Omnibearing real-time data acquisition and management platform for construction site

By implementing a comprehensive real-time data acquisition and management platform at the construction site and using technologies such as the Internet of Things, the shortcomings of traditional data acquisition and management methods have been solved, and refined, efficient and intelligent management at the construction site have been achieved, and construction efficiency and quality have been improved.

CN119539559APending Publication Date: 2025-02-28ANHUI YUANXIN ENG PROJECT MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411434722.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-15
Publication Date
2025-02-28

AI Technical Summary

Technical Problem

The data collection and management methods of traditional construction sites have problems such as inaccurate, untimely and incomplete data, which is difficult to meet the requirements of modern construction management for refinement, efficiency and intelligence.

Method used

It provides a comprehensive real-time data acquisition and management platform at the construction site. Through the integration of technologies such as the Internet of Things, cloud computing, big data and artificial intelligence, it realizes real-time collection, transmission, analysis and management of various aspects of data such as construction site personnel, equipment, materials, and environment.

Benefits of technology

It has achieved efficient, accurate and intelligent management of construction site data, improved construction efficiency and quality, reduced construction costs and safety risks, optimized construction processes and resource allocation, and improved the management level and competitiveness of construction companies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119539559A_ABST
    Figure CN119539559A_ABST
Patent Text Reader

Abstract

The invention discloses an omnibearing real-time data acquisition and management platform for a construction site. The omnibearing real-time data acquisition and management platform comprises a construction site data acquisition system, a construction site data management system, a wireless transmission module, a central processing unit, an information storage module and an electronic display module. Through fusion application of technologies such as the Internet of Things, cloud computing, big data and artificial intelligence, real-time acquisition, transmission, analysis and management of data in multiple aspects such as personnel, equipment, materials and environment on a construction site are realized, an efficient, accurate and intelligent management means is provided for construction management personnel, the construction efficiency and quality are improved, and the construction quality is improved. The construction cost and the safety risk are reduced, through real-time data acquisition and analysis, the construction process and resource allocation are optimized, and the waiting time and waste in construction are reduced, so that the construction efficiency is improved, the construction cost can be accurately controlled according to the management of the acquired data, unnecessary waste and hyper-branch are avoided, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of building construction, and in particular to a comprehensive real-time data collection and management platform for construction sites. Background Art

[0002] At construction sites, traditional data collection and management methods often rely on manual records and regular reports. This method has problems such as inaccurate, untimely, and incomplete data, and it is difficult to meet the requirements of modern construction management for refinement, efficiency, and intelligence. With the development of information technology, although some digital management tools have emerged, most of them have single functions and low integration, and cannot achieve real-time collection and effective management of all-round data on the construction site. Summary of the invention

[0003] The purpose of the present invention is to provide a comprehensive real-time data collection and management platform for construction sites to solve the problems raised in the above-mentioned background technology.

[0004] To achieve the above object, the present invention provides the following technical solutions: A comprehensive real-time data collection and management platform for a construction site, comprising a construction site data collection system, a construction site data management system, a wireless transmission module, a central processing unit, an information storage module and an electronic display module, wherein the central processing unit is electrically connected to the information storage module, and the electronic display module is electrically connected to the central processing unit via the wireless transmission module; Preferably, the construction site data acquisition system includes a personnel management system, an environment detection system, an equipment detection system and a material management system, and the personnel management system, the environment detection system, the equipment detection system, the equipment management system and the material management system are all electrically connected to the central processor via a wireless transmission module; Preferably, the construction site data management system includes a data analysis and processing module, a data sharing module, an application function module, a comparison module, an early warning detection module, an alarm module and an equipment management system, wherein the data analysis and processing module, the data sharing module, the application function module, the comparison module and the early warning detection module are all electrically connected to the central processing unit, and the alarm module and the equipment management system are electrically connected to the central processing unit via a wireless transmission module; Preferably, the personnel management module includes a personnel positioning module, a fingerprint recognition module, a time module, an infrared temperature measurement module and a face recognition module; Preferably, the environment detection system includes a sound sensor, a dust sensor and a temperature and humidity sensor; Preferably, the equipment detection system includes a sensing detection module and a positioning detection module; Preferably, the material management system includes an input device and an image acquisition module; Preferably, the data analysis and processing module includes data cleaning and conversion and data analysis; Preferably, the application function modules include schedule management, quality management, cost management, safety management and decision support; Preferably, the device management system includes a power control module and a device control module; Preferably, the personnel positioning module adopts a smart helmet or a positioning bracelet, the fingerprint recognition module adopts a fingerprint clock, the time module adopts a time clock module, the infrared temperature measurement module adopts an infrared temperature measurement device, and the face recognition module adopts a face recognition device; Preferably, the input device is a keyboard, and the image acquisition module is a camera; Preferably, the wireless transmission module adopts wireless WiFi; Preferably, the electronic display module adopts an electronic display screen.

[0005] Compared with the prior art, the present invention has the following beneficial effects: The present invention realizes the real-time collection, transmission, analysis and management of various data such as personnel, equipment, materials and environment on the construction site through the integration and application of technologies such as the Internet of Things, cloud computing, big data and artificial intelligence, and provides construction management personnel with efficient, accurate and intelligent management means, which helps to improve construction efficiency and quality, reduce construction costs and safety risks, optimize construction processes and resource allocation through real-time data collection and analysis, reduce waiting time and waste in construction, and thus improve construction efficiency. According to the management of the collected data, the construction cost can be accurately controlled, unnecessary waste and overspending can be avoided, and the construction cost can be reduced, thereby realizing the digitization, intelligence and visualization of construction management, and improving the management level and competitiveness of construction enterprises; The present invention can monitor and alarm the construction process in real time through timely comparison of data, timely discover and solve construction problems, ensure that the construction quality meets the standards and requirements, and at the same time can timely discover and eliminate safety hazards, reduce the incidence of safety accidents, and ensure the life safety of construction personnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0006] Figure 1 It is a system block diagram of the construction site data acquisition system of the construction site all-round real-time data acquisition and management platform of the present invention; Figure 2 It is a system block diagram of the construction site data management system of the construction site all-round real-time data collection and management platform of the present invention. DETAILED DESCRIPTION

[0007] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0008] See also Figure 1-2 , the present invention provides a technical solution: A comprehensive real-time data collection and management platform for a construction site, comprising a construction site data collection system, a construction site data management system, a wireless transmission module, a central processing unit, an information storage module and an electronic display module, wherein the central processing unit is electrically connected to the information storage module, and the electronic display module is electrically connected to the central processing unit via the wireless transmission module; The construction site data acquisition system includes a personnel management system, an environmental detection system, an equipment detection system and a material management system, and the personnel management system, the environmental detection system, the equipment detection system, the equipment management system and the material management system are all electrically connected to the central processor through a wireless transmission module; The construction site data management system includes a data analysis and processing module, a data sharing module, an application function module, a comparison module, an early warning detection module, an alarm module and an equipment management system. The data analysis and processing module, the data sharing module, the application function module, the comparison module and the early warning detection module are all electrically connected to the central processing unit, and the alarm module and the equipment management system are electrically connected to the central processing unit via a wireless transmission module; Through the above scheme, the construction site data collection system can realize the comprehensive collection of construction site data, and the collected data can be managed and coordinated through the construction site data management system, so as to facilitate the management personnel to carry out coordinated management; In this embodiment, preferably, the personnel management module includes a personnel positioning module, a fingerprint recognition module, a time module, an infrared temperature measurement module and a face recognition module; Through the above solution, the personnel management module collects personnel information data and body temperature data of the workers at the construction site, and can obtain the personnel's location information data in real time; In this embodiment, preferably, the environment detection system includes a sound sensor, a dust sensor and a temperature and humidity sensor; Through the above scheme, the noise, dust, temperature and humidity data of the construction site environment are collected in real time through the environmental detection system; In this embodiment, preferably, the device detection system includes a sensor detection module and a positioning detection module; Through the above scheme, the equipment detection system collects real-time working parameter data and location data of the equipment on the construction site; In this embodiment, preferably, the material management system includes an input device and an image acquisition module; Through the above scheme, the material management system records the quantity and weight of the materials at the construction site, as well as the subsequent retrieval time and material retrieval situation. When there is surplus material usage, the material return situation and return time are recorded in time. At the same time, the image acquisition module monitors the material usage at the construction site in real time. The image acquisition module can also monitor various operating conditions at the construction site in real time. In this embodiment, preferably, the data analysis and processing module includes data cleaning and conversion and data analysis; Through the above scheme, the collected data is cleaned through the data analysis and processing module to remove duplicate, erroneous and invalid data, and then the data of different formats and sources are converted and integrated to form a unified data format. Then, the construction data is deeply analyzed through algorithms such as statistical analysis and data mining, including progress analysis, quality analysis, cost analysis and safety risk analysis; In this embodiment, preferably, the application function modules include schedule management, quality management, cost management, safety management and decision support; Through the above solution, managers can track the construction progress in real time according to data analysis, compare the planned progress with the actual progress, and promptly discover progress deviations. Then, by adjusting resource allocation and construction plans, they can ensure that the project is completed on time, promptly discover quality problems, trace and deal with the causes and responsibilities of quality problems, promptly monitor the occurrence of construction costs, conduct cost analysis and cost control, optimize resource allocation, reduce construction costs, promptly monitor the safety status of the construction site and discover safety hazards, record and analyze safety accidents, formulate corresponding safety measures and emergency plans, and provide decision-making support for construction managers based on the results of data analysis; In this embodiment, preferably, the device management system includes a power control module and a device control module; Through the above scheme, according to the collection results of the equipment on the construction site, the power supply of the construction equipment is controlled through the power control module. When the equipment fails, the power supply of the equipment is cut off, and the equipment is remotely controlled through the equipment control module to ensure the normal operation and safety of the equipment. In this embodiment, preferably, the personnel positioning module adopts a smart helmet or a positioning bracelet, the fingerprint recognition module adopts a fingerprint clock, the time module adopts a time clock module, the infrared temperature measurement module adopts an infrared temperature measurement device, and the face recognition module adopts a face recognition device; Through the above scheme, the location information and work trajectory data of the construction workers can be obtained in real time through smart safety helmets or positioning bracelets. The fingerprint information of the construction workers can be collected by a fingerprint clock-in machine, and the identity information and body temperature data of the construction workers can be collected through an infrared temperature measuring device and a face recognition device. The time when the data is collected can be collected through a time clock module; In this embodiment, preferably, the input device is a keyboard, and the image acquisition module is a camera; Through the above scheme, the corresponding data of the material can be input by using the keyboard, and the remote image data can be monitored by the camera; In this embodiment, preferably, the wireless transmission module adopts wireless WiFi; Through the above scheme, the collected data can be transmitted through wireless WiFi and the signal transmission of the instructions issued by the central processor can be carried out; In this embodiment, preferably, the electronic display module adopts an electronic display screen; Through the above scheme, an electronic display screen can be used to display data and various processing results; When the construction site all-round real-time data collection and management platform of this embodiment is used, the construction site data is collected in all-round real-time through the construction site data collection system, and the collected data is managed and processed through the construction site data management system. When collecting data, the personnel information data and body temperature data of the staff on the construction site are collected through the personnel management module, and the location information data of the personnel can be obtained in real time. The information storage module stores the information of the construction personnel, and the temperature reference threshold is set in the early warning detection module. After the collection and processing by the central processor, the collected data is compared with the stored data through the comparison module. If the personnel information does not match or the body temperature exceeds the normal range, the early warning detection module is used to compare the collected data with the stored data ... The module transmits a signal to the alarm module to issue an alarm, and the alarm is displayed through the electronic display module. During the construction process, the location information and work trajectory data of the construction personnel are collected through the personnel positioning module, so that the data of the construction personnel at the construction site are collected and managed in real time. The environmental data of the construction site is collected in real time through the environmental detection system, and the real-time working parameter data and location data of the equipment at the construction site are collected through the equipment detection system. Similarly, the threshold values ​​of environmental data, equipment working parameters and location parameters are also set in the early warning detection module. After comparison by the comparison module, if the environmental parameter data of the construction site and the working parameters and location parameter data of the construction equipment are abnormal, the alarm is also sent out. The module will sound an alarm. Through the material management system, the material warehouse manager will use the input device to record the quantity and weight of the materials entering the construction site, as well as the subsequent retrieval time and material retrieval situation. When there is a surplus of materials, the material return situation and return time will be recorded in time. At the same time, the material usage of the construction site will be monitored in real time through the image acquisition module, thereby realizing the real-time collection of material data on the construction site. The image acquisition module can also monitor various operating conditions of the construction site in real time. After the corresponding construction site data passes through the central processor, it can be cleaned through the data analysis and processing module to remove duplicate, erroneous and invalid data, and then the data of different formats and sources will be converted and integrated to form a unified Data format, and then conduct in-depth analysis of construction data through statistical analysis and data mining algorithms, including progress analysis, quality analysis, cost analysis and safety risk analysis, etc. Specific data operations can be performed through application function modules, so as to facilitate managers to carry out progress management, quality management, cost management, safety management and decision support, thereby realizing the management function of the management platform. The information storage module is also used to store data. It can use a combination of relational database and non-relational database to store various types of data in the construction process to ensure the security and reliability of the data. At the same time, the data is backed up and restored regularly to prevent data loss. A data interface is established through the data sharing module to realize data sharing and interaction with other construction management systems.This supports data sharing and collaborative work between different departments within a construction company, improving work efficiency; It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0009] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A comprehensive real-time data collection and management platform for construction sites, featuring: It includes a construction site data acquisition system, a construction site data management system, a wireless transmission module, a central processing unit, an information storage module and an electronic display module, wherein the central processing unit is electrically connected to the information storage module, and the electronic display module is electrically connected to the central processing unit via the wireless transmission module; The construction site data acquisition system includes a personnel management system, an environmental detection system, an equipment detection system and a material management system, and the personnel management system, the environmental detection system, the equipment detection system, the equipment management system and the material management system are all electrically connected to the central processor through a wireless transmission module; The construction site data management system includes a data analysis and processing module, a data sharing module, an application function module, a comparison module, an early warning detection module, an alarm module and an equipment management system. The data analysis and processing module, the data sharing module, the application function module, the comparison module, the early warning detection module are all electrically connected to the central processing unit, and the alarm module and the equipment management system are electrically connected to the central processing unit via a wireless transmission module.

2. The construction site omni-directional real-time data collection and management platform according to claim 1 is characterized by: The personnel management module includes a personnel positioning module, a fingerprint recognition module, a time module, an infrared temperature measurement module and a face recognition module.

3. The construction site omni-directional real-time data collection and management platform according to claim 1 is characterized by: The environment detection system includes a sound sensor, a dust sensor, and a temperature and humidity sensor.

4. The construction site omni-directional real-time data collection and management platform according to claim 1 is characterized by: The equipment detection system includes a sensing detection module and a positioning detection module.

5. The construction site omni-directional real-time data collection and management platform according to claim 1 is characterized by: The material management system includes an input device and an image acquisition module.

6. The construction site omni-directional real-time data collection and management platform according to claim 1 is characterized by: The data analysis and processing module includes data cleaning and conversion and data analysis.

7. The construction site omni-directional real-time data collection and management platform according to claim 1 is characterized by: The application function modules include schedule management, quality management, cost management, safety management and decision support.

8. The construction site omni-directional real-time data collection and management platform according to claim 1 is characterized by: The device management system includes a power control module and a device control module.

9. The construction site omni-directional real-time data collection and management platform according to claim 2 is characterized by: The personnel positioning module adopts a smart safety helmet or a positioning bracelet, the fingerprint recognition module adopts a fingerprint clock, the time module adopts a time clock module, the infrared temperature measurement module adopts an infrared temperature measurement device, and the face recognition module adopts a face recognition device.

10. The construction site omni-directional real-time data collection and management platform according to claim 5, characterized in that: The input device adopts a keyboard, and the image acquisition module adopts a camera.

11. The construction site omni-directional real-time data collection and management platform according to claim 1, characterized in that: The wireless transmission module adopts wireless WiFi.

12. The construction site omni-directional real-time data collection and management platform according to claim 1, characterized in that: The electronic display module adopts an electronic display screen.