River embankment gate bridge connected with river beach
By designing a bridge with detachable assembled flat-panel gates on the river bank, the problem of inconvenience in the river bank and flood control functions is solved, and convenient access and flood control safety of the river bank is achieved.
Patent Information
- Application Number
- CN202510002700.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-02
- Publication Date
- 2025-03-14
AI Technical Summary
The lack of a river-to-river passage in traditional river beaches has caused inconvenience in entry and exit of pedestrians and vehicles. The natural barrier of the river bank makes it difficult to develop and transform, and it is necessary to take into account flood control functions.
A river embankment bridge connecting the river beach is designed. The bridge body is equipped with a detachable assembled flat gate. The bottom plate of the bridge body leads to the river beach. The joint section is filled with clay soil and a drainage pipe. The anti-seepage wall and rubber water stop are used to prevent water flow from penetration.
The river embankment passage is smooth, making it convenient for pedestrians and vehicles to enter and exit the beach. At the same time, the passage can be effectively closed during the flood season, preventing flooding, protecting urban safety, and avoiding repeated investment and waste of resources.
Smart Images

Figure CN119615825A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of water conservancy projects, and in particular relates to a river bank sluice bridge connecting a river beach. Background Art
[0002] As part of the riverside belt, the river beach is mainly formed by silt deposition. It has flood control and landscape functions. It also serves as the opening space of the riverside city, plays a role in improving the urban landscape and carrying historical and cultural connotations. In recent years, with the development of tourism and catering industries, the construction of river beaches can also drive the economic development of surrounding areas. In this context, local governments have strengthened their attention and investment in river beach construction to promote the sustainable development of river beaches.
[0003] Traditional river beaches are beach areas outside the embankment, and usually have no access to the river. Pedestrians can only enter and exit through the few gates on the embankment, which is extremely inconvenient. Due to the natural barrier of the embankment, the river beach and the city separated by the embankment are like two different worlds. To develop and transform the river beach, the first task is to open up the embankment channel so that pedestrians and vehicles can enter and exit conveniently; at the same time, the setting of the channel cannot affect the flood control function of the embankment, and the channel can be effectively closed during the flood season to protect people's lives and property.
[0004] To sum up, it is extremely necessary to build a sluice bridge on the embankment that has both traffic and flood control functions. Summary of the invention
[0005] The purpose of the present invention is to provide a river bank sluice bridge connecting a river beach, so as to solve the problem of inconvenience for tourists to enter and exit the river beach, while taking into account the flood prevention function.
[0006] The technical solution of the present invention is: a river bank lock bridge connecting a river beach, a gap is opened on the river bank, a bridge body is arranged at the gap, an assembled flat plate gate is detachably installed at the bridge hole of the bridge body, a bridge body bottom plate is arranged at the bottom of the bridge hole, and the bridge body bottom plate leads to the river beach.
[0007] As a further improvement of the present invention, bridge side walls are provided at both ends of the bridge body, the bridge side walls are connected to the river bank through a connecting section, an open trough is provided in the connecting section, the open trough is filled with clay, and a drainage pipe is provided on the backwater side of the open trough.
[0008] As a further improvement of the present invention, a deformation joint is provided between the side wall of the bridge body and the connecting section, and an embedded rubber waterstop is provided at the position of the deformation joint.
[0009] As a further improvement of the present invention, a connecting section bottom plate is provided at the bottom of the connecting section; and an anti-seepage wall is provided on the water-facing surfaces of the bridge body bottom plate and the connecting section bottom plate.
[0010] As a further improvement of the present invention, the anti-seepage wall is formed by overlapping cement mixing piles, and a rectangular pile top cap beam is provided on the top of the cement mixing pile; a copper sheet waterstop is provided between the pile top cap beam and the bridge body bottom plate, and between the pile top cap beam and the connecting section bottom plate.
[0011] As a further improvement of the present invention, the assembled flat gate includes two side gate posts, multiple middle gate posts and multiple steel baffles, the middle gate posts are arranged side by side between the two side gate posts, and the sides of the side gate posts and the middle gate posts are provided with embedded grooves, and steel baffles are provided between adjacent side gate posts and middle gate posts and between adjacent middle gate posts, and the two sides of the steel baffles are embedded and installed in the embedded grooves; a gate groove is opened on the bottom plate of the bridge body, and steel baffle embedded parts and gate post embedded parts are provided in the gate groove, the lower end of the steel baffle is located in the gate groove and fixed by the steel baffle embedded parts, and the lower end of the middle gate post is located in the gate groove and fixed by the gate post embedded parts; the side gate posts are embedded in the side walls of the bridge body, and the side gate posts are fixed to the side walls of the bridge body through side embedded parts.
[0012] As a further improvement of the present invention, a rubber pad is provided at the assembly gap of the assembled flat gate.
[0013] As a further improvement of the present invention, a plurality of gate back supports are provided on the back water surface of the assembled flat plate gate, and the gate back supports are connected to the middle gate column one by one; a back support groove is opened on the bottom plate of the bridge body, and a back support embedded part is provided in the back support groove, and the bottom of the gate back support is located in the back support groove and is fixed by the back support embedded part.
[0014] As a further improvement of the present invention, a gate slot cover plate is detachably provided on the top of the gate slot; and a back-support slot cover plate is detachably provided on the top of the back-support slot.
[0015] As a further improvement of the present invention, a main drainage pipe and multiple branch drainage pipes are pre-buried in the bottom plate of the bridge body. The branch drainage pipes are connected to the main drainage pipe. Each branch drainage pipe is respectively connected to the gate groove and the back-support groove. The main drainage pipe is connected to the municipal drainage network.
[0016] The beneficial effects of the present invention are as follows: the present invention sets a gate bridge at the river bank, and through the integrated design of the bridge and the gate, adopts a detachable assembled flat gate, opens up the river bank passage, and allows pedestrians and vehicles to easily enter and exit the river beach. While satisfying the traffic function, it does not affect the flood control function of the river bank, and can effectively close the passage during the flood season to prevent flood backflow and protect the safety of the city. The present invention reduces the construction of the sluice working bridge and the gate chamber through the idea of building a bridge and a gate together, effectively avoids repeated investment caused by the separate construction of the bridge and the gate, and saves social resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a vertical layout diagram of a river bank sluice bridge connected to a river beach in a water retaining state according to the present invention; Figure 2It is a plan view of a river bank sluice bridge water retaining state connected to a river beach according to the present invention; Figure 3 It is a cross-sectional layout diagram of a river bank sluice bridge connected to a river beach in a water retaining state according to the present invention; Figure 4 It is a elevational layout diagram of a river bank sluice bridge connecting a river beach in an open state according to the present invention; Figure 5 It is a plan view of a river bank sluice bridge connecting a river beach in an open state according to the present invention; Figure 6 It is a cross-sectional layout diagram of a river bank sluice bridge connecting a river beach in an open state according to the present invention; Figure 7 It is a cross-sectional layout diagram of the connecting section in the present invention.
[0018] In the figure: 1-assembled flat gate; 11-steel baffle; 12-middle gate column; 13-side gate column; 14-gate back support; 15-steel baffle embedded parts; 16-back support embedded parts; 17-side embedded parts; 18-gate column embedded parts; 2-bridge body; 21-bridge body side wall; 22-bridge body bottom plate; 23-bridge body top plate; 24-decorative column; 25-landscape railing; 26-gate slot cover plate; 27-back support slot cover plate; 28-gate slot; 29-back support slot; 3-connecting section; 31-open slot; 32-connecting section bottom plate; 33-decorative relief plate; 34-drain pipe; 4-anti-seepage wall; 41-cement mixing pile; 42-pile top cap beam; 43-red copper sheet waterstop; 5-rubber waterstop; 6-drainage main pipe; 61-drainage branch pipe. DETAILED DESCRIPTION
[0019] The present invention is described in detail below with reference to the accompanying drawings.
[0020] Embodiment 1, like Figure 1-7 As shown, a river bank gate bridge connecting a river beach has a gap on the river bank, a bridge body 2 is provided at the gap, an assembled flat gate 1 is detachably installed at the bridge hole of the bridge body 2, a bridge body bottom plate 22 is provided at the bottom of the bridge hole, and the bridge body bottom plate 22 leads to the river beach. The municipal road inside the river bank is connected to the river beach through the bridge body bottom plate 22.
[0021] Bridge body side walls 21 are provided at both ends of the bridge body 2, and the bridge body side walls 21 are connected to the river bank through the connecting section 3 to resist the uplift pressure of groundwater on both sides of the lock bridge. An open groove 31 is provided in the connecting section 3, and the open groove 31 is filled with clay soil, which is filled and compacted in layers. In order to prevent water accumulation in the fill soil in the open groove 31, a drainage pipe 34 is provided on the back side of the open groove 31. The drainage pipe 34 is made of φ50mm PVC pipe, and a needle-punched non-woven geotextile is arranged on the soil surface.
[0022] A deformation joint is provided between the bridge body side wall 21 and the connecting section 3, and an embedded rubber water stop 5 is provided at the deformation joint. At the same time, asphalt fir boards are used to fill the joints, and LB-10D sealant is used to seal the joints.
[0023] A connecting section bottom plate 32 is provided at the bottom of the connecting section 3; an anti-seepage wall 4 is provided on the water-facing surface of the bridge body bottom plate 22 and the connecting section bottom plate 32 to prevent water from penetrating downward to form seepage under the action of the water level difference when the lock bridge is blocking water during the flood season, thereby ensuring the stability of the lock bridge foundation.
[0024] The anti-seepage wall 4 is formed by overlapping cement mixing piles 41, and the pile body is made of ordinary Portland cement; a rectangular pile top cap beam 42 is provided on the top of the cement mixing pile 41 to improve its overall stability; a copper sheet waterstop 43 is provided between the pile top cap beam 42 and the bridge body bottom plate 22, and between the pile top cap beam 42 and the connecting section bottom plate 32. The copper sheet waterstop 43 is arranged along the entire length of the structure, and both ends are pre-buried in the concrete of the pile top cap beam 42 and the connecting section bottom plate 32.
[0025] The assembled flat gate 1 is composed of two side gate posts 13, a plurality of middle gate posts 12 and a plurality of steel baffles 11. The middle gate posts 12 are arranged side by side between the two side gate posts 13. Embedding grooves are provided on the sides of the side gate posts 13 and the middle gate posts 12. Steel baffles 11 are provided between adjacent side gate posts 13 and middle gate posts 12 and between adjacent middle gate posts 12. Both sides of the steel baffles 11 are embedded and installed in the embedding grooves. A gate groove 28 is opened on the bridge body bottom plate 22. A steel baffle embedded part 15 and a gate post embedded part 18 are provided in the gate groove 28. The lower end of the steel baffle 11 is located in the gate groove 28 and is fixed by the steel baffle embedded part 15. The lower end of the middle gate post 12 is located in the gate groove 28 and is fixed by the gate post embedded part 18. The side gate posts 13 are embedded in the side wall 21 of the bridge body, and the side gate posts 13 are fixed to the side wall 21 of the bridge body through the side embedded parts 17.
[0026] A rubber pad is provided at the assembling gap of the assembled flat gate 1 .
[0027] A plurality of gate back supports 14 are provided on the back water surface of the assembled flat gate 1 to enhance the stability and bearing capacity of the gate. The gate back supports 14 are connected to the middle gate column 12 one by one. A back support groove 29 is opened on the bridge body bottom plate 22, and a back support embedded part 16 is provided in the back support groove 29. The bottom of the gate back support 14 is located in the back support groove 29 and is fixed by the back support embedded part 16.
[0028] A gate slot cover plate 26 is detachably provided on the top of the gate slot 28 ; a back-support slot cover plate 27 is detachably provided on the top of the back-support slot 29 .
[0029] A main drainage pipe 6 and a plurality of branch drainage pipes 61 are pre-buried in the bridge bottom plate 22 . The branch drainage pipes 61 are connected to the main drainage pipe 6 . Each branch drainage pipe 61 is respectively connected to the gate groove 28 and the back-support groove 29 . The main drainage pipe 6 is connected to the municipal drainage network.
[0030] The bridge body 2 is a frame bridge, which adopts a single-hole rectangular reinforced concrete frame and is arranged longitudinally along the river bank. The bridge body 2 is connected to the river bank for pedestrians and vehicles to pass. The bridge body top plate 23 adopts a variable thickness design, the top surface is consistent with the vertical curve of the embankment top road, the bottom surface adopts a circular curve, the curve radius is 18.0m, the top plate mid-span thickness is 0.6m, the root thickness is 1.35m, the bridge body top plate 23 is horizontally protruded 1m to both sides, and the top is provided with a cornice along the longitudinal direction. The bridge body side wall 21 is 1.1m thick and 6.0m wide in the transverse direction of the bridge. During construction, it is necessary to pay attention to the pre-embedding of the side gate column 13. The bridge body side wall 21 is connected to the bridge body bottom plate 22, which has a size of 14m×7.0m×1.2m. It is not only a component of the bridge body 2, but also used as a gate bottom plate. A 10cm thick C15 plain concrete cushion is set under the bridge body bottom plate 22.
[0031] The top of the open trench 31 is 0.5m wide, and the inside slopes downward at a slope of 1:15. The connecting section bottom plate 32 is 7.0m wide and 1.0m thick. A 10cm thick C15 plain concrete cushion is set under the connecting section bottom plate 32.
[0032] Decorative columns 24 with semicircular cross-sections are provided on both sides of the bridge body side walls 21. A 10 cm deep groove is reserved on the outer surface of both sides of the connecting section 3, and the groove is filled with a decorative relief plate 33, and a drain pipe 34 runs through the decorative relief plate 33. Landscape railings 25 are installed on the bridge body 2. Through its own exterior decoration design, a recognizable cultural landscape is created.
[0033] The assembled flat gate 1 is removed, and the gate slot cover 26 is installed on the top of the gate slot 28, and the back support slot cover 27 is installed on the top of the back support slot 29, so that the surface of the bridge bottom plate 22 is flat, and vehicles and tourists can enter and exit the river beach through the bridge bottom plate 22.
[0034] During the flood season, the gate is closed and traffic is prohibited. The steel baffle 11 is embedded and installed in the embedded grooves of the middle gate column 12 and the side gate column 13 to assemble the assembled flat gate 1, and rubber pads are installed at the assembly gaps; the gate groove cover 26 and the back support groove cover 27 are removed, and the lower end of the assembled flat gate 1 is placed in the gate groove 28, and the steel baffle 11 is fixed by the steel baffle embedded parts 15, the middle gate column 12 is fixed by the gate column embedded parts 18, and the side gate column 13 is fixed by the side embedded parts 17; the gate back support 14 is installed on the middle gate column 12 on the back side of the assembled flat gate 1, and the bottom of the gate back support 14 is fixed in the back support groove 29 by the back support embedded parts 16. By closing the gate, flood backflow is prevented and urban safety is protected.
[0035] The present invention can realize the traffic function on both sides of the river bank and also play a role in flood prevention. At the same time, it avoids the aesthetically unattractive rack structure and bulky valve form of traditional sluice projects, and can better meet the landscape requirements of the city.
Claims
1. A riverbank sluice bridge connecting a river beach, characterized in that: A gap is opened on the river bank, a bridge body (2) is provided at the gap, an assembled flat gate (1) is detachably installed at the bridge hole of the bridge body (2), a bridge body bottom plate (22) is provided at the bottom of the bridge hole, and the bridge body bottom plate (22) leads to the river beach.
2. The embankment lock bridge connecting the river beach according to claim 1, characterized in that: Bridge body side walls (21) are provided at both ends of the bridge body (2). The bridge body side walls (21) are connected to the river bank through a connecting section (3). An open trough (31) is provided in the connecting section (3). The open trough (31) is filled with clay soil. A drainage pipe (34) is provided on the backwater side of the open trough (31).
3. The embankment lock bridge connecting the river beach according to claim 2 is characterized by: A deformation joint is provided between the bridge body side wall (21) and the connecting section (3), and an embedded rubber water stop strip (5) is provided at the deformation joint.
4. The embankment lock bridge connecting the river beach according to claim 3 is characterized by: A connecting section bottom plate (32) is provided at the bottom of the connecting section (3); and an anti-seepage wall (4) is provided on the water-facing surfaces of the bridge body bottom plate (22) and the connecting section bottom plate (32).
5. The embankment lock bridge connecting the river beach according to claim 4, characterized in that: The anti-seepage wall (4) is formed by overlapping cement mixing piles (41), and a rectangular pile top cap beam (42) is provided on the top of the cement mixing pile (41); a copper sheet water stop strip (43) is provided between the pile top cap beam (42) and the bridge body bottom plate (22), and between the pile top cap beam (42) and the connecting section bottom plate (32).
6. A riverbank lock bridge connecting a river beach according to any one of claims 2 to 5, characterized in that: The assembled flat gate (1) comprises two side gate posts (13), a plurality of middle gate posts (12) and a plurality of steel baffles (11), wherein the middle gate posts (12) are arranged side by side between the two side gate posts (13), and the side portions of the side gate posts (13) and the middle gate posts (12) are provided with embedded grooves, and steel baffles (11) are provided between adjacent side gate posts (13) and middle gate posts (12) and between adjacent middle gate posts (12), and both sides of the steel baffles (11) are embedded and installed in the embedded grooves; the bridge body A gate groove (28) is provided on the bottom plate (22), and a steel baffle embedded part (15) and a gate column embedded part (18) are provided in the gate groove (28); the lower end of the steel baffle (11) is located in the gate groove (28) and is fixed by the steel baffle embedded part (15); the lower end of the middle gate column (12) is located in the gate groove (28) and is fixed by the gate column embedded part (18); the side gate column (13) is embedded in the side wall (21) of the bridge body, and the side gate column (13) is fixed to the side wall (21) of the bridge body by the side embedded part (17).
7. The embankment lock bridge connecting the river beach according to claim 6, characterized in that: A rubber pad is provided at the assembly gap of the assembled flat gate (1).
8. The embankment lock bridge connecting the river beach according to claim 7, characterized in that: A plurality of gate back supports (14) are provided on the back surface of the assembled flat gate (1), and the gate back supports (14) are connected to the middle gate column (12) in a one-to-one correspondence; a back support groove (29) is provided on the bridge body bottom plate (22), and a back support embedded part (16) is provided in the back support groove (29); the bottom of the gate back support (14) is located in the back support groove (29) and is fixed by the back support embedded part (16).
9. The embankment lock bridge connecting the river beach according to claim 8, characterized in that: The gate slot (28) has a gate slot cover plate (26) detachably disposed on the top thereof; and the back support slot (29) has a back support slot cover plate (27) detachably disposed on the top thereof.
10. The embankment lock bridge connecting the river beach according to claim 9, characterized in that: A main drainage pipe (6) and a plurality of drainage branch pipes (61) are pre-buried in the bridge body bottom plate (22); the drainage branch pipes (61) are connected to the main drainage pipe (6); each drainage branch pipe (61) is respectively connected to a gate groove (28) and a back support groove (29); and the main drainage pipe (6) is connected to a municipal drainage network.