Capacitor voltage balancing method and system of flexible DC converter valve test system

By obtaining the bridge arm voltage and the capacitance voltage operating conditions of the submodule in the flexible direct converter valve test system, voltage control pulses are generated to match the capacitance voltage of the bridge arm to be tested, and interference to the test current is eliminated through reverse series and voltage balance, the problem that the test current is affected by the change in the capacitance voltage of the submodule is solved, and more accurate operating conditions are achieved.

CN119535011AActive Publication Date: 2025-02-28GUANGDONG POWER GRID CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411636376.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-15
Publication Date
2025-02-28
Estimated Expiration
2044-11-15

AI Technical Summary

Technical Problem

In the working condition simulation test of the flexible direct converter valve submodule, the capacitance voltage of the submodule is not clamped by the DC source, resulting in the test current being affected by the change of the capacitance voltage of the submodule, which in turn interferes with the control of the test current and affects the accuracy of the dynamic working condition test.

Method used

By obtaining the bridge arm voltage and the capacitance voltage condition of the actual direct converter valve system, a first voltage control pulse is generated to drive the semiconductor switching device in the submodule of the bridge arm to be tested so that its capacitance voltage is close to the capacitance voltage of the actual system. Then, the measured bridge arm and the auxiliary bridge arm are connected in reverse series, and the second voltage control pulse balances the submodule capacitance voltage of the auxiliary bridge arm so that its output voltage is the same as the submodule output voltage of the measured bridge arm, thereby eliminating interference to the test current.

Benefits of technology

The test current operating conditions are decoupled from the voltage operating conditions of the submodule being tested, and the accuracy and reliability of operating conditions are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119535011A_ABST
    Figure CN119535011A_ABST
Patent Text Reader

Abstract

The invention discloses a capacitor voltage balancing method and system for a flexible DC converter valve test system, and the method comprises the steps: obtaining a bridge arm voltage reference value, generating a first voltage control pulse, and driving a sub-module semiconductor switching device of a tested bridge arm, so as to guarantee that the capacitor voltage of the sub-module semiconductor switching device is close to the capacitor voltage of an actual system. Sampling the capacitor voltage of the tested bridge arm and the auxiliary bridge arm to obtain a sampling result; wherein the tested bridge arm and the auxiliary bridge arm are reversely connected in series, and each of the tested bridge arm and the auxiliary bridge arm comprises a plurality of flexible direct current converter valve sub-modules with the same number; and according to a sampling result, adjusting the pulse width of the first voltage control pulse to obtain a second voltage control pulse, and adjusting the capacitor voltage of the sub-module of the auxiliary bridge arm based on the second voltage control pulse so as to balance the capacitor voltage of the sub-module of the auxiliary bridge arm. According to the invention, the test current working condition and the voltage working condition of the tested sub-module can be decoupled, so that more accurate working condition test is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of flexible direct current power transmission, and in particular to a capacitor voltage balancing method and system for a flexible direct current converter valve testing system. Background Art

[0002] With the advancement of renewable energy generation technology, more and more new energy systems such as photovoltaics and wind power are connected to the power grid through high-voltage flexible direct current transmission technology. As a key device for energy conversion and power regulation, the flexible direct current converter valve plays a vital role in the flexible direct current transmission system. In order to ensure the operational reliability of the flexible direct current converter valve, the key component, the submodule, must be fully tested before the equipment is put into use.

[0003] At present, in the working condition simulation test technology of the flexible direct current converter valve submodule, in order to decouple the test current working condition from the voltage working condition of the submodule being tested, a current generator is generally used to generate the test current, while ensuring that the switch pulse and capacitor voltage of the submodule being tested are as close as possible to its working condition in the actual system. However, since the submodule capacitor voltage is not clamped by the DC source, the test current of the current generator may be affected by the change of the submodule capacitor voltage. In the prior art, in the process of dynamic working condition testing, in order to maintain the balance of the submodule capacitor voltage, it is often necessary to superimpose a large additional modulation voltage component, which causes the submodule to output an additional voltage, thereby interfering with the control of the test current, causing the test current to be distorted in the dynamic working condition, affecting the accuracy of the dynamic working condition test. Summary of the invention

[0004] The embodiment of the present invention provides a capacitor voltage balancing method and system for a flexible direct current converter valve test system. By implementing the present invention, the test current operating condition can be decoupled from the voltage operating condition of the submodule being tested, thereby achieving a more accurate operating condition test.

[0005] An embodiment of the present invention provides a capacitor voltage balancing method for a flexible direct current converter valve test system, comprising:

[0006] According to the actual bridge arm voltage of the flexible direct current converter valve system and the submodule capacitor voltage operating conditions, a test current reference value and a bridge arm voltage reference value are obtained;

[0007] Transmitting the bridge arm voltage reference value to a voltage controller so that the voltage controller generates a first voltage control pulse;

[0008] According to the first voltage control pulse, the semiconductor switch device in the submodule of the bridge arm under test is driven to make the capacitor voltage of the submodule of the bridge arm under test match the capacitor voltage of the actual flexible direct current converter valve system;

[0009] The capacitor voltages of the measured bridge arm and the auxiliary bridge arm are sampled to obtain a first sampling result and a second sampling result respectively; wherein the measured bridge arm and the auxiliary bridge arm are reversely connected in series, the measured bridge arm and the auxiliary bridge arm respectively contain a plurality of flexible direct current converter valve submodules of the same number, and the flexible direct current converter valve submodules are forward cascaded;

[0010] Transmitting the first sampling result and the second sampling result to the balance controller, so that the balance controller adjusts the pulse width of the first voltage control pulse to obtain a second voltage control pulse;

[0011] According to the second voltage control pulse, the semiconductor switch device in the submodule of the auxiliary bridge arm is driven to balance the capacitor voltage of the submodule of the auxiliary bridge arm.

[0012] Further, after obtaining the test current reference value and the bridge arm voltage reference value according to the actual bridge arm voltage of the flexible direct current converter valve system and the submodule capacitor voltage working condition, it also includes:

[0013] transmitting the test current reference value to a current controller so that the current controller generates a current control pulse;

[0014] The current control pulses are sent to the current generator to match the test current with the current of the actual flexible DC converter valve system.

[0015] Furthermore, the current control pulse is generated in the following manner:

[0016] The current controller generates a current control pulse based on a proportional-integral control method or a proportional-integral resonant control method.

[0017] Further, transmitting the first sampling result and the second sampling result to the balancing controller so that the balancing controller adjusts the pulse width of the first voltage control pulse to obtain the second voltage control pulse, including:

[0018] The first sampling result and the second sampling result are transmitted to the balance controller, so that the balance controller calculates the average value of the capacitor voltage according to the first sampling result and the second sampling result, and adjusts the pulse width of the first voltage control pulse according to the average value of the capacitor voltage to obtain the second voltage control pulse.

[0019] Furthermore, the pulse width of the first voltage control pulse is adjusted by:

[0020] When the test current flows into the bridge arm under test, determine whether the average value of the capacitor voltage exceeds the preset upper limit; if the average value of the capacitor voltage exceeds the preset upper limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the off time of the flexible direct current converter valve submodule of the auxiliary bridge arm; if the average value of the capacitor voltage is less than the preset lower limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the on time of the flexible direct current converter valve submodule;

[0021] When the test current flows out of the tested bridge arm, determine whether the average value of the capacitor voltage exceeds the preset upper limit; if the average value of the capacitor voltage exceeds the preset upper limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the conduction time of the flexible DC converter valve submodule of the auxiliary bridge arm; if the average value of the capacitor voltage is less than the preset lower limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the turn-off time of the flexible DC converter valve submodule of the auxiliary bridge arm.

[0022] Based on the above method embodiments, the present invention provides corresponding system embodiments.

[0023] An embodiment of the present invention provides a capacitor voltage balancing system of a flexible direct current converter valve testing system, comprising: a main control chip, a voltage controller and a balancing controller;

[0024] The main control chip is used to obtain a test current reference value and a bridge arm voltage reference value according to the actual bridge arm voltage of the flexible direct current converter valve system and the submodule capacitor voltage operating conditions, and transmit the bridge arm voltage reference value to the voltage controller;

[0025] The voltage controller is used to generate a first voltage control pulse according to a bridge arm voltage reference value;

[0026] The main control chip is further used to drive the semiconductor switch device in the submodule of the bridge arm under test according to the first voltage control pulse, so that the capacitor voltage of the submodule of the bridge arm under test matches the capacitor voltage of the actual flexible direct current converter valve system;

[0027] The main control chip is also used to sample the capacitor voltage of the measured bridge arm and the auxiliary bridge arm to obtain a first sampling result and a second sampling result respectively; wherein the measured bridge arm and the auxiliary bridge arm are reversely connected in series, the measured bridge arm and the auxiliary bridge arm respectively contain a plurality of flexible direct current converter valve submodules of the same number, and the flexible direct current converter valve submodules are forward cascaded; and the first sampling result and the second sampling result are sent to the balancing controller;

[0028] The balance controller is used to adjust the pulse width of the first voltage control pulse according to the first sampling result and the second sampling result to obtain the second voltage control pulse;

[0029] The main control chip is further used to drive the semiconductor switch device in the submodule of the auxiliary bridge arm according to the second voltage control pulse, so as to balance the capacitor voltage of the submodule of the auxiliary bridge arm.

[0030] Furthermore, the capacitor voltage balancing system of the flexible DC converter valve test system further includes: a current controller and a current generator;

[0031] The current controller is used to generate a current control pulse according to a test current reference value, and transmit the current control pulse to the current generator;

[0032] The current generator is used to generate a test current according to a current control pulse so that the test current matches the current of an actual flexible direct current converter valve system.

[0033] Furthermore, the balancing controller is used to adjust the pulse width of the first voltage control pulse according to the first sampling result and the second sampling result to obtain the second voltage control pulse, including:

[0034] The balance controller calculates an average value of the capacitor voltage according to the first sampling result and the second sampling result; and then adjusts the pulse width of the first voltage control pulse according to the average value of the capacitor voltage to obtain a second voltage control pulse.

[0035] Furthermore, the pulse width of the first voltage control pulse is adjusted by:

[0036] When the test current flows into the bridge arm under test, determine whether the average value of the capacitor voltage exceeds the preset upper limit; if the average value of the capacitor voltage exceeds the preset upper limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the off time of the flexible direct current converter valve submodule of the auxiliary bridge arm; if the average value of the capacitor voltage is less than the preset lower limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the on time of the flexible direct current converter valve submodule;

[0037] When the test current flows out of the tested bridge arm, determine whether the average value of the capacitor voltage exceeds the preset upper limit; if the average value of the capacitor voltage exceeds the preset upper limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the conduction time of the flexible DC converter valve submodule of the auxiliary bridge arm; if the average value of the capacitor voltage is less than the preset lower limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the turn-off time of the flexible DC converter valve submodule of the auxiliary bridge arm.

[0038] Compared with the prior art, the present invention has the following beneficial effects:

[0039] The present invention calculates and generates a first voltage control pulse according to a bridge arm voltage reference value; the first voltage control pulse drives the semiconductor switch device in the submodule of the bridge arm under test, ensuring that the capacitor voltage of the submodule of the bridge arm under test is close to the capacitor voltage of the actual flexible direct current converter valve system at this time, so that the submodule in the bridge arm under test has a test condition similar to that of the submodule in the actual flexible direct current converter valve; because the output voltage of the submodule of the bridge arm under test will interfere with the test current, the bridge arm under test and the auxiliary bridge arm are reversely connected in series in the test circuit, and the capacitor voltage of the submodule of the auxiliary bridge arm is balanced by the second voltage control pulse, so that the output voltage of the submodule of the auxiliary bridge arm is the same as the output voltage of the submodule of the bridge arm under test, so that the output voltage of the submodule of the bridge arm under test is always in a state of offset, and will not interfere with the control of the test current. By implementing the present invention, the test current condition can be decoupled from the voltage condition of the submodule under test, thereby achieving more accurate condition testing. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a flow chart of a capacitor voltage balancing method of a flexible direct current converter valve test system provided by one embodiment of the present invention.

[0041] Figure 2 It is a structural schematic diagram of a capacitor voltage balancing system of a flexible direct current converter valve test system provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0043] like Figure 1 As shown, an embodiment of the present invention provides a capacitor voltage balancing method for a flexible direct current converter valve test system, which at least includes the following steps:

[0044] Step S1, obtaining a test current reference value and a bridge arm voltage reference value according to an actual bridge arm voltage of the flexible direct current converter valve system and a submodule capacitor voltage operating condition;

[0045] Specifically, in a preferred embodiment, after obtaining the test current reference value and the bridge arm voltage reference value according to the actual bridge arm voltage of the flexible direct current converter valve system and the submodule capacitor voltage working condition, it also includes:

[0046] transmitting the test current reference value to a current controller so that the current controller generates a current control pulse;

[0047] The current control pulses are sent to the current generator to match the test current with the current of the actual flexible DC converter valve system.

[0048] Exemplarily, the current control pulse is generated in the following manner:

[0049] The current controller generates a current control pulse based on a proportional-integral control method or a proportional-integral resonant control method.

[0050] Optionally, by simulating and analyzing the bridge arm voltage and submodule capacitor voltage operating conditions of an actual flexible direct current converter valve system, a test current reference value and a bridge arm voltage reference value are obtained.

[0051] It should be noted that the current controller is composed of a DC power supply and a bridge inverter. In the above process, the current controller generates a modulation voltage according to the test current reference value, and then generates a control pulse of the bridge inverter according to the modulation voltage, that is, a current control pulse; the current control pulse is sent to the current generator to drive the current generator to output the required test current, thereby making the test current close to the actual flexible DC converter valve bridge arm current in the main circuit.

[0052] It is understandable that obtaining the test current reference value and the bridge arm voltage reference value through the bridge arm voltage of the actual flexible direct current converter valve system and the submodule capacitor voltage working condition can more accurately reflect the actual operating state of the system, thereby improving the accuracy and credibility of the working condition test results. By transmitting the test current reference value to the current controller and generating a current control pulse, the test current can be effectively controlled to ensure that it matches the test current, thereby achieving more accurate current control. At the same time, the method of generating current control pulses based on the proportional integral control method or the proportional integral resonant control method can improve the stability and response speed of the system and further optimize the current control effect.

[0053] Step S2: transmitting the bridge arm voltage reference value to a voltage controller so that the voltage controller generates a first voltage control pulse.

[0054] Specifically, in a preferred embodiment, the first voltage control pulse generation method is specifically:

[0055] The voltage controller generates a first voltage control pulse based on a proportional-integral control method or a proportional-integral resonant control method.

[0056] It is understandable that by transmitting the bridge arm voltage reference value to the voltage controller so that the voltage controller generates a first voltage control pulse based on the proportional integral control method or the proportional integral resonant control method, the voltage control effect can be further optimized. The proportional integral control method can take into account the magnitude and duration of the voltage error, and by adjusting the amplitude and width of the control signal, the response of the system can be smoother and faster. The proportional integral resonant control method can control the bridge arm voltage while also taking into account the influence of the resonant frequency, so that the voltage control of the system near the resonant frequency is more accurate and stable.

[0057] Step S3: according to the first voltage control pulse, drive the semiconductor switch device in the submodule of the bridge arm under test, so that the capacitor voltage of the submodule of the bridge arm under test matches the capacitor voltage of the actual flexible direct current converter valve system.

[0058] It can be understood that precise driving of semiconductor switching devices helps to achieve precise control of the flexible DC converter system, and can match the capacitor voltage of the measured bridge arm submodule with the capacitor voltage of the actual system, so that the system can better adapt to the actual working environment and load changes, and improve the stability and reliability of the power grid.

[0059] Step S4, sampling the capacitor voltages of the measured bridge arm and the auxiliary bridge arm to obtain a first sampling result and a second sampling result respectively; wherein the measured bridge arm and the auxiliary bridge arm are reversely connected in series, the measured bridge arm and the auxiliary bridge arm respectively contain a plurality of flexible direct current converter valve submodules of the same number, and the flexible direct current converter valve submodules are forward cascaded;

[0060] In an optional embodiment, since the measured bridge arm and the auxiliary bridge arm contain multiple identical numbers of flexible DC converter valve sub-modules, the roles of the measured bridge arm and the auxiliary bridge arm can be interchanged. The auxiliary bridge arm can be used as the measured bridge arm, and the measured bridge arm can be used as the auxiliary bridge arm accordingly.

[0061] It can be understood that by reversely connecting the measured bridge arm and the auxiliary bridge arm in series, and using the second voltage control pulse to balance the sub-module capacitor voltage of the auxiliary bridge arm, the sub-module output voltage of the auxiliary bridge arm is made the same as the sub-module output voltage of the measured bridge arm, thereby eliminating the interference of the measured bridge arm sub-module output voltage on the test current, ensuring the stability and accuracy of the test current control during the operating condition test, and thereby improving the reliability of the test results of the operating condition test.

[0062] Step S5, transmitting the first sampling result and the second sampling result to the balance controller, so that the balance controller adjusts the pulse width of the first voltage control pulse to obtain a second voltage control pulse;

[0063] Specifically, transmitting the first sampling result and the second sampling result to the balancing controller so that the balancing controller adjusts the pulse width of the first voltage control pulse to obtain the second voltage control pulse includes:

[0064] The first sampling result and the second sampling result are transmitted to the balance controller, so that the balance controller calculates the average value of the capacitor voltage according to the first sampling result and the second sampling result, and adjusts the pulse width of the first voltage control pulse according to the average value of the capacitor voltage to obtain the second voltage control pulse.

[0065] In an optional embodiment, the pulse width of the first voltage control pulse is adjusted by:

[0066] When the test current flows into the bridge arm under test, determine whether the average value of the capacitor voltage exceeds the preset upper limit; if the average value of the capacitor voltage exceeds the preset upper limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the off time of the flexible direct current converter valve submodule of the auxiliary bridge arm; if the average value of the capacitor voltage is less than the preset lower limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the on time of the flexible direct current converter valve submodule;

[0067] When the test current flows out of the tested bridge arm, determine whether the average value of the capacitor voltage exceeds the preset upper limit; if the average value of the capacitor voltage exceeds the preset upper limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the conduction time of the flexible DC converter valve submodule of the auxiliary bridge arm; if the average value of the capacitor voltage is less than the preset lower limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the turn-off time of the flexible DC converter valve submodule of the auxiliary bridge arm.

[0068] Optionally, the capacitor voltage average value is calculated using the following formula:

[0069]

[0070] Among them, V avg is the average value of capacitor voltage; is the capacitance voltage of the i-th submodule of the measured bridge arm m; is the capacitor voltage of the i-th submodule of the auxiliary bridge arm n; k is the number of flexible direct current valve submodules of the same number contained in the measured bridge arm and the auxiliary bridge arm.

[0071] It is understandable that the pulse width adjustment of the second voltage control pulse is limited to the dead zone level, and the bridge arm output pulse difference caused by the pulse adjustment has no obvious interference on the control of the current generator, and therefore, does not increase the ripple of the test current.

[0072] Step S6: driving the semiconductor switch device in the submodule of the auxiliary bridge arm according to the second voltage control pulse, so as to balance the capacitor voltage of the submodule of the auxiliary bridge arm.

[0073] It can be understood that by driving the semiconductor switching device of the auxiliary bridge arm sub-module according to the second voltage control pulse, the capacitor voltage balance of the auxiliary bridge arm sub-module can be achieved, which helps to reduce the difference between the capacitor voltages, reduce the capacitor imbalance in the system, and thereby reduce the interference of capacitor voltage fluctuations on the test current, thereby improving the stability and reliability of the test system.

[0074] Based on the above method embodiments, the present invention provides corresponding system embodiments.

[0075] like Figure 2 As shown, an embodiment of the present invention provides a capacitor voltage balancing system of a flexible DC converter valve testing system, comprising: a main control chip 101, a voltage controller 102 and a balancing controller 103;

[0076] The main control chip 101 is used to obtain a test current reference value and a bridge arm voltage reference value according to the actual bridge arm voltage of the flexible direct current converter valve system and the submodule capacitor voltage working condition, and transmit the bridge arm voltage reference value to the voltage controller;

[0077] The voltage controller 102 is used to generate a first voltage control pulse according to a bridge arm voltage reference value;

[0078] The main control chip 101 is further used to drive the semiconductor switch device in the submodule of the bridge arm under test according to the first voltage control pulse, so that the capacitor voltage of the submodule of the bridge arm under test matches the capacitor voltage of the actual flexible direct current converter valve system;

[0079] The main control chip 101 is also used to sample the capacitor voltage of the measured bridge arm and the auxiliary bridge arm to obtain a first sampling result and a second sampling result respectively; wherein the measured bridge arm and the auxiliary bridge arm are reversely connected in series, and the measured bridge arm and the auxiliary bridge arm respectively contain a plurality of flexible direct current converter valve submodules of the same number, and the flexible direct current converter valve submodules are forward cascaded; and the first sampling result and the second sampling result are sent to the balancing controller;

[0080] The balance controller 103 is used to adjust the pulse width of the first voltage control pulse according to the first sampling result and the second sampling result to obtain the second voltage control pulse;

[0081] The main control chip 101 is further used to drive the semiconductor switch device in the submodule of the auxiliary bridge arm according to the second voltage control pulse, so as to balance the capacitor voltage of the submodule of the auxiliary bridge arm.

[0082] In this embodiment, a capacitor voltage balancing system of a flexible DC converter valve test system further includes: a current controller 104 and a current generator 105;

[0083] The current controller 104 is used to generate a current control pulse according to a test current reference value, and transmit the current control pulse to the current generator;

[0084] According to the current generator 105, it is used to generate a test current according to the current control pulse, so that the test current matches the current of the actual flexible direct current converter valve system.

[0085] In an optional embodiment, the balancing controller 103 is used to adjust the pulse width of the first voltage control pulse according to the first sampling result and the second sampling result to obtain the second voltage control pulse, including:

[0086] The balance controller calculates an average value of the capacitor voltage according to the first sampling result and the second sampling result; and then adjusts the pulse width of the first voltage control pulse according to the average value of the capacitor voltage to obtain a second voltage control pulse.

[0087] Specifically, the method for adjusting the pulse width of the first voltage control pulse includes:

[0088] When the test current flows into the bridge arm under test, determine whether the average value of the capacitor voltage exceeds the preset upper limit; if the average value of the capacitor voltage exceeds the preset upper limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the off time of the flexible direct current converter valve submodule of the auxiliary bridge arm; if the average value of the capacitor voltage is less than the preset lower limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the on time of the flexible direct current converter valve submodule;

[0089] When the test current flows out of the tested bridge arm, determine whether the average value of the capacitor voltage exceeds the preset upper limit; if the average value of the capacitor voltage exceeds the preset upper limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the conduction time of the flexible DC converter valve submodule of the auxiliary bridge arm; if the average value of the capacitor voltage is less than the preset lower limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the turn-off time of the flexible DC converter valve submodule of the auxiliary bridge arm.

[0090] The specific embodiments described above further illustrate the purpose, technical solutions and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of protection of the present invention.

Claims

1. A capacitor voltage balancing method for a flexible direct current converter valve test system, characterized in that: include: According to the actual bridge arm voltage of the flexible direct current converter valve system and the submodule capacitor voltage operating conditions, a test current reference value and a bridge arm voltage reference value are obtained; Transmitting the bridge arm voltage reference value to a voltage controller so that the voltage controller generates a first voltage control pulse; According to the first voltage control pulse, the semiconductor switch device in the submodule of the bridge arm under test is driven to make the capacitor voltage of the submodule of the bridge arm under test match the capacitor voltage of the actual flexible direct current converter valve system; The capacitor voltages of the measured bridge arm and the auxiliary bridge arm are sampled to obtain a first sampling result and a second sampling result respectively; wherein the measured bridge arm and the auxiliary bridge arm are reversely connected in series, the measured bridge arm and the auxiliary bridge arm respectively contain a plurality of flexible direct current converter valve submodules of the same number, and the flexible direct current converter valve submodules are forward cascaded; Transmitting the first sampling result and the second sampling result to the balance controller, so that the balance controller adjusts the pulse width of the first voltage control pulse to obtain a second voltage control pulse; According to the second voltage control pulse, the semiconductor switch device in the submodule of the auxiliary bridge arm is driven to balance the capacitor voltage of the submodule of the auxiliary bridge arm.

2. A capacitor voltage balancing method for a flexible DC converter valve test system according to claim 1, characterized in that: After obtaining the test current reference value and the bridge arm voltage reference value according to the actual bridge arm voltage of the flexible direct current converter valve system and the submodule capacitor voltage working condition, it also includes: transmitting the test current reference value to a current controller so that the current controller generates a current control pulse; The current control pulses are sent to the current generator to match the test current with the current of the actual flexible DC converter valve system.

3. A capacitor voltage balancing method for a flexible DC converter valve test system as claimed in claim 2, characterized in that: The current control pulse is generated in the following manner: The current controller generates a current control pulse based on a proportional-integral control method or a proportional-integral resonant control method.

4. The capacitor voltage balancing method of the flexible direct current converter valve test system according to claim 1, characterized in that: The first voltage control pulse generation method is specifically as follows: The voltage controller generates a first voltage control pulse based on a proportional-integral control method or a proportional-integral resonant control method.

5. The capacitor voltage balancing method of the flexible direct current converter valve test system according to claim 1, characterized in that: The first sampling result and the second sampling result are transmitted to the balancing controller so that the balancing controller adjusts the pulse width of the first voltage control pulse to obtain the second voltage control pulse, including: The first sampling result and the second sampling result are transmitted to the balance controller, so that the balance controller calculates the average value of the capacitor voltage according to the first sampling result and the second sampling result, and adjusts the pulse width of the first voltage control pulse according to the average value of the capacitor voltage to obtain the second voltage control pulse.

6. A capacitor voltage balancing method for a flexible DC converter valve test system as claimed in claim 5, characterized in that: The method for adjusting the pulse width of the first voltage control pulse includes: When the test current flows into the bridge arm under test, determine whether the average value of the capacitor voltage exceeds the preset upper limit; if the average value of the capacitor voltage exceeds the preset upper limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the off time of the flexible direct current converter valve submodule of the auxiliary bridge arm; if the average value of the capacitor voltage is less than the preset lower limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the on time of the flexible direct current converter valve submodule; When the test current flows out of the tested bridge arm, determine whether the average value of the capacitor voltage exceeds the preset upper limit; if the average value of the capacitor voltage exceeds the preset upper limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the conduction time of the flexible DC converter valve submodule of the auxiliary bridge arm; if the average value of the capacitor voltage is less than the preset lower limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the turn-off time of the flexible DC converter valve submodule of the auxiliary bridge arm.

7. A capacitor voltage balancing system for a flexible DC converter valve test system, characterized in that: include: Main control chip, voltage controller and balance controller; The main control chip is used to obtain a test current reference value and a bridge arm voltage reference value according to the actual bridge arm voltage of the flexible direct current converter valve system and the submodule capacitor voltage operating conditions, and transmit the bridge arm voltage reference value to the voltage controller; The voltage controller is used to generate a first voltage control pulse according to a bridge arm voltage reference value; The main control chip is further used to drive the semiconductor switch device in the submodule of the bridge arm under test according to the first voltage control pulse, so that the capacitor voltage of the submodule of the bridge arm under test matches the capacitor voltage of the actual flexible direct current converter valve system; The main control chip is also used to sample the capacitor voltage of the measured bridge arm and the auxiliary bridge arm to obtain a first sampling result and a second sampling result respectively; wherein the measured bridge arm and the auxiliary bridge arm are reversely connected in series, the measured bridge arm and the auxiliary bridge arm respectively contain a plurality of flexible direct current converter valve submodules of the same number, and the flexible direct current converter valve submodules are forward cascaded; and the first sampling result and the second sampling result are sent to the balancing controller; The balance controller is used to adjust the pulse width of the first voltage control pulse according to the first sampling result and the second sampling result to obtain the second voltage control pulse; The main control chip is further used to drive the semiconductor switch device in the submodule of the auxiliary bridge arm according to the second voltage control pulse, so as to balance the capacitor voltage of the submodule of the auxiliary bridge arm.

8. The capacitor voltage balancing system of the flexible DC converter valve test system according to claim 7, characterized in that: Also includes: Current controller and current generator; The current controller is used to generate a current control pulse according to a test current reference value, and transmit the current control pulse to the current generator; The current generator is used to generate a test current according to a current control pulse so that the test current matches the current of an actual flexible direct current converter valve system.

9. The capacitor voltage balancing system of the flexible DC converter valve test system according to claim 7, characterized in that: The balancing controller is used to adjust the pulse width of the first voltage control pulse according to the first sampling result and the second sampling result to obtain the second voltage control pulse, including: The balance controller calculates an average value of the capacitor voltage according to the first sampling result and the second sampling result; and then adjusts the pulse width of the first voltage control pulse according to the average value of the capacitor voltage to obtain a second voltage control pulse.

10. The capacitor voltage balancing system of the flexible DC converter valve test system according to claim 9, characterized in that: The method for adjusting the pulse width of the first voltage control pulse includes: When the test current flows into the bridge arm under test, determine whether the average value of the capacitor voltage exceeds the preset upper limit; if the average value of the capacitor voltage exceeds the preset upper limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the off time of the flexible direct current converter valve submodule of the auxiliary bridge arm; if the average value of the capacitor voltage is less than the preset lower limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the on time of the flexible direct current converter valve submodule; When the test current flows out of the tested bridge arm, determine whether the average value of the capacitor voltage exceeds the preset upper limit; if the average value of the capacitor voltage exceeds the preset upper limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the conduction time of the flexible DC converter valve submodule of the auxiliary bridge arm; if the average value of the capacitor voltage is less than the preset lower limit, adjust the pulse width of the reference control pulse of the auxiliary bridge arm to increase the turn-off time of the flexible DC converter valve submodule of the auxiliary bridge arm.

Citation Information

Patent Citations

  • Circular current injection type mixed MMC HBSM (Half Bridge Sub Modular) capacitor voltage balancing method

    CN108777492A

  • Flexible DC converter valve power module capacitor voltage equalizing method

    CN112600451A

  • Modular multilevel converter (MMC) topologies with voltage self-balancing capability

    EP3197038A1

  • Control of balance of arm capacitor voltages in STATCOMS based on chain links of H bridge modules

    US9590483B1