A carbon emission calculation method and system based on a new pipeline gallery lining construction technology
By refining material and energy consumption in the new pipeline lining construction technology, optimizing transportation models, and establishing a carbon emission factor database, the problem of carbon emission calculation deviation in pipeline engineering in the existing technology is solved, and more accurate carbon emission quantification and low-carbon design support is achieved.
Patent Information
- Application Number
- CN202510032744.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-09
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2045-01-09
AI Technical Summary
When calculating the carbon emissions of comprehensive pipeline projects, the prior art may easily lead to deviations in the calculation results due to the direct borrowing of the house construction method, affecting the low-carbon design.
Provide a carbon emission calculation method and system based on the new pipeline lining construction technology. By analyzing the upstream substances and energy flows of materials and energy, a database of carbon emission factors is established, and the consumption of various materials and energy is refined, and the transportation model is optimized to accurately calculate carbon emissions.
The refinement and accurate calculation of carbon emissions of new pipeline lining construction technology has been achieved, the miscalculation of carbon emissions of turnover materials has been reduced, and more accurate low-carbon design data has been provided.
Smart Images

Figure CN119418808B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of information technology applicable to administrative purposes, and in particular to a carbon emission calculation method and system based on a new type of pipeline corridor lining construction technology. Background Art
[0002] At present, carbon emission calculations are mainly used in house construction. For carbon emission analysis of integrated pipeline corridor projects, most of them are calculated by analogy from the perspective of house construction. However, the construction process of integrated pipeline corridors is not exactly the same as that of house construction. Directly using the method of house construction to calculate carbon emissions for pipeline corridor construction can easily lead to large deviations in the calculation results, thereby affecting the early low-carbon design.
[0003] Therefore, it is necessary to provide an improved technical solution to address the above-mentioned deficiencies in the prior art. Summary of the invention
[0004] The purpose of this application is to provide a carbon emission calculation method and system based on a new type of pipeline lining construction technology, fully consider the details of the new type of pipeline lining construction technology, improve the calculation method, so as to solve or alleviate the problems existing in the above-mentioned prior art.
[0005] In order to achieve the above objectives, this application provides the following technical solutions:
[0006] The present application provides a carbon emission calculation method based on a new pipe gallery lining construction technology. The new pipe gallery lining construction technology uses a portable lining trolley as a main support, and the main support is connected to a template unit. The template is a combination of a steel template and a PP plastic template, including:
[0007] Analyze the upstream material and energy flows of materials and energy, and establish a carbon emission factor database;
[0008] Identify the main materials and turnover materials in the construction of new pipe gallery linings, consider the turnover frequency and refine the consumption of various materials, and calculate the carbon emissions of construction technology materials CL ;
[0009] Determine the category of lightweight turnover materials, consider the full load mass and full load volume of the transport vehicle, optimize the off-site transportation model, and calculate the off-site transportation carbon emissions of the construction technology CYS ;
[0010] Considering the working efficiency of the engines of the on-site transport vehicles and combining the standard length of the corridor, the on-site transport model is optimized to calculate the carbon emissions of on-site transport of the construction technology. CNS ;
[0011] Calculate the energy and carbon emissions of construction technology NY ;
[0012] Carbon emissions from construction technology and materials CL , Construction technology Off-site transportation carbon emissions CYS , Construction technology On-site transportation carbon emissions CNS , Construction Technology Energy Carbon Emissions NY The total carbon emissions of the new pipeline corridor lining construction technology are obtained by summing them up.
[0013] Some possible implementation methods include analyzing the upstream material and energy flows of materials and energy and establishing a carbon emission factor database, including:
[0014] Sort out the types of materials and energy used in the new pipe gallery lining construction technology, and clarify the life cycle stages of each type of material and energy;
[0015] Calculate the carbon emissions of each type of material and energy at each life cycle stage and sum them up. Multiply the summed results by the uneven coefficients of materials and energy to obtain the corresponding material carbon emission factor per unit mass. and energy carbon emission factors , and establish a carbon emission factor database for new pipeline corridor lining construction technology based on the calculation results.
[0016] In some possible implementation methods, the main materials and turnover materials in the construction of new pipe gallery linings are identified, the turnover frequency is considered and the consumption of each type of materials is refined to calculate the carbon emissions of construction technology materials. CL ,include:
[0017] Divide the materials used on site into main materials and turnover materials;
[0018] Counting the amortization times of different turnover materials, and calculating the actual usage of each type of turnover materials according to the amortization times;
[0019] Calculate the product of the theoretical usage of each type of main material and the carbon emission factor of the main material to obtain the material carbon emission of each type of main material;
[0020] Calculate the product of the actual usage of each type of turnover material and the carbon emission factor of this type of turnover material, and then divide it by the amortization times corresponding to this type of turnover material to obtain the material carbon emission of each type of turnover material;
[0021] The carbon emissions of construction technology materials are obtained by adding up the carbon emissions of all types of main materials and all types of turnover materials. CL .
[0022] In some possible implementations, the categories of lightweight turnover materials are determined, the full load mass and full load volume of the transport vehicle are considered, the off-site transportation model is optimized, and the off-site transportation carbon emissions of the construction technology are calculated. CYS ,include:
[0023] further classifying the turnover materials into heavy materials and light materials, and determining the actual usage of each type of heavy materials and light materials;
[0024] Obtain the full-load mass and full-load volume values of various transport vehicles, and calculate the total off-site transportation volume of various lightweight materials in combination with the density of the lightweight materials;
[0025] The carbon emissions of off-site transportation of construction technology are calculated according to the following formula CYS :
[0026] ,
[0027] In the formula, , Respectively represent b Lightweight materials, d Actual usage of heavy-duty materials; Indicates the transport b Lightweight materials used c The fully loaded mass value of the vehicle; Indicates the transport d Type 1 for heavy materials e The fully loaded mass value of the vehicle; , Respectively represent b Lightweight materials, d The distance that heavy materials are transported from the market to the construction site; , Respectively represent c Category e Energy usage per 100 kilometers at full load mass of similar vehicles; Indicates c The fully loaded volume value of the vehicle; Indicates b Density of similar lightweight materials; , Indicates c Category e The density of energy used by the vehicle; , Indicates c Category e Carbon emission factor of the energy used by this type of vehicle.
[0028] In some possible implementations, the on-site transportation model is optimized by considering the working efficiency of the on-site transportation vehicle engine and combining it with the standard length of the pipeline corridor to calculate the on-site transportation carbon emissions of the construction technology. CNS ,include:
[0029] Determine the energy correction factor of various vehicles under low engine efficiency ;
[0030] Based on the standard length of the corridor d , determine the total one-way distance of on-site transportation S ;
[0031] According to the energy correction factor , Total one-way distance of on-site transportation S , the energy usage per kilometer of various vehicles in normal and empty states, and the carbon emission factors of the energy used by various vehicles, calculate the on-site transportation carbon emissions of various vehicles one by one, and sum them up to obtain the on-site transportation carbon emissions of construction technology CNS .
[0032] In some possible implementations, the calculation obtains the construction technology energy carbon emissions NY ,include:
[0033] Based on the energy usage of construction equipment and the carbon emission factor of the energy used, the carbon emissions of each shift of each type of construction equipment are calculated, and then the carbon emissions of all types of construction equipment in all shifts are summarized to obtain the carbon emissions of construction technology energy. NY .
[0034] This embodiment also provides a carbon emission calculation system based on a new pipe gallery lining construction technology. The new pipe gallery lining construction technology uses a portable lining trolley as a main support, and the main support is connected to a template unit. The template is a combination of a steel template and a PP plastic template. The system includes:
[0035] A database building unit, configured to analyze the upstream substances and energy flows of materials and energy and to build a carbon emission factor database;
[0036] The material carbon emission calculation unit is configured to identify the main materials and turnover materials in the construction of the new pipe gallery lining, consider the turnover frequency and refine the consumption of each type of material, and calculate the carbon emission of construction technology materials. CL ;
[0037] The off-site transportation carbon emission calculation unit is configured to determine the category of lightweight turnover materials, consider the full load mass and full load volume of the transport vehicle, optimize the off-site transportation model, and calculate the off-site transportation carbon emission of the construction technology. CYS ;
[0038] The on-site transportation carbon emission calculation unit is configured to consider the working efficiency of the on-site transportation vehicle engine, combine the standard section length of the pipeline corridor, optimize the on-site transportation model, and calculate the on-site transportation carbon emission of the construction technology. CNS ;
[0039] Energy carbon emission calculation unit, configured to calculate and obtain construction technology energy carbon emission NY ;
[0040] Aggregation unit, configured to aggregate the carbon emissions of construction technology materials CL , Construction technology Off-site transportation carbon emissions CYS , Construction technology On-site transportation carbon emissions CNS , Construction Technology Energy Carbon Emissions NY The total carbon emissions of the new pipeline corridor lining construction technology are obtained by summing them up.
[0041] The technical solution of the embodiment of the present application has the following beneficial effects:
[0042] The method provided in this embodiment establishes a carbon emission factor database by analyzing the upstream substances and energy flows of materials and energy in the new tunnel lining construction technology. Then, for the construction details of the new tunnel lining construction technology, the main materials and turnover materials are identified, and the turnover rate is considered in the carbon emission calculation to refine the energy consumption of each type of material, thereby alleviating the problem that the carbon emissions of turnover materials in traditional methods are usually ignored or roughly estimated; on the basis of identifying the main materials and turnover materials, the turnover materials are further identified, and the lightweight turnover materials are determined. The full load mass and full load volume of the transport vehicle are considered, and the off-site transportation carbon emissions of the construction technology are more accurately calculated by optimizing the transportation model. CYS ; Combined with the standard length of the pipeline corridor, optimize the on-site transportation model and accurately calculate the carbon emissions of on-site transportation of construction technology CNS ; Through the improvement of the above-mentioned calculation method, detailed and precise carbon emission calculation can be achieved, which can more accurately and comprehensively quantify the carbon emissions of pipeline lining construction technology, thereby providing direction for the low-carbon development of modern construction technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 A schematic flow chart of a carbon emission calculation method based on a novel pipeline corridor lining construction technology provided according to some embodiments of the present application.
[0044] Figure 2 A technical flow chart of a carbon emission calculation method based on a novel pipeline corridor lining construction technology provided according to some embodiments of the present application.
[0045] Figure 3 This is a structural block diagram of a carbon emission calculation system based on a novel pipeline corridor lining construction technology provided according to some embodiments of the present application. DETAILED DESCRIPTION
[0046] As the concept of low-carbon and environmental protection is integrated into the construction process of integrated pipe corridors, more and more low-carbon measures are being applied to underground projects to reduce carbon emissions, such as: using low-carbon or even "zero-carbon" building materials to reduce carbon emissions from the source; using new force-bearing structures to reduce the consumption of high-carbon emission materials. New construction technology has low test costs, fast results, and a wide range of applications. Compared with the use of low-carbon materials or new force-bearing structures to reduce carbon emissions, the use of new pipe corridor construction technology is more likely to be favored by construction units.
[0047] However, after the construction measures are improved, if the original carbon emission calculation method in the field of housing construction is still used, it is easy to cause errors in the calculation results. The inventors found that there are many details differences between the new pipe gallery lining construction technology and the traditional housing construction technology: First, the turnover materials need to consider the number of amortization times, which is different from the carbon emission calculation of one-time materials. The existing calculation method ignores this detail; lightweight turnover materials such as templates and foam boards are large in volume, and the transportation quality is low when the vehicle is fully loaded. If the existing calculation method is considered, it is impossible to accurately quantify the carbon emissions in the off-site transportation stage; finally, the integrated pipe gallery is operated in a standard section length, and materials such as steel bars, concrete, and cement need to be transported in batches. At the same time, the transportation distance and transportation volume are different each time, but the existing calculation method does not reflect this part of the impact.
[0048] In view of this, the present application provides a carbon emission calculation method and system based on the new tunnel lining construction technology. The new tunnel lining construction technology uses a portable lining trolley as the main support, and the main support is connected to the template unit. The template is a combination of a steel template and a PP plastic template. The carbon emission calculation method based on the new tunnel lining construction technology not only considers the type and quantity of materials, but also comprehensively considers factors such as the material mass volume ratio and the standard section length of the tunnel, so as to accurately and comprehensively quantify the carbon emissions of the tunnel lining construction technology, and provide direction for the low-carbon development of modern construction technology.
[0049] The embodiments of the present application are described below in conjunction with the accompanying drawings.
[0050] The terms "first", "second", "third" and "fourth" etc. in the specification and claims of the present application and the drawings are used to distinguish different objects, rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally includes steps or units that are not listed, or optionally includes other steps or units inherent to these processes, methods, products or devices.
[0051] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0052] "Multiple" means two or more. "And / or" describes the relationship between related objects, indicating that there can be three relationships. For example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the related objects are in an "or" relationship.
[0053] This embodiment provides a carbon emission calculation method based on a new pipe gallery lining construction technology. The new pipe gallery lining construction technology uses a portable lining trolley as the main support, and the main support is connected to a template unit. The template is a combination of a steel template and a PP plastic template; Figure 1 As shown, the method includes:
[0054] Step S1: Analyze the upstream substances and energy flows of materials and energy, and establish a carbon emission factor database.
[0055] Step S2: Identify the main materials and turnover materials in the construction of the new pipe gallery lining, consider the turnover frequency and refine the consumption of each type of material, and calculate the carbon emissions of construction technology materials CL ;
[0056] Step S3: Determine the category of lightweight turnover materials, consider the full load mass and full load volume of the transport vehicle, optimize the off-site transportation model, and calculate the off-site transportation carbon emissions of the construction technology CYS ;
[0057] Step S4: Considering the working efficiency of the on-site transport vehicle engine and combining the standard length of the pipeline corridor, the on-site transport model is optimized to calculate the on-site transport carbon emissions of the construction technology. CNS ;
[0058] Step S5: Calculate the energy carbon emissions of construction technology NY ;
[0059] Step S6: Material carbon emission CL , Construction technology Off-site transportation carbon emissions CYS , Construction technology On-site transportation carbon emissions CNS , Construction Technology Energy Carbon Emissions NY The total carbon emissions of the new pipeline corridor lining construction technology are obtained by summing them up.
[0060] In order to facilitate the understanding of the method proposed in this application, the application scenario of the method is first introduced, namely the new pipeline corridor lining construction technology and supporting equipment.
[0061] In the above-mentioned embodiment, the portable trolley is a device specially used for transporting and installing the template, and has the functions of self-lifting and tilting.
[0062] Using a portable lining trolley as the main support can realize the automatic installation, disassembly and movement of the template, which is conducive to integrated and continuous construction, reducing the frequency and quantity of material transportation at the construction site, improving construction efficiency and reducing energy consumption. At the same time, through the precise assembly and disassembly of the template by the portable lining trolley, it can effectively reduce the loss and damage of the template, reduce material consumption, increase the turnover frequency of the template and the use efficiency of turnover materials, and reduce carbon emissions in the production process.
[0063] In this embodiment, the main support is connected to the template unit, and the length of the template unit exceeds the preset length threshold. After the pouring is completed, the formwork (a combination of the template unit and other temporary support structures) can move as a whole with the trolley, ensuring the quality of concrete pouring and maintenance while greatly improving construction efficiency.
[0064] Furthermore, the formwork is a combination of a steel formwork and a PP plastic formwork.
[0065] Among them, steel formwork is a highly durable material with a long service life and can be reused in multiple construction processes. PP plastic formwork is light in weight and easy to transport and carry, which reduces energy consumption during transportation and reduces carbon emissions in the transportation process. At the same time, PP plastic formwork is relatively durable and can be used multiple times, reducing material consumption and carbon emissions in production. In addition, by using a combination system of steel formwork and PP plastic formwork, combining the high strength of steel formwork and the lightness of PP plastic formwork, it is possible to reduce material consumption while ensuring construction quality, especially in the use of turnover materials, which can increase the reuse rate of formwork and further reduce carbon emissions. Such a low-carbon formwork design further highlights the deviation of traditional carbon emission calculation methods.
[0066] In some embodiments, the main frame is made of double-jointed channel steels welded together, and the double-jointed channel steels are connected by bolts to assemble into a portable lining trolley, and reinforcement measures are taken at the corresponding template positions;
[0067] The portable lining trolley is equipped with a trolley lifting system and a trolley power system. Correspondingly, its disassembly, assembly and movement process is as follows:
[0068] The operating personnel dismantled some reinforcement measures, and the outer primary and secondary ribs of the side wall formwork were lifted by the trolley lifting system, while the inner primary and secondary ribs relied on the main support, and cooperated with the trolley power system to move the formwork as a whole. After moving to the layout marking point, the side wall formwork was reassembled.
[0069] In this embodiment, the main support is made of double-jointed channel steels, which are welded together by two channel steels to form a strong structural support.
[0070] The double-jointed channel steels are connected by bolts. The bolt connection design facilitates disassembly and reassembly when necessary, while ensuring the reliability of the connection.
[0071] By welding and bolting the double-jointed channel steels, a complete and convenient lining trolley frame is assembled. The overall structure of the trolley has good stability and load-bearing capacity and is suitable for use in the lining construction process.
[0072] The connection between the trolley and the formwork needs to be reinforced to ensure that the formwork does not move or deform during construction. This can be achieved by adding connection points, adding support rods, using transverse reinforcements, etc. For example, steel strands and reinforcement frames can be used for fixing and reinforcement to ensure the stability of the trolley during construction.
[0073] In some embodiments, the template is a template that is processed to a certain size according to the actual situation on site;
[0074] Bolts are used to connect the steel formworks and the steel formworks to the PP plastic formworks, and plastic pins are used to connect the PP plastic formworks.
[0075] The template is processed to the required size according to the actual size requirements of the site. Before processing, the dimensions of the construction site should be measured first, especially the specific dimensions of the walls, tunnels and other structures, to ensure that the template is made to fully match the site conditions. When processing to the required size, possible errors during the construction process are also taken into account, so the processing size of the template should leave a slight margin for adjustment.
[0076] The steel formworks are connected with bolts to ensure the stability and strength of the formworks during the construction process.
[0077] Bolts are also used to connect the steel formwork and the PP plastic formwork. Due to the material difference between the steel formwork and the PP plastic formwork, the connection design should ensure that the strength of the bolt holes and the connection parts is sufficient to withstand the load during construction. For the bolt holes, you can choose reinforced plastic formwork or set steel bushings on the formwork to prevent the bolts from causing excessive pressure or damage to the plastic formwork.
[0078] In some embodiments, the novel tunnel lining construction technology further includes: arranging the positions of attached vibrators according to the standard section length of the tunnel lining.
[0079] Through the above structure, the new tunnel lining construction technology can realize the integral one-time casting scheme of the tunnel side wall without through-rods, which minimizes the use of circulating materials, ensures the strength and stability of the formwork, and saves construction costs.
[0080] The new tunnel lining construction technology includes five construction steps: side wall reinforcement binding, wall formwork installation, convenient lining trolley assembly, concrete pouring and vibration, and side wall formwork removal and reassembly.
[0081] First, the new pipe gallery lining construction technology adopts the "steel formwork + PP plastic formwork" combination system. According to the actual situation on site, the template size is fixed and processed. Bolts are used between steel formworks and between steel formworks and PP plastic formworks, and plastic pins are used to connect PP plastic formworks to achieve a quick assembly effect. Secondly, the main support is made by welding double-jointed channel steel, and the positions of multiple main supports are accurately located in conjunction with lifting equipment. Bolts are used to connect each other to complete the assembly of the convenient lining trolley, and reinforcement measures are taken at the corresponding template positions. Then, according to the standard section length of the pipe gallery lining, the position of the attached vibrator is reasonably arranged to ensure that its range of action covers the entire concrete pouring area. Finally, the operator dismantles some reinforcement measures, and the outer primary and secondary ribs of the side wall template are lifted by the convenient lining trolley lifting system, while the inner primary and secondary ribs rely on the main support, and cooperate with the trolley power system to realize the overall movement of the formwork. After moving to the marking point for laying out the line, the side wall template is reassembled.
[0082] In some embodiments, analyzing the upstream material and energy flows of materials and energy and establishing a carbon emission factor database includes:
[0083] Step S11: sort out the types of materials and energy used in the new pipe gallery lining construction technology, and clarify the life cycle stages of each type of material and energy;
[0084] Step S12: Calculate the carbon emissions of each type of material and energy at each life cycle stage and sum them up. Multiply the summed results by the material and energy heterogeneity coefficients to obtain the corresponding material carbon emission factor per unit mass. and energy carbon emission factors , and establish a carbon emission factor database for new pipeline corridor lining construction technology based on the calculation results.
[0085] In this embodiment, sorting out the types of materials and energy used in the new tunnel lining construction technology and understanding its production process will help to more accurately estimate the carbon emissions of each material and energy during use, thereby improving the accuracy of the emission factor.
[0086] Among them, the carbon emission factors of different types of materials per unit mass are and energy carbon emission factors The calculation formula is as follows:
[0087] (1)
[0088] (2)
[0089] Where: YCJ Represents the carbon emissions generated during the mining stage of raw materials in this type of material; YCY Indicates the carbon emissions generated during the transportation of raw materials in this category of materials; YCS Indicates the carbon emissions generated during the raw material processing stage of this type of material; , is the coefficient of non-uniformity; M Indicates the total amount of this type of material; RLS Indicates the carbon emissions released by direct combustion of this type of energy; JXS Represents the carbon emissions generated during the production phase of equipment powered by this type of energy; JXW Represents the carbon emissions generated during the maintenance phase of equipment powered by this type of energy; N Indicates the total amount of this type of energy.
[0090] The carbon emission factors of materials per unit mass are calculated by the above formula. and energy carbon emission factors , statistical results and establish a dynamic database of carbon emission factors, which can be adjusted in real time according to market conditions to meet timeliness requirements.
[0091] In some embodiments, the main materials and turnover materials in the construction of new pipe gallery linings are identified, the turnover frequency is considered and the consumption of each type of material is refined to calculate the carbon emissions of construction technology materials. CL ,include:
[0092] Step S21: Divide the materials used on site into main materials and turnover materials;
[0093] Step S22: Counting the amortization times of different turnover materials, and calculating the actual usage of each type of turnover material according to the amortization times;
[0094] Step S23: Calculate the product of the theoretical usage of each type of main material and the carbon emission factor of the main material to obtain the material carbon emission of each type of main material;
[0095] Step S24: Calculate the product of the actual usage of each type of turnover material and the carbon emission factor of the turnover material, and then divide it by the amortization times corresponding to the turnover material to obtain the material carbon emission of the turnover material;
[0096] Step S25: Add up the material carbon emissions of all types of main materials and all types of turnover materials to obtain the material carbon emissions CL .
[0097] Specifically, first, identify the types of materials used on site in combination with the material contract, which are mainly divided into main materials and turnover materials. The main materials include steel bars, concrete, cement, sand, etc., and the turnover materials include steel formwork, PP plastic formwork, wooden formwork, wooden support, etc. Secondly, count the number of amortization times of different turnover materials , taking it into account in the material carbon emission calculation model, further refining the actual use of turnover materials; finally, the carbon emission of construction technology materials is calculated according to the following expression CL :
[0098] (3)
[0099] Where: Indicates a Theoretical usage of main materials; Indicates a Carbon emission factor of main materials; Indicates g Theoretical usage of turnover materials; Indicates g Carbon emission factors of turnover materials; Indicates the number of amortization times corresponding to turnover materials.
[0100] In some embodiments, step S3: determine the category of lightweight turnover materials, consider the full load mass and full load volume of the transport vehicle, optimize the off-site transportation model, and calculate the off-site transportation carbon emissions of the construction technology. CYS ,include:
[0101] Step S31: further classify the turnover materials into heavy materials and light materials, and determine the actual usage of each type of heavy materials and light materials;
[0102] Step S32: Obtain the full load mass and full load volume values of various types of transport vehicles, and calculate the total off-site transportation volume of various types of lightweight materials in combination with the density of the lightweight materials;
[0103] Step S33: Calculate the off-site transportation carbon emissions of construction technology according to the following formula CYS :
[0104] (4)
[0105] In the formula, , Respectively represent b Lightweight materials, d Actual usage of heavy-duty materials (theoretical turnover); Indicates the transport b Lightweight materials used c The fully loaded mass value of the vehicle; Indicates the transport d Type 1 for heavy materials e The fully loaded mass value of the vehicle; , Respectively represent b Lightweight materials, d The distance that heavy materials are transported from the market to the construction site; , Respectively represent c Category e Energy usage per 100 kilometers at full load mass of similar vehicles; Indicates c The fully loaded volume value of the vehicle; Indicates b Density of similar lightweight materials; , Indicates c Category e The density of energy used by the vehicle; , Indicates c Category e Carbon emission factor of the energy used by this type of vehicle.
[0106] Specifically, in step S31, the use of heavy materials and lightweight materials in the turnover materials is determined in combination with the design drawings, where heavy materials refer to construction materials with small volume and high density, such as steel formwork, tension screws, etc.; lightweight materials refer to construction materials with large volume and low density, such as PP plastic formwork, wooden formwork, etc. In step S32, the full load mass and full load volume values of the lightweight turnover material transportation vehicle are collected, and the ratio of the product of the full load volume and material density to the full load mass is used to obtain the correction coefficient, which is taken into account in the off-site transportation carbon emission calculation model of construction technology, and the total off-site transportation volume is further refined in combination with the material density; finally, in step S33, the off-site transportation carbon emission of construction technology is calculated using formula (4): CYS .
[0107] In some embodiments, step S4: considering the working efficiency of the engine of the on-site transport vehicle and combining the standard section length of the pipeline corridor, optimizing the on-site transport model, and calculating the on-site transport carbon emissions of the construction technology CNS ,include:
[0108] Step S41: Determine the energy correction coefficients of various vehicles under low engine efficiency ;
[0109] Step S42: Based on the standard length of the corridord , determine the total one-way distance of on-site transportation S ;
[0110] Step S43: Based on the energy correction factor , Total one-way distance of on-site transportation S , the energy usage per kilometer of various vehicles in normal and empty states, and the carbon emission factors of the energy used by various vehicles, calculate the on-site transportation carbon emissions of various vehicles one by one, and sum them up to obtain the on-site transportation carbon emissions of construction technology CNS .
[0111] Specifically, first, the energy consumption per kilometer of the vehicle is obtained based on the information provided by the manufacturer and the actual application effect on site, and then the energy consumption per kilometer is calculated based on the theoretical value. f Energy correction factor for vehicles with low engine efficiency ; Secondly, based on the standard length of the corridor d , using the Gaussian algorithm, determine the total one-way distance of transportation within the field S ; Finally, the following formula is used to calculate the carbon emissions of transportation within the construction technology site CNS :
[0112] (5)
[0113] Where: Indicates f Energy usage per kilometer under normal conditions for this type of vehicle; It represents the energy usage per kilometer of the f-type transport vehicle when it is unloaded; Indicates f The density of energy used by the vehicle; Indicates f Carbon emission factor of the energy used by this type of vehicle.
[0114] The standard length of the corridor is determined based on the construction design and actual site conditions, reflecting the actual workload and transportation distance in the corridor construction. d , using the Gaussian algorithm, determine the total one-way distance of transportation within the field S , which can more accurately reflect the actual transportation needs and construction conditions of each construction stage, so that the total transportation distance can accurately reflect the transportation mileage required in the actual construction, and thus provide a basis for calculating the carbon emissions generated during the transportation process. In other words, considering the standard section length can help to more reasonably design the transportation route in the construction area, avoid underestimating the transportation distance, and ensure that the actual transportation carbon emissions are calculated. The standard section length can be used as a benchmark to clarify the transportation distance of different construction stages, thereby providing more accurate data support for the calculation of carbon emissions.
[0115] Among them, the Gaussian algorithm is a method for calculating the shortest path and optimizing the transportation route. It finds the most effective path by iteratively calculating multiple possible paths to the target point. The specific implementation steps of the algorithm can be performed with reference to the existing technology and will not be repeated here.
[0116] In some embodiments, step S5: Calculate and obtain the carbon emissions of construction technology energy NY , including: based on the energy usage of construction equipment and the carbon emission factor of the energy used, calculate the carbon emissions of each shift of various types of construction equipment, and then summarize the carbon emissions of all types of construction equipment in all shifts to obtain the construction technology energy carbon emissions NY , the specific calculation formula is as follows:
[0117] (6)
[0118] Where: Indicates j Type of construction equipment shift; Indicates j Energy usage of each type of construction equipment per shift; Indicates j Carbon emission factors of energy used by this type of construction equipment.
[0119] In step S6, the total carbon emissions of the new pipe gallery lining construction technology are calculated according to the following formula:
[0120] (7)
[0121] Combine the following Figure 2 The implementation process of the method provided in this embodiment is further described:
[0122] like Figure 2 As shown, the method provided in this embodiment is applied to the new pipe gallery lining construction technology. First, the new pipe gallery lining construction technology and supporting equipment are introduced, then the carbon emission calculation method is selected, and a carbon emission factor database is established. On this basis, the carbon emissions of construction technology materials, the carbon emissions of construction technology off-site transportation, the carbon emissions of construction technology on-site transportation, and the energy emissions of construction technology (mechanical carbon emissions) are calculated respectively. Finally, the above carbon emissions are summarized to calculate the total carbon emissions of the new pipe gallery lining construction technology.
[0123] The technical solution of this embodiment has the following beneficial effects:
[0124] 1. This embodiment refines the material types, takes into account the number of amortization times of turnover materials, and further optimizes the material transportation volume based on the full load mass and volume of the vehicle, so that the carbon emissions of materials and off-site transportation are calculated more accurately.
[0125] 2. Combined with the standard length of the corridor lining, this embodiment takes into account the details of on-site transportation and uses the energy correction factor The actual fuel consumption of various types of vehicles was adjusted, and the energy consumption of the vehicles in normal and no-load states per kilometer was combined to further optimize the carbon emission calculation model for transportation within the construction technology site.
[0126] 3. Based on the method of this embodiment, a comprehensive and accurate carbon emission of the new pipe gallery lining construction technology is obtained. With reference to the carbon emission of traditional construction technology, enterprises can compare and analyze the low-carbon effect of the new technology under the premise of high credibility. When there is a large difference from the expectation, the management personnel can realize the refined design while ensuring the quality of the pipe gallery lining, by adjusting the side wall formwork type, increasing the number of formwork turnover, increasing the energy utilization rate of the vehicle engine, changing the concrete grade, etc., in order to reduce the total carbon emission of the new technology, and finally promote the construction of the comprehensive pipe gallery to develop in the direction of low carbonization and mechanization.
[0127] In summary, the method provided in this embodiment first establishes a carbon emission factor database by analyzing the upstream substances and energy flows of materials and energy in the new tunnel lining construction technology, and then targets the construction details of the new tunnel lining construction technology, identifies the categories of main materials and turnover materials, considers the turnover rate in the carbon emission calculation, and refines the energy consumption of various types of materials, thereby alleviating the problem that the carbon emissions of turnover materials in traditional methods are usually ignored or roughly estimated; on the basis of identifying the main materials and turnover materials, further identify the turnover materials, determine the lightweight turnover materials, consider the full load mass and full load volume of the transport vehicle, and more accurately calculate the off-site transportation carbon emissions of the construction technology by optimizing the transportation model. CYS ; Combined with the standard length of the pipeline corridor, optimize the on-site transportation model and accurately calculate the carbon emissions of on-site transportation of construction technology CNS ; Through the improvement of the above calculation method, detailed and accurate carbon emission calculation can be achieved.
[0128] The method provided in this embodiment calculates carbon emissions in a more detailed and precise manner, so that during the construction of a new type of pipeline corridor developed with the goals of low carbon and environmental protection, the construction unit can more accurately evaluate the carbon emissions during the construction process, and provide data support for subsequent carbon emission reduction measures and green construction design.
[0129] Based on the same inventive concept, this embodiment provides a carbon emission calculation system based on a new pipe gallery lining construction technology. The new pipe gallery lining construction technology uses a portable lining trolley as the main support, and the main support is connected to a template unit. The template is a combination of a steel template and a PP plastic template, such as Figure 3 As shown, the system includes: a database building unit 401, a material carbon emission calculation unit 402, an off-site transportation carbon emission calculation unit 403, an on-site transportation carbon emission calculation unit 404, an energy carbon emission calculation unit 405 and a summary unit 406. Among them:
[0130] A database building unit 401 is configured to analyze material and energy upstream substances and energy flows and build a carbon emission factor database;
[0131] The material carbon emission calculation unit 402 is configured to identify the main materials and turnover materials in the construction of the new pipe gallery lining, consider the turnover frequency and refine the consumption of each type of material, and calculate the carbon emission of construction technology materials. CL ;
[0132] The off-site transportation carbon emission calculation unit 403 is configured to determine the category of lightweight turnover materials, consider the full load mass and full load volume of the transport vehicle, optimize the off-site transportation model, and calculate the off-site transportation carbon emission of the construction technology. CYS ;
[0133] The on-site transportation carbon emission calculation unit 404 is configured to consider the working efficiency of the on-site transportation vehicle engine, combine the standard section length of the pipeline corridor, optimize the on-site transportation model, and calculate the on-site transportation carbon emission of the construction technology. CNS ;
[0134] Energy carbon emission calculation unit 405, configured to calculate and obtain construction technology energy carbon emission NY ;
[0135] The aggregation unit 406 is configured to aggregate the carbon emissions of construction technology materials CL , Construction technology Off-site transportation carbon emissions CYS , Construction technology On-site transportation carbon emissions CNS , Construction Technology Energy Carbon Emissions NY The total carbon emissions of the new pipeline corridor lining construction technology are obtained by summing them up.
[0136] The carbon emission calculation system based on the new pipeline lining construction technology provided in this embodiment can implement the process and steps of the carbon emission calculation method based on the new pipeline lining construction technology provided in any of the above embodiments, and achieve the same technical effect, which will not be described one by one here.
[0137] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A carbon emission calculation method based on a new pipe gallery lining construction technology, characterized in that: The novel pipe gallery lining construction technology uses a portable lining trolley as the main support, and the carbon emission calculation method includes: Analyze the upstream material and energy flows of materials and energy, and establish a carbon emission factor database; Identify the main materials and turnover materials in the construction of new pipe gallery linings, consider the turnover frequency and refine the consumption of various materials, and calculate the carbon emissions of construction technology materials CL ; Determine the category of lightweight turnover materials, consider the full load mass and full load volume of the transport vehicle, optimize the off-site transportation model, and calculate the off-site transportation carbon emissions of the construction technology CYS ; Considering the working efficiency of the engines of the on-site transport vehicles and combining the standard length of the corridor, the on-site transport model is optimized to calculate the carbon emissions of on-site transport of the construction technology. CNS ; Calculate the energy and carbon emissions of construction technology NY ; Carbon emissions from construction technology and materials CL , Construction Technology Off-site Transportation Carbon Emissions CYS , Construction technology On-site transportation carbon emissions CNS , Construction Technology Energy Carbon Emissions NY The total carbon emissions of the new pipe gallery lining construction technology are obtained by summing them up; Determine the category of lightweight turnover materials, consider the full load mass and full load volume of the transport vehicle, optimize the off-site transportation model, and calculate the off-site transportation carbon emissions of the construction technology CYS ,include: further classifying the turnover materials into heavy materials and light materials, and determining the actual usage of each type of heavy materials and light materials; Obtain the full-load mass and full-load volume values of various transport vehicles, and calculate the total off-site transportation volume of various lightweight materials in combination with the density of the lightweight materials; The carbon emissions of off-site transportation of construction technology are calculated according to the following formula CYS : , In the formula, , Respectively represent b Lightweight materials, d Actual usage of heavy-duty materials; Indicates the transport b Lightweight materials used c The fully loaded mass value of the vehicle; Indicates the transport d Type 1 for heavy materials e The fully loaded mass value of the vehicle; , Respectively represent b Lightweight materials, d The distance that heavy materials are transported from the market to the construction site; , Respectively represent c Category e Energy usage per 100 kilometers at full load mass of similar vehicles; Indicates c The fully loaded volume value of the vehicle; Indicates b Density of similar lightweight materials; , Indicates c Category e The density of energy used by the vehicle; , Indicates c Category e Carbon emission factor of the energy used by this type of vehicle.
2. The carbon emission calculation method according to claim 1, characterized in that: Analyze the upstream material and energy flows of materials and energy, and establish a carbon emission factor database, including: Sort out the types of materials and energy used in the new pipe gallery lining construction technology, and clarify the life cycle stages of each type of material and energy; Calculate the carbon emissions of each type of material and energy at each life cycle stage and sum them up. Multiply the summed results by the uneven coefficients of materials and energy to obtain the corresponding material carbon emission factor per unit mass. and energy carbon emission factors , and establish a carbon emission factor database for new pipeline corridor lining construction technology based on the calculation results.
3. The carbon emission calculation method according to claim 1, characterized in that: Identify the main materials and turnover materials in the construction of new pipe gallery linings, consider the turnover frequency and refine the consumption of various materials, and calculate the carbon emissions of construction technology materials CL ,include: Divide the materials used on site into main materials and turnover materials; Counting the amortization times of different turnover materials, and calculating the actual usage of each type of turnover materials according to the amortization times; Calculate the product of the theoretical usage of each type of main material and the carbon emission factor of the main material to obtain the material carbon emission of each type of main material; Calculate the product of the actual usage of each type of turnover material and the carbon emission factor of this type of turnover material, and then divide it by the amortization times corresponding to this type of turnover material to obtain the material carbon emission of each type of turnover material; The carbon emissions of construction technology materials are obtained by adding up the carbon emissions of all types of main materials and all types of turnover materials. CL .
4. The carbon emission calculation method according to claim 1, characterized in that: Considering the working efficiency of the engines of the on-site transport vehicles and combining the standard length of the corridor, the on-site transport model is optimized to calculate the carbon emissions of on-site transport of the construction technology. CNS ,include: Determine the energy correction factor of various vehicles under low engine efficiency ; Based on the standard length of the corridor d , determine the total one-way distance of on-site transportation S ; According to the energy correction factor , Total one-way distance of on-site transportation S , the energy usage per kilometer of various vehicles in normal and empty states, and the carbon emission factors of the energy used by various vehicles, calculate the on-site transportation carbon emissions of various vehicles one by one, and sum them up to obtain the on-site transportation carbon emissions of construction technology CNS .
5. The carbon emission calculation method according to claim 1, characterized in that: The calculations obtained for the energy and carbon emissions of construction technology NY ,include: Based on the energy usage of construction equipment and the carbon emission factor of the energy used, the carbon emissions of each shift of each type of construction equipment are calculated, and then the carbon emissions of all types of construction equipment in all shifts are summarized to obtain the carbon emissions of construction technology energy. NY .
6. A carbon emission calculation system based on a new pipe gallery lining construction technology, characterized in that: The novel pipe gallery lining construction technology uses a portable lining trolley as the main support, and the carbon emission calculation system includes: A database building unit, configured to analyze the upstream substances and energy flows of materials and energy and to build a carbon emission factor database; The material carbon emission calculation unit is configured to identify the main materials and turnover materials in the construction of the new pipe gallery lining, consider the turnover frequency and refine the consumption of each type of material, and calculate the carbon emission of construction technology materials. CL ; The off-site transportation carbon emission calculation unit is configured to determine the category of lightweight turnover materials, consider the full load mass and full load volume of the transport vehicle, optimize the off-site transportation model, and calculate the off-site transportation carbon emission of the construction technology. CYS ; The on-site transportation carbon emission calculation unit is configured to consider the working efficiency of the on-site transportation vehicle engine, combine the standard section length of the pipeline corridor, optimize the on-site transportation model, and calculate the on-site transportation carbon emission of the construction technology. CNS ; Energy carbon emission calculation unit, configured to calculate and obtain construction technology energy carbon emission NY ; Aggregation unit, configured to aggregate construction technology and material carbon emissions CL , Construction Technology Off-site Transportation Carbon Emissions CYS , Construction technology On-site transportation carbon emissions CNS , Construction Technology Energy Carbon Emissions NY The total carbon emissions of the new pipe gallery lining construction technology are obtained by summing them up; Determine the category of lightweight turnover materials, consider the full load mass and full load volume of the transport vehicle, optimize the off-site transportation model, and calculate the off-site transportation carbon emissions of the construction technology CYS ,include: further classifying the turnover materials into heavy materials and light materials, and determining the actual usage of each type of heavy materials and light materials; Obtain the full-load mass and full-load volume values of various transport vehicles, and calculate the total off-site transportation volume of various lightweight materials in combination with the density of the lightweight materials; The carbon emissions of off-site transportation of construction technology are calculated according to the following formula CYS : , In the formula, , Respectively represent b Lightweight materials, d Actual usage of heavy-duty materials; Indicates the transport b Lightweight materials used c The fully loaded mass value of the vehicle; Indicates the transport d Type 1 for heavy materials e The fully loaded mass value of the vehicle; , Respectively represent b Lightweight materials, d The distance that heavy materials are transported from the market to the construction site; , Respectively represent c Category e Energy usage per 100 kilometers at full load mass of similar vehicles; Indicates c The fully loaded volume value of the vehicle; Indicates b Density of similar lightweight materials; , Indicates c Category e The density of energy used by the vehicle; , Indicates c Category e Carbon emission factor of the energy used by this type of vehicle.
Citation Information
Patent Citations
Method and system for calculating carbon emission of transformer substation project
CN116029590A
Building-based carbon emission budgeting method, electronic equipment and storage medium
CN117196891A