Single-base engineering quantity checking method and system for distribution network engineering

By adopting single-base project quantity verification methods and systems in the construction of distribution network projects, the problems of low management efficiency, data inconsistency and cumbersome settlement processes are solved, and the construction progress is carried out according to plan and the reliability and consistency of data are achieved.

CN119515600APending Publication Date: 2025-02-25GUANGDONG POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411633888.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-15
Publication Date
2025-02-25

AI Technical Summary

Technical Problem

During the construction of distribution network projects, low management efficiency, data inconsistency, and cumbersome settlement processes lead to the construction progress not being carried out as planned, and data security and consistency are difficult to ensure.

Method used

Provide a single-base engineering quantity verification method and system for distribution network projects. By obtaining quantitative record information at the construction site, data review and screening, generating project verification tables, and comparing them item by item with the engineering quantity record database to quickly judge construction. Whether the process complies with the construction plan.

Benefits of technology

It improves the efficiency and accuracy of construction management, ensures that the construction progress is carried out as planned, reduces data inconsistency and the complexity of settlement processes, and provides data support for subsequent acceptance and project progress tracking.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119515600A_ABST
    Figure CN119515600A_ABST
Patent Text Reader

Abstract

The invention provides a single-base engineering quantity checking method and system for a distribution network project, and the method comprises the steps: 1, obtaining the quantitative record information of a construction worker at a construction site, carrying out the data checking of the quantitative record information, and superposing a checking result into an engineering quantity recording database; 2, performing data screening on the audit result based on a preset data screening rule, and generating a corresponding engineering check table according to a data screening result; 3, when an engineering quantity checking task is obtained, comparing the engineering checking table with the engineering quantity recording database item by item based on the engineering quantity checking task so as to output a corresponding comparison result; and 4, carrying out data judgment on the comparison result, and if the comparison result meets a preset engineering quantity data requirement, judging that the comparison result accords with a construction plan.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of data processing technology, and in particular to a single-base engineering quantity verification method and system for a distribution network project. Background Art

[0002] At present, with the rapid development of digital technologies such as cloud computing, big data, the Internet of Things, mobile Internet, and artificial intelligence, the digital transformation of the power industry has become an important trend. As the basic link of power supply and distribution, the construction quality of the distribution network is crucial to the stable operation of the power system. However, there are still many challenges in the management of distribution network infrastructure projects, such as multiple and wide construction sites, low management efficiency, and difficulty in ensuring data security and consistency.

[0003] Currently, the construction preparation, construction process, intermediate acceptance, design changes and visas in the distribution network project construction process have been managed online through the construction of an information management system. The system realizes the online collection, compilation and review of node materials such as construction drawings, construction application, construction process records, supervision records, acceptance records, design changes, engineering visas, etc.

[0004] The current management of the construction process has the following defects: 1. Management efficiency needs to be improved: Currently, construction process records have been collected, compiled, and approved online through a number of information systems. However, they rely on manual maintenance by construction unit personnel, and project managers cannot understand the progress and problems on site in real time, and cannot ensure that the construction progress is carried out as planned. The strength of project managers, supervisors, and safety inspectors has failed to achieve full coverage of construction site safety supervision, which can easily lead to omissions in the intermediate acceptance links and the loss of hidden project data.

[0005] 2. Data inconsistency: The offline and online management modes lead to poor data flow. Currently, the construction process records cannot be penetrated. The monthly, weekly, and daily plans of the construction units reported at the project site are manually compiled. The accuracy and effectiveness of the plans cannot be verified, and it is impossible to ensure that the on-site construction progress is carried out as planned.

[0006] 3. Complicated settlement process: Before the distribution network project settlement audit report and the general settlement report are prepared, a large amount of data files need to be obtained from the construction unit and the design unit. These data involve a large amount of data required for settlement, which needs to be manually extracted from various files by settlement personnel. In this process, a lot of manpower will be consumed, and there will be problems such as inaccurate data, low work efficiency, and impact on settlement progress. Summary of the invention

[0007] The embodiments of the present application provide a single-base engineering quantity verification method and system for a distribution network project, so as to at least solve the deficiencies in the above-mentioned related technologies.

[0008] In a first aspect, an embodiment of the present application provides a single-base engineering quantity verification method for a distribution network project, comprising the following steps: Step 1: Obtain the quantitative record information of the construction personnel at the construction site, conduct data review on the quantitative record information, and superimpose the review results into the engineering quantity record database; Step 2: Screen the audit results based on preset data screening rules, and generate a corresponding engineering checklist based on the data screening results; Step 3: When the engineering quantity verification task is obtained, the engineering verification table is compared with the engineering quantity record database item by item based on the engineering quantity verification task to output corresponding comparison results; Step 4: Perform data judgment on the comparison result. If the comparison result meets the preset engineering quantity data requirements, it is determined that the comparison result meets the construction plan.

[0009] Furthermore, the step 1 includes: Collecting construction information of construction workers at the construction site, and performing data processing on the construction information to obtain corresponding quantitative record information; The quantitative record information is audited, and the audit results are added to the engineering quantity record database.

[0010] Furthermore, the step 2 includes: Obtaining the construction type of the construction site, and constructing corresponding data screening rules according to the construction type; The audit results are screened according to the data screening rules, and a corresponding engineering verification table is generated according to the obtained data screening results.

[0011] Furthermore, the step three includes: When an engineering quantity verification task is obtained, a task identifier of the engineering quantity verification task is obtained, and a corresponding comparison rule is constructed according to the task identifier; The engineering checklist is compared item by item with the engineering quantity record database according to the comparison rule to output corresponding comparison results.

[0012] Furthermore, the step 4 includes: Obtaining a construction schedule for the construction site, and comparing the construction schedule with the comparison result; If the comparison result meets the engineering quantity data requirements in the construction schedule, it is determined that the comparison result meets the construction plan.

[0013] In a second aspect, an embodiment of the present application provides a single-base engineering quantity verification system for a distribution network project, including: A data acquisition module is used to acquire the quantitative record information of the construction personnel at the construction site, and to perform data review on the quantitative record information, and to superimpose the review results into the engineering quantity record database; A data screening module, used to screen the audit results based on preset data screening rules, and generate a corresponding engineering checklist according to the data screening results; A data comparison module is used to compare the engineering quantity verification table with the engineering quantity record database item by item based on the engineering quantity verification task when an engineering quantity verification task is obtained, so as to output a corresponding comparison result; The data verification module is used to perform data judgment on the comparison result. If the comparison result meets the preset engineering quantity data requirements, it is determined that the comparison result is in line with the construction plan.

[0014] Furthermore, the data acquisition module includes: A data collection unit, used to collect construction information of construction workers at the construction site, and perform data processing on the construction information to obtain corresponding quantitative record information; The data review unit is used to review the quantitative record information and add the review results to the engineering quantity record database.

[0015] Furthermore, the data screening module includes: A rule building unit, used to obtain the construction type of the construction site and build a corresponding data screening rule according to the construction type; The data screening unit is used to screen the audit results according to the data screening rules, and generate a corresponding engineering verification table according to the obtained data screening results.

[0016] Furthermore, the data comparison module includes: A task acquisition unit, used for acquiring a task identifier of the engineering quantity verification task when acquiring the engineering quantity verification task, and constructing a corresponding comparison rule according to the task identifier; The data comparison unit is used to compare the engineering checklist with the engineering quantity record database item by item according to the comparison rule to output a corresponding comparison result.

[0017] Furthermore, the data verification module includes: A comparison and judgment unit, used for obtaining a construction schedule of the construction site, and comparing and judging the construction schedule with the comparison result; The data checking unit is used to determine that the comparison result complies with the construction plan if the comparison result complies with the engineering quantity data requirements in the construction plan table.

[0018] Compared with the related art, the embodiment of the present application provides a single-base quantity verification method and system for a distribution network project. The method obtains the quantitative record information provided by the construction personnel, performs data review on the quantitative record information, synchronizes the review results with the quantity record database, parses the single-base quantity in a single distribution network project by providing structured data designed through digitalization, performs data screening on the review results, and constructs a project verification table based on the screening results. When a quantity verification task is obtained, the quantity verification table and the quantity record database are used for item-by-item comparison to quickly determine whether the construction process complies with the construction plan. By matching the designed structured data with the specific pile position information of the operation plan, the on-site quantity data entered in the daily and weekly plans are automatically verified with the design quantity to verify the accuracy and effectiveness of the plan, providing data support for subsequent acceptance and project progress tracking.

[0019] Details of one or more embodiments of the present application are set forth in the following drawings and description to make other features, objects, and advantages of the present application more readily apparent. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings: Figure 1 It is a flow chart of a single-base engineering quantity verification method for a distribution network project in a first embodiment of the present invention; Figure 2 for Figure 1 Detailed flow chart of step S101; Figure 3 for Figure 1 Detailed flowchart of step S102; Figure 4 for Figure 1 Detailed flow chart of step S103; Figure 5 for Figure 1 Detailed flow chart of step S104; Figure 6 A system architecture diagram constructed by the single-base engineering quantity verification method for distribution network engineering in the first embodiment of the present invention; Figure 7 It is a structural block diagram of a single-base engineering quantity verification system for a distribution network project in the second embodiment of the present invention.

[0021] The following specific implementation manner will further illustrate the present invention in conjunction with the above-mentioned drawings. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is described and illustrated below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. Based on the embodiments provided in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.

[0023] Obviously, the drawings described below are only some examples or embodiments of the present application. For ordinary technicians in this field, the present application can also be applied to other similar scenarios based on these drawings without creative work. In addition, it can also be understood that although the efforts made in this development process may be complicated and lengthy, for ordinary technicians in this field related to the content disclosed in this application, some changes in design, manufacturing or production based on the technical content disclosed in this application are just conventional technical means, and should not be understood as insufficient content disclosed in this application.

[0024] Reference to "embodiments" in this application means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those of ordinary skill in the art that the embodiments described in this application may be combined with other embodiments without conflict.

[0025] Unless otherwise defined, the technical terms or scientific terms involved in this application should be understood by people with ordinary skills in the technical field to which this application belongs. The words "one", "a", "a", "the" and the like involved in this application do not indicate a quantitative limitation and may represent the singular or plural. The terms "include", "comprise", "have" and any of their variations involved in this application are intended to cover non-exclusive inclusions; for example, a process, method, system, product or device that includes a series of steps or modules (units) is not limited to the listed steps or units, but may also include steps or units that are not listed, or may also include other steps or units inherent to these processes, methods, products or devices. The words "connect", "connected", "coupled" and the like involved in this application are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. Embodiment 1

[0026] See also Figure 1, which shows a single-base engineering quantity verification method for a distribution network project in a first embodiment of the present invention, and the method specifically includes steps S101 to S104: S101, obtaining quantitative record information of construction personnel at the construction site, and performing data review on the quantitative record information, and superimposing the review results into the engineering quantity record database; For further information, see Figure 2 , the step S101 specifically includes steps S1011~S1012: S1011, collecting construction information of construction workers at the construction site, and performing data processing on the construction information to obtain corresponding quantitative record information; S1012, performing data review on the quantitative record information, and superimposing the obtained review results into the engineering quantity record database.

[0027] During the specific implementation, the construction information transmitted by the construction workers at the construction site is collected. Specifically, the construction drawings (preliminary design) and budget design results of the distribution network project are synchronized using preset tools to automatically obtain the contents of the engineering material summary table and the pole tower detailed table, and automatically classify the entities of the buildings contained in each base pole tower in the engineering material summary table and the pole tower detailed table according to the information of foundation, pole head, equipment, accessories, etc. to form structured data; Furthermore, after receiving the quantitative record information, a corresponding audit notice is issued to the supervision unit for data audit, and the audit results obtained are superimposed on the engineering quantity record database.

[0028] S102, performing data screening on the audit results based on preset data screening rules, and generating a corresponding engineering checklist according to the data screening results; For further information, see Figure 3 , the step S102 specifically includes steps S1021~S1022: S1021, obtaining the construction type of the construction site, and constructing corresponding data screening rules according to the construction type; S1022, performing data screening on the audit results according to the data screening rules, and generating a corresponding engineering verification table according to the obtained data screening results.

[0029] In the specific implementation, the construction type of the construction site is obtained, and corresponding data screening rules are constructed according to the construction type, wherein the data screening rules can perform data screening according to information such as material name, unfinished projects, daily planned engineering quantity data, weekly planned engineering quantity data, etc.; Specifically, the audit results are screened according to the above-mentioned data screening rules, and a corresponding engineering verification table is generated according to the screened results, the single-base engineering quantity (equipment and materials) in the single distribution network project is analyzed, and the designed structured data is matched with the specific pile position information of the operation plan.

[0030] This embodiment can automatically verify the consistency between the engineering quantity data entered on site and the designed engineering quantity by associating the designed structured data with the monthly, weekly and daily planned pile position information created by the construction unit in the system, thereby significantly improving the accuracy and effectiveness of the construction plan, ensuring that the on-site construction progress proceeds as planned, and reducing delays and waste caused by inaccurate plans or inadequate execution.

[0031] S103, when the engineering quantity verification task is obtained, the engineering verification table is compared with the engineering quantity record database item by item based on the engineering quantity verification task to output a corresponding comparison result; For further information, see Figure 4 , the step S103 specifically includes steps S1031~S1032: S1031, when an engineering quantity verification task is obtained, obtaining a task identifier of the engineering quantity verification task, and constructing a corresponding comparison rule according to the task identifier; S1032: Compare the engineering checklist with the engineering quantity record database item by item according to the comparison rule to output corresponding comparison results.

[0032] In the specific implementation, when the engineering quantity verification task sent by the supervision owner is obtained, the task identifier of the engineering quantity verification task is obtained, and the corresponding comparison rule is constructed according to the task identifier, wherein the task identifier of the engineering quantity verification task is a unique identifier, which will be issued together with the task when the supervision owner issues the task, and the corresponding comparison rule is selected from the comparison rule library according to the task representation, and then the engineering verification table and the engineering quantity record database are compared item by item according to the selected comparison rule to output the corresponding comparison result.

[0033] S104, performing data judgment on the comparison result, if the comparison result meets the preset engineering quantity data requirement, then determining that the comparison result meets the construction plan.

[0034] For further information, see Figure 5 , the step S104 specifically includes steps S1041-S1042: S1041, obtaining a construction schedule of the construction site, and comparing the construction schedule with the comparison result; S1042: If the comparison result meets the engineering quantity data requirements in the construction plan table, determine that the comparison result meets the construction plan.

[0035] During the specific implementation, the construction schedule of the construction site is obtained, and the construction schedule is compared with the comparison result. If the comparison result meets the engineering quantity data requirements in the construction schedule, the comparison result is judged to be in line with the construction plan. Specifically, the engineering quantity records in the engineering quantity verification table can be compared with the material list item by item, and the interface can be used to prominently prompt personnel for the materials that exceed the predetermined amount.

[0036] See also Figure 6 , shown is the system architecture diagram constructed by the engineering quantity verification method in this embodiment, which uses digital design results and is applied to the construction site. This method makes the engineering quantity data of the construction site visible and traceable in real time, forming a transparent management model. The construction progress and engineering cost can be mastered, problems can be discovered and solved in time, and the quality and safety of the project can be ensured; project managers can grasp the construction progress and engineering cost at any time, discover and solve problems in time, and ensure the quality and safety of the project; by recording, analyzing and managing the construction process, the intelligence and information level of the distribution network project can be continuously improved. Provide accurate decision-making basis for project managers.

[0037] In summary, the single-base quantity verification method for distribution network projects in the above-mentioned embodiments of the present invention obtains the quantitative record information provided by the construction personnel, and performs data review on the quantitative record information, synchronizes the review results in the quantity record database, and parses the single-base quantity in the single distribution network project by providing structured data through digital design, performs data screening on the review results, and constructs a project verification table according to the screening results. When the project quantity verification task is obtained, the project quantity verification table and the project quantity record database are used for item-by-item comparison to quickly determine whether the construction process complies with the construction plan, and the structured data of the design is matched with the specific pile position information of the operation plan, and the on-site project quantity data entered in the daily and weekly plans are automatically verified with the design project quantity to verify the accuracy and effectiveness of the plan, so as to provide data support for subsequent acceptance and project progress tracking. Embodiment 2

[0038] On the other hand, the present invention also proposes a single-base engineering quantity verification system for distribution network engineering, please refer to Figure 7 , shown is a single-base engineering quantity verification system for a distribution network project in a second embodiment of the present invention, comprising: The data acquisition module 11 is used to acquire the quantitative record information of the construction personnel at the construction site, and to perform data review on the quantitative record information, and to add the review result into the engineering quantity record database; Furthermore, the data acquisition module 11 includes: A data collection unit, used to collect construction information of construction workers at the construction site, and perform data processing on the construction information to obtain corresponding quantitative record information; The data review unit is used to review the quantitative record information and add the review results to the engineering quantity record database.

[0039] A data screening module 12 is used to screen the audit results based on preset data screening rules, and generate a corresponding engineering checklist according to the data screening results; Furthermore, the data screening module 12 includes: A rule building unit, used to obtain the construction type of the construction site and build a corresponding data screening rule according to the construction type; The data screening unit is used to screen the audit results according to the data screening rules, and generate a corresponding engineering verification table according to the obtained data screening results.

[0040] The data comparison module 13 is used to compare the engineering quantity verification table with the engineering quantity record database item by item based on the engineering quantity verification task when the engineering quantity verification task is obtained, so as to output the corresponding comparison result; Furthermore, the data comparison module 13 includes: A task acquisition unit, used for acquiring a task identifier of the engineering quantity verification task when acquiring the engineering quantity verification task, and constructing a corresponding comparison rule according to the task identifier; The data comparison unit is used to compare the engineering checklist with the engineering quantity record database item by item according to the comparison rule to output a corresponding comparison result.

[0041] The data checking module 14 is used to perform data judgment on the comparison result. If the comparison result meets the preset engineering quantity data requirements, it is determined that the comparison result meets the construction plan.

[0042] Furthermore, the data verification module 14 includes: A comparison and judgment unit, used for obtaining a construction schedule of the construction site, and comparing and judging the construction schedule with the comparison result; The data checking unit is used to determine that the comparison result complies with the construction plan if the comparison result complies with the engineering quantity data requirements in the construction plan table.

[0043] The functions or operation steps implemented when the above modules are executed are substantially the same as those in the above method embodiments, and will not be repeated here.

[0044] An embodiment of the present invention provides a single-base engineering quantity verification system for a distribution network project, and its implementation principle and technical effects are the same as those of the aforementioned method embodiment. For the sake of brief description, for matters not mentioned in the system embodiment, reference may be made to the corresponding contents in the aforementioned method embodiment.

[0045] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0046] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

Claims

1. A single-base engineering quantity verification method for a distribution network project, characterized in that: The following steps are involved: Step 1: Obtain the quantitative record information of the construction personnel at the construction site, conduct data review on the quantitative record information, and superimpose the review results into the engineering quantity record database; Step 2: Screen the audit results based on preset data screening rules, and generate a corresponding engineering checklist based on the data screening results; Step 3: When the engineering quantity verification task is obtained, the engineering verification table is compared with the engineering quantity record database item by item based on the engineering quantity verification task to output corresponding comparison results; Step 4: Perform data judgment on the comparison result. If the comparison result meets the preset engineering quantity data requirements, it is determined that the comparison result meets the construction plan.

2. The single-base engineering quantity verification method for distribution network engineering according to claim 1 is characterized in that: The step one comprises: Collecting construction information of construction workers at the construction site, and performing data processing on the construction information to obtain corresponding quantitative record information; The quantitative record information is audited, and the audit results are added to the engineering quantity record database.

3. The single-base engineering quantity verification method for distribution network engineering according to claim 1 is characterized in that: The second step comprises: Obtaining the construction type of the construction site, and constructing corresponding data screening rules according to the construction type; The audit results are screened according to the data screening rules, and a corresponding engineering verification table is generated according to the obtained data screening results.

4. The single-base engineering quantity verification method for distribution network engineering according to claim 1 is characterized in that: The step three comprises: When an engineering quantity verification task is obtained, a task identifier of the engineering quantity verification task is obtained, and a corresponding comparison rule is constructed according to the task identifier; The engineering checklist is compared item by item with the engineering quantity record database according to the comparison rule to output corresponding comparison results.

5. The single-base engineering quantity verification method for distribution network engineering according to claim 1 is characterized in that: The fourth step comprises: Obtaining a construction schedule for the construction site, and comparing the construction schedule with the comparison result; If the comparison result meets the engineering quantity data requirements in the construction schedule, it is determined that the comparison result meets the construction plan.

6. A single-base engineering quantity verification system for distribution network engineering, characterized in that: include: A data acquisition module is used to acquire the quantitative record information of the construction personnel at the construction site, and to perform data review on the quantitative record information, and to superimpose the review results into the engineering quantity record database; A data screening module, used to screen the audit results based on preset data screening rules, and generate a corresponding engineering checklist according to the data screening results; A data comparison module is used to compare the engineering quantity verification table with the engineering quantity record database item by item based on the engineering quantity verification task when an engineering quantity verification task is obtained, so as to output a corresponding comparison result; The data verification module is used to perform data judgment on the comparison result. If the comparison result meets the preset engineering quantity data requirements, it is determined that the comparison result is in line with the construction plan.

7. The single-base engineering quantity verification system for distribution network engineering according to claim 6 is characterized in that: The data acquisition module comprises: A data collection unit, used to collect construction information of construction workers at the construction site, and perform data processing on the construction information to obtain corresponding quantitative record information; The data review unit is used to review the quantitative record information and add the review results to the engineering quantity record database.

8. The single-base engineering quantity verification system for distribution network engineering according to claim 6 is characterized in that: The data screening module comprises: A rule building unit, used to obtain the construction type of the construction site and build a corresponding data screening rule according to the construction type; The data screening unit is used to screen the audit results according to the data screening rules, and generate a corresponding engineering verification table according to the obtained data screening results.

9. The single-base engineering quantity verification system for distribution network engineering according to claim 6, characterized in that: The data comparison module includes: A task acquisition unit, used for acquiring a task identifier of the engineering quantity verification task when acquiring the engineering quantity verification task, and constructing a corresponding comparison rule according to the task identifier; The data comparison unit is used to compare the engineering checklist with the engineering quantity record database item by item according to the comparison rule to output a corresponding comparison result.

10. The single-base engineering quantity verification system for distribution network engineering according to claim 6, characterized in that: The data verification module comprises: A comparison and judgment unit, used for obtaining a construction schedule of the construction site, and comparing and judging the construction schedule with the comparison result; The data checking unit is used to determine that the comparison result complies with the construction plan if the comparison result complies with the engineering quantity data requirements in the construction plan table.