Whole-process combined prevention and control high, large and light prefabricated wallboard mounting method
Through the whole process, the installation methods of high-lightweight prefabricated wall panels, including dip coating of steel mesh, intelligent storage and storage, rapid transportation and flexible connection installation, the problem of prefabricated wall panels being prone to cracks during transportation and installation is solved, and construction efficiency and quality are improved.
Patent Information
- Application Number
- CN202510167953.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-17
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2045-02-17
AI Technical Summary
In the prior art, prefabricated wall panels are prone to cracks during transportation and installation, and the dip coating and drying operation of the steel mesh is low and labor costs are high.
The installation method of high and lightweight prefabricated wall panels is adopted for the whole process combination prevention and control, including lightweight prefabricated wall panel reinforcement mesh dip coating device, prefabricated wall panel storage device, simple board transfer device and flexible connection installation structure.
The efficiency of dip coating and drying of steel mesh is improved, and the quality of steel mesh is ensured. Through intelligent storage and storage and rapid transportation technology, the risk of moisture and transportation damage of prefabricated wall panels is reduced; the flexible connection installation technology prevents cracks from occurring during the installation process.
Smart Images

Figure CN119664011A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a prefabricated wall panel installation, and in particular to a method for installing a tall and lightweight prefabricated wall panel with combined prevention and control throughout the entire process. Background Art
[0002] In recent years, my country has made remarkable achievements in the modernization of the construction industry, among which the development momentum of steel structure prefabricated buildings is getting better and better. The technology of prefabricated wall panels and other parts matching steel structures is also becoming more and more mature. Autoclaved aerated concrete roof panels, exterior wall panels, floor panels, and partition panels are referred to as ALC wall panels, which are tall and lightweight prefabricated wall panels. Rebars are required to produce ALC wall panels so that the components can withstand the bending tensile stress generated by bending loads. Due to the porosity and low alkalinity of autoclaved aerated concrete itself, autoclaved aerated concrete cannot effectively protect the steel bars inside it from rusting. On the contrary, due to the autoclaving curing process and easy moisture absorption during the use of autoclaved aerated concrete, the steel bars are corroded. Therefore, the steel bars and their storage must be processed. Conventional steel mesh dipping and drying are divided into two devices and steps, with low operating efficiency and high labor costs. Moreover, when the prefabricated wall panels are transported to the construction site, the commonly used ordinary carts are prone to cause wall panel collisions and cracks during the carting process. In addition, due to the inherent characteristics of prefabricated wall panels, conventional rigid installation can easily cause cracks in the wall panels, affecting construction quality.
[0003] In summary, it is particularly important to seek a full-process combined prevention and control method for the installation of tall and lightweight prefabricated wall panels with high construction efficiency, simple operation and cost saving. Summary of the invention
[0004] The purpose of the present invention is to overcome the deficiencies in the prior art and provide a method for installing a tall lightweight prefabricated wall panel with a combined prevention and control system throughout the entire process.
[0005] In order to achieve the above technical objectives, the present invention adopts the following technical solution: a method for installing a tall and lightweight prefabricated wall panel with a combined prevention and control system throughout the entire process, comprising the following specific steps: Step 1: Making the wall panel steel mesh: Making the steel mesh according to the drawing requirements. After the steel mesh is made, the steel mesh is impregnated and dried by a lightweight prefabricated wall panel steel mesh dipping device; Step 2: Prefabrication of wall panels: Install the casting formwork, put the steel mesh in the casting formwork, and then pour concrete. After the concrete pouring is completed, remove the casting formwork to obtain the prefabricated wall panels, and then cover the prefabricated wall panels with protective film or waterproof cloth for maintenance; Step 3, prefabricated wall panel storage: the prefabricated wall panel storage device is used to store the prefabricated wall panels; the prefabricated wall panel storage device includes a storage box, a transverse slide rail, a telescopic rod, and a second clamping block; a box door is provided on the storage box, a telescopic inclined plate is installed on one side of the storage box, and the inclined plate is slidably connected to the bottom plate of the storage box; a conveyor belt is provided on the inclined plate and the bottom plate of the storage box; two transverse slide rails are connected to the top of the storage box through a fixed block, and a number of connecting rods are evenly arranged between the transverse slide rails; the upper end of the telescopic rod is connected to the transverse slide rail, and the bottom of the telescopic rod is connected to the bottom plate of the storage box; The second clamping block is connected; when storing the prefabricated wall panels, the box door on the storage box is opened, the prefabricated wall panels are placed on the conveying block, the conveying block is placed on the conveyor belt, and the prefabricated wall panels are conveyed to the inside of the storage box through the conveyor belt; the operation of the transverse slide rail and the telescopic rod is controlled by the controller to move the second clamping block to the top of the prefabricated wall panel and clamp the prefabricated wall panel, and then the second clamping block is moved horizontally and vertically to place the prefabricated wall panel in the limit groove in the storage box for storage; when all the prefabricated wall panels are stored, the box door is closed; Step 4: Transport of prefabricated wall panels: Before installing the prefabricated wall panels, use a simple panel transport device to quickly transport the prefabricated wall panels to the vicinity of the construction site; Step 5: Measure and lay out: Clean the work surface before laying out, and use an ink fountain to draw the control line of the prefabricated wall panels on the floor according to the designed position and the panel layout plan; Step 6: Flexible connection and installation of prefabricated wall panels: Connect the U-shaped card with the prefabricated wall panel, place the end of the prefabricated wall panel in the U-shaped card, and tighten the prefabricated wall panel by adjusting the bolts; set an elastic cushion layer at the end of the U-shaped card, and connect the anchor bolts at the end of the U-shaped card to the floor slab; connect adjacent prefabricated wall panels by means of plug blocks and sockets, one side of the prefabricated wall panel is provided with a plug block, and the other side is provided with a socket matching the plug block; when connecting adjacent prefabricated wall panels, the plug block on one prefabricated wall panel is inserted into the socket on the other prefabricated wall panel; Step 7. Check and correct: Use a hanging line and a ruler to check the verticality and flatness of the prefabricated wall panels. If they do not meet the requirements, make adjustments immediately.
[0006] Preferably, in step one, the steel mesh dipping device for lightweight prefabricated wall panels comprises a steel mesh dipping tank, a support rod, an inclined slide rail, a connecting rod, and a first clamping block. Telescopic vertical rods are installed on both sides of the steel mesh dipping tank, a cross rod is provided between the top ends of the telescopic vertical rods, and an inclined rod is provided between the cross rod and the telescopic vertical rod; the top of the support rod is connected to the cross rod, the bottom of the support rod is fixedly connected to the inclined slide rail, and the two ends of the connecting rod are connected to the cross rod and the inclined slide rail; a slider is welded above the first clamping block, the slider is placed in the inclined slide rail and is slidably connected to the inclined slide rail; a force sensor is provided on the top of the first clamping block, and the force sensor is located between the slider and the first clamping block; the force sensor is connected to the processor through a data transmission line; an oven is provided on one side of the steel mesh dipping tank, and a box door is provided at the upper end of the oven; a plurality of partitions are provided in the oven; Add preservatives to the steel mesh impregnation tank, put the finished steel mesh into the steel mesh impregnation tank for impregnation, after the steel mesh is impregnated, move the support rod downward, use the first clamping block to clamp the steel mesh, and move the first clamping block forward through the inclined slide rail to position the steel mesh in an oven with a built-in partition, then close the oven door and bake the steel mesh.
[0007] Preferably, when the steel mesh is baked, the baking time is 20-30 minutes.
[0008] Preferably, the lightweight prefabricated wall panel steel mesh dipping device further comprises a cable, the support rod, the connecting rod and the oblique slide rail are all hollow structures, one end of the cable is connected to one end of the oblique slide rail, the cable penetrates the connecting rod and the support rod, and the other end of the cable is connected to a tensioner; the tension of the cable is adjusted by the tensioner; the tensioner is arranged in the cavity inside the support rod. The tensioner is controlled to operate by a processor; when the value detected by the force sensor is higher than the set value, the processor controls the tensioner to operate to tighten the cable in the stretched state.
[0009] Preferably, in step four, the simple plate moving device includes a body, a handle is provided at one end of the body, a support frame is provided on the body, a connecting shaft is connected to the bottom of the support frame, and tires are respectively connected to the two ends of the connecting shaft; short rods are provided at both ends of the fixing rod, the fixing rod is fixedly connected to the body through the short rods at both ends, a concave arc groove is provided on the bottom plate of the body, and the fixing rod is placed in the concave arc groove; a groove body is provided on the fixing rod, the groove body is arranged along the axial direction of the fixing rod, a plurality of spring rods are provided in the groove body, the spring rods are connected in sequence, and a limiting rod is welded at the connection between adjacent spring rods; when the prefabricated wall panels are transported, the prefabricated wall panels are placed between the two limiting rods.
[0010] Preferably, in step six, limiting grooves are respectively provided on both sides of the prefabricated wall panels, a connecting plate is installed between adjacent prefabricated wall panels, the connecting plate is installed in the limiting grooves on two adjacent prefabricated wall panels, both sides of the connecting plate are connected to the prefabricated wall panels by bolts, and reserved holes for connecting bolts are provided on the prefabricated wall panels, and the bolts pass through the reserved holes.
[0011] Preferably, an annular elastic cushion layer is provided in the reserved hole.
[0012] Preferably, an elastic short column (42) is provided on one side of the elastic cushion layer (41), and an embedding hole corresponding to the elastic short column (42) is provided on the U-shaped card (39), and the elastic short column (42) is embedded in the embedding hole.
[0013] The beneficial effects of the present invention are: 1. The present invention adopts the anti-cracking technology of the steel mesh dipping device for lightweight prefabricated wall panels, sets the steel mesh dipping tank and the oven as an integrated device, and arranges a force sensor to ensure that the clamping block does not collapse when clamping the steel mesh. The steel mesh is placed in the oven by moving the slider, thereby improving the efficiency of the steel mesh dipping and drying, and ensuring the production quality of the steel mesh.
[0014] 2. The present invention is provided with a prefabricated wall panel storage device, which uses a conveyor to quickly transport the prefabricated wall panels, controls the prefabricated wall panels to move up and down and left and right through an intelligent screen, and places them in the limit grooves of the storage device to prevent the prefabricated wall panels from getting damp.
[0015] 3. The present invention adopts a simple plate shifting device with efficient transport technology. According to the thickness of the prefabricated wall panels, the limit rod is used to adjust the extension and contraction of the spring rod, and the spacing between adjacent limit rods is changed to be suitable for the rapid transport of wall panels of different sizes.
[0016] 4. The present invention adopts flexible connection crack prevention and control technology, by arranging a buffer cushion layer and a buffer column on the U-shaped card, and combining it with an adjusting bolt, a flexible connection installation is formed to prevent cracks. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a structural schematic diagram of a lightweight prefabricated wall panel steel mesh dipping device; Figure 2 is a cross-sectional view of the clamping structure of the steel mesh dipping device; Figure 3 It is a structural schematic diagram of a prefabricated wall panel storage device; Figure 4 It is a plan view of the arrangement of the transverse rails of the prefabricated wall panel storage device; Figure 5 is a cross-sectional view of the arrangement of the transverse slide rails of the prefabricated wall panel storage device; Figure 6 It is a structural schematic diagram of a simple plate shifting device; Figure 7 It is a structural schematic diagram of a simple plate moving device when transporting plates; Figure 8 yes Figure 6 The structural diagram of part A in the figure; Fig. 9 It is a cross-sectional view of the flexible connection to prevent cracks; Fig.10 It is a cross-sectional view of the U-shaped card; Fig.11 It is a structural diagram of a prefabricated wall panel; Fig.12 It is a structural schematic diagram of the connection of prefabricated wall panels; Fig.13 It is a plan view of the prefabricated wall panel connections.
[0018] In the figure: 1- partition, 2- oven, 3- box door, 4- steel mesh impregnation tank, 5- telescopic vertical rod, 6- oblique rod, 7- horizontal rod, 8- support rod, 9- connecting rod, 10- oblique slide rail, 11- slider, 12- first clamping block, 13- cable, 14- processor, 15- data transmission line, 16- force sensor, 17- conveyor belt, 18- inclined plate, 19- fixed block, 20- storage box, 21- horizontal slide rail, 22- connecting rod, 23- smart screen, 24- prefabricated wall panel, 25- limit groove, 26 -Wall panels to be stored, 27-transmission block, 28-handle, 29-connecting shaft, 30-tire, 31-support frame, 32-body, 33-limit rod, 34-spring rod, 35-fixing rod, 36-short rod, 37-concave arc groove, 38-adjusting bolt, 39-U-shaped card, 40-anchor bolt, 41-elastic cushion, 42-elastic short column, 43-floor, 44-limiting groove, 45-insert block, 46-connecting plate, 47-bolt, 48, tensioner, 49, telescopic rod, 50, second clamping block. DETAILED DESCRIPTION
[0019] The present invention is further described below in conjunction with embodiments, wherein conventional construction methods such as welding and installation are not described in detail. The description of the following embodiments is only used to help understand the present invention. It should be noted that, for those of ordinary skill in the art, several improvements and modifications may be made to the present invention without departing from the principles of the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
[0020] Figure 1 It is a structural schematic diagram of a lightweight prefabricated wall panel steel mesh dipping device; Figure 2 is a cross-sectional view of the clamping structure of the steel mesh dipping device; Figure 3 It is a structural schematic diagram of a prefabricated wall panel storage device; Figure 4 It is a plan view of the arrangement of the transverse rails of the prefabricated wall panel storage device; Figure 5 is a cross-sectional view of the arrangement of the transverse slide rails of the prefabricated wall panel storage device; Figure 6 It is a structural schematic diagram of a simple plate shifting device; Figure 7 It is a structural schematic diagram of a simple plate moving device when transporting plates; Figure 8 yes Figure 6 The structural diagram of part A in the figure; Fig. 9 It is a cross-sectional view of the flexible connection to prevent cracks; Fig.10 It is a cross-sectional view of the U-shaped card; Fig.11 It is a structural diagram of a prefabricated wall panel; Fig.12 It is a structural schematic diagram of the connection of prefabricated wall panels; Fig.13 It is a plan view of the prefabricated wall panel connections.
[0021] Referring to the figures, the whole process combined prevention and control method for installing a tall lightweight prefabricated wall panel includes a partition 1, an oven 2, a door 3, a steel mesh impregnation tank 4, a telescopic vertical rod 5, an inclined rod 6, a horizontal rod 7, a support rod 8, a connecting rod 9, an inclined slide rail 10, a slider 11, a first clamping block 12, a cable 13, a processor 14, a data transmission line 15, a force sensor 16, a conveyor belt 17, an inclined plate 18, a fixed block 19, a storage box 20, a horizontal slide rail 21, a connecting rod 22, a smart screen 23, a prefabricated wall panel 24, a limit groove 25, a conveying block 27, and a handle 28, connecting shaft 29, tire 30, support frame 31, body 32, limit rod 33, spring rod 34, fixing rod 35, short rod 36, concave arc groove 37, adjusting bolt 38, U-shaped card 39, anchor bolt 40, elastic cushion layer 41, elastic short column 42, floor 43, limit groove 44, plug block 45, connecting plate 46, bolt 47; the whole process combined prevention and control high lightweight prefabricated wall panel installation method adopts lightweight prefabricated wall panel steel mesh dipping device, prefabricated wall panel storage device, simple plate moving device, prefabricated wall panel flexible connection installation structure.
[0022] The steel mesh dipping device for lightweight prefabricated wall panels includes a steel mesh dipping tank 4, a support rod 8, an inclined slide rail 10, a connecting rod 9, a first clamping block 12, and a cable 13. Telescopic vertical rods 5 are installed on both sides of the steel mesh dipping tank 4. A cross bar 7 is provided between the top ends of the telescopic vertical rods 5. An inclined rod 6 is provided between the cross bar 7 and the telescopic vertical rod 5, and the stability of the structure is enhanced by the inclined rod 6; the top of the support rod 8 is connected to the cross bar 7, the bottom of the support rod 8 is fixedly connected to the inclined slide rail 10, and the two ends of the connecting rod 9 are connected to the cross bar 7 and the inclined slide rail 10; a slider 11 is welded above the first clamping block 12, the slider 11 is placed in the inclined slide rail 10 and is slidably connected to the inclined slide rail 10; a force sensor 16 is provided on the top of the first clamping block 12, and the force sensor 16 is located between the slider 11 and the first clamping block 12; the force sensor 16 is connected to the processor 14 through a data transmission line 15. Among them, the support rod 8, the connecting rod 9 and the inclined slide rail 10 are all hollow structures, one end of the cable 13 is connected to one end of the inclined slide rail, the cable 13 is inserted into the connecting rod 9 and the support rod 8, and the other end of the cable 13 is connected to the tensioner 48; the tension of the cable 13 is adjusted by the tensioner 48. The tensioner 48 is set in the cavity inside the support rod 8. The operation of the tensioner 48 is controlled by the processor 14; when the value detected by the force sensor 16 is higher than the set value, the processor 14 will control the tensioner 48 to operate to tighten the cable 13 in the stretched state to prevent the bracket from collapsing. An oven 2 is provided on one side of the steel mesh impregnation tank 4, and a door 3 is provided on the upper end of the oven 2, and the door 3 can be flipped upward to open. A number of partitions 1 are provided in the oven 2. The finished steel mesh is placed in the steel mesh impregnation tank 4 for impregnation. After the steel mesh is completely impregnated, the support rod 8 is moved down, the steel mesh is clamped by the first clamping block 12, and the first clamping block 12 is moved forward by the inclined slide rail 10, and the steel mesh is positioned and placed in the oven 2 with the partition 1 inside, and then the oven door 3 is closed, and the steel mesh is baked for 20 to 30 minutes to complete the drying.
[0023] The prefabricated wall panel storage device comprises a storage box 20, a transverse slide rail 21, a telescopic rod 49, and a second clamping block 50. The storage box 20 is provided with a box door 3. A telescopic inclined plate 18 is installed on one side of the storage box 20. The inclined plate 18 is slidably connected with the bottom plate of the storage box 20, and the inclined plate 18 can be pulled relative to the bottom plate of the storage box 20. A conveyor belt 17 is arranged on the bottom plate of the inclined plate 18 and the storage box 20, and the prefabricated wall panel 24 is placed on the conveyor block 27, and the conveyor block 27 is placed on the conveyor belt, and the prefabricated wall panel 24 is conveyed to the inside of the storage box 20 through the conveyor belt; two transverse slide rails 21 are connected to the top of the storage box 20 through a fixed block 19, and a plurality of connecting rods 22 are evenly arranged between the transverse slide rails 21; the upper end of the telescopic rod is connected to the transverse slide rail 21, and the bottom of the telescopic rod 49 is connected to the second clamping block 50. The operation of the transverse slide rail 21 and the telescopic rod 49 is controlled by the controller. The transverse slide rail 21 is used to drive the second clamping block 50 to move horizontally, and the telescopic rod 49 is used to drive the second clamping block 50 to move vertically. A plurality of limit slots 25 for placing the prefabricated wall panels 24 are provided in the storage box 20. The controller is provided with an intelligent screen 23. The prefabricated wall panels 24 are clamped by the second clamping block 50, and the second clamping block 50 is controlled by the controller to move horizontally or vertically, and the prefabricated wall panels 24 are placed in the limit slots 25 in the storage box 20 for storage. After the storage is completed, the box door 3 is closed.
[0024] The simple plate moving device includes a body 32, a handle 28 is provided at one end of the body 32, a support frame 31 is provided on the body 32, a connecting shaft 29 is connected to the bottom of the support frame 31, and tires 30 are connected to both ends of the connecting shaft 29. Short rods 36 are provided at both ends of the fixing rod 35, and the fixing rod 35 is fixedly connected to the body 32 through the short rods 36 at both ends. A concave arc groove 37 is provided on the bottom plate of the body 32, and the fixing rod 35 is placed in the concave arc groove 37. A groove body is provided on the fixing rod 35, and the groove body is arranged along the axial direction of the fixing rod 35. A plurality of spring rods 34 are provided in the groove body, and the spring rods 34 are connected in sequence, and a limiting rod 33 is welded at the connection between adjacent spring rods 34; when the prefabricated wall panel 24 is transported, the prefabricated wall panel 24 is placed between two limiting rods 33 to avoid collision; the existence of the spring rod 34 can change the spacing between adjacent limiting rods 33, and according to the thickness of the prefabricated wall panel 24, the limiting rod 33 is used to adjust the extension and contraction of the spring rod 34, so as to be suitable for the rapid movement of wall panels of different sizes.
[0025] The flexible connection installation structure of the prefabricated wall panel includes a prefabricated wall panel 24 and a U-shaped card 39. An anchor bolt 40 is provided at the end of the U-shaped card 39. The U-shaped card 39 is connected to the floor slab 43 by using the anchor bolt 40 at its end; an elastic cushion layer 41 and an elastic short column 42 are provided at the end of the U-shaped card 39. The elastic short column 42 is arranged on one side of the elastic cushion layer 41. The U-shaped card 39 is provided with an embedding hole corresponding to the elastic short column 42, and the elastic short column 42 is embedded in the embedding hole; adjusting bolts 38 are provided on both sides of the U-shaped card 39, and the end of the prefabricated wall panel 24 is placed in the U-shaped card 39, and the prefabricated wall panel 24 is tightened by the adjusting bolts 38 to further position and fix the prefabricated wall panel 24; adjacent prefabricated wall panels 24 are connected by means of plug blocks 45 and plug holes A plug block 45 is provided on one side of the prefabricated wall panel 24, and a socket matching the plug block 45 is provided on the other side; when adjacent prefabricated wall panels 24 are connected, the plug block 45 on one prefabricated wall panel 24 is inserted into the socket on the other prefabricated wall panel 24; limiting grooves 44 are provided on both sides of the prefabricated wall panel 24, and a connecting plate 46 is installed between adjacent prefabricated wall panels 24. The connecting plate 46 is installed in the limiting grooves 44 on the two adjacent prefabricated wall panels 24. The two sides of the connecting plate 46 are connected to the prefabricated wall panels 24 by bolts 47. A reserved hole for connecting the bolts 47 is provided on the prefabricated wall panel 24, and the bolts 47 pass through the reserved hole. An annular elastic cushion layer 41 is provided in the reserved hole to improve the buffering capacity of the prefabricated wall panel 24 when subjected to force.
[0026] The present invention also provides a method for installing the whole-process combined prevention and control tall lightweight prefabricated wall panel, and its main construction steps are as follows: Step 1: Making the wall panel steel mesh: Use a floor-standing spot welding machine, set up the program, complete the straightening, cutting, welding and other work of the steel bars, and make the steel mesh according to the drawing requirements. Add the preservative to the steel mesh immersion tank 4, place all the prepared steel meshes in the steel mesh immersion tank and immerse them in the preservative. After the steel mesh is impregnated, move the support rod 8 downward, use the first clamping block 12 to clamp the steel mesh, and move the first clamping block 12 forward through the inclined slide rail 10, position the steel mesh in the oven 2 with the partition 1 inside, then close the oven door 3, bake the steel mesh for 20~30 minutes, and complete the drying.
[0027] Step 2, prefabrication of wall panels: install the casting template, put the steel mesh in the casting template, and then pour concrete. After the concrete pouring is completed, remove the casting template to obtain the prefabricated wall panel 24, and then cover the prefabricated wall panel 24 with a protective film or waterproof cloth for maintenance.
[0028] Step 3, storage of prefabricated wall panels: use the prefabricated wall panel storage device to store the prefabricated wall panels; first open the box door 3 on the storage box 20, place the prefabricated wall panels 24 on the conveying block 27, place the conveying block 27 on the conveyor belt, and convey the prefabricated wall panels 24 to the inside of the storage box 20 through the conveyor belt; control the operation of the transverse slide rail 21 and the telescopic rod 49 through the controller, so that the second clamping block 50 moves to the top of the prefabricated wall panel 24 and clamps the prefabricated wall panel 24, and then the second clamping block 50 moves horizontally and vertically to place the prefabricated wall panel 24 in the limiting groove 25 in the storage box 20 for storage; close the box door 3 when all the prefabricated wall panels 24 are stored.
[0029] Step 4: Moving the prefabricated wall panels: Before installing the prefabricated wall panels 24 , a simple panel moving device is used to quickly move the prefabricated wall panels to the vicinity of the construction site. When the prefabricated wall panels 24 are moved, the prefabricated wall panels 24 are placed between the two limit rods 33 .
[0030] Step 5: Measurement and layout: Clean the work surface before layout, and use an ink fountain to draw the control line of the prefabricated wall panel on the floor slab 43 according to the designed position and panel layout plan.
[0031] Step 6: Flexible connection and installation of prefabricated wall panels: Connect the U-shaped card 39 with the prefabricated wall panel 24, place the end of the prefabricated wall panel 24 in the U-shaped card 39, and tighten the prefabricated wall panel 24 by adjusting the bolt 38; set an elastic cushion layer 41 at the end of the U-shaped card 39, and connect the anchor bolt 40 at the end of the U-shaped card 39 to the floor slab 43; connect adjacent prefabricated wall panels 24 by means of plug blocks 45 and sockets, one side of the prefabricated wall panel 24 is provided with a plug block 45, and the other side is provided with a socket matching the plug block 45; the adjacent prefabricated wall panels 24 are connected When the prefabricated wall panels 24 are connected, the plug block 45 on one of the prefabricated wall panels 24 is inserted into the plug hole on the other prefabricated wall panel 24; limiting grooves 44 are respectively provided on both sides of the prefabricated wall panels 24, and a connecting plate 46 is installed between adjacent prefabricated wall panels 24. The connecting plate 46 is installed in the limiting grooves 44 on the two adjacent prefabricated wall panels 24. The two sides of the connecting plate 46 are connected to the prefabricated wall panels 24 by bolts 47. The prefabricated wall panels 24 are provided with reserved holes for connecting the bolts 47, and the reserved holes are provided with an annular elastic cushion layer 41, and the bolts 47 pass through the reserved holes.
[0032] Step 7: Check and correct: Use a hanging line and a ruler to check the verticality and plane of the prefabricated wall panel 24. If it does not meet the requirements, adjust it immediately.
Claims
1. A method for installing a large and lightweight prefabricated wall panel with a combined prevention and control system throughout the entire process, characterized in that: The specific steps include: Step 1: Making the wall panel steel mesh: Making the steel mesh according to the drawing requirements. After the steel mesh is made, the steel mesh is impregnated and dried by a lightweight prefabricated wall panel steel mesh dipping device; Step 2: prefabrication of wall panels: installing a casting template, placing a steel mesh in the casting template, and then pouring concrete. After the concrete pouring is completed, the casting template is removed to obtain a prefabricated wall panel (24), and then a protective film or waterproof cloth is covered on the prefabricated wall panel (24) for maintenance; Step 3: Prefabricated wall panel storage: using a prefabricated wall panel storage device to store the prefabricated wall panels; Step 4: Moving the prefabricated wall panels: Before installing the prefabricated wall panels (24), use a simple panel moving device to quickly move the prefabricated wall panels to the vicinity of the construction site; Step 5: Measurement and setting out: Clean the work surface before setting out, and use an ink fountain to draw the control line of the prefabricated wall panel (24) on the floor slab (43) according to the designed position and the panel layout plan; Step 6, flexible connection installation of prefabricated wall panels: connect the U-shaped card (39) with the prefabricated wall panel (24), place the end of the prefabricated wall panel (24) in the U-shaped card (39), and tighten the prefabricated wall panel (24) by adjusting the bolt (38); set an elastic cushion layer (41) at the end of the U-shaped card (39), and connect the anchor bolt (40) at the end of the U-shaped card (39) to the floor slab (43); connect adjacent prefabricated wall panels (24) by means of an insert block (45) and a socket, one side of the prefabricated wall panel (24) is provided with an insert block (45), and the other side is provided with a socket matching the insert block (45); when connecting adjacent prefabricated wall panels (24), the insert block (45) on one prefabricated wall panel (24) is inserted into the socket on the other prefabricated wall panel (24); Step 7: Check and correct: Use a hanging line and a ruler to check the verticality and planeness of the prefabricated wall panel (24). If it does not meet the requirements, adjust it immediately.
2. The whole process combined prevention and control high and lightweight prefabricated wall panel installation method according to claim 1 is characterized in that: In step 1, the lightweight prefabricated wall panel steel mesh dipping device comprises a steel mesh dipping tank (4), a support rod (8), an inclined slide rail (10), a connecting rod (9), and a first clamping block (12). Telescopic vertical rods (5) are installed on both sides of the steel mesh dipping tank (4). A cross rod (7) is provided between the top ends of the telescopic vertical rods (5). An inclined rod (6) is provided between the cross rod (7) and the telescopic vertical rod (5). The top of the support rod (8) is connected to the cross rod (7), the bottom of the support rod (8) is fixedly connected to the inclined slide rail (10), and both ends of the connecting rod (9) are connected to the cross rod (7) and the inclined slide rail (10). connection; a slider (11) is welded above the first clamping block (12), the slider (11) is placed in the inclined slide rail (10) and is slidably connected to the inclined slide rail (10); a force sensor (16) is provided on the top of the first clamping block (12), the force sensor (16) is located between the slider (11) and the first clamping block (12); the force sensor (16) is connected to the processor (14) via a data transmission line (15); an oven (2) is provided on one side of the steel mesh impregnation tank (4), and an oven door (3) is provided at the upper end of the oven (2); a plurality of partitions (1) are provided in the oven (2); An antiseptic is added to the steel mesh impregnation tank (4), and the manufactured steel mesh is placed in the steel mesh impregnation tank (4) for impregnation. After the steel mesh is impregnated, the support rod (8) is moved downward, the steel mesh is clamped by the first clamping block (12), and the first clamping block (12) is moved forward by the inclined slide rail (10), and the steel mesh is positioned and placed in the oven (2) with the partition (1) therein, and then the oven door (3) is closed to bake the steel mesh.
3. The whole process combined prevention and control high and lightweight prefabricated wall panel installation method according to claim 2 is characterized in that: When baking the steel mesh, the baking time is 20-30 minutes.
4. The whole process combined prevention and control high and lightweight prefabricated wallboard installation method according to claim 2 is characterized in that: The lightweight prefabricated wall panel steel mesh dipping device also includes a cable (13), the support rod (8), the connecting rod (9) and the inclined slide rail (10) are all hollow structures, one end of the cable (13) is connected to one end of the inclined slide rail, the cable (13) penetrates the connecting rod (9) and the support rod (8), and the other end of the cable (13) is connected to a tensioner (48); the tension of the cable (13) is adjusted by the tensioner (48); the tensioner (48) is arranged in a cavity inside the support rod (8); the operation of the tensioner (48) is controlled by the processor (14); when the value detected by the force sensor (16) is higher than the set value, the processor (14) controls the operation of the tensioner (48) to tighten the cable (13) in a stretched state.
5. The whole process combined prevention and control high and lightweight prefabricated wall panel installation method according to claim 1 is characterized in that: In step 4, the simple plate moving device comprises a body (32), one end of the body (32) is provided with a handle (28), the body (32) is provided with a support frame (31), the bottom of the support frame (31) is connected with a connecting shaft (29), and the two ends of the connecting shaft (29) are respectively connected with tires (30); short rods (36) are provided at both ends of the fixing rod (35), the fixing rod (35) is fixedly connected to the body (32) through the short rods (36) at both ends, and the bottom of the body (32) is provided with a connecting shaft (29). The plate is provided with a concave arc groove (37), and the fixing rod (35) is placed in the concave arc groove (37); the fixing rod (35) is provided with a groove body, which is arranged along the axial direction of the fixing rod (35), and a plurality of spring rods (34) are arranged in the groove body, the spring rods (34) are connected in sequence, and a limiting rod (33) is welded at the connection between adjacent spring rods (34); when the prefabricated wall panel (24) is transported, the prefabricated wall panel (24) is placed between the two limiting rods (33).
6. The whole process combined prevention and control high and lightweight prefabricated wall panel installation method according to claim 1 is characterized in that: In step six, limiting grooves (44) are respectively provided on both sides of the prefabricated wall panels (24), and a connecting plate (46) is installed between adjacent prefabricated wall panels (24). The connecting plate (46) is installed in the limiting grooves (44) on two adjacent prefabricated wall panels (24), and both sides of the connecting plate (46) are connected to the prefabricated wall panels (24) by bolts (47). Pre-reserved holes for connecting the bolts (47) are provided on the prefabricated wall panels (24), and the bolts (47) pass through the reserved holes.
7. The whole process combined prevention and control high and lightweight prefabricated wallboard installation method according to claim 6 is characterized in that: An annular elastic cushion layer (41) is provided in the reserved hole.
8. The method for installing a large lightweight prefabricated wall panel with a combined prevention and control system during the whole process according to claim 6 is characterized in that: An elastic short column (42) is provided on one side of the elastic cushion layer (41), and an embedding hole corresponding to the elastic short column (42) is provided on the U-shaped card (39), and the elastic short column (42) is embedded in the embedding hole.
9. The method for installing a large lightweight prefabricated wall panel with combined prevention and control throughout the entire process according to claim 1 is characterized in that: In step 3, the prefabricated wall panel storage device comprises a storage box (20), a transverse slide rail (21), a telescopic rod (49), and a second clamping block (50); the storage box (20) is provided with a box door (3); a telescopic inclined plate (18) is installed on one side of the storage box (20); the inclined plate (18) and the bottom plate of the storage box (20) are slidably connected; a conveyor belt (17) is arranged on the inclined plate (18) and the bottom plate of the storage box (20); two transverse slide rails (21) are connected to the top of the storage box (20) through a fixed block (19); a plurality of connecting rods (22) are evenly arranged between the transverse slide rails (21); the upper end of the telescopic rod is connected to the transverse slide rail (21), and the bottom of the telescopic rod (49) is connected to the second clamping block (50); When storing the prefabricated wall panels (24), the box door (3) on the storage box (20) is opened, the prefabricated wall panels (24) are placed on the conveying block (27), the conveying block (27) is placed on the conveyor belt, and the prefabricated wall panels (24) are conveyed to the inside of the storage box (20) via the conveyor belt; the operation of the transverse slide rail (21) and the telescopic rod (49) is controlled by the controller, so that the second clamping block (50) moves to the top of the prefabricated wall panel (24) and clamps the prefabricated wall panel (24); then, the second clamping block (50) is moved horizontally and vertically to place the prefabricated wall panel (24) in the limiting groove (25) in the storage box (20) for storage; and the box door (3) is closed after all the prefabricated wall panels (24) are stored.
Citation Information
Patent Citations
Prefabricated wallboard information collecting and hoisting method based on NB-IoT technology
CN109019343A
Integrated treatment method for covering light wallboard with high-strength exterior facing
CN116950406A
Wallboard and upper main body structure connecting assembly
CN214738974U
Prefabricated building concrete prefabricated part
CN215563531U
Reinforcing mesh anti-corrosion dipping device
CN219273505U