a limit plate (410) is arranged above the limit block (408), a limit groove (409) is arranged on the lower surface of the limit plate (410), the limit block (408) is installed in the limit groove (409), a clamping block (411) is fixedly connected to the upper surface of the limit plate (410), a matching groove (407) is arranged at the lower end of the No. 1 splicing bolt (109), and the clamping block (411) is installed in the matching groove (407).