Converter valve half-bridge submodule short-time overvoltage test method and related device

By designing a short -time over -voltage test method for the half -bridge module for flexible DC streaming valves, the test device is used to simulate the failure state, verify its voltage protection protection function, and solve the energy accumulation and system stop of the flexible DC power grid during failure and the system stop of the system. The problem of transportation realizes the stable operation and overvoltage protection of the system.

CN119355467AActive Publication Date: 2025-01-24ELECTRIC POWER RES INST CHINA SOUTHERN POWER GRID CO LTD +1

Patent Information

Application Number
CN202411610088.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-12
Publication Date
2025-01-24
Estimated Expiration
2044-11-12

AI Technical Summary

Technical Problem

When the AC system at the receiving end fails, energy accumulation between the transmitting and receiving ends, resulting in excessive DC voltage on the DC side, and the capacitance voltage of the submodule rises rapidly, even exceeding the overvoltage withstandability, causing the system to be locked and shut down, and ordinary power supply The state and operation of the half-bridge submodule of the converter valve cannot be simulated.

Method used

Design a stream -changing valve half -bridge module in a short -term over -voltage test method. Through the testing of the trailer circuit, voltage voltage protection branch and capacitive tower test circuit in the test device, simulate the short -term fault voltage of the DC side, trigger the leakage voltage Protect the branch movement and realize the multiple release of capacitor surplus energy and verification of overvoltage protection functions.

Benefits of technology

A variety of releasing and overvoltage protection functions of flexible DC stream -changing valve half -bridge modules is realized, the reliability performance of the voltage protection support branch is verified to ensure that the system can operate stably under the fault.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119355467A_ABST
    Figure CN119355467A_ABST
Patent Text Reader

Abstract

The invention discloses a converter valve half-bridge sub-module short-time overvoltage test method and a related device, and the method comprises the steps: forming a charging current to charge a sub-module capacitor based on a sub-module twin-trawling loop through an external connection capacitor tower test loop, simulating a DC side sub-module capacitor voltage rising state, and achieving a certain voltage; and the pressure relief protection branch circuit of the power module acts to realize multiple times of release of surplus energy of the capacitor of the half-bridge sub-module of the flexible direct current converter valve and verification of an overvoltage protection function. According to the test method, the tested sub-module is large in short-time energy, the energy release state of the tested sub-module is similar to that of an engineering sub-module, a plurality of sets of high-power capacitor towers are adopted to synthesize a plurality of single-periodic charging currents based on a sub-module twin-trawling loop, and therefore repeated continuous overvoltage is achieved, and the energy release function and the reliability of a voltage release protection branch are verified.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power transmission and distribution testing, and in particular to a short-time overvoltage testing method for a converter valve half-bridge submodule and a related device. Background Art

[0002] Flexible DC transmission technology can provide reactive power support for the power grid due to its advantages of efficient transmission, strong flexibility, and no commutation failure, and is suitable for new energy islands without stable power grids. In recent years, the scale of flexible DC transmission projects has continued to expand, and the transmission capacity has been greatly improved based on the performance upgrade of power devices.

[0003] When the flexible DC grid is connected to a new energy island, when a fault occurs in the AC system at the receiving end, the converter station at the sending end cannot immediately sense the fault and reduce the transmitted power due to its long distance. This will cause the receiving system to accumulate excess surplus energy within tens of milliseconds, and the power transmitted to the receiving grid will suddenly drop. Energy accumulation will occur between the sending and receiving ends, the DC side voltage will be too high, and the sub-module capacitor voltage will rise rapidly, even exceeding the overvoltage tolerance capacity of the sub-module, causing the system to lock out.

[0004] Within tens of milliseconds after a fault occurs on the receiving AC side, the shutdown system will cause a shortage of active power in the AC system, which will have an adverse impact on the system frequency stability. Therefore, the flexible DC grid is required to have fault ride-through capability, that is, when the AC system fails, the DC system will not stop and can operate normally and stably.

[0005] By placing overvoltage protection devices at both ends of the DC side of the submodule, the capacitor voltage can be quickly released when a short-term overvoltage is generated by the above-mentioned system fault, and surplus energy can be consumed before the sending-end system reduces power or puts other devices into use to respond, thereby clearing the short-term overvoltage fault.

[0006] The flexible DC converter valve stores large energy and has high power during short-term overvoltage. Ordinary power supplies cannot simulate its state and action. Therefore, it is urgent to design a short-term overvoltage test method for the half-bridge submodule of the flexible DC converter valve. Summary of the invention

[0007] The present application provides a short-time overvoltage test method and related device for a converter valve half-bridge submodule, which are used to verify the multiple release performance of the voltage relief protection circuit on the capacitive surplus energy of the flexible DC converter valve half-bridge submodule, as well as the overvoltage protection function.

[0008] In view of this, the first aspect of the present application provides a short-time overvoltage test method for a converter valve half-bridge submodule, which is applied to a test device, wherein the test device includes: a towing circuit, a pressure relief protection branch and a capacitor tower test circuit, wherein the towing circuit includes: a power supply S1, a tested submodule B t , Tested submodule Bt Capacitor, test submodule P t The capacitor tower test circuit includes: an oscillating circuit for generating a periodic charging current and a capacitor tower charging power supply S2; the towing circuit passes through the tested submodule B t The capacitors are respectively connected in parallel with the pressure relief protection branch and the capacitor tower test circuit;

[0009] Methods include:

[0010] S1, based on the pair-pulling circuit, the tested submodule B is controlled by the upper level t Work at rated voltage and current;

[0011] S2, generating a charging current through the capacitor tower test circuit so that the tested submodule B t The voltage of the capacitor is increased for a short time, thus simulating the voltage increase state of a short-term fault on the DC side;

[0012] S3, when the tested submodule B t When the voltage of the capacitor rises to the overvoltage fault protection threshold voltage, the pressure relief protection branch is controlled to consume energy until the voltage of the tested submodule B is reached. t The voltage of the capacitor drops to the rated voltage;

[0013] S4, repeating step S3 until a preset number of times is reached, disconnecting the capacitor tower charging power supply S2 of the capacitor tower test circuit, and discharging to the ground, thereby ending the test.

[0014] Optionally, the capacitor tower test circuit is: a plurality of groups of oscillation circuit structures;

[0015] Wherein, each of the oscillation circuit structures comprises: a capacitor, an adjustable reactor, a thyristor valve and an isolation knife switch.

[0016] Optionally, step S1 includes:

[0017] When the tested submodule B t and the accompanying test submodule P t When both are in the locked state, the energy supply S1 is started to output the minimum energy-taking voltage, so that the tested submodule B t be in normal working order;

[0018] Increase the output voltage of the energy supply S1, and when it reaches the output voltage of the tested submodule B t When the rated working voltage reaches t Run, and increase the current of the towing circuit through the upper control to reach the tested submodule B t Rated operating current.

[0019] Optionally, step S2 includes:

[0020] By adjusting the adjustable reactor and the charging voltage of the capacitor in the capacitor tower test circuit, a single-cycle charging current is generated to make the tested submodule B t The capacitor rises to the overvoltage fault preset protection threshold voltage, thereby triggering the energy dissipation protection branch action, and by sequentially triggering the thyristor valves of each branch of the capacitor tower test circuit, a periodic charging current is generated, thereby causing the tested submodule B to t The voltage of the capacitor rises and the pressure relief protection branch operates and releases energy.

[0021] The second aspect of the present application provides a converter valve half-bridge submodule short-time overvoltage test system, which is applied to a test device, wherein the test device includes: a towing circuit, a pressure relief protection branch and a capacitor tower test circuit, wherein the towing circuit includes: a power supply S1, a tested submodule B t , Tested submodule B t Capacitor, test submodule P t The capacitor tower test circuit includes: an oscillating circuit for generating a periodic charging current and a capacitor tower charging power supply S2; the towing circuit passes through the tested submodule B t The capacitors are respectively connected in parallel with the pressure relief protection branch and the capacitor tower test circuit;

[0022] The system includes:

[0023] The first control unit is used to control the tested submodule B through the upper control based on the pair-pulling circuit. t Work at rated voltage and current;

[0024] The second control unit is used to generate a charging current through the capacitor tower test circuit to make the tested submodule B t The voltage of the capacitor is increased for a short time, thus simulating the voltage increase state of a short-term fault on the DC side;

[0025] The third control unit is used when the tested submodule B t When the voltage of the capacitor rises to the overvoltage fault protection threshold voltage, the pressure relief protection branch is controlled to consume energy until the voltage of the tested submodule B is reached. t The voltage of the capacitor drops to the rated voltage;

[0026] The fourth control unit is used to trigger the third control unit until a preset number of times is reached, disconnect the capacitor tower charging power supply S2 of the capacitor tower test circuit, and discharge to the ground, thereby ending the test.

[0027] Optionally, the capacitor tower test circuit is: a plurality of groups of oscillation circuit structures;

[0028] Wherein, each of the oscillation circuit structures comprises: a capacitor, an adjustable reactor, a thyristor valve and an isolation knife switch.

[0029] Optionally, the first control unit is specifically configured to:

[0030] When the tested submodule B t and the accompanying test submodule P t When both are in the locked state, the energy supply S1 is started to output the minimum energy-taking voltage, so that the tested submodule B t be in normal working order;

[0031] Increase the output voltage of the energy supply S1, and when it reaches the output voltage of the tested submodule B t When the rated working voltage reaches t Run, and increase the current of the towing circuit through the upper control to reach the tested submodule B t Rated operating current.

[0032] Optionally, the second control unit is specifically configured to:

[0033] By adjusting the adjustable reactor and the charging voltage of the capacitor in the capacitor tower test circuit, a single-cycle charging current is generated to make the tested submodule B t The capacitor rises to the overvoltage fault preset protection threshold voltage, thereby triggering the energy dissipation protection branch action, and by sequentially triggering the thyristor valves of each branch of the capacitor tower test circuit, a periodic charging current is generated, thereby causing the tested submodule B to t The voltage of the capacitor rises and the pressure relief protection branch operates and releases energy.

[0034] A third aspect of the present application provides a converter valve half-bridge submodule short-time overvoltage test device, the device comprising a processor and a memory:

[0035] The memory is used to store program codes and transmit the program codes to the processor;

[0036] The processor is used to execute the steps of the short-time overvoltage test method for the converter valve half-bridge sub-module as described in the first aspect according to the instructions in the program code.

[0037] A fourth aspect of the present application provides a computer-readable storage medium, which is used to store program codes, and the program codes are used to execute the short-time overvoltage test method for the converter valve half-bridge submodule described in the first aspect.

[0038] It can be seen from the above technical solutions that this application has the following advantages:

[0039] The embodiment of the present application provides a short-term overvoltage test method for a converter valve half-bridge submodule, which is based on a submodule towing circuit and simultaneously forms a charging current to charge the submodule capacitor through an externally connected capacitor tower test circuit, simulating the DC side submodule capacitor voltage rise state, reaching a certain voltage, and the pressure relief protection branch of the power module is actuated to achieve multiple releases of the capacitor surplus energy of the flexible DC converter valve half-bridge submodule and verification of the overvoltage protection function. The test method of the present application has a large short-term energy of the tested submodule, which is similar to the energy discharge state of the engineering submodule. Based on the submodule towing circuit, multiple groups of high-power capacitor towers are used to synthesize a periodic charging current, thereby achieving multiple continuous overvoltage energy release functions and verifying the reliability of its pressure relief protection branch. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 A schematic flow chart of a short-time overvoltage test method for a converter valve half-bridge submodule provided in an embodiment of the present application;

[0041] Figure 2 This is a schematic diagram of the flexible DC converter valve half-bridge submodule pairing provided in an embodiment of the present application;

[0042] Figure 3 A schematic diagram of a method for generating periodic charging current for a high-voltage and high-power capacitor tower provided in an embodiment of the present application;

[0043] Figure 4 To provide a periodic charging current waveform of a high-voltage and high-power capacitor tower in an embodiment of the present application;

[0044] Figure 5 Schematic diagram of the structure of a converter valve half-bridge submodule short-time overvoltage test system provided in an embodiment of the present application. DETAILED DESCRIPTION

[0045] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0046] See also Figures 1 to 3 A short-time overvoltage test method for a converter valve half-bridge submodule provided in an embodiment of the present application is applied to a test device, the test device comprising: a towing circuit, a pressure relief protection branch and a high-power capacitor tower test circuit, wherein the towing circuit comprises: a power supply S1, a tested submodule B t , Tested submodule B t Capacitor, test submodule Pt ; The capacitor tower test circuit includes: an oscillating circuit for generating a periodic charging current and a capacitor tower charging power supply S2; the towing circuit passes through the tested submodule B t The capacitors are connected in parallel with the pressure relief protection branch and the capacitor tower test circuit respectively.

[0047] In one embodiment, the capacitor tower test circuit is: a plurality of groups of oscillation circuit structures; wherein each of the oscillation circuit structures comprises: a capacitor, an adjustable reactor, a thyristor valve and an isolation switch.

[0048] It should be noted that the test device Figure 2 As shown, the submodule rated voltage / current operating state is achieved through the towing platform. The towing circuit includes the energy supplement power supply S1 and the tested submodule B. t , Accompanying test module P t and inductor L; the adjustable DC energy supply S1 is connected in parallel to the test submodule P t And the tested submodule B t At both ends of the capacitor, the midpoints of the outputs of the two sub-module bridge arms are connected through an inductor L.

[0049] Tested submodule B t The two ends of the capacitor are connected in parallel with the pressure relief protection branch and the capacitor tower test circuit (high voltage and high power capacitor tower test system), that is, the towing circuit is connected through the tested submodule B. t The capacitor is connected in parallel with the pressure relief protection branch and the capacitor tower test circuit.

[0050] like Figure 3 As shown, the tested submodule B t A high-voltage and high-power capacitor tower test circuit is connected in parallel at both ends of the capacitor. The capacitor tower test circuit generates a periodic charging current through multiple groups of LC oscillation circuits of the capacitor tower to simulate the DC side voltage rise process, including: capacitors C1, C2, C3...Cn of the high-voltage and high-power capacitor tower, adjustable reactors L1, L2, L3...Ln, thyristor valves V1, V2, V3...Vn, isolation switch K V1 , K V2 , K V3 ···Kvn; Each LC oscillation circuit has the same parameters and structure. Taking the capacitor tower L1 / C1 branch as an example, the capacitor tower charging power supply S2 (such as Figure 3 Us in the high voltage end is connected to the isolation switch K S1 Then connect the current limiting resistor R1 and the isolation switch K in series. R1 ; The high-voltage end of capacitor C1 is connected in series with adjustable reactor L1, thyristor valve V1, and isolation knife switch K V1 Then it is connected to the high voltage end of the capacitor C of the tested submodule, the capacitor tower charging power supply S2, the low voltage end of the capacitor C1, the low voltage end of the current limiting resistor R1, and the tested submodule Bt The low voltage end is connected to the primary grounding terminal of the test circuit.

[0051] Methods include:

[0052] Step 101: Based on the towing loop, the upper control makes the tested submodule B t Work at rated voltage and current.

[0053] It should be noted that upper control refers to control through the upper computer issuing control commands.

[0054] like Figure 2 and Figure 3 As shown, in one embodiment, step 101 includes:

[0055] When the tested submodule B t and the accompanying test module P t When both are in the locked state, start the energy supply S1 to output the minimum energy voltage, so that the tested submodule B t be in normal working order;

[0056] Increase the output voltage of the energy supply S1, and when it reaches the tested submodule B t When the rated working voltage is reached, unlock the tested submodule B t Run, and increase the current of the towing circuit through the upper control to reach the tested submodule B t Rated operating current.

[0057] Step 102: Generate a charging current through the oscillation circuit in the capacitor tower test circuit to make the tested submodule B t The voltage of the capacitor increases for a short time, thereby simulating the voltage rise state caused by a short-term fault on the DC side.

[0058] In one embodiment, step 102 includes:

[0059] By adjusting the adjustable reactor in the capacitor tower test circuit and the charging voltage of the capacitor, a single-cycle charging current is generated to make the tested submodule B t The capacitor rises to the overvoltage fault preset protection threshold voltage, thereby triggering the energy dissipation protection branch action, and by sequentially triggering the thyristor valves of each branch of the capacitor tower test circuit, a periodic charging current is generated, thereby causing the tested sub-module B to t The voltage of the capacitor rises multiple times and the pressure relief protection branch operates and releases energy multiple times.

[0060] It should be noted that if Figure 2 and Figure 3 As shown:

[0061] Adjust the size of the adjustable reactor L1 to meet the test conditions and close the isolation switch K.S1 and K R1 , adjust the DC charging voltage of the capacitor tower charging power supply S2, charge the capacitor C1 of the capacitor tower, and disconnect the isolation switch K after reaching the preset test voltage. S1 and K R1 ;

[0062] Charging current trigger event method: close the isolation switch K V1 , triggering the thyristor valve V1 to conduct forward, the capacitor C1 of the capacitor tower, the adjustable reactor L1 and the thyristor valve V1 form a DC circuit to generate a charging current; at a certain interval, V1-V2-V3···Vn are triggered in sequence to form a periodic charging current, and the charging current of the capacitor tower is supplied to the tested sub-module B. t Capacitor C is charged.

[0063] Step 103: When the tested submodule B t When the voltage of the capacitor rises to the overvoltage fault protection threshold voltage, the pressure relief protection branch is controlled to consume energy until the tested submodule B is reached. t The voltage across the capacitor drops to the rated voltage.

[0064] It should be noted that when the tested submodule B t The voltage of the capacitor is increased to the overvoltage fault protection threshold voltage U 导通 When the test submodule B is triggered t The pressure relief protection branch is put into operation, and the capacitor energy is released through this circuit, so that the overvoltage fault can be quickly cleared, and the submodule capacitor voltage is reduced. When the capacitor voltage drops to the rated voltage U 额定 When the voltage of the pressure relief protection branch stops working, the energy discharge operation is terminated, and the next charging current is waiting for the arrival, and the tested submodule continues to rise.

[0065] Step 104, repeating step 103 until a preset number of times is reached, disconnecting the capacitor tower charging power supply S2 of the capacitor tower test circuit, and discharging to the ground, thereby ending the test.

[0066] It should be noted that step 103 is repeatedly executed to perform fault clearing operations until the actual test requirements are met. Then the capacitor tower charging power supply S2 is disconnected, discharged to ground, and the submodule in the towing circuit is restored to the rated voltage and current state; the current in the circuit and the voltage of the energy source S1 are reduced in turn, the energy source S1 is disconnected, discharged to ground, the submodule capacitor is grounded and discharged, and the test is completed.

[0067] The following is a specific test example provided in the embodiments of this application:

[0068] 1) Pre-treatment before the test: conditioning Figure 3The adjustable reactors L1, L2, L3, etc. Cn in the part are sized so that the bottom width of the single-cycle charging current waveform meets 20ms. Figure 3 The DC output voltage Us of the medium-high voltage and high-power capacitor tower charging power supply S2 changes the peak value of the charging current. The short-term charging energy can meet the capacitor voltage of the tested submodule from the rated voltage to the threshold voltage;

[0069] Single cycle charging current oscillation width:

[0070] ;

[0071] Single cycle charging current peak:

[0072] ;

[0073] 2) Based on the submodule towing circuit, after the submodule is unlocked and running, the voltage and current of the tested submodule are made to reach the rated value through the upper control;

[0074] 3) Based on the high-voltage and high-power capacitor tower test circuit, close the isolation switch K S1 and K R1 , adjust the DC charging voltage Us of the capacitor tower charging power supply S2 to charge the capacitor C1 of the capacitor tower. After reaching the preset test voltage, disconnect the isolation switch K S1 and K R1 ;

[0075] 4) Charging current generation method: triggering thyristor valve V1, capacitor tower capacitor C1, adjustable reactor L1, thyristor V1 and isolation knife switch K V1 A loop is formed to generate a single-cycle charging current;

[0076] 5) Trigger thyristor valves V1, V2, V3,...Vn in sequence at intervals, such as Figure 4 As shown, a periodic charging current is generated, and the charging energy causes the capacitor voltage of the tested submodule to increase from the rated voltage U 额定 Raised to the threshold voltage U 导通 ; Due to the certain fluctuation of the capacitor voltage of the tested submodule in the towing circuit, the threshold voltage U 导通 Further settings are:

[0077] ;

[0078] Among them, m is the conduction margin, which is specified as 30%~35%;

[0079] 6) When the capacitor voltage of the tested submodule is detected to be close to the shutdown threshold voltage U 关断, the charging current is naturally turned off, the pressure relief protection branch stops working, and the overvoltage fault protection state is exited. When the next cycle charging current arrives, the submodule capacitor voltage rises again. The tested submodule B t The pressure relief protection branch is put into operation again and the fault clearing operation is repeated;

[0080] Furthermore, the cut-off voltage is specified as:

[0081] ;

[0082] Among them, U 关断 is the test power supply charging current shutdown voltage, n is the shutdown margin, which is specified as 0%~5%;

[0083] 7) Disconnect the capacitor tower charging power supply S2, discharge to ground, and restore the sub-module in the towing circuit to the rated voltage and current state; reduce the current in the circuit and the voltage of the energy source S1 in turn, disconnect the energy source S1, discharge to ground, and discharge the sub-module capacitor to ground, and the test is completed.

[0084] The embodiment of the present application provides a short-term overvoltage (fault clearing) test method for a flexible DC converter valve half-bridge submodule. Based on the submodule towing circuit, a charging current is formed to charge the submodule capacitor by connecting an external capacitor tower test circuit, simulating the DC side submodule capacitor voltage rise state. When a certain voltage is reached, the pressure relief protection branch of the power module is actuated to realize multiple releases of the capacitor surplus energy of the flexible DC converter valve half-bridge submodule and verification of the overvoltage protection function. The test method of the present application has a large short-term energy of the tested submodule, which is similar to the energy discharge state of the engineering submodule. Based on the submodule towing circuit, multiple groups of high-power capacitor towers are used to synthesize a periodic charging current, thereby realizing multiple continuous overvoltage energy release functions and verifying the reliability of its pressure relief protection branch.

[0085] The above is a short-time overvoltage test method for a converter valve half-bridge submodule provided in an embodiment of the present application, and the following is a short-time overvoltage test system for a converter valve half-bridge submodule provided in an embodiment of the present application.

[0086] See also Figure 5 A converter valve half-bridge submodule short-time overvoltage test system provided in an embodiment of the present application is applied to a test device, the test device includes: a towing circuit, a pressure relief protection branch and a capacitor tower test circuit, wherein the towing circuit includes: a supplementary power supply S1, a tested submodule B t , Tested submodule B t Capacitor, test submodule P t ; The capacitor tower test circuit includes: an oscillating circuit for generating a periodic charging current and a capacitor tower charging power supply S2; the towing circuit passes through the tested submodule B tThe capacitors are connected in parallel with the pressure relief protection branch and the capacitor tower test circuit respectively.

[0087] The system includes:

[0088] The first control unit 201 is used to control the tested submodule B through the upper control based on the drag loop. t Work at rated voltage and current.

[0089] The second control unit 202 is used to generate a charging current through an oscillating circuit in the capacitor tower test circuit to make the tested submodule B t The voltage of the capacitor increases for a short time, thereby simulating the voltage rise state caused by a short-term fault on the DC side.

[0090] The third control unit 203 is used to t When the voltage of the capacitor rises to the overvoltage fault protection threshold voltage, the pressure relief protection branch is controlled to consume energy until the tested submodule B is reached. t The voltage across the capacitor drops to the rated voltage.

[0091] The fourth control unit 204 is used to trigger the third control unit 203 until a preset number of times is reached, disconnect the capacitor tower charging power supply S2 of the capacitor tower test circuit, and discharge to the ground, thereby ending the test.

[0092] Furthermore, an embodiment of the present application also provides a converter valve half-bridge submodule short-time overvoltage test device, the device comprising a processor and a memory:

[0093] The memory is used to store program codes and transmit the program codes to the processor;

[0094] The processor is used to execute the steps of the converter valve half-bridge submodule short-time overvoltage test method as described in the above method embodiment according to the instructions in the program code.

[0095] Furthermore, a computer-readable storage medium is provided in an embodiment of the present application, and the computer-readable storage medium is used to store program code, and the program code is used to execute the short-time overvoltage test method for the converter valve half-bridge submodule described in the above method embodiment.

[0096] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0097] The terms "first", "second", "third", "fourth", etc. (if any) in the specification of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein, for example. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0098] It should be understood that in this application, "at least one (item)" means one or more, and "plurality" means two or more. "And / or" is used to describe the association relationship of associated objects, indicating that three relationships may exist. For example, "A and / or B" can mean: only A exists, only B exists, and A and B exist at the same time, where A and B can be singular or plural. The character " / " generally indicates that the objects associated before and after are in an "or" relationship. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items. For example, at least one of a, b or c can mean: a, b, c, "a and b", "a and c", "b and c", or "a and b and c", where a, b, c can be single or multiple.

[0099] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.

[0100] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0101] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0102] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (full name in English: Read-Only Memory, English abbreviation: ROM), random access memory (full name in English: Random Access Memory, English abbreviation: RAM), disk or optical disk and other media that can store program codes.

[0103] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A short-time overvoltage test method for a converter valve half-bridge submodule, characterized in that: Applied to the test device, the test device includes: a towing circuit, a pressure relief protection branch and a capacitor tower test circuit, wherein the towing circuit includes: a power supply S1, a tested submodule B t , Tested submodule B t Capacitor, test submodule P t The capacitor tower test circuit includes: an oscillating circuit for generating a periodic charging current and a capacitor tower charging power supply S2; the towing circuit passes through the tested submodule B t The capacitors are respectively connected in parallel with the pressure relief protection branch and the capacitor tower test circuit; Methods include: S1, based on the pair-pulling circuit, the tested submodule B is controlled by the upper level t Work at rated voltage and current; S2, generating a charging current through the capacitor tower test circuit so that the tested submodule B t The voltage of the capacitor is increased for a short time, thus simulating the voltage increase state of a short-term fault on the DC side; S3, when the tested submodule B t When the voltage of the capacitor rises to the overvoltage fault protection threshold voltage, the pressure relief protection branch is controlled to consume energy until the voltage of the tested submodule B is reached. t The voltage of the capacitor drops to the rated voltage; S4. Repeat step S3 until a preset number of times is reached, disconnect the capacitor tower charging power supply S2 of the capacitor tower test circuit, and discharge to the ground, thereby ending the test.

2. The short-time overvoltage test method for the converter valve half-bridge submodule according to claim 1 is characterized in that: The capacitor tower test circuit is: a multi-group oscillation circuit structure; Wherein, each of the oscillation circuit structures comprises: a capacitor, an adjustable reactor, a thyristor valve and an isolation knife switch.

3. The short-time overvoltage test method for the converter valve half-bridge submodule according to claim 1 is characterized in that: Step S1 includes: When the tested submodule B t and the accompanying test submodule P t When both are in the locked state, the energy supply S1 is started to output the minimum energy-taking voltage, so that the tested submodule B t be in normal working order; Increase the output voltage of the energy supply S1, and when it reaches the output voltage of the tested submodule B t When the rated working voltage reaches t Run, and increase the current of the towing circuit through the upper control to reach the tested submodule B t Rated operating current.

4. The converter valve half-bridge submodule short-time overvoltage test method according to claim 2, characterized in that: Step S2 comprises: By adjusting the adjustable reactor and the charging voltage of the capacitor in the capacitor tower test circuit, a single-cycle charging current is generated to make the tested submodule B t The capacitor rises to the overvoltage fault preset protection threshold voltage, thereby triggering the energy dissipation protection branch action, and by sequentially triggering the thyristor valves of each branch of the capacitor tower test circuit, a periodic charging current is generated, thereby causing the tested submodule B to t The voltage of the capacitor rises and the pressure relief protection branch operates and releases energy.

5. A short-time overvoltage test system for a converter valve half-bridge submodule, characterized in that: Applied to the test device, the test device includes: a towing circuit, a pressure relief protection branch and a capacitor tower test circuit, wherein the towing circuit includes: a power supply S1, a tested submodule B t , Tested submodule B t Capacitor, test submodule P t The capacitor tower test circuit includes: an oscillating circuit for generating a periodic charging current and a capacitor tower charging power supply S2; the towing circuit passes through the tested submodule B t The capacitors are respectively connected in parallel with the pressure relief protection branch and the capacitor tower test circuit; The system includes: The first control unit is used to control the tested submodule B through the upper control based on the pair-pulling circuit. t Work at rated voltage and current; The second control unit is used to generate a charging current through the capacitor tower test circuit to make the tested submodule B t The voltage of the capacitor is increased for a short time, thus simulating the voltage increase state of a short-term fault on the DC side; The third control unit is used when the tested submodule B t When the voltage of the capacitor rises to the overvoltage fault protection threshold voltage, the pressure relief protection branch is controlled to consume energy until the voltage of the tested submodule B is reached. t The voltage of the capacitor drops to the rated voltage; The fourth control unit is used to trigger the third control unit until a preset number of times is reached, disconnect the capacitor tower charging power supply S2 of the capacitor tower test circuit, and discharge to the ground, thereby ending the test.

6. The converter valve half-bridge submodule short-time overvoltage test system according to claim 5, characterized in that: The capacitor tower test circuit is: a multi-group oscillation circuit structure; Wherein, each of the oscillation circuit structures comprises: a capacitor, an adjustable reactor, a thyristor valve and an isolation knife switch.

7. The converter valve half-bridge submodule short-time overvoltage test system according to claim 5, characterized in that: The first control unit is specifically used for: When the tested submodule B t and the accompanying test submodule P t When both are in the locked state, the energy supply S1 is started to output the minimum energy-taking voltage, so that the tested submodule B t be in normal working order; Increase the output voltage of the energy supply S1, and when it reaches the output voltage of the tested submodule B t When the rated working voltage reaches t Run, and increase the current of the towing circuit through the upper control to reach the tested submodule B t Rated operating current.

8. The converter valve half-bridge submodule short-time overvoltage test system according to claim 6, characterized in that: The second control unit is specifically used for: By adjusting the adjustable reactor and the charging voltage of the capacitor in the capacitor tower test circuit, a single-cycle charging current is generated to make the tested submodule B t The capacitor rises to the overvoltage fault preset protection threshold voltage, thereby triggering the energy dissipation protection branch action, and by sequentially triggering the thyristor valves of each branch of the capacitor tower test circuit, a periodic charging current is generated, thereby causing the tested submodule B to t The voltage of the capacitor rises and the pressure relief protection branch operates and releases energy.

9. A short-time overvoltage test equipment for a converter valve half-bridge submodule, characterized in that: The device comprises a processor and a memory: The memory is used to store program code and transmit the program code to the processor; The processor is used to execute the short-time overvoltage test method for the converter valve half-bridge submodule according to any one of claims 1-4 according to the instructions in the program code.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium is used to store program codes, and the program codes are used to execute the short-time overvoltage test method for the converter valve half-bridge submodule according to any one of claims 1 to 4.

Citation Information

Patent Citations

  • Direct current converter valve non-periodic trigger test apparatus based on capacitance-resistance apparatus

    CN102486514A

  • Charging method of flexible direct current power transmission converter valve testing device

    CN105305575A

  • Test device of power operation of flexible direct current power transmission converter valve submodule and test method

    CN106872834A

  • Converter valve routine testing circuit and testing method thereof

    CN107505524A

  • Flexible direct current converter valve submodule operation test platform starting method and related device

    CN118589837A

Cited By

  • Transient breakdown test system and method for flexible direct current converter valve assembly-level lightning arrester

    CN121633760A