Full-scale optimal calculation method for cable force of cable-stayed buckling arch bridge buckling cable
Through a full -scale optimization calculation method, combined with linear and geometric non -linear analysis, the status, cutting displacement and buckle section correction are performed to solve the simplified and inaccurate problems of the calculation of cable -hooking for force in existing technologies, and realize the realization of the calculation of cable force. The goal of the initial tension optimization of the buckle and the pine cable into the arched line.
Patent Information
- Application Number
- CN202411228087.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2044-09-03
AI Technical Summary
The existing method of calculating cable force calculation has limitations such as excessive simplification of the structure, inconsistent with the actual project, failure to consider the tangential assembly of the arch ribs and geometric nonlinearity, and complicated calculation process.
Adopt a full -scale optimization method of a cable buckle arched bridge buckle cable force. By establishing an arched model of a falling frame, a linear and geometric non -linear analysis, combined with status correction, cutting displacement correction, buckle section correction, geometric non -linear linearity Amendment and gradually optimizing the at the beginning of the deduction.
Under the premise of ensuring the deduction stress to meet the allowable stress of the material, the buckle is tensor once, so that the pine cable arched lines that are considering the influence of the assembly and geometric non -linearity meet the target requirements, simplify the calculation process and improve the calculation. accuracy.
Smart Images

Figure CN119378186A_ABST
Abstract
Citation Information
Patent Citations
Determination method of initial completion initial cable force of cable-stayed bridge
CN101937485A
Large-span arch bridge arch ring line shape control method and optimization calculation model
CN111709175A
Method for calculating cable hanging force of cable-stayed buckle of arch bridge
CN116611289A
Calculation method for reasonable finished bridge state of cable-stayed bridge
CN116796395A
Method for calculating cable-stayed hanging and buckling cable force and pre-lifting amount of arch rib of large-span steel arch bridge
CN117332656A
Cited By
Method for calculating cable hanging force of one-time tensioning cable-stayed buckle based on influence matrix method
CN119939951A