A method, device, equipment and medium for obtaining a block scheme of an assembled structure
By identifying the reverse bending point of the prefabricated structure and calculating the maximum number of modules, combining the weight model and constraints, the optimal blocking scheme of the prefabricated structure is automatically screened, which solves the problems of low manual decision-making efficiency and unreliable results in the existing technology, and achieves rapid and scientific blocking scheme acquisition.
Patent Information
- Application Number
- CN202510062322.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-15
- Publication Date
- 2025-05-09
- Estimated Expiration
- 2045-01-15
AI Technical Summary
The optimal blocking scheme of existing prefabricated structures is difficult to obtain, mainly relying on manual decision-making, time-consuming and unable to traverse all feasible solutions, resulting in inefficiency and unreliable results.
By obtaining the bending moment envelope diagram of the prefabricated structure, identifying the reverse bending points as the cross-slit segmentation position, calculating the maximum number of modules, generating the weight model of each block scheme, filtering the scheme that meets the constraints, and finally selecting the scheme with the smallest carbon emissions as the optimal block scheme.
It realizes the optimal blocking scheme for fast and scientific acquisition of prefabricated structures, reduces the time and human error of manual decision-making, and improves the efficiency and reliability of blocking schemes.
Smart Images

Figure CN119475539B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the fields of green and low-carbon technology and intelligent construction technology, and in particular to a method, device, equipment and medium for obtaining a block scheme for an assembled structure. Background Art
[0002] The construction scale of the prefabricated structure used in foundation pit excavation is usually hundreds of meters long and tens of meters high. Especially with the development of underground complexes in my country, its construction scale is very large. Because it adopts prefabricated production and mechanized transportation and construction, the prefabricated structure needs to be reasonably divided into blocks to improve the efficiency of the prefabricated construction industry chain and ensure the bearing performance of the structure after splicing.
[0003] However, the optimal block division scheme of prefabricated structures used in foundation pit excavation is currently mainly determined by manual decision-making, which consumes a lot of human resources and time resources, and is unable to traverse all feasible schemes and find the block division result with the highest comprehensive benefit. Therefore, how to quickly and scientifically obtain the optimal block division scheme of existing prefabricated structures is an urgent problem to be solved. Summary of the invention
[0004] The present invention provides a method, device, computer equipment and medium for obtaining a block scheme of an assembled structure, so as to solve the technical problem of how to obtain the optimal block scheme of an existing assembled structure.
[0005] In a first aspect, a method for obtaining a block scheme of an assembled structure is provided, comprising:
[0006] Obtain a bending moment envelope diagram of the assembled structure, obtain an inflection point in the bending moment envelope diagram, select the position of the inflection point as a transverse seam division position, and obtain the number of transverse seam division positions;
[0007] According to the number of transverse seam division positions, a maximum number of modules is obtained, and when the total number of modules on the prefabricated structure is not greater than the maximum number of modules, a block division scheme corresponding to the total number of modules is obtained;
[0008] Obtaining the vertical length, longitudinal length, thickness, and cavity ratio of a single block of the prefabricated structure in each block division scheme, wherein the single block of the prefabricated structure is a single module in the prefabricated structure;
[0009] Generate a model based on the vertical length, longitudinal length, thickness, cavity ratio and weight of the single block of the prefabricated structure in each block scheme, and generate the weight of the single block of the prefabricated structure in each block scheme;
[0010] Using preset constraints, the vertical length, longitudinal length, thickness, cavity ratio of the assembled structure monoblock in each block scheme and the weight of the assembled structure monoblock in each block scheme are screened to obtain a block scheme that meets the constraints;
[0011] A block scheme that meets the constraint conditions is selected as a preferred block scheme, the construction carbon emissions corresponding to each preferred block scheme are obtained, and the preferred block scheme with the smallest construction carbon emissions is selected as the optimal block scheme for the prefabricated structure.
[0012] Furthermore, the maximum number of modules is obtained according to the number of transverse seam division positions, and when the total number of modules on the prefabricated structure is not greater than the maximum number of modules, a block division scheme corresponding to the total number of modules is obtained, including:
[0013] Adding the number of transverse seam division positions and 1, the maximum number of modules of the prefabricated structure is obtained;
[0014] When the total number of modules on the prefabricated structure is not greater than the maximum number of modules, a block division scheme corresponding to the total number of modules is obtained.
[0015] Furthermore, the vertical length, longitudinal length, thickness, and cavity ratio of a single block of the prefabricated structure in each block division scheme are obtained, wherein the single block of the prefabricated structure is a single module in the prefabricated structure, including:
[0016] Get the data table corresponding to each block scheme;
[0017] In the data table corresponding to each block scheme, the vertical length, longitudinal length, thickness, and cavity ratio of the assembled structure monoblock in each block scheme are obtained, and the assembled structure monoblock is a single module in the assembled structure.
[0018] Furthermore, the generating model according to the vertical length, longitudinal length, thickness, cavity ratio and weight of the assembled structure monoblock in each block scheme to generate the weight of the assembled structure monoblock in each block scheme includes:
[0019] Get the weight generation model in the preset file;
[0020] A model is generated according to the vertical length, longitudinal length, thickness, cavity ratio and weight of a single block of the prefabricated structure in each block scheme, and the weight of the single block of the prefabricated structure in each block scheme is generated.
[0021] Furthermore, the preset constraints are used to screen the vertical length, longitudinal length, thickness, cavity ratio of the assembled structure monoblock in each block scheme and the weight of the assembled structure monoblock in each block scheme to obtain a block scheme that meets the constraints, including:
[0022] Get the configuration file and read the constraints in the configuration file;
[0023] By using the constraint conditions, the vertical length, longitudinal length, thickness, cavity ratio and weight of the assembled structure monoblock in each block scheme are screened to obtain a block scheme that meets the constraint conditions.
[0024] Furthermore, the selecting of the block scheme that meets the constraint condition as the preferred block scheme, obtaining the construction carbon emission corresponding to each preferred block scheme, and selecting the preferred block scheme with the smallest construction carbon emission as the optimal block scheme of the prefabricated structure includes:
[0025] Selecting a block scheme that meets the constraint condition as a preferred block scheme, and obtaining the construction carbon emissions corresponding to each preferred block scheme;
[0026] The construction carbon emissions corresponding to each of the preferred block schemes are ranked, and according to the ranking results, the preferred block scheme with the smallest construction carbon emissions is selected as the optimal block scheme for the prefabricated structure.
[0027] Furthermore, after selecting the block scheme that meets the constraint condition as the preferred block scheme, obtaining the construction carbon emission corresponding to each preferred block scheme, and selecting the preferred block scheme with the smallest construction carbon emission as the optimal block scheme for the prefabricated structure, the block scheme acquisition method includes:
[0028] A save instruction is obtained, the save instruction is executed, the optimal block scheme is saved in a preset storage area, and when a display instruction is received, the optimal block scheme is read from the storage area and the optimal block scheme is displayed.
[0029] In a second aspect, a device for obtaining a block scheme of an assembled structure is provided, comprising:
[0030] A first acquisition module is used to acquire a bending moment envelope diagram of the prefabricated structure, acquire an inflection point in the bending moment envelope diagram, select the position of the inflection point as a transverse seam division position, and acquire the number of transverse seam division positions;
[0031] The second acquisition module is used to acquire the maximum number of modules according to the number of transverse seam division positions, and when the total number of modules on the prefabricated structure is not greater than the maximum number of modules, acquire the block division scheme corresponding to the total number of modules;
[0032] A third acquisition module is used to acquire the vertical length, longitudinal length, thickness, and cavity ratio of a single block of the prefabricated structure in each block division scheme, wherein the single block of the prefabricated structure is a single module in the prefabricated structure;
[0033] A generation module, used to generate a model according to the vertical length, longitudinal length, thickness, cavity ratio and weight of the assembled structure monoblock in each block scheme, and generate the weight of the assembled structure monoblock in each block scheme;
[0034] A screening module is used to screen the vertical length, longitudinal length, thickness, cavity ratio and weight of the assembled structure monoblock in each block scheme by using preset constraints to obtain a block scheme that meets the constraints;
[0035] The fourth acquisition module is used to select a block scheme that meets the constraint conditions as a preferred block scheme, obtain the construction carbon emissions corresponding to each preferred block scheme, and select the preferred block scheme with the smallest construction carbon emissions as the optimal block scheme for the prefabricated structure.
[0036] In a third aspect, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned block scheme acquisition method when executing the computer program.
[0037] In a fourth aspect, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned block scheme acquisition method are implemented.
[0038] The present application provides a method, device, computer equipment and medium for obtaining a block scheme for an assembled structure, which has beneficial effects in two aspects. On the one hand, a block scheme that meets the constraint conditions is selected as a preferred block scheme, and the construction carbon emissions corresponding to each preferred block scheme are obtained. The preferred block scheme with the smallest construction carbon emissions is selected as the optimal block scheme for the assembled structure. Since no manual decision is required, the time for obtaining the optimal block scheme for the assembled structure is reduced, which is beneficial to improving the efficiency of obtaining the optimal block scheme for the assembled structure. On the other hand, since the optimal block scheme is automatically obtained and will not be affected by manual decision-making, it is beneficial to improve the reliability of the obtained optimal block scheme for the assembled structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments of the present invention will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative labor.
[0040] Figure 1 It is a schematic diagram of an application environment of a method for obtaining a block scheme in an embodiment of the present invention;
[0041] Figure 2 A schematic diagram of a flow chart of a method for obtaining a block scheme provided by an embodiment of the present invention;
[0042] Figure 3 yes Figure 2 A schematic flow chart of a specific implementation of step S23;
[0043] Figure 4 yes Figure 2 A schematic flow chart of a specific implementation of step S25;
[0044] Figure 5 yes Figure 2 A schematic flow chart of a specific implementation of step S26;
[0045] Figure 6 is a structural schematic diagram of a block scheme acquisition device in one embodiment of the present invention;
[0046] Figure 7 It is a structural diagram of a computer device in one embodiment of the present invention. DETAILED DESCRIPTION
[0047] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0048] See also Figure 1 , Figure 1 FIG. 1 is a schematic diagram of an application environment of a method for obtaining a block solution in an embodiment of the present invention. The method for obtaining a block solution provided in an embodiment of the present invention can be applied in the following embodiments: Figure 1 In an application environment, a client communicates with a server through a network.
[0049] The server obtains a bending moment envelope diagram of the prefabricated structure through the client, obtains an inflection point in the bending moment envelope diagram, selects the position of the inflection point as a transverse seam division position, and obtains the number of transverse seam division positions;
[0050] According to the number of transverse seam division positions, a maximum number of modules is obtained, and when the total number of modules on the prefabricated structure is not greater than the maximum number of modules, a block division scheme corresponding to the total number of modules is obtained;
[0051] Obtaining the vertical length, longitudinal length, thickness, and cavity ratio of a single block of the prefabricated structure in each block division scheme, wherein the single block of the prefabricated structure is a single module in the prefabricated structure;
[0052] Generate a model based on the vertical length, longitudinal length, thickness, cavity ratio and weight of the single block of the prefabricated structure in each block scheme, and generate the weight of the single block of the prefabricated structure in each block scheme;
[0053] Using preset constraints, the vertical length, longitudinal length, thickness, cavity ratio of the assembled structure monoblock in each block scheme and the weight of the assembled structure monoblock in each block scheme are screened to obtain a block scheme that meets the constraints;
[0054] A block scheme that meets the constraint conditions is selected as a preferred block scheme, the construction carbon emissions corresponding to each preferred block scheme are obtained, and the preferred block scheme with the smallest construction carbon emissions is selected as the optimal block scheme for the prefabricated structure.
[0055] In the scheme implemented by the above-mentioned block scheme acquisition method, device, equipment and medium, the beneficial effects are in two aspects. On the one hand, a block scheme that meets the constraint conditions is selected as the preferred block scheme, and the construction carbon emissions corresponding to each preferred block scheme are obtained. The preferred block scheme with the smallest construction carbon emissions is selected as the optimal block scheme for the prefabricated structure. Since no manual decision is required, the acquisition time of the optimal block scheme for the prefabricated structure is reduced, which is beneficial to improving the efficiency of acquiring the optimal block scheme for the prefabricated structure. On the other hand, since the optimal block scheme is automatically acquired and will not be affected by manual decision-making, it is beneficial to improve the reliability of the acquired optimal block scheme for the prefabricated structure.
[0056] The device running the client is referred to as a client device.
[0057] The device running the server is referred to as the server device.
[0058] Among them, client devices include but are not limited to smartphones, personal computers, Internet of Vehicles terminals, tablets and portable wearable devices.
[0059] The server device may be implemented by an independent server or a server cluster composed of multiple servers. The present invention is described in detail below through specific embodiments. Figure 2 , Figure 2 A flowchart of a method for obtaining a block solution provided by an embodiment of the present invention includes the following steps:
[0060] S21, obtaining a bending moment envelope diagram of the prefabricated structure, obtaining an inflection point in the bending moment envelope diagram, selecting the position of the inflection point as a transverse seam division position, and obtaining the number of transverse seam division positions;
[0061] Among them, prefabricated structures include but are not limited to solid permanent and temporary prefabricated structures and cavity permanent and temporary prefabricated structures.
[0062] Among them, the solid permanent and temporary prefabricated structure refers to a structure formed by organically combining permanent structure and temporary structure by using solid prefabricated components in prefabricated buildings.
[0063] Among them, the cavity permanent and temporary combined prefabricated structure refers to a structure formed by organically combining permanent structure and temporary structure by using cavity prefabricated components in prefabricated buildings.
[0064] Among them, the moment envelope diagram is a moment diagram formed when various loads act on the prefabricated structure and the most unfavorable situation is taken at each position. The moment envelope diagram reflects the relationship between the maximum moment and the axis of the prefabricated structure under different load combinations.
[0065] Among them, the transverse seam division position is the division position of the transverse seam. The transverse seam refers to the seam reserved or formed in the horizontal direction between different prefabricated structural blocks in the prefabricated structure. The design and construction of the transverse seam are crucial to the overall performance of the prefabricated structure. The main function of the transverse seam is to allow the prefabricated structure to produce a certain deformation under factors such as temperature changes and loads, thereby avoiding structural damage caused by internal stress concentration. By reasonably setting the transverse seam, it can be ensured that the prefabricated structure can effectively disperse and release stress when subjected to various external forces, thereby improving the overall stability and safety of the structure.
[0066] S22, obtaining a maximum number of modules according to the number of transverse seam division positions, and when the total number of modules on the prefabricated structure is not greater than the maximum number of modules, obtaining a block division scheme corresponding to the total number of modules;
[0067] The block scheme is a scheme that divides the prefabricated structure into multiple prefabricated structure blocks. The purpose of the block scheme is to simplify the manufacturing process of the prefabricated structure, reduce the difficulty of transportation, and improve the efficiency of installation.
[0068] The total number of modules refers to the total number of single blocks of the prefabricated structure.
[0069] The maximum number of modules is the maximum number of single blocks of the prefabricated structure.
[0070] Among them, the prefabricated structure block is a single module in the prefabricated structure.
[0071] Among them, the individual modules in the prefabricated structure are components of the entire prefabricated structure. The individual modules in the prefabricated structure are usually prefabricated in the factory, which can greatly improve production efficiency and shorten the construction period.
[0072] Wherein, the maximum number of modules is obtained according to the number of transverse seam division positions, and when the total number of modules on the prefabricated structure is not greater than the maximum number of modules, a block division scheme corresponding to the total number of modules is obtained, including:
[0073] Adding the number of transverse seam division positions and 1, the maximum number of modules of the prefabricated structure is obtained;
[0074] When the total number of modules on the prefabricated structure is not greater than the maximum number of modules, a block division scheme corresponding to the total number of modules is obtained.
[0075] When the total number of modules on the prefabricated structure is not greater than the maximum number of modules, a recursive algorithm is used to obtain a block division scheme corresponding to the total number of modules.
[0076] Among them, a recursive algorithm is an algorithm that solves a problem by directly or indirectly calling its own functions or methods.
[0077] For the sake of illustration, an example is given below:
[0078] For example, the number of potential transverse seam division positions on the prefabricated structure is 6, and the recursive algorithm sets the maximum number of modules on the prefabricated structure to 7.
[0079] When the total number of modules on the prefabricated structure is 1, and 1 is not greater than 7, a recursive algorithm is used to obtain a block scheme formed when the total number of modules of the prefabricated structure is 1, and the block schemes formed when the total number of modules of the prefabricated structure is 1 are formed into a scheme group P1;
[0080] When the total number of modules on the prefabricated structure is 2, and 2 is not greater than 7, a recursive algorithm is used to obtain the block scheme formed when the total number of modules of the prefabricated structure is 2, and the block scheme formed when the total number of modules of the prefabricated structure is 2 is formed into a scheme group P2;
[0081] When the total number of modules on the prefabricated structure is 3, and 3 is not greater than 7, a recursive algorithm is used to obtain the block scheme formed when the total number of modules of the prefabricated structure is 2, and the block scheme formed when the total number of modules of the prefabricated structure is 2 is formed into a scheme group cubic meter;
[0082] When the total number of modules on the prefabricated structure is 4, and 4 is not greater than 7, a recursive algorithm is used to obtain the block scheme formed when the total number of modules of the prefabricated structure is 2, and the block scheme formed when the total number of modules of the prefabricated structure is 2 is formed into a scheme group P4;
[0083] When the total number of modules on the prefabricated structure is 5, and 5 is not greater than 7, a recursive algorithm is used to obtain the block scheme formed when the total number of modules of the prefabricated structure is 2, and the block scheme formed when the total number of modules of the prefabricated structure is 2 is formed into a scheme group P5;
[0084] When the total number of modules on the prefabricated structure is 6, and 6 is not greater than 7, a recursive algorithm is used to obtain the block scheme formed when the total number of modules of the prefabricated structure is 2, and the block scheme formed when the total number of modules of the prefabricated structure is 2 is formed into a scheme group P6;
[0085] When the total number of modules on the prefabricated structure is 7 and 7 is not greater than 7, a recursive algorithm is used to obtain the block scheme formed when the total number of modules of the prefabricated structure is 2, and the block schemes formed when the total number of modules of the prefabricated structure is 2 are formed into scheme group P7.
[0086] P1, P2, P, P4, P5, P6, and P7 are grouped into a solution group P. The solution group P has a block solution corresponding to each total number of modules.
[0087] S23, obtaining the vertical length, longitudinal length, thickness, and cavity ratio of a single block of the prefabricated structure in each block division scheme, wherein the single block of the prefabricated structure is a single module in the prefabricated structure;
[0088] Among them, the vertical length of the prefabricated structure single block refers to the size of the prefabricated structure single block in the vertical direction, that is, the height of the prefabricated structure single block from the bottom to the top.
[0089] The longitudinal length of the assembled structure monoblock refers to the extension of the assembled structure monoblock in the direction of the long axis, that is, the length of the assembled structure monoblock.
[0090] The thickness of a single block of the prefabricated structure refers to the dimension of the single block of the prefabricated structure perpendicular to the main force direction.
[0091] The cavity ratio of a single block of a prefabricated structure refers to the ratio of the volume occupied by the cavity to the total volume of the single block of the prefabricated structure.
[0092] S24, generating a model according to the vertical length, longitudinal length, thickness, cavity ratio and weight of the single block of the prefabricated structure in each block scheme, and generating the weight of the single block of the prefabricated structure in each block scheme;
[0093] The method of generating a model according to the vertical length, longitudinal length, thickness, cavity ratio and weight of the assembled structure monoblock in each block scheme to generate the weight of the assembled structure monoblock in each block scheme includes:
[0094] Get the weight generation model in the preset file;
[0095] A model is generated according to the vertical length, longitudinal length, thickness, cavity ratio and weight of a single block of the prefabricated structure in each block scheme, and the weight of the single block of the prefabricated structure in each block scheme is generated.
[0096] Exemplarily, the weight generation model is:
[0097] ;
[0098] is the weight of a single block of the prefabricated structure in the bth block scheme;
[0099] ρ is the density of the fabricated structure;
[0100] is the longitudinal length of the single block of the prefabricated structure in the bth block scheme;
[0101] is the vertical length of the single block of the prefabricated structure in the bth block scheme;
[0102] is the thickness of a single block of the prefabricated structure in the bth block scheme;
[0103] is the cavity ratio of the prefabricated structure.
[0104] Among them, the weight generation model is a generation model of weight.
[0105] S25, using preset constraints, screening the vertical length, longitudinal length, thickness, cavity ratio of the assembled structure monoblock in each block scheme and the weight of the assembled structure monoblock in each block scheme to obtain a block scheme that meets the constraints;
[0106] Exemplarily, the constraints are:
[0107] ;
[0108] ;
[0109] ;
[0110] ;
[0111] is the vertical length of the single block of the prefabricated structure in the bth block scheme; is the first limit;
[0112] is the longitudinal length of the single block of the prefabricated structure in the bth block scheme; is the second limit;
[0113] is the thickness of a single block of the prefabricated structure in the bth block scheme; is the third limit;
[0114] is the weight length of the single block of the prefabricated structure in the bth block scheme; is the fourth limit.
[0115] The first limit value, the second limit value, the third limit value, and the fourth limit value are different limit values. The first limit value, the second limit value, the third limit value, and the fourth limit value can be set according to local transportation management conditions and are not limited here.
[0116] S26, selecting a block scheme that meets the constraint conditions as a preferred block scheme, obtaining the construction carbon emissions corresponding to each preferred block scheme, and selecting the preferred block scheme with the smallest construction carbon emissions as the optimal block scheme for the prefabricated structure.
[0117] Among them, construction carbon emissions refer to the carbon emissions during the construction process, which includes the production stage, transportation stage and construction stage.
[0118] Among them, selecting the preferred block scheme with the smallest construction carbon emissions as the optimal block scheme for the prefabricated structure not only reduces the operating costs of the enterprise, but also promotes the research and development and application of clean energy and low-carbon technologies, promotes the optimization and upgrading of the economic structure, and achieves a win-win situation of economic benefits and environmental protection.
[0119] For the sake of explanation, we take the project as an example and describe it in detail as follows:
[0120] The station in a certain city adopts a prefabricated structure. The station has two floors, with cast-in-place ground-connected walls at both ends and a prefabricated structure in the middle. The prefabricated structure adopts a lightweight cavity setting.
[0121] Combined with the local transportation management situation of the city, according to the block plan acquisition method of the prefabricated structure,
[0122] A recursive algorithm was used to calculate all the block solutions that met the mechanical properties, a total of 100. The width of each block solution was iterated through a sorting algorithm. Finally, the block solutions were screened according to the constraints, and 3 block solutions whose block lengths were greater than the transportation length limit were finally removed, resulting in 70 block solutions that met the constraints.
[0123] Carbon emissions were calculated for 70 block schemes, and it was found that when the width of the single-ring prefabricated structure is U1 meter, and it is vertically divided into three blocks with each block being U2 meters, U2 meters, and U3 meters in length, the scheme has the lowest construction carbon emissions, achieving the optimal mechanical properties and construction carbon emissions of the prefabricated structure blocks.
[0124] By calculating and analyzing the construction carbon emissions of all feasible block schemes, it can be seen that the above optimal block scheme reduces the construction carbon emissions and can ensure the bearing capacity of the structure at the same time, which confirms the rationality and effectiveness of the block decision method proposed in the present invention.
[0125] Wherein, after selecting the block scheme that meets the constraint condition as the preferred block scheme, obtaining the construction carbon emission corresponding to each preferred block scheme, and selecting the preferred block scheme with the smallest construction carbon emission as the optimal block scheme of the prefabricated structure, the block scheme acquisition method includes:
[0126] A save instruction is obtained, the save instruction is executed, the optimal block scheme is saved in a preset storage area, and when a display instruction is received, the optimal block scheme is read from the storage area and the optimal block scheme is displayed.
[0127] In the embodiment of the present invention, the beneficial effects are in two aspects. On the one hand, a block scheme that meets the constraint conditions is selected as a preferred block scheme, and the construction carbon emissions corresponding to each preferred block scheme are obtained. The preferred block scheme with the smallest construction carbon emissions is selected as the optimal block scheme for the prefabricated structure. Since no manual decision is required, the time for obtaining the optimal block scheme for the prefabricated structure is reduced, which is beneficial to improving the efficiency of obtaining the optimal block scheme for the prefabricated structure. On the other hand, since the optimal block scheme is automatically obtained and will not be affected by manual decision-making, it is beneficial to improve the reliability of the obtained optimal block scheme for the prefabricated structure.
[0128] See also Figure 3 , Figure 3 yes Figure 2 A specific implementation flow diagram of step S23 is described in detail as follows:
[0129] S31, obtaining a data table corresponding to each block scheme;
[0130] S32, in a data table corresponding to each block scheme, obtain the vertical length, longitudinal length, thickness, and cavity ratio of a single block of the prefabricated structure in each block scheme, wherein the single block of the prefabricated structure is a single module in the prefabricated structure.
[0131] The corresponding relationship between the block scheme and the data table is one-to-one, that is, one block scheme corresponds to one data table, and different block schemes correspond to different data tables.
[0132] In an embodiment of the present invention, the vertical length, longitudinal length, thickness, and cavity ratio of the prefabricated structure block in each block scheme are obtained. By understanding the differences between the vertical length, longitudinal length, thickness, and cavity ratio of the prefabricated structure block in each block scheme and the constraints, the optimization of the production process can be guided, unnecessary waste and delays can be reduced, and the overall production efficiency can be improved.
[0133] See also Figure 4 , Figure 4 yes Figure 2 A specific implementation flow diagram of step S25 is described in detail as follows:
[0134] S41, obtaining a configuration file and reading constraints in the configuration file;
[0135] S42, using constraint conditions, screening the vertical length, longitudinal length, thickness, cavity ratio and weight of the prefabricated structure single block in each block scheme, and obtaining a block scheme that meets the constraint conditions.
[0136] In an embodiment of the present invention, the vertical length, longitudinal length, thickness, cavity, and weight of a single block of the prefabricated structure in the block scheme that meets the constraints strictly follow the established standards and specifications of the constraints, thereby effectively reducing technical risks and safety hazards and improving the reliability of the prefabricated structure.
[0137] See also Figure 5 , Figure 5 yes Figure 2 A specific implementation flow diagram of step S26 is described in detail as follows:
[0138] S51, selecting a block scheme that meets the constraint condition as a preferred block scheme, and obtaining the construction carbon emission corresponding to each preferred block scheme;
[0139] Exemplarily, selecting a block scheme that meets the constraint condition as a preferred block scheme, and obtaining the construction carbon emissions corresponding to each preferred block scheme includes:
[0140] Select the block scheme that meets the constraint conditions as the preferred block scheme, obtain the carbon emissions of the prefabricated structure single block of each preferred block scheme in the production stage, obtain the carbon emissions of the prefabricated structure single block of each preferred block scheme in the transportation stage, and obtain the carbon emissions of the prefabricated structure single block of each preferred block scheme in the construction stage;
[0141] By building a carbon emission generation model, the carbon emissions of the prefabricated structure of each preferred block scheme in the production stage, the carbon emissions of the prefabricated structure of each preferred block scheme in the transportation stage, and the carbon emissions of the prefabricated structure of each preferred block scheme in the construction stage are added together to obtain the construction carbon emissions of the prefabricated structure of each preferred block scheme;
[0142] Among them, the construction carbon emission generation model is:
[0143] ;
[0144] is the carbon emission of the construction of a single block of the prefabricated structure of the kth optimal block scheme;
[0145] is the carbon emission of the prefabricated structure of the kth optimal block scheme in the production stage;
[0146] is the carbon emission of the prefabricated structure of the kth optimal block scheme during the transportation stage;
[0147] is the carbon emission of a single block of the prefabricated structure of the kth optimal block scheme during the construction phase.
[0148] Optionally, a block scheme that meets the constraint condition is selected as a preferred block scheme, and the carbon emissions of the prefabricated structure monoblock in the production stage of each preferred block scheme are obtained, the carbon emissions of the prefabricated structure monoblock in the transportation stage of each preferred block scheme are obtained, and the carbon emissions of the prefabricated structure monoblock in the construction stage of each preferred block scheme are obtained, including:
[0149] According to the preset first generation model, the carbon emissions of the assembled structure block of each preferred block scheme in the production stage are obtained;
[0150] According to the preset second generation model, the carbon emissions of the assembled structure block of each preferred block scheme in the transportation stage are obtained;
[0151] According to the preset third generation model, the carbon emissions of the prefabricated structure block of each preferred block scheme during the construction phase are obtained.
[0152] Among them, the first generation model is:
[0153] ;
[0154] in, is the carbon emission of the prefabricated structure of the kth optimal block scheme in the production stage;
[0155] is the consumption of material i used in the production stage of the assembled structure block of the kth optimal block scheme;
[0156] is the carbon emission coefficient corresponding to the material i used in the production stage of the assembled structure block of the kth optimal block scheme;
[0157] is the time for the kth optimal block-division scheme to use machine j to operate the prefabricated structure unit in the production stage, in units of shifts;
[0158] is the energy consumption per shift of machine j;
[0159] It is the carbon emission coefficient of the unit energy consumed by machine j in the production stage of the prefabricated structure block of the kth preferred block scheme.
[0160] Material i is the i-th material, i is the serial number of the material, and n is the total number of materials.
[0161] Machine j is the jth machine, j is the serial number of the machine, and m is the total quantity of materials.
[0162] Among them, the second generation model is:
[0163] ;
[0164] in, is the carbon emission of the prefabricated structure of the kth optimal block scheme during the transportation stage;
[0165] is the transport weight of a single block of the prefabricated structure of the kth optimal block-division scheme;
[0166] is the transportation distance of a single block of the prefabricated structure of the kth optimal block-division scheme;
[0167] is the carbon emission coefficient of the single block of the prefabricated structure of the kth optimal block scheme during the transportation stage;
[0168] Among them, the third generation model is:
[0169] ;
[0170] in, is the carbon emission of a single block of the prefabricated structure of the kth optimal block scheme during the construction phase;
[0171] in, is the consumption of material i used at the construction site for the prefabricated structure block of the kth optimal block scheme;
[0172] is the carbon emission coefficient of the assembled structure of the kth optimal block scheme using material i at the construction site;
[0173] is the operating time of machine j at the construction site for the kth optimal block solution, in units of shifts;
[0174] is the energy consumption per shift of machine j;
[0175] It is the carbon emission coefficient of the unit energy consumed by the prefabricated structure of the kth optimal block scheme using machine j at the construction site.
[0176] Material i is the i-th material, i is the serial number of the material, and n is the total number of materials.
[0177] Machine j is the jth machine, j is the serial number of the machine, and m is the total quantity of materials.
[0178] Among them, the machine shift is a composite unit of measurement commonly used in engineering, which is used to describe the utilization of machinery and equipment per unit time. A machine shift represents the usage or work efficiency of a piece of machinery and equipment in a standard work shift.
[0179] Among them, the energy consumption of machine j per shift is the total amount of energy consumed by machine j in each shift.
[0180] S52, sorting the construction carbon emissions corresponding to each of the preferred block schemes, and according to the sorting results, selecting the preferred block scheme with the smallest construction carbon emissions as the optimal block scheme for the prefabricated structure.
[0181] In an embodiment of the present invention, the construction carbon emissions corresponding to each of the preferred block schemes are ranked, and based on the ranking results, the preferred block scheme with the smallest construction carbon emissions is selected as the optimal block scheme for the prefabricated structure. Since no manual decision is required, the time for obtaining the optimal block scheme for the prefabricated structure is reduced, which is conducive to improving the efficiency of obtaining the optimal block scheme for the prefabricated structure.
[0182] See also Figure 6 , Figure 6 is a schematic diagram of a block scheme acquisition device in one embodiment of the present invention. Figure 6 As shown, the block scheme acquisition device includes a first acquisition module 101, a second acquisition module 102, a third acquisition module 103, a generation module 104, a screening module 105, and a fourth acquisition module 106. The functional modules are described in detail as follows:
[0183] The first acquisition module 101 is used to acquire a bending moment envelope diagram of the prefabricated structure, acquire an inflection point in the bending moment envelope diagram, select the position of the inflection point as a transverse seam division position, and acquire the number of transverse seam division positions;
[0184] The second acquisition module 102 is used to acquire the maximum number of modules according to the number of transverse seam division positions, and when the total number of modules on the prefabricated structure is not greater than the maximum number of modules, acquire a block division scheme corresponding to the total number of modules;
[0185] The third acquisition module 103 is used to acquire the vertical length, longitudinal length, thickness, and cavity ratio of a single block of the prefabricated structure in each block scheme, wherein the single block of the prefabricated structure is a single module in the prefabricated structure;
[0186] A generation module 104, for generating a model according to the vertical length, longitudinal length, thickness, cavity ratio and weight of the assembled structure monoblock in each block scheme, and generating the weight of the assembled structure monoblock in each block scheme;
[0187] The screening module 105 is used to screen the vertical length, longitudinal length, thickness, cavity ratio and weight of the assembled structure monoblock in each block scheme by using preset constraints to obtain a block scheme that meets the constraints;
[0188] The fourth acquisition module 106 is used to select a block scheme that meets the constraint conditions as a preferred block scheme, obtain the construction carbon emissions corresponding to each preferred block scheme, and select the preferred block scheme with the smallest construction carbon emissions as the optimal block scheme for the prefabricated structure.
[0189] In the embodiment of the present invention, the beneficial effects are in two aspects. On the one hand, a block scheme that meets the constraint conditions is selected as a preferred block scheme, and the construction carbon emissions corresponding to each preferred block scheme are obtained. The preferred block scheme with the smallest construction carbon emissions is selected as the optimal block scheme for the prefabricated structure. Since no manual decision is required, the time for obtaining the optimal block scheme for the prefabricated structure is reduced, which is beneficial to improving the efficiency of obtaining the optimal block scheme for the prefabricated structure. On the other hand, since the optimal block scheme is automatically obtained and will not be affected by manual decision-making, it is beneficial to improve the reliability of the obtained optimal block scheme for the prefabricated structure.
[0190] The specific limitations on the block solution acquisition device can be found in the above limitations on the block solution acquisition method, which will not be repeated here.
[0191] Each module in the above-mentioned block scheme acquisition device can be implemented in whole or in part by software, hardware and a combination thereof. Each of the above-mentioned modules can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute the operations corresponding to each of the above modules.
[0192] See also Figure 7 , Figure 7 1 is another structural diagram of a computer device in one embodiment of the present invention. In one embodiment, a computer device is provided. The computer device is a server device or a client device. The internal structure diagram thereof can be as shown in FIG. Figure 7 As shown. The computer device includes a processor, a memory, a network interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external device. When the computer program is executed by the processor, the functions or steps of a method for obtaining a block scheme of an assembled structure can be realized.
[0193] In one embodiment, a computer device is provided, comprising a memory, a processor, and a computer program stored on the memory and executable on the processor.
[0194] It should be noted that the above functions or steps that can be implemented by the computer-readable storage medium or computer device can refer to the relevant description of the aforementioned method embodiment. In order to avoid repetition, they will not be described one by one here.
[0195] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software may depend on the specific application and design constraints of the technical solution. Technicians can use different methods to implement the described functions for each specific application, but such implementation should not be considered to exceed the scope of the embodiments of the present disclosure.
Claims
1. A method for obtaining a block scheme for an assembled structure, characterized in that: include: Obtain a bending moment envelope diagram of the assembled structure, obtain an inflection point in the bending moment envelope diagram, select the position of the inflection point as a transverse seam division position, and obtain the number of transverse seam division positions; According to the number of transverse seam division positions, a maximum number of modules is obtained, and when the total number of modules on the prefabricated structure is not greater than the maximum number of modules, a block division scheme corresponding to the total number of modules is obtained; Obtaining the vertical length, longitudinal length, thickness, and cavity ratio of a single block of the prefabricated structure in each block division scheme, wherein the single block of the prefabricated structure is a single module in the prefabricated structure; Generate a model based on the vertical length, longitudinal length, thickness, cavity ratio and weight of the single block of the prefabricated structure in each block scheme, and generate the weight of the single block of the prefabricated structure in each block scheme; Using preset constraints, the vertical length, longitudinal length, thickness, cavity ratio of the assembled structure monoblock in each block scheme and the weight of the assembled structure monoblock in each block scheme are screened to obtain a block scheme that meets the constraints; Selecting a block scheme that meets the constraint conditions as a preferred block scheme, obtaining the construction carbon emissions corresponding to each preferred block scheme, and selecting the preferred block scheme with the smallest construction carbon emissions as the optimal block scheme for the prefabricated structure; The method of generating a model according to the vertical length, longitudinal length, thickness, cavity ratio and weight of the assembled structure monoblock in each block scheme to generate the weight of the assembled structure monoblock in each block scheme includes: Get the weight generation model in the preset file; Generate a model based on the vertical length, longitudinal length, thickness, cavity ratio and weight of the single block of the prefabricated structure in each block scheme, and generate the weight of the single block of the prefabricated structure in each block scheme; The preset constraint conditions are used to screen the vertical length, longitudinal length, thickness, cavity ratio of the assembled structure monoblock in each block scheme and the weight of the assembled structure monoblock in each block scheme to obtain a block scheme that meets the constraint conditions, including: Get the configuration file and read the constraints in the configuration file; By using the constraint conditions, the vertical length, longitudinal length, thickness, cavity ratio and weight of the assembled structure monoblock in each block scheme are screened to obtain a block scheme that meets the constraint conditions.
2. The method for obtaining a block scheme according to claim 1, characterized in that: The method of obtaining the maximum number of modules according to the number of transverse seam division positions, and obtaining a block division scheme corresponding to the total number of modules when the total number of modules on the prefabricated structure is not greater than the maximum number of modules, includes: Adding the number of transverse seam division positions and 1, the maximum number of modules of the prefabricated structure is obtained; When the total number of modules on the prefabricated structure is not greater than the maximum number of modules, a block division scheme corresponding to the total number of modules is obtained.
3. The method for obtaining a block scheme according to claim 1, characterized in that: The obtaining of the vertical length, longitudinal length, thickness, and cavity ratio of a single block of the prefabricated structure in each block division scheme, wherein the single block of the prefabricated structure is a single module in the prefabricated structure, includes: Get the data table corresponding to each block scheme; In the data table corresponding to each block scheme, the vertical length, longitudinal length, thickness, and cavity ratio of the assembled structure monoblock in each block scheme are obtained, and the assembled structure monoblock is a single module in the assembled structure.
4. The method for obtaining a block scheme according to claim 1, characterized in that: The step of selecting a block scheme that meets the constraint conditions as a preferred block scheme, obtaining the construction carbon emissions corresponding to each preferred block scheme, and selecting the preferred block scheme with the smallest construction carbon emissions as the optimal block scheme for the prefabricated structure includes: Selecting a block scheme that meets the constraint condition as a preferred block scheme, and obtaining the construction carbon emissions corresponding to each preferred block scheme; The construction carbon emissions corresponding to each of the preferred block schemes are ranked, and according to the ranking results, the preferred block scheme with the smallest construction carbon emissions is selected as the optimal block scheme for the prefabricated structure.
5. The method for obtaining a block scheme according to claim 1, characterized in that: After selecting the block scheme that meets the constraint condition as the preferred block scheme, obtaining the construction carbon emission corresponding to each preferred block scheme, and selecting the preferred block scheme with the smallest construction carbon emission as the optimal block scheme for the prefabricated structure, the block scheme acquisition method includes: A save instruction is obtained, the save instruction is executed, the optimal block scheme is saved in a preset storage area, and when a display instruction is received, the optimal block scheme is read from the storage area and the optimal block scheme is displayed.
6. A device for obtaining a block solution for an assembled structure based on the method for obtaining a block solution as claimed in any one of claims 1 to 5, characterized in that: include: A first acquisition module is used to acquire a bending moment envelope diagram of the prefabricated structure, acquire an inflection point in the bending moment envelope diagram, select the position of the inflection point as a transverse seam division position, and acquire the number of transverse seam division positions; The second acquisition module is used to acquire the maximum number of modules according to the number of transverse seam division positions, and when the total number of modules on the prefabricated structure is not greater than the maximum number of modules, acquire the block division scheme corresponding to the total number of modules; A third acquisition module is used to acquire the vertical length, longitudinal length, thickness, and cavity ratio of a single block of the prefabricated structure in each block division scheme, wherein the single block of the prefabricated structure is a single module in the prefabricated structure; A generation module, used to generate a model according to the vertical length, longitudinal length, thickness, cavity ratio and weight of the assembled structure monoblock in each block scheme, and generate the weight of the assembled structure monoblock in each block scheme; A screening module is used to screen the vertical length, longitudinal length, thickness, cavity ratio and weight of the assembled structure monoblock in each block scheme by using preset constraints to obtain a block scheme that meets the constraints; The fourth acquisition module is used to select a block scheme that meets the constraint conditions as a preferred block scheme, obtain the construction carbon emissions corresponding to each preferred block scheme, and select the preferred block scheme with the smallest construction carbon emissions as the optimal block scheme for the prefabricated structure.
7. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method for acquiring a block scheme as claimed in any one of claims 1 to 5 are implemented.
8. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method for acquiring a block scheme as claimed in any one of claims 1 to 5 are implemented.
Citation Information
Patent Citations
Transformer substation fabricated integrated guard house and manufacturing method thereof
CN110158775A
Method and device for calculating carbon emission of assembled bridge engineering based on IFC expansion
CN116011088A