An assembled high-performance component for railway bridge engineering and its production process

By designing drainage protective walls and drainage auxiliary mechanisms in railway bridge protective walls, the problem of water and debris blockage in bridge area is solved, and efficient drainage on the bridge deck and extending the life of components is achieved.

CN119615742BActive Publication Date: 2025-04-18GUANGZHOU HUATUNGWEI PREFABRICATED PARTS CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202510147885.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-02-11
Publication Date
2025-04-18
Estimated Expiration
2045-02-11

AI Technical Summary

Technical Problem

The installation of protective walls on the bridge deck of railway bridges makes it easy to form snow and water accumulation in rainy and snowy weather, resulting in the oxidation and corrosion of railway tracks and bridge deck components accelerated, and the drainage system is easily blocked by debris, making it difficult to discharge water accumulation.

Method used

A prefabricated high-performance component is designed, including a drainage protective wall and a general protective wall. The drainage protective wall has a built-in drainage tank group and a drainage auxiliary mechanism. The main filter plate is turned over with the air duct and ventilation tank and the wind wheel to clean up the debris on the bridge deck and ensure that the accumulated water can be continuously discharged.

Benefits of technology

It effectively reduces the problem of difficult water accumulation caused by the blockage of debris in the bridge deck drain, improves the drainage effect of the drainage system on railway bridges, and extends the service life of the bridge deck components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119615742B_ABST
    Figure CN119615742B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of railway bridge engineering, specifically to an assembled high-performance component and its production process for railway bridge engineering, including a drainage protection wall and an ordinary protection wall, a splicing assembly is provided between the drainage protection wall and the ordinary protection wall, the drainage protection wall includes a drainage wall body, a drainage trough group is provided inside the drainage wall body, the drainage trough group includes an air induced trough provided inside the drainage wall body, a built-in trough is provided inside the drainage wall body and near the air induced trough, a lower water trough is provided on the surface of one side of the drainage wall close to the rail, and a drainage auxiliary mechanism is provided inside the drainage wall and near the lower water trough. The present application sets up a drainage auxiliary mechanism so that the accumulated water on the bridge deck can be continuously discharged, reducing the possibility that the water on the bridge deck is difficult to be discharged in time due to the blockage of the upper and lower water inlets of the railway bridge by debris, and helping to improve the drainage effect of the drainage system on the railway bridge.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of railway bridge engineering, and specifically to an assembled high-performance component used in railway bridge engineering and a production process thereof. Background Art

[0002] Railway bridges are structures built for railways to cross rivers, lakes, straits, valleys or other obstacles, and for realizing the three-dimensional intersection of railway lines with railway lines or roads. The components of railway bridges mainly include superstructures (bridge deck structures, main beams, etc.), piers and abutments, foundation structures, bearings, guardrails and safety facilities, drainage systems and additional facilities, etc. All parts work closely together to ensure that the bridge can safely and reliably carry the railway traffic load and maintain stability and durability during use.

[0003] As an important part of railway construction, the protective wall is not only related to the safety and stability of the railway line, but also closely related to the harmonious coexistence of the surrounding environment. It can effectively prevent debris and stones on the bridge deck from sliding down, protecting the railway and pedestrians below. At the same time, the protective wall can also isolate noise and reduce the impact on the surrounding environment and residents.

[0004] Regarding the above-mentioned related technologies, since the protective walls are arranged on both sides of the rails on the bridge deck, a U-shaped space is formed between the upper end surface of the bridge deck and the two protective walls. In rainy and snowy weather, snow and water are easily formed near the rails, which will cause the rails and various components on the bridge deck to be immersed in the accumulated water, which will accelerate the oxidation and corrosion of various components. Therefore, it is necessary to use a drainage system to discharge the accumulated water on the bridge deck in time. However, the drainage outlet of the drainage system on the bridge deck is generally easily blocked by fallen leaves and other debris, resulting in the entrance of the drainage outlet of the drainage system being blocked, which is not conducive to the timely discharge of accumulated water. Summary of the invention

[0005] In view of the above shortcomings of the prior art, the present application provides an assembled high-performance component for railway bridge engineering, including a drainage protection wall and a common protection wall, wherein the drainage protection wall includes a drainage wall body, a splicing assembly is provided on the drainage wall, a drainage trough group is provided inside the drainage wall, the drainage trough group includes an air induced trough provided inside the drainage wall body, a built-in trough is provided inside the drainage wall and close to the air induced trough, a lower water trough is provided on the surface of one side of the drainage wall close to the rail, and a drainage auxiliary mechanism is provided inside the drainage wall and close to the lower water trough;

[0006] In which, the drainage auxiliary mechanism includes a main filter plate arranged on the drainage wall, the lower end of the main filter plate is provided with a U-shaped plate, one end of the U-shaped plate is provided with a strap, the lower end surface of the strap is overlapped with the bridge deck, the main filter plate is provided with a filter plate shaft on the side surface facing the lower water tank, the main filter plate is rotatably connected to the drainage wall through the filter plate shaft, the upper end of the main filter plate is provided with a traction hook, the interior of the traction hook is provided with a traction rope, a limit rod is provided inside the drainage wall and close to the traction rope, one end of the traction rope passes around the limit rod from the bottom of the limit rod and is inserted into the built-in through groove, the end of the traction rope inserted in the built-in through groove is provided with a driving shaft, the driving shaft is installed inside the drainage wall and close to the center of the wind induced slot, a wind wheel is sleeved on the driving shaft, and a wind gathering component is provided inside the wind induced slot and close to the wind wheel.

[0007] Furthermore, the wind gathering component includes two side plates arranged at both ends of the driving shaft, the driving shaft is rotatably connected to the side plates, a stabilizing plate is provided between the two side plates, an air-inducing bottom plate is provided between the two side plates and at one end close to the stabilizing plate, and an air-inducing top plate is provided between the two side plates and at one end away from the air-inducing bottom plate.

[0008] Furthermore, a ventilation hole is provided between the stabilizing plate and the draft-inducing top plate, a through hole for the traction rope to pass through is provided between the stabilizing plate and the draft-inducing bottom plate, and a ventilation hole is also provided between the draft-inducing top plate and the draft-inducing bottom plate, and the two ventilation holes correspond to the concave surfaces of the wind wheel blades.

[0009] Furthermore, one end of the air induced groove passes through one side surface of the drainage wall, and the other end of the air induced groove passes through the other side surface of the drainage wall. The contour of the inner wall of the air induced groove is set to a structure formed by splicing two quadrangular pyramids, the top surfaces of the two quadrangular pyramids overlap each other, and the top surface area of ​​the quadrangular pyramid is smaller than the bottom surface area.

[0010] Furthermore, the splicing assembly includes a first splicing block and a second splicing block, the first splicing block is arranged at one end of the drainage wall and close to the upper end surface, the second splicing block is arranged at the other end of the drainage wall and close to the lower end surface, and the ordinary protective wall is also provided with a splicing assembly, the first splicing block on the drainage wall is abutted against the second splicing block on one of the ordinary protective walls, and the second splicing block on the drainage wall is abutted against the first splicing block on the other ordinary protective wall.

[0011] Furthermore, a docking block is provided on the lower end surface of the first splicing block near the center, and a docking groove for plugging the docking block is provided on the upper end surface of the second splicing block near the center. The first splicing block is spliced ​​with the second splicing block by plugging the docking block into the docking groove.

[0012] Furthermore, an assembly groove is provided on the upper end surface of the drainage wall near the center, and a detachable assembly barrier is inserted into the assembly groove. An assembly groove for installing an assembly barrier is also provided on the upper end surface of the ordinary protective wall near the center, and two adjacent assembly barriers are fixedly connected by bolts.

[0013] A production process for assembled high-performance components used in railway bridge engineering, comprising the following steps:

[0014] S1. Material preparation: according to the performance requirements of the protective wall, prepare the concrete mixture for pouring the protective wall;

[0015] S2. Template configuration: prepare a template for pouring the protective wall according to the size requirements of the protective wall, and prepare a template for opening the drainage trough group according to the grooving requirements of each trough on the drainage wall;

[0016] S3. Prefabrication of ordinary protective walls: assemble a template for pouring the protective wall at the pouring site, fill the concrete mixture for pouring the wall into the template, smooth it with a trowel, and vibrate it appropriately with a small vibrator before smoothing. After pouring, remove the mold after resting, and perform maintenance according to the corresponding maintenance system to obtain a prefabricated part of the ordinary protective wall;

[0017] S4. Prefabrication of drainage protection wall: Assemble formwork 1 for pouring the wall at the pouring site, place formwork 2 for opening each trough of the drainage trough group inside formwork 1, smooth it with a trowel, and vibrate it appropriately with a small vibrator before smoothing. After pouring, remove the formwork after resting, and perform maintenance in accordance with the corresponding maintenance system to obtain the prefabricated parts of the drainage wall, and install the drainage auxiliary mechanism in the drainage wall.

[0018] Compared with the known prior art, the technical solution provided by this application has the following beneficial effects:

[0019] 1. The present application sets up a drainage auxiliary mechanism, opens a drainage trough group in the drainage wall, installs a wind wheel and a main filter plate and other structures in the drainage trough group, uses the wind induced trough to introduce the airflow impacting the outer wall of the protective wall into the drainage wall, drives the wind wheel to rotate, and then drives the main filter plate to flip intermittently, uses the main filter plate to prevent bridge deck debris from entering the sewer channel, and uses the flipping of the main filter plate to push away the debris, so that the accumulated water on the bridge deck can be continuously discharged, reducing the possibility that the water on the bridge deck is difficult to be discharged in time due to the blockage of the upper and lower water inlets of the railway bridge by debris, and helps to improve the drainage effect of the drainage system on the railway bridge;

[0020] 2. The present application sets a wind gathering component, sets a wind induction top plate and a wind induction bottom plate on the outside of the wind wheel, and guides the airflow entering the wind induction slot to the concave surface of the wind wheel blade through the vents opened on the wind gathering component, so that the thrust of the airflow on the wind wheel is more concentrated, ensuring the thrust of the airflow on the wind wheel, thereby ensuring the effect of the wind wheel rotation, reducing the possibility that the airflow is difficult to continuously push the wind wheel due to excessive dispersion of the airflow, and improving the effect of tightening the traction rope;

[0021] 3. The present application sets an air induced draft groove so that the air flow enters the drainage wall from the groove at either end of the air induced draft groove, which can drive the wind wheel to rotate. The inner wall contour of the air induced draft groove is set to a four-sided pyramid structure with two overlapping top surfaces, so that the inner diameter of the openings at both ends of the air induced draft groove is larger than the inner diameter at the center, so that the air flow entering the air induced draft groove is more concentrated, thereby increasing the thrust of the air flow on the wind wheel and ensuring the working efficiency of the drainage auxiliary mechanism. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 This is a schematic diagram of the overall structure in an embodiment of the present application;

[0023] Figure 2 This is a schematic diagram of the structure of the drainage protection wall in the embodiment of the present application;

[0024] Figure 3 This is a schematic diagram of the structure of the drainage trough group in the embodiment of the present application;

[0025] Figure 4 This is a schematic diagram of the structure of the splicing assembly in the embodiment of the present application;

[0026] Figure 5 This is a structural schematic diagram of the drainage auxiliary mechanism in the embodiment of the present application;

[0027] Figure 6 This is a schematic diagram of the structure of the traction rope in the embodiment of the present application;

[0028] Figure 7 This is a schematic diagram of the structure of the wind wheel in the embodiment of the present application;

[0029] Figure 8 This is a schematic diagram of the structure of the main filter plate in the embodiment of the present application;

[0030] Fig. 9 This is a schematic diagram of the structure of the wind gathering component in the embodiment of the present application;

[0031] Fig.10 Schematic diagram of the connection between the wind gathering component and the wind wheel in the embodiment of the present application.

[0032] In the figure: 1. drainage protection wall; 11. drainage wall; 12. first splicing block; 121. docking block; 13. second splicing block; 131. docking groove; 14. assembly groove; 15. drainage groove group; 151. induced draft groove; 152. built-in groove; 153. lower sink; 2. ordinary protection wall; 3. assembly barrier; 4. drainage auxiliary mechanism; 41. main filter plate; 411. U-shaped plate; 412. bridging plate; 413. filter plate shaft; 414. traction hook; 42. traction rope; 43. limit rod; 44. driving shaft; 45. wind wheel; 46. wind gathering component; 461. side plate; 462. stabilizing plate; 463. induced draft top plate; 464. induced draft bottom plate. DETAILED DESCRIPTION

[0033] In order to better understand the above technical solution, Figure 1-10 And specific implementation methods are used to describe the above technical solutions in detail.

[0034] refer to Figures 1 to 5The present application discloses an assembled high-performance component for railway bridge engineering, including a drainage protection wall 1, an ordinary protection wall 2, an assembled barrier 3 and a drainage auxiliary mechanism 4. The drainage protection wall 1 includes a drainage wall body 11, a first splicing block 12, a docking block 121, a second splicing block 13 and a drainage trough group 15. The first splicing block 12 is arranged at one end of the drainage wall body 11 and close to the upper end surface, and the docking block 121 is arranged at the lower end surface of the first splicing block 12 and close to the center. The second splicing block 13 is arranged at the other end of the drainage wall body 11 and close to the lower end surface, and a docking groove 131 is provided on the upper end surface of the second splicing block 13 and close to the center. The outer side wall of the ordinary protection wall 2 is also provided with a splicing assembly including the first splicing block 12, the docking block 121, the second splicing block 13 and the docking groove 131. Among them, the docking block 121 on one wall is inserted into the docking groove 131 of the other wall, and the adjacent walls are assembled by splicing components, and multiple walls are assembled in sequence along the length direction of the bridge. The drainage trough group 15 is opened inside the drainage wall 11, and the drainage trough group 15 includes an air induced groove 151, a built-in groove 152 and a lower trough 153. The built-in groove 152 is opened inside the drainage wall 11 and close to the center. The air induced groove 151 is opened on the outer wall of the drainage wall 11 and close to the built-in groove 152, and one end of the air induced groove 151 passes through one side surface of the outer wall of the drainage wall 11, and the other end of the air induced groove 151 passes through the other side surface of the outer wall of the drainage wall 11. The contour of the inner wall of the air induced groove 151 is set as a structure formed by splicing two trapezoidal bodies, and the two trapezoidal bodies are symmetrically distributed about the built-in groove 152. The trapezoidal body is a quadrangular pyramid whose bottom and top surfaces are similar and whose side surfaces are all trapezoidal. The bottom area of ​​the quadrangular pyramid is larger than the top area, and the top surfaces of the two quadrangular pyramids overlap each other, and the overlapping top surfaces of the two quadrangular pyramids are located inside the drainage wall 11 and close to the center. The bottom surface of the quadrangular pyramid is opened on the outer wall of the drainage wall 11. The airflow can enter the interior of the drainage wall 11 from any notch of the air duct 151. The lower water trough 153 is opened on the lower end of the drainage wall 11 and on the side surface close to the railroad track, and the lower water trough 153 is opened at a position close to the bridge deck drain. The drainage auxiliary mechanism 4 is installed inside the drainage wall 11 and close to the lower water trough 153. An assembly groove 14 is provided on the upper end surface of the drainage wall 11 and near the center. An assembly groove 14 is also provided on the upper end surface of the common protective wall 2 and near the center. The assembly groove 14 provided on the drainage wall 11 has the same structure as the assembly groove 14 provided on the common protective wall 2. The detachable assembly barrier 3 is inserted into the assembly groove 14 from the upper end opening of the assembly groove 14. Two adjacent assembly barriers 3 are fixedly connected by bolts. The assembly barrier 3 can be selected to include assembled components such as protective nets and sound insulation boards.

[0035] The drainage wall 11 and the ordinary protective wall 2 are both prefabricated components for concrete pouring. When making the ordinary protective wall 2, the template 1 for pouring the protective wall is assembled at the pouring site, the concrete mixture for pouring the wall is filled into the template 1, and it is smoothed with a trowel. Before smoothing, a small vibrator can be used to vibrate appropriately. After pouring, the mold is removed after resting, and maintenance is carried out according to the corresponding maintenance system to obtain the prefabricated parts of the ordinary protective wall 2. Similarly, when making the drainage wall 11, the template 1 for pouring the wall is assembled at the pouring site, and the template 2 for opening each trough of the drainage trough group 15 is assembled at the same time. The template 2 is placed inside the template 1, and it is smoothed with a trowel. Before smoothing, a small vibrator can be used to vibrate appropriately. After pouring, the mold is removed after resting, and maintenance is carried out according to the corresponding maintenance system to obtain the prefabricated parts of the drainage wall 11, and then the drainage auxiliary mechanism 4 is installed in the drainage wall 11 to obtain the prefabricated parts of the drainage protective wall 1.

[0036] When paving the protective wall on the railway bridge, the prefabricated wall parts are transported to the designated installation position on the bridge deck by hoisting. According to the assembly requirements of the protective wall of the railway bridge, the ordinary protective wall 2 and the drainage protective wall 1 are placed in sequence, one of the walls is placed in the designated position first, and then the docking block 121 on the other wall is plugged into the docking groove 131 on the previous wall, so as to realize the serial splicing of adjacent walls, and then realize the serial connection of a row of walls. The drainage wall 11 is placed at the position where the drain is opened on the bridge deck, so that the drain trough 153 on the drainage wall 11 is docked with the drain on the bridge deck. After the protective wall is assembled, the assembly barrier 3 is plugged into the assembly groove 14 opened on the upper end face of the wall, and the adjacent assembly barriers 3 are fixedly connected by bolts. The drainage auxiliary mechanism 4 located inside the drainage wall 11 can improve the drainage effect of the drainage system of the bridge deck.

[0037] refer to Figure 2 , Figure 3 , Figures 5 to 8The drainage auxiliary mechanism 4 includes a main filter plate 41, a U-shaped plate 411, a bridging plate 412, a filter plate shaft 413, a traction hook 414, a traction rope 42, a limit rod 43, a driving shaft 44, a wind wheel 45 and a wind gathering component 46. An installation slot is provided inside the drainage wall 11 and near the lower water tank 153. The filter plate shaft 413 is inserted into one of the installation slots, and the main filter plate 41 is sleeved on the outside of the filter plate shaft 413. The main filter plate 41 is rotatably connected to the filter plate shaft 413, and the main filter plate 41 is rotatably connected to the drainage wall 11 through the filter plate shaft 413. The U-shaped plate 411 is fixedly mounted on the lower end of the main filter plate 41, and the concave surface of the U-shaped plate 411 faces upward. The U-shaped plate 411 is used to lift the debris attached to the outer wall of the main filter plate 41 to prevent the debris from falling. The strap 412 is fixedly mounted on one end of the U-shaped plate 411, and the strap 412 overlaps the bridge deck to prevent the main filter plate 41 from overturning. The traction hook 414 is fixedly mounted on the upper end of the main filter plate 41 and on a side surface facing the lower water tank 153. One end of the traction rope 42 is inserted into the mounting hole on the traction hook 414, and the other end of the traction rope 42 is inserted into the interior of the built-in through groove 152. The limit rod 43 is fixedly mounted inside the drainage wall 11 and close to the position of the traction rope 42, and the limit rod 43 is inserted into the mounting groove inside the drainage wall 11 and close to the position of the lower water tank 153. The installation height of the limit rod 43 is lower than the height of the traction hook 414, and the traction rope 42 passes through the lower water tank 153 from the bottom of the limit rod 43 and is inserted into the built-in through groove 152. The driving shaft 44 is installed inside the drainage wall 11 and close to the wind channel 151. The driving shaft 44 is installed inside the wind channel 151 and close to the center. The wind gathering component 46 is installed inside the drainage wall 11 and close to the driving shaft 44. The driving shaft 44 rotates inside the wind gathering component 46. One end of the traction rope 42 is inserted into the built-in through groove 152, passes through the built-in through groove 152, and then is inserted into the wind channel 151. One end of the traction rope 42 is inserted into the wind channel 151 and is fixedly connected to the driving shaft 44. The traction rope 42 is fixedly installed on the outside of the driving shaft 44 and close to the center. Two wind wheels 45 are sleeved on the outside of the driving shaft 44, and the two wind wheels 45 are symmetrically distributed about the traction rope 42. The wind wheel 45 is fixedly connected to the driving shaft 44 , and the wind wheel 45 drives the driving shaft 44 to rotate. When the driving shaft 44 rotates, the end of the traction rope 42 fixed to the driving shaft 44 is wound up, thereby achieving the purpose of tightening the traction rope 42 .

[0038] When the drainage protection wall 1 is prefabricated, the driving shaft 44 and the wind wheel 45 are installed between the two side plates 461 of the wind gathering component 46, and the traction rope 42 on the driving shaft 44 is extended from the through hole between the stabilizing plate 462 and the wind induction bottom plate 464. The wind gathering component 46 with the wind wheel 45 installed is embedded in the drainage wall 11 and close to the wind induction groove 151, so that the through hole between the stabilizing plate 462 and the wind induction bottom plate 464 is connected to the built-in groove 152 inside the drainage wall 11. One end of the traction rope 42 extends out of the wind gathering component 46 and passes through the built-in groove 152 and is inserted into the lower water tank 153. Insert the limiting rod 43 into the installation groove inside the drainage wall 11 and close to the lower water tank 153, pass the end of the traction rope 42 located in the lower water tank 153 from under the limiting rod 43, and then insert the traction rope 42 into the traction hook 414 at the upper end of the main filter plate 41, and finally install the main filter plate 41 at the opening of the lower water tank 153 through the filter plate rotating shaft 413, so that the main filter plate 41 is rotatably connected to the drainage wall 11.

[0039] Due to weather factors and train running, high-speed airflow will be formed on the bridge deck. When the drainage auxiliary mechanism 4 is working, the airflow formed by weather factors and train running can drive the wind wheel 45 to rotate after entering the drainage wall 11 from the slot at either end of the wind induced groove 151. Due to the structure of the wind induced groove 151, after the airflow enters the wind induced groove 151 from the slot at either end of the wind induced groove 151, the airflow speed at the wind wheel 45 is greater than the airflow speed at the entrance of the wind induced groove 151, thereby ensuring the rotation effect of the wind wheel 45. The airflow enters the interior of the drainage wall 11 from the slot of the wind induced groove 151. The high-speed flowing gas impacts the wind wheel 45, causing the wind wheel 45 to rotate, and the rotation of the wind wheel 45 drives the rotation of the driving shaft 44, and then the rotation of the driving shaft 44 winds up one end of the traction rope 42 fixed to the driving shaft 44, thereby achieving the purpose of tightening the traction rope 42. The other end of the traction rope 42 is used to pull the upper end of the main filter plate 41, so that the upper end of the main filter plate 41 is turned over to the inside of the lower water tank 153. At the same time, the end of the main filter plate 41 with the U-shaped plate 411 is turned over to the outside of the lower water tank 153. When water accumulates on the bridge deck and debris in the accumulated water accumulates at the position of the lower water tank 153, the main filter plate 41 can prevent the debris from entering the lower water tank 153, preventing the debris from blocking the bridge's water discharge channel. When too much debris accumulates at the main filter plate 41, the filter holes on the main filter plate 41 are blocked, resulting in a reduced discharge effect of the main filter plate 41. The main filter plate 41 is turned over by the rotation of the wind wheel 45, and the debris accumulated on the outside of the main filter plate 41 is lifted up to the outside of the lower water tank 153 by the U-shaped plate 411, and a channel for rapid discharge is opened between the U-shaped plate 411 and the bridge deck water outlet, and the water under the debris flows into the lower water tank 153 through the opening here, realizing the continuous discharge of accumulated water. When the air velocity inside the air duct 151 decreases, the force exerted by the air flow on the wind wheel 45 disappears, and the main filter plate 41 rotates back to the original position due to its own weight. When the main filter plate 41 rotates, it pulls the traction rope 42, so that the end of the traction rope 42 wound on the driving shaft 44 is unwound, and the wind wheel 45 rotates back to the original position. When the main filter plate 41 and the wind wheel 45 rotate back to the original position, the water channel between the U-shaped plate 411 and the bridge deck is closed, and the main filter plate 41 can continue to prevent debris outside the lower water tank 153 from entering the lower water tank 153.

[0040] refer to Figure 5 , Fig. 9 and Fig.10The wind gathering component 46 includes a side plate 461, a stabilizing plate 462, an air induction top plate 463, and an air induction bottom plate 464. The stabilizing plate 462 is fixedly installed between the two side plates 461, and the two side plates 461 are symmetrically distributed about the stabilizing plate 462. The lower end surface of the stabilizing plate 462 abuts against the inner wall of the drainage wall 11, and the outer wall of the side plate 461 abuts against the inner wall of the drainage wall 11. One end of the driving shaft 44 is inserted into the interior of one of the side plates 461, and the other end of the driving shaft 44 is inserted into the interior of the other side plate 461. The air induction top plate 463 is fixedly installed between the two side plates 461 and close to the upper end of the side plates 461. The air induction bottom plate 464 is fixedly installed between the two side plates 461 and close to the lower end of the side plates 461. A vent is provided between the draft top plate 463 and the stabilizing plate 462, and a vent is also provided between the draft bottom plate 464 and the draft top plate 463. The two vents are symmetrical about the center of the wind wheel 45, and the positions of the vents correspond to the concave surfaces of the blades of the wind wheel 45. A through hole is provided between the draft bottom plate 464 and the stabilizing plate 462 for the traction rope 42 to pass through.

[0041] The vent between the stabilizing plate 462 and the draft top plate 463 corresponds to the concave surface of the fan blade of the wind wheel 45, and the vent between the draft top plate 463 and the draft bottom plate 464 also corresponds to the concave surface of the fan blade of the wind wheel 45. The airflow passing through the draft slot 151 enters the range of the wind wheel 45 from the vent, and the airflow directly hits the concave surface of the fan blade of the wind wheel 45 after passing through the vent, further reducing the channel for the airflow to flow, accelerating the airflow, ensuring the force of the airflow blowing the wind wheel 45, and ensuring the normal flipping of the main filter plate 41.

[0042] A production process for assembled high-performance components used in railway bridge engineering, comprising the following steps:

[0043] S1. Material preparation: according to the performance requirements of the protective wall, prepare the concrete mixture for pouring the protective wall;

[0044] S2 template configuration, according to the size requirements of the protective wall, prepare a template for pouring the protective wall, according to the requirements of the grooves of each trough on the drainage wall 11, prepare a template for opening the drainage trough group 15;

[0045] S3. Prefabrication of ordinary protective wall 2, assembling a template for pouring the protective wall at the pouring site, filling the concrete mixture for pouring the wall into the template, smoothing it with a trowel, and vibrating it appropriately with a small vibrator before smoothing. After pouring, remove the mold after resting, and perform maintenance in accordance with the corresponding maintenance system to obtain a prefabricated part of the ordinary protective wall 2;

[0046] S4. Prefabrication of the drainage protection wall 1. Assemble the template 1 for pouring the wall at the pouring site, place the template 2 for opening each trough of the drainage trough group 15 inside the template 1, and smooth it with a trowel. Before smoothing, use a small vibrator to vibrate appropriately. After the pouring is completed, remove the mold after resting, and perform maintenance according to the corresponding maintenance system to obtain the prefabricated parts of the drainage wall 11, and install the drainage auxiliary mechanism 4 in the drainage wall 11.

[0047] The working principle of the embodiment of this application:

[0048] Prefabricated drainage wall 11 and ordinary protective wall 2, the prefabricated parts are transferred to the bridge deck of the railway bridge. When paving the protective wall on the railway bridge, one wall is first installed at the designated position on the bridge deck, and then the docking block 121 on the other wall is inserted into the docking groove 131 on the previous wall to complete the series connection of the protective walls.

[0049] During heavy rain, debris on the bridge deck gathers on the outside of the lower water tank 153 along with the water flow, and the main filter plate 41 blocks the debris to prevent it from entering the lower water channel of the bridge deck. The airflow formed by weather factors and train running flows into the interior of the drainage wall 11 from the notches at either end of the wind induced groove 151, and the airflow flows at a high speed inside the wind induced groove 151, and enters the rotation range of the wind wheel 45 after passing through the vent. The high-speed airflow directly impacts the concave surface of the fan blades of the wind wheel 45, driving the wind wheel 45 to rotate rapidly, so that the driving shaft 44 winds up one end of the traction rope 42 fixed to the driving shaft 44, thereby tightening the traction rope 42, and the other end of the traction rope 42 pulls the traction hook 414 on the main filter plate 41, so that the upper end of the main filter plate 41 turns over to the inside of the lower water tank 153, and at the same time, the lower end of the main filter plate 41 turns over to the outside of the lower water tank 153. The debris accumulated on the outside of the main filter plate 41 is pushed by the raised U-shaped plate 411, and a gap is opened between the U-shaped plate 411 and the bridge deck, which is only for the accumulated water to pass through, so as to ensure the normal discharge of the accumulated water on the bridge deck. The airflow intermittently flows into the air induction groove 151, so that the main filter plate 41 is intermittently turned over, so that the main filter plate 41 intermittently moves the debris accumulated on the outside of the lower water tank 153, and vacates a channel for the accumulated water to pass through, so as to ensure the drainage effect.

[0050] Although the embodiments of the present application have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A prefabricated high-performance component used in railway bridge engineering, characterized in that: The invention comprises a drainage protection wall (1) and a common protection wall (2), wherein the drainage protection wall (1) comprises a drainage wall body (11), a splicing assembly is provided on the drainage wall body (11), a drainage groove group (15) is provided inside the drainage wall body (11), the drainage groove group (15) comprises an air induction groove (151) provided inside the drainage wall body (11), the contour of the inner side wall of the air induction groove (151) is set as a structure formed by splicing two quadrangular pyramids, the top surfaces of the two quadrangular pyramids overlap each other, and the top surface area of ​​the quadrangular pyramid is small. On the bottom surface, one end of the air induction groove (151) penetrates through one side surface of the drainage wall (11), the other end of the air induction groove (151) penetrates through the other side surface of the drainage wall (11), a built-in groove (152) is provided inside the drainage wall (11) and close to the air induction groove (151), a lower water trough (153) is provided on the side surface of the drainage wall (11) close to the rails, and a drainage auxiliary mechanism (4) is provided inside the drainage wall (11) and close to the lower water trough (153); The drainage auxiliary mechanism (4) comprises a main filter plate (41) arranged on the drainage wall (11); a U-shaped plate (411) is provided at the lower end of the main filter plate (41); a strap plate (412) is provided at one end of the U-shaped plate (411); the lower end surface of the strap plate (412) overlaps the bridge deck; a filter plate rotating shaft (413) is provided on a surface of the main filter plate (41) on one side facing the lower water tank (153); the main filter plate (41) is rotatably connected to the drainage wall (11) via the filter plate rotating shaft (413); a traction hook (414) is provided at the upper end of the main filter plate (41); a traction rope (42) is provided on the traction hook (414); A limit rod (43) is provided inside the drainage wall (11) and near the traction rope (42); one end of the traction rope (42) passes through the limit rod (43) from below the limit rod (43) and is inserted into the built-in through groove (152); a driving shaft (44) is provided at the end of the traction rope (42) inserted into the built-in through groove (152); the driving shaft (44) is installed inside the drainage wall (11) and near the center of the air induction groove (151); a wind wheel (45) is sleeved on the driving shaft (44); and a wind gathering component (46) is provided inside the air induction groove (151) and near the wind wheel (45); The wind gathering component (46) comprises two side plates (461) arranged at both ends of the driving shaft (44), the driving shaft (44) being rotatably connected to the side plates (461), a stabilizing plate (462) being arranged between the two side plates (461), an air induction bottom plate (464) being arranged between the two side plates (461) and at one end close to the stabilizing plate (462), an air induction top plate (463) being arranged between the two side plates (461) and at one end away from the air induction bottom plate (464), a ventilating opening being arranged between the stabilizing plate (462) and the air induction top plate (463), a through hole for the traction rope (42) to pass through being arranged between the stabilizing plate (462) and the air induction bottom plate (464), and a ventilating opening being arranged between the air induction top plate (463) and the air induction bottom plate (464), and the two ventilating openings corresponding to the concave surfaces of the fan blades of the wind wheel (45).

2. The high-performance assembled component used in railway bridge engineering according to claim 1, characterized in that: The splicing assembly comprises a first splicing block (12) and a second splicing block (13); the first splicing block (12) is arranged at one end of the drainage wall (11) and close to the upper end surface; the second splicing block (13) is arranged at the other end of the drainage wall (11) and close to the lower end surface; the common protective wall (2) is also provided with a splicing assembly; the first splicing block (12) on the drainage wall (11) abuts against the second splicing block (13) on one of the common protective walls (2); and the second splicing block (13) on the drainage wall (11) abuts against the first splicing block (12) on the other common protective wall (2).

3. The high-performance assembled component used in railway bridge engineering according to claim 2, characterized in that: A docking block (121) is provided on the lower end surface of the first splicing block (12) and near the center thereof, and a docking groove (131) for plugging the docking block (121) is provided on the upper end surface of the second splicing block (13) and near the center thereof, and the first splicing block (12) is spliced ​​with the second splicing block (13) by plugging the docking block (121) into the docking groove (131).

4. The high-performance assembled component for railway bridge engineering according to claim 1, characterized in that: An assembly groove (14) is provided on the upper end surface of the drainage wall (11) and near the center, and a detachable assembly barrier (3) is inserted into the assembly groove (14). An assembly groove (14) is also provided on the upper end surface of the common protective wall (2) and near the center, and two adjacent assembly barriers (3) are fixedly connected by bolts.

5. A production process for a prefabricated high-performance component used in railway bridge engineering based on claim 4, characterized in that: The steps include: S1. Material preparation: according to the performance requirements of the protective wall, prepare the concrete mixture for pouring the protective wall; S2. Template configuration: according to the size requirements of the protective wall, prepare a template for pouring the protective wall, and according to the groove requirements of each groove on the drainage wall (11), prepare a template for opening the drainage groove group (15); S3. Prefabrication of ordinary protective wall (2), assembling a template for pouring the protective wall at the pouring site, filling the concrete mixture for pouring the wall into the template, smoothing it with a trowel, and vibrating it appropriately with a small vibrator before smoothing. After pouring, remove the mold after resting, and perform maintenance in accordance with the corresponding maintenance system to obtain a prefabricated part of the ordinary protective wall (2); S4. Prefabrication of the drainage protection wall (1). Assemble the template 1 for pouring the wall at the pouring site, place the template 2 for opening each trough of the drainage trough group (15) inside the template 1, smooth it with a trowel, and vibrate it appropriately with a small vibrator before smoothing. After pouring, remove the template after resting, and perform maintenance according to the corresponding maintenance system to obtain the prefabricated part of the drainage wall (11), and install the drainage auxiliary mechanism (4) inside the drainage wall (11).

Citation Information

Patent Citations

  • Highway bridge drainage structure

    CN212983593U