A station yard signal state inspection method, electronic equipment and readable storage medium
By receiving and updating the status of station signal equipment, the system automatically checks for conflicts between shunting routes and passenger train routes, resolving the issue of relying on manual judgment for inspections in Technical Regulations 301 in interlocking stations and TDCS stations, and achieving a high-efficiency, low-cost improvement in safety management capabilities.
Patent Information
- Application Number
- CN202411476924.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-22
- Publication Date
- 2025-12-26
- Estimated Expiration
- 2044-10-22
AI Technical Summary
In the existing technology, the management and safety protection functions of train operation procedures in interlocking stations and TDCS stations are insufficient, which leads to the reliance on manual judgment for inspection in Article 301 of the Railway Technical Management Regulations, increasing the burden on operators and posing safety hazards.
By receiving status information from station signal equipment, the route set is updated in real time. In accordance with Article 301 of the Railway Technical Management Regulations, conflicts between shunting routes and passenger train routes are automatically checked, providing a check method based on station signal status according to Article 301 of the Technical Regulations and corresponding electronic equipment.
It improves the efficiency of route conflict inspection, can promptly detect safety hazards that violate Technical Regulations 301, is applicable to various scenarios, including unconventional operations, reduces the workload and safety risks of operators, and has low investment costs.
Smart Images

Figure CN119502984B_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to a method for checking the railway technical management regulation No. 301, in particular to a station yard signal state checking method, electronic equipment and readable storage medium. BACKGROUND
[0002] The railway technical management regulation No. 301, hereinafter referred to as the technical regulation 301, is a red line for the safety production of the station, which mainly regulates the safety, stability and comfort principles of the train in operation, and the prevention and treatment measures of the train accident. Once the shunting operation violates the technical regulation 301, the shunting signal rushes to the passenger train, which is likely to cause a more serious train accident and endanger the safety of passengers. The specific content of the railway technical management regulation No. 301 is as follows: when the passenger train is received and sent, the line without separation equipment or derailers from the received and sent train route is not allowed to be shunted to the direction that can enter the received and sent train route.
[0003] According to the statistics, as of the end of 2023, the proportion of CTC stations is about 45.9%, the proportion of TDCS stations is about 37.4%, and the proportion of interlocking stations is about 16.7%. For interlocking stations and some TDCS stations, the process management of train operation and the safety protection function related to the train attribute have not been realized, and the checking of the technical regulation 301 completely depends on the manual judgment and comparison, which increases the work intensity of the station attendant and the signalman, causes the high nervousness of the operation personnel, and inevitably leads to the manual missing check, which has the safety hidden danger. Therefore, in view of the insufficient station technical protection function, it is urgent to upgrade the technology to dynamically remind the safety risk of violating the technical regulation 301 in the operation, timely block the illegal behavior, realize the change from the human control to the technical protection, improve the safety of the station received and sent train, and improve the station safety control ability. SUMMARY
[0004] The purpose of the present application is to overcome the defects of the prior art, and to provide a widely applicable technical regulation 301 checking method based on the station yard signal state.
[0005] The purpose of the present application can be realized by the following technical scheme:
[0006] A technical regulation 301 checking method based on the station yard signal state, which receives the state indication information of the station yard signal equipment, updates the establishment and cancellation state of the passenger train route responsible for receiving and sending trains and the shunting route, and realizes the conflict checking of the shunting route and the passenger train route according to the provisions of the railway technical management regulation No. 301.
[0007] The present application provides a station yard signal state checking method, which comprises the following steps:
[0008] S1, initialize a route set for storing shunting routes and train routes;
[0009] S2, receive state representation information of station equipment;
[0010] S3, update the establishment and cancellation state of passenger train routes and shunting routes in the route set, and complete the conflict check of shunting routes or shunting machines and passenger train routes according to the provisions of Article 301 of the Railway Technical Management Regulations.
[0011] Further, in step S1, initializing the route set includes establishing an empty route set, and updating the shunting routes and train routes in real time according to the state representation information of the station signal equipment.
[0012] Further, in step S2, it includes receiving the state representation information of the signal, receiving the state representation information of the train window, and receiving the state representation information of the track section.
[0013] Further, if the state representation information of the signal is received in step S2, it is judged whether the signal is open;
[0014] S311, if the state is open, the locked track section is continuously searched according to the equipment connection relationship according to the direction of the signal, the established route is determined, and is added to the route set; otherwise, the end step is executed.
[0015] S312, if it is a shunting route, it is checked whether the shunting route and the existing passenger train route constitute the conflict of Article 301 of the Railway Technical Management Regulations.
[0016] S313, if it is a train route and a passenger train route, it is checked whether the existing shunting route and the passenger train route constitute the conflict of Article 301 of the Railway Technical Management Regulations.
[0017] Further, if the state representation information of the train window is received in step S2, the adjacent train signal that has been opened is searched according to the equipment connection relationship.
[0018] S321, the corresponding train route in the route set is found according to the train signal that has been opened, and the train number information of the train route in the route set is updated.
[0019] S322, it is judged whether the train route is a passenger train route, if yes, it is checked whether the existing shunting route and the passenger train route constitute the conflict of Article 301 of the Railway Technical Management Regulations, otherwise, the end step is executed.
[0020] Further, if the state representation information of the track section is received in step S2, it is judged whether the current state is clear or occupied.
[0021] If the state is clear, step S331 is executed, if the state is occupied, step S334 is executed, otherwise, an end step is executed;
[0022] S331, judging the last state of the track section, if the last state is occupied or locked, step S332 is executed, otherwise, an end step is executed;
[0023] S332, finding the route in the route set containing the track section device, removing the device from the locked section set of the route, updating the route set;
[0024] S333, judging whether the locked section set of the route has been completely emptied, if yes, removing the route from the route set, updating the route set, otherwise, an end step is executed;
[0025] S334, judging whether the state representation information of the track section has a locomotive number, if yes, checking whether a conflict of article 301 of the Railway Technical Management Regulations is formed between the locomotive and the existing passenger train route.
[0026] Further, the establishment of the route includes the following judgment rules:
[0027] For a train route, the start signal machine opens the train permission signal, and at the same time, all track sections on the route including turnouts, turnout-free sections and tracks are in a locked state;
[0028] For a shunting route, the start signal machine opens the shunting permission signal, and at the same time, all track sections on the route including turnouts, turnout-free sections and tracks are in a locked state.
[0029] Further, the route data stored in the route set includes: route type, route start signal machine, locked section set and train number.
[0030] Further, checking whether a conflict of article 301 of the Railway Technical Management Regulations is formed between the shunting route or the locomotive and the passenger train route includes the following steps:
[0031] S31, finding the last locked section in the shunting route, or the track section occupied by the locomotive, taking it as the starting point for searching;
[0032] S32, according to the signal device connection relationship, searching for the next adjacent signal device in the route direction, if it is the signal device of the station, step S33 is executed, otherwise, step S36 is executed;
[0033] S33, judging whether the signal device is a turnout, if yes, step S34 is executed, otherwise, step S32 is executed;
[0034] S34, judge whether the current state of the turnout is locked or occupied, if yes, execute step S35, otherwise, turn to step S32;
[0035] S35, check whether the set of locked sections of the passenger train route in the route set contains the turnout, if yes, it indicates that the shunting route and the passenger train route constitute the conflict of the 301st article of the railway technical management regulation;
[0036] S36, end.
[0037] In addition, the present application also provides an electronic device, comprising a processor and a memory, wherein the memory stores a computer program, and the computer program is executed by the processor to realize the method.
[0038] The present application also provides a readable storage medium, wherein the readable storage medium stores a computer program, and the computer program is executed by a processor to realize the method.
[0039] Compared with the prior art, the present application has the following advantages:
[0040] 1. The working efficiency of the route conflict checking is improved: the method provided by the present application can timely find the safety hazards that violate the 301st article of the technical regulation, and greatly improves the working efficiency compared with the manual judgment by the operation personnel;
[0041] 2. Multiple application scenarios: the method provided by the present application is based on the station signal state, and is not only suitable for detecting whether there is a conflict of the 301st article of the technical regulation according to the route state change, but also can adapt to some irregular operations of the station shunting, such as the reverse movement or back-and-forth movement of the station engineering vehicle in the shunting route, and the like. According to the occupation indication state of the track section, the method provided by the present application can timely find the safety hazards of the shunting collision with the train;
[0042] 3. Wide application prospect and low investment cost: the equipment investment cost required by the present application only includes the modification cost of the existing software. At present, the proportion of interlocking stations and TDCS stations is still more than 50%. The method provided by the present application can be applied to almost all interlocking stations and TDCS stations. On the basis of the insufficient station technical defense function, the method is expanded, and the safety control ability of the station for the key operation is improved by means of the change from manual control to technical defense. BRIEF DESCRIPTION OF DRAWINGS
[0043] Figure 1 The flowchart of the station signal state checking method of the present application;
[0044] Figure 2 The flowchart of the method for checking whether the shunting route or the shunting machine and the passenger train route constitute the conflict of the 301st article of the technical regulation;
[0045] Figure 3 A schematic diagram of a passenger train route handled by the application;
[0046] Figure 4 A schematic diagram of a shunting route handled by the application constituting a conflict with the Technical Regulation 301. DETAILED DESCRIPTION
[0047] The station yard signal state checking method, electronic device and readable storage medium of the application are further described in detail below in combination with the drawings and specific embodiments. The advantages and features of the application will be clearer according to the following description. It should be noted that the drawings are greatly simplified and all use non-precise proportions, only for the purpose of facilitating and clearly assisting the description of the embodiments of the application. In order to make the purpose, features and advantages of the application more obvious and easy to understand, please refer to the drawings. It should be noted that the structure, proportion, size and the like shown in the drawings attached to the specification are only used to cooperate with the content disclosed in the specification, so as to be understood and read by those skilled in the art, and are not used to limit the conditions for implementing the application, therefore, any modification of structure, change of proportion relationship or adjustment of size, which does not affect the effect and purpose that can be achieved by the application, should still fall within the scope covered by the disclosed technology.
[0048] The application is based on the Technical Regulation 301 checking method of the station yard signal state, which aims to receive the state representation information of the station yard signal device, update the establishment and cancellation state of the passenger train route and the shunting route responsible for receiving and sending trains, and realize the conflict checking of the shunting route and the passenger train route according to the provisions of Article 301 of the Railway Technical Management Regulations, and the specific process is as shown in Figure 1
[0049] S1, initialize the route set for storing the shunting route and the train route; specifically, initialize the route set includes establishing an empty route set, and update the shunting route and the train route in the route set in real time according to the state representation information of the station yard signal device;
[0050] S2, receive the state representation information of the station device, including receiving the state representation information of the signal, receiving the state representation information of the train window and receiving the state representation information of the track section.
[0051] S3, update the establishment and cancellation state of the passenger train route responsible for receiving and sending trains and the shunting route in the route set; and complete the conflict checking of the shunting route and the passenger train route according to the provisions of Article 301 of the Railway Technical Management Regulations.
[0052] If the state representation information of the signal machine is received in step S2, it is determined whether the signal machine is open.
[0053] S311, if the state is open, then according to the signal machine direction, the locked track section is found continuously according to the device connection relationship, the established route is determined, and is added to the route set; otherwise, the end step is executed.
[0054] S312, if it is a shunting route, it is checked whether the shunting route and the existing passenger train route constitute the conflict of article 301 of the Railway Technical Management Regulations.
[0055] S313, if it is a train route and is a passenger train route, it is checked whether the existing shunting route and the passenger train route constitute the conflict of article 301 of the Railway Technical Management Regulations.
[0056] If the state representation information of the train window is received in step S2, the adjacent opened train signal machine is found according to the device connection relationship.
[0057] S321, the corresponding train route in the route set is found according to the opened train signal machine, and the train number information of the train route in the route set is updated.
[0058] S322, it is determined whether the train route is a passenger train route, if yes, it is checked whether the existing shunting route and the passenger train route constitute the conflict of article 301 of the Railway Technical Management Regulations, otherwise, the end step is executed.
[0059] If the state representation information of the track section is received in step S2, it is determined whether the current state is clear or occupied.
[0060] If the state is clear, step S331 is executed, if the state is occupied, step S334 is executed, otherwise, the end step is executed.
[0061] S331, the previous state of the track section is determined, if the previous state is occupied or locked, step S332 is executed, otherwise, the end step is executed.
[0062] S332, the route containing the device of the track section in the route set is found, the device is removed from the locked section set of the route, and the route set is updated.
[0063] S333, it is determined whether the locked section set of the route has been completely emptied, if yes, the route is removed from the route set, the route set is updated, otherwise, the end step is executed.
[0064] S334, judge whether the state representation information of the track section has a shunting number, if yes, check whether the shunting and the existing passenger train route form the conflict of the 301st article of the railway technical management regulation.
[0065] For the establishment of the route, the following judgment rules are included:
[0066] For the train route, the start signal opens the train permission signal, and at the same time, all track sections on the route including turnout, non-turnout section and track are in the locked state;
[0067] For the shunting route, the start signal opens the shunting permission signal, and at the same time, all track sections on the route including turnout, non-turnout section and track are in the locked state.
[0068] The route data stored in the route set includes route type, route start signal, locked section set and train number and other information.
[0069] The specific process of checking whether the shunting route or the shunting and the passenger train route form the 301st conflict of the technical regulation in the method is as shown in Figure 2
[0070] S31, find the last locked section in the shunting route or the track section occupied by the shunting machine, and take it as the starting point of the search;
[0071] S32, according to the signal equipment connection relationship, find the next adjacent signal equipment according to the route direction, if it is the signal equipment of the station, execute step S33, otherwise go to step S36;
[0072] S33, judge whether the signal equipment is a turnout, if yes, execute step S34, otherwise go to step S32;
[0073] S34, judge whether the current state of the turnout is locked or occupied, if yes, execute step S35, otherwise go to step S32;
[0074] S35, check whether the locked section set of the passenger train route in the route set contains the turnout, if yes, it indicates that the shunting route and the passenger train route form the 301st conflict of the railway technical management regulation;
[0075] S36, end.
[0076] As Figure 3 The diagram shows a schematic of passenger train route processing. Passenger train K15 is processing the XII-S departure route. Signal XII is given a train permission signal, and the XII-S departure route is stored in the route set. The route type is a passenger train route, the starting signal is XII, the locked section set includes turnouts 2, 4, and 6, and the train number is K15.
[0077] like Figure 4 The diagram illustrates a conflict arising from the handling of shunting routes as defined in Technical Regulations 301. Shunting locomotive 0088 handles shunting route D1-D3. Signal D1 issues a shunting permission signal, and shunting route D1-D3 is added to the route set. The route type is shunting route, the starting signal is D1, and the locked sections include turnouts 1 and 3. The route set already contains passenger train route XII-S. It is necessary to check whether shunting route D1-D3 conflicts with passenger train route XII-S as defined in Technical Regulations 301. According to... Figure 2 The process shown starts with turnout 3, the last locked section in the D1-D3 shunting route, as the search starting point. Turnout 5 is found in the down direction. Since it passes through turnout 5 in the reverse direction, turnout 5 is in the reverse position. The search continues until IIG is found. When turnout 2 is found, it is determined that the current state of turnout 2 is locked and it belongs to the set of locked sections in the XII-S passenger train route. Therefore, the D1-D3 shunting route and the XII-S passenger train route constitute a conflict with Technical Regulations 301.
[0078] The inspection method used in this invention can greatly improve the station's safety control capabilities for critical operations.
[0079] In addition, the present invention also proposes an electronic device, including a processor and a memory, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the above-mentioned inspection method is implemented.
[0080] In addition, the present invention also proposes a readable storage medium storing a computer program, which, when executed by a processor, implements the above-described checking method.
[0081] Compared with the prior art, the present invention has the following advantages:
[0082] 1. Improved efficiency of route conflict inspection: The method provided by this invention can promptly detect safety hazards that violate the Technical Regulations 301, which greatly improves work efficiency compared to manual judgment by operators;
[0083] 2. Multiple application scenarios: The method provided by the application is based on station signal state, which is not only suitable for detecting whether there is a "technical regulation" 301 conflict according to the change of route state, but also can adapt to some irregular operations of station shunting, such as reverse movement or back and forth movement of station engineering vehicles in shunting route, etc. The method provided by the application can timely find the safety hazard of train collision according to the occupancy indication state of track section.
[0084] 3. Wide application prospect and low investment cost: The equipment investment cost required by the application only includes the modification cost of existing software. At present, the proportion of interlocking stations and TDCS stations is still more than 50%. The method provided by the application can be applied to almost all interlocking stations and TDCS stations. On the basis of insufficient station security function, the method is expanded, and with the help of the change from manual control to security, the safety control ability of the station for key operation is improved.
[0085] Although the content of the application has been described in detail through the above preferred embodiments, it should be recognized that the above description should not be considered as a limitation of the application. After reading the above content, various modifications and alternatives of the application will be obvious to those skilled in the art. Therefore, the protection scope of the application should be defined by the appended claims.
Claims
1. A method of inspecting a signal state of a station yard, characterized by, The method comprises the following steps: S1, initializing a route set for storing shunting routes and train routes; S2, receiving state representation information of station equipment, including receiving state representation information of signal machines, receiving state representation information of train window, and receiving state representation information of track sections; S3, updating the establishment and cancellation states of passenger train routes and shunting routes in the route set responsible for receiving and sending trains; and according to the provisions of Article 301 of the Railway Technical Management Regulations, checking the conflicts between the shunting route or the shunting machine and the passenger train route; if the state representation information of the signal machine is received in step S2, it is judged whether the signal machine is open; S311, if the state is open, the locked track sections are continuously searched according to the equipment connection relationship according to the signal machine direction, the established route is determined, and is added to the route set; otherwise, the end step is executed; S312, if it is a shunting route, it is checked whether the shunting route and the existing passenger train route constitute the conflict of Article 301 of the Railway Technical Management Regulations; S313, if it is a train route and a passenger train route, it is checked whether the existing shunting route and the passenger train route constitute the conflict of Article 301 of the Railway Technical Management Regulations; if the state representation information of the train window is received in step S2, the adjacent open train signal machine is searched according to the equipment connection relationship; S321, the corresponding train route in the route set is found according to the open train signal machine, and the train number information of the train route in the route set is updated; S322, it is judged whether the train route is a passenger train route, if yes, it is checked whether the existing shunting route and the passenger train route constitute the conflict of Article 301 of the Railway Technical Management Regulations, otherwise, the end step is executed; if the state representation information of the track section is received in step S2, it is judged whether the current state is clear or occupied; S331, the previous state of the track section is judged, if the previous state is occupied or locked, step S332 is executed, otherwise, the end step is executed; S332, the route containing the track section equipment in the route set is found, the equipment is removed from the locked section set of the route, and the route set is updated; S333, it is judged whether the locked section set of the route has been completely emptied, if yes, the route is removed from the route set, the route set is updated, otherwise, the end step is executed; S334, it is judged whether the state representation information of the track section has a shunting machine number, if yes, it is checked whether the shunting machine and the existing passenger train route constitute the conflict of Article 301 of the Railway Technical Management Regulations.
2. The yard signal status checking method according to claim 1, characterized in that, In step S1, initializing the route set comprises establishing an empty route set, and updating the shunting route and the train route in real time according to the state representation information of the station signal equipment.
3. The yard signal status checking method according to claim 1, characterized in that, The establishment of the route comprises the following judgment rules: for a train route, the start-end signal machine is open, the train allows signal, and all track sections on the route, including switches, non-switch sections and tracks, are in a locked state; For the shunting route, the shunting permission signal of the initial signal is opened, and all track sections on the route, including the turnout, the turnout-free section and the track, are in the locked state.
4. The yard signal status checking method according to claim 1, characterized in that, The route data stored in the route set include a route type, a route initial signal, a locked section set and a train number.
5. The yard signal state checking method of claim 1, wherein, checking whether a shunting route or a shunting locomotive and a passenger train route constitute a conflict of article 301 of the Railway Technical Management Regulations, comprising the following steps: S31, finding the last locked section in the shunting route or the track section occupied by the shunting locomotive, taking it as the starting point for searching; S32, searching for the next adjacent signal equipment according to the signal equipment connection relationship in the route direction, if it is the signal equipment of the station, executing step S33, otherwise, executing step S36; S33, judging whether the signal equipment is a turnout, if yes, executing step S34, otherwise, executing step S32; S34, judging whether the current state of the turnout is locked or occupied, if yes, executing step S35, otherwise, executing step S32; S35, checking whether the locked section set of the passenger train route in the route set contains the turnout, if yes, indicating that the shunting route and the passenger train route constitute a conflict of article 301 of the Railway Technical Management Regulations; S36, ending.
6. An electronic device, comprising: The computer program is stored in the readable storage medium and is executed by the processor to implement the method of any one of claims 1 to 5.
7. A readable storage medium, characterized by, The computer program is stored in the readable storage medium and is executed by the processor to implement the method of any one of claims 1 to 5.
Citation Information
Patent Citations
Track traffic route conflict processing and alarming method based on playback file
CN110281981A
Passenger car shunting and freight car shunting integration method and device based on CTC3.0
CN115092214A