Maintenance device for construction road

By designing a multifunctional maintenance device, using drive components, cleaning components, water spray components, coating components and capping components, the problems of low efficiency and waste of labor in road surface cleaning, water spraying and film capping in the prior art are solved, and efficient road maintenance is achieved.

CN119711303AInactive Publication Date: 2025-03-28HONGCHAO CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510241905.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-03
Publication Date
2025-03-28
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The prior art cannot effectively clean the road surface, spray water uniformly, and timely use soil and rocks to press the film after covering the film, resulting in low maintenance efficiency and waste of manpower.

Method used

A maintenance device including a vehicle frame, a fixing frame, a drive assembly, a lifting assembly, a cleaning assembly, a water spray assembly, a soil and stone silo, a coating assembly, a membrane laying assembly and a cap assembly are designed. The driving component drives the cleaning component to clean and convey the earth and rocks, the water spraying component is uniformly sprayed, the film coating component lays and fixes the film, and the pressure cap component uses the earth and rocks to press the film.

Benefits of technology

It realizes efficient cleaning of road surfaces, uniform water spraying maintenance and effective laying and capping of films, improves maintenance efficiency and reduces labor waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119711303A_ABST
    Figure CN119711303A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of road maintenance, in particular to a maintenance device for a construction road, and effectively solves the problems that a road surface cannot be cleaned, water cannot be uniformly sprayed, and a film cannot be pressed by soil blocks in time after film covering. Comprising a frame, the right end of the frame is fixedly connected with a fixing frame, and a driving assembly is arranged on the right side in the fixing frame; by arranging the driving assembly, the lifting frame can be driven by the driving assembly to ascend and descend, then the sweeping assembly can be driven to be unfolded and folded, and meanwhile after the sweeping assembly is completely unfolded, the driving assembly can drive the sweeping assembly to conduct sweeping and convey soil and stones on the road surface into the soil and stone bin in a centralized mode through the conveying frame to be used for covering and pressing a film; and meanwhile, the driving assembly can drive a spraying pipe in the water spraying assembly to descend to a proper position and then drive the spraying pipe to swing left and right, then the spraying pipe is driven to spray the ground, the ground is maintained, and the purposes of sweeping and uniform spraying maintenance are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of road maintenance, and in particular to a maintenance device for construction roads. Background Art

[0002] After concrete pouring, if the climate is hot and the air is dry, if the concrete is not maintained in time, the water in the concrete will evaporate too quickly, resulting in dehydration, which will prevent the cement particles that have formed a gel from being fully hydrated and converted into stable crystals. The lack of sufficient bonding force will cause flakes or powders to fall off on the concrete surface. In addition, when the concrete does not yet have sufficient strength, the premature evaporation of water will also produce large shrinkage deformation and shrinkage cracks. Therefore, the maintenance in the initial stage after concrete pouring is very important. The concrete should be maintained immediately after final setting. The dry hard concrete should be maintained immediately after pouring. The existing maintenance device cannot clean the road surface and spray water evenly when in use. At the same time, the film needs to be pressed down manually with soil and stones to prevent the film from being blown away and losing its function. However, the process is long and wastes manpower, which needs to be solved urgently. Summary of the invention

[0003] In view of the above situation, in order to overcome the defects of the prior art, the purpose of the present invention is to provide a maintenance device for construction roads, which effectively solves the problem of being unable to clean the road surface, spray water evenly, and use soil blocks to press down the film in time after coating.

[0004] The technical solution is as follows: the present invention comprises a frame, a fixing frame is fixedly connected to the right end of the frame, a driving assembly is arranged on the right side of the fixing frame, a lifting frame is arranged on the right side of the driving assembly, cleaning assemblies are respectively arranged on the front and rear sides of the lifting frame, the driving assembly can drive the cleaning assembly to lift and lower and clean the ground, a conveying frame is arranged in the middle of the lifting frame, the conveying frame can be lifted and lowered following the cleaning assembly, a liftable water spraying assembly is arranged on the lower side of the frame, the driving assembly can drive the water spraying assembly to swing, a soil and stone bin is arranged on the left side of the frame, the conveying frame is connected with the soil and stone bin, a film covering assembly is arranged on the left side of the frame, a film roll is arranged in the middle of the film covering assembly, a film laying assembly is arranged on the lower side of the film covering assembly, and a pressing cover assembly is respectively arranged on the front and rear sides of the lower end of the soil and stone bin.

[0005] The driving assembly includes a rotating rod, and spur gears are rotatably connected to the front and rear sides of the rotating rod respectively, and a plurality of connecting grooves evenly distributed along the circumferential direction are respectively opened at the opposite ends of the two spur gears. A hexagonal prism is fixedly connected to the middle of the rotating rod, and a transmission rod is slidably connected to the hexagonal prism. The front and rear sides of the transmission rod are respectively fixedly connected with connecting pins corresponding to the connecting grooves on the corresponding sides, a rack meshing with the spur gear on the rear side is fixedly connected to the rear side of the left end of the lifting frame, and a deflection plate is fixedly connected to the front end of the rotating rod.

[0006] The upper end of the frame is fixedly connected to a driving motor coaxial with the rotating rod, the output end of the driving motor is fixedly connected to the front end of the deflection plate, the lower end of the fixed frame is fixedly connected to a hydraulic rod, the output end of the hydraulic rod is fixedly connected to a moving ring, and the moving ring is rotatably connected to the transmission rod.

[0007] The cleaning assembly includes a connecting shaft, which is fixedly connected to the lifting frame, a rolling shaft is rotatably connected to the right end of the connecting shaft, a support plate is rotatably connected to the outer wall of the rolling shaft, an anti-collision plate is hinged on the lower side of the support plate, a driven shaft is rotatably connected to one side of the outer wall of the support plate, the driven shaft and the rolling shaft are connected via a belt, a plurality of cleaning plates evenly distributed along the outer wall of the belt are fixedly connected to the belt, arc grooves are respectively provided on the front and rear sides of the lifting frame, and a support rod that can be inserted into the corresponding side arc groove is fixedly connected to the left end of the support plate.

[0008] The right end of the fixed frame is fixedly connected to a fixed plate located on the right side of the lifting frame, and the fixed plate is provided with two front-to-back symmetrical and N-shaped toggle grooves, a toggle rod is slidably connected in the toggle groove, one end of the toggle rod is fixedly connected to a toggle frame, the rear end of the support plate is fixedly connected to a toggle pin located in the toggle frame on the corresponding side, a sleeve rod is rotatably connected to the front end of the lifting frame, and polygonal columns are slidably connected to the left and right sides of the sleeve rod, and a toggle plate is rotatably connected on the polygonal column, and the toggle plate is slidably connected to the toggle rod, and a bevel gear is fixedly connected to the other end of the polygonal column, and a helical gear that can mesh with the bevel gear on the corresponding side is fixedly connected to the right end of the rolling shaft, an auxiliary shaft is rotatably connected in the lifting frame, and a combined gear that can mesh with the spur gear on the front side is rotatably connected on the upper side of the lifting frame, and the sleeve rod, the auxiliary shaft and the combined gear are connected via belt two transmissions.

[0009] A sliding groove is provided in the middle of the frame, and sliding pins located in the sliding groove are fixedly connected on the front and rear sides of the middle of the conveying frame respectively. The water spray assembly includes a spray pipe, and the front and rear sides of the spray pipe are fixedly connected with mounting frames respectively, the mounting frame is slidably connected to the frame, and the upper end of the mounting frame is fixedly connected with a cross bar, and the lower end of the cross bar can contact the upper side of the sliding pin on its corresponding side, and the front end of the front mounting frame is slidably connected with an L-shaped push-pull rod, and a swing groove is provided at the right end of the push-pull rod, and the upper end of the spray pipe is fixedly connected with a swing pin located in the swing groove, and the other end of the push-pull rod is fixedly connected with a clamping plate, and a clamping groove is provided on the clamping plate, and the clamping groove cooperates with the deflection disk.

[0010] The upper end of the frame is fixedly connected with a water tank, which is communicated with the spray pipe via a water-conducting hose.

[0011] The coating assembly includes a placing frame, a film roll is located in the placing frame, and the front and rear sides of the placing frame are respectively slidably connected with fixed shafts via compression springs, and the front and rear sides of the film roll are respectively sleeved with the fixed shafts on their corresponding sides, a rotating rod is provided in the middle of the placing frame, and movable grooves are respectively opened on the front and rear sides of the placing frame, and the front and rear sides of the rotating rod are respectively fixedly connected with movable pins located in the movable grooves on their corresponding sides, a T-shaped balancing frame is rotatably connected to the movable pin, the balancing frame is slidably connected to the placing frame, and a reset spring located between the balancing frame and the placing frame is sleeved on the balancing frame, a front end of the movable pin on the front side is fixedly connected with a bevel gear 1, a rotating motor is fixedly connected to the front side of the placing frame, a telescopic rod is fixedly connected to the output end of the rotating motor, a bevel gear 2 that can mesh with the bevel gear 1 is fixedly connected to the lower end of the telescopic rod, and the bevel gear 2 is rotatably connected to the balancing frame on the front side.

[0012] The film laying assembly includes a U-shaped lower pressure frame, which is hinged to the frame, and has two left and right opposite clamping rods rotatably connected to the lower side of the lower pressure frame. The clamping rod on the left side can contact the ground, and the clamping rod on the right side is slightly higher than the clamping rod on the left side. Lower pressure grooves are respectively provided on the front and rear sides inside the lower pressure frame, and the middle part of the frame is slidably connected with push rods located in the lower pressure grooves on the corresponding sides on the front and rear sides, and the middle part of the conveying frame is fixedly connected with straight plates on the front and rear sides, and push grooves are provided on the straight plates, and push rods located in the push grooves on the corresponding sides are respectively fixedly connected on the front and rear sides of the upper side of the push rods.

[0013] The pressure cover assembly includes two feeding pipes facing each other front and back, the left end of the feeding pipe is fixedly connected to the discharging pipe, the right side of the feeding pipe is hinged to the lower end of the earth and rock bin, the front and rear sides of the earth and rock bin are connected to the feeding pipes through guide hoses respectively, the horizontal height of the discharging pipes is higher than the clamping rod, the distance between the front and rear two discharging pipe outlets is less than the length of the clamping rod, a connecting frame is opened on the lower side of the feeding pipe, and the front and rear sides of the lower pressure frame are respectively fixedly connected to connecting pins located in the connecting frames on the corresponding sides.

[0014] Beneficial effects: The present invention is capable of using the driving component to drive the lifting frame to rise and fall, thereby driving the expansion and retraction of the cleaning component. At the same time, after being fully expanded, the driving component can drive the cleaning component to clean and concentrate the soil and rocks on the road surface and transport them to the soil and rock bin by the conveying frame for covering the film. At the same time, the driving component can drive the spray pipe in the water spray component to descend to a suitable position and then start to drive it to swing left and right, thereby driving the spray pipe to spray the ground, thereby maintaining the ground and achieving the purpose of cleaning and uniform spraying maintenance.

[0015] The present invention can use the film covering component to fix the film roll and drive the film roll to rotate by arranging a film covering component, a film laying component and a pressing cover component. Then, the film laying component is used to lay the film on the road surface, so as to maintain the ground by laying the film and prevent the ground from cracking due to water loss. At the same time, the pressing cover component is used to press soil and rocks on the film to prevent the wind from lifting the film and losing its function. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is the main axonometric drawing of the present invention.

[0017] Figure 2 It is a bottom view schematic diagram of the present invention.

[0018] Figure 3 It is a right side schematic diagram of the cleaning assembly in the present invention.

[0019] Figure 4 It is a left side schematic diagram of the cleaning assembly in the present invention.

[0020] Figure 5 It is a left side schematic diagram of the driving assembly in the present invention.

[0021] Figure 6 It is a right side schematic diagram of the fixing plate in the present invention.

[0022] Figure 7 It is a left-view exploded schematic diagram of the spray pipe in the present invention.

[0023] Figure 8 It is a right side schematic diagram of the spur gear in the present invention.

[0024] Fig. 9 It is a front view schematic diagram of the conveying frame in the present invention.

[0025] Fig.10 It is a bottom view schematic diagram of the conveying frame in the present invention.

[0026] Fig.11 It is a left side schematic diagram of the placement rack in the present invention.

[0027] Fig.12 It is a top view schematic diagram of the earth and stone bin in the present invention.

[0028] Fig.13 The present invention Figure 4 Enlarged view of area A in the middle.

[0029] In the figure: 1, frame; 2, fixed frame; 3, lifting frame; 4, conveying frame; 5, water spray assembly; 6, soil and stone bin; 7, film covering assembly; 8, film roll; 9, film laying assembly; 10, pressure cover assembly; 11, rotating rod; 12, spur gear; 13, connecting groove; 14, transmission rod; 15, rack; 16, deflection plate; 17, driving motor; 18, hydraulic rod; 19, moving ring; 20, connecting shaft; 21, rolling shaft; 22, support plate; 23, anti-collision plate; 24, cleaning plate; 25, arc groove; 26, support rod; 27, fixed plate; 28, toggle groove; 29, toggle rod; 30, toggle frame; 31, toggle pin; 32, sleeve rod; 33, multi-prism; 34, toggle plate; 35, bevel gear; 36, helical gear; 37, auxiliary Auxiliary shaft; 38, combined gear; 39, belt two; 40, sliding groove; 41, sliding pin; 42, spray pipe; 43, mounting frame; 44, cross bar; 45, push-pull rod; 46, swing groove; 47, swing pin; 48, clamping plate; 49, clamping groove; 50, water tank; 51, water hose; 52, placement frame; 53, fixed shaft; 54, rotating rod; 55, movable groove; 56, movable pin; 57, balancing frame; 58, bevel gear one; 59, rotating motor; 60, telescopic rod; 61, bevel gear two; 62, lower pressure frame; 63, clamping rod; 64, lower pressure groove; 65, push rod; 66, straight plate; 67, push groove; 68, push pin; 69, feeding pipe; 70, discharge pipe; 71, connecting frame; 72, connecting pin. DETAILED DESCRIPTION

[0030] The specific implementation modes of the present invention are further described in detail below in conjunction with the accompanying drawings.

[0031] Depend on Figures 1 to 13 It is given, including a frame 1, a fixed frame 2 is fixedly connected to the right end of the frame 1, a driving component is provided on the right side of the fixed frame 2, a lifting frame 3 is provided on the right side of the driving component, cleaning components are respectively provided on the front and rear sides of the lifting frame 3, the driving component can drive the cleaning component to lift and clean the ground, a conveying frame 4 is provided in the middle of the lifting frame 3, the conveying frame 4 can be lifted and lowered following the cleaning component, a liftable water spraying component 5 is provided on the lower side of the frame 1, the driving component can drive the water spraying component 5 to swing, a soil and stone bin 6 is provided on the left side of the frame 1, the conveying frame 4 is connected with the soil and stone bin 6, a coating component 7 is provided on the left side of the frame 1, a film roll 8 is provided in the middle of the coating component 7, a film laying component 9 is provided on the lower side of the coating component 7, and a pressure covering component 10 is respectively provided on the front and rear sides of the lower end of the soil and stone bin 6.

[0032] As shown in the figure, a fixed frame 2, a driving component, a lifting frame 3, a cleaning component, a conveying frame 4 and a water spraying component 5 are set. The driving component can be used to drive the lifting frame 3 to rise and fall, and then drive the cleaning component to be deployed and retracted. At the same time, after being fully deployed, the driving component can drive the cleaning component to clean and concentrate the soil and rocks on the road surface and use the conveying frame 4 to transport them to the soil and rock bin 6 for covering the film. At the same time, the driving component can drive the spray pipe 42 in the water spraying component 5 to drop to a suitable position and then start to drive it to swing left and right, thereby driving the spray pipe 42 to spray the ground, which plays a maintenance role on the ground, achieving cleaning. For the purpose of sweeping and evenly spraying maintenance, a soil and stone bin 6 is set to carry soil and stone so as to cover the film. A film covering component 7, a film laying component 9 and a pressing cover component 10 are set. The film covering component 7 can be used to fix the film roll 8 and drive the film roll 8 to rotate. Then the film laying component 9 is used to lay the film on the road surface, so as to maintain the ground by laying the film to prevent the ground from cracking due to water loss. At the same time, the pressing cover component 10 is used to press the soil and stone on the film to prevent the wind from lifting the film and losing its function. A conveyor belt is provided in the conveyor frame 4, and a motor is provided in the conveyor frame 4 to drive the conveyor belt to transport the soil and stone.

[0033] The driving assembly includes a rotating rod 11, and the front and rear sides of the rotating rod 11 are respectively rotatably connected with spur gears 12, and the opposite ends of the two spur gears 12 are respectively provided with a plurality of connecting grooves 13 evenly distributed along the circumferential direction thereof. A hexagonal prism is fixedly connected to the middle of the rotating rod 11, and a transmission rod 14 is slidably connected to the hexagonal prism. The front and rear sides of the transmission rod 14 are respectively fixedly connected with connecting pins corresponding to the connecting grooves 13 on the corresponding sides thereof, a rack 15 meshing with the spur gear 12 on the rear side is fixedly connected to the rear side of the left end of the lifting frame 3, and a deflection disk 16 is fixedly connected to the front end of the rotating rod 11.

[0034] As shown in the figure, the rotating rod 11, the spur gear 12, the connecting groove 13, the hexagonal prism, the transmission rod 14, the connecting pin and the rack 15 and the deflection plate 16 are arranged. The rotation of the rotating rod 11 can be used to drive the hexagonal prism and the transmission rod 14 to rotate, and then by changing the connection between the transmission rod 14 and the connecting groove 13 of different spur gears 12, it is possible to drive different components to operate. When the transmission rod 14 is connected with the spur gear 12 on the rear side, the lifting frame 3 can be driven to rise and fall. When the transmission rod 14 is connected with the spur gear 12 on the front side, the cleaning component can be driven to clean the ground. At the same time, after the lifting frame 3 is lowered, the clamping plate 48 cooperates with the deflection plate 16, and then the spray pipe 42 can be driven to swing and spray evenly.

[0035] A driving motor 17 coaxial with the rotating rod 11 is fixedly connected to the upper end of the frame 1, and the output end of the driving motor 17 is fixedly connected to the front end of the deflection disk 16. A hydraulic rod 18 is fixedly connected to the lower end of the fixed frame 2, and the output end of the hydraulic rod 18 is fixedly connected to a moving ring 19, which is rotatably connected to the transmission rod 14.

[0036] As shown in the figure, the driving motor 17, the hydraulic rod 18 and the moving ring 19 are arranged so that the driving motor 17 can provide power for the operation of the components. At the same time, the hydraulic rod 18 can drive the transmission rod 14 to move back and forth through the moving ring 19, so as to achieve the purpose of driving different components to operate.

[0037] The cleaning component includes a connecting shaft 20, the connecting shaft 20 is fixedly connected to the lifting frame 3, the right end of the connecting shaft 20 is rotatably connected to a rolling shaft 21, the outer wall of the rolling shaft 21 is rotatably connected to a support plate 22, the lower side of the support plate 22 is hinged to a collision avoidance plate 23, one side of the outer wall of the support plate 22 is rotatably connected to a driven shaft, the driven shaft and the rolling shaft 21 are传动连接 by a first belt, and a plurality of cleaning plates 24 evenly distributed along its outer wall are fixedly connected to the first belt. Arc-shaped grooves 25 are respectively formed on the front and rear sides of the lifting frame 3, and a support rod 26 that can be inserted into the arc-shaped groove 25 on its corresponding side is fixedly connected to the left end of the support plate 22.

[0038] As shown in the figure, the cleaning component is arranged so that the rotation of the rolling shaft 21 can drive the first belt to rotate in a cycle. Then, the cleaning plates 24 are used to sweep the soil and stones to the conveying frame 4, and then conveyed into the soil and stone bin 6 by the conveying frame 4 for recycling, and at the same time, the ground is maintained. The arc-shaped grooves 25 and the support rods 26 are arranged to ensure that the cleaning component can be normally retracted and released, and ensure that it is in a vertical state when retracted and in a horizontal state when lowered, avoiding excessive swinging angles. The collision avoidance plate 23 is arranged to prevent the road surface from having protrusions that cause abnormal passage and collisions.

[0039] The right end of the fixed frame 2 is fixedly connected to a fixing plate 27 located on the right side of the lifting frame 3. Two front and rear symmetric and丿-shaped拨动槽 28 are formed on the fixing plate 27. A拨动杆 29 is slidably connected in the拨动槽 28. One end of the拨动杆 29 is fixedly connected to a拨动框 30. A拨动 pin 31 located in the拨动框 30 on its corresponding side is fixedly connected to the rear end of the support plate 22. A sleeve rod 32 is rotatably connected to the front end of the lifting frame 3. A multi-prism 33 is slidably connected to the left and right sides of the sleeve rod 32 respectively. A拨板 34 is rotatably connected to the multi-prism 33. The拨板 34 is slidably connected to the拨动杆 29. The other end of the multi-prism 33 is fixedly connected to a bevel gear 35. A helical gear 36 that can be meshed with the bevel gear 35 on its corresponding side is fixedly connected to the right end of the rolling shaft 21. An auxiliary shaft 37 is rotatably connected in the lifting frame 3. A combined gear 38 that can be meshed with the front straight gear 12 is rotatably connected to the upper side of the lifting frame 3. The sleeve rod 32, the auxiliary shaft 37 and the combined gear 38 are传动连接 by a second belt 39.

[0040] As shown in the figure, a fixing plate 27, a toggle slot 28, a toggle rod 29, a toggle frame 30 and a toggle pin 31 are provided so that the toggle rod 29 can be driven to move in the toggle slot 28 by the lifting of the lifting frame 3, and then the cleaning component is driven to swing through the toggle frame 30 and the toggle pin 31, so that it is in a vertical state when it is retracted and in a horizontal state when it is put down. A sleeve rod 32, a polygonal column 33, a toggle plate 34, a bevel gear 35, a helical gear 36, an auxiliary shaft 37 and a combined gear 38 as well as a belt 2 39 are provided so that the lifting of the lifting frame 3 can be used to drive the combined gear 38 to disengage or engage with the spur gear 12 on the front side. When disengaged, the driving component cannot drive the cleaning component to operate, and when engaged, the spur gear 12 on the front side can be used to rotate. By driving the sleeve rod 32 to rotate through the belt 2 39, the polygonal column 33, the bevel gear 35 and the helical gear 36 can be used to drive the rolling shaft 21 to rotate, thereby realizing the operation of the belt 1. The paddle plate 34 is set so that the bevel gear 35 and the helical gear 36 can be disengaged when the cleaning component is fully retracted, which is convenient for subsequent inspection and maintenance. When the cleaning component is lowered, the bevel gear 35 is meshed with the helical gear 36 again to ensure normal transmission, and the paddle plate 34 is slidably connected to the toggle rod 29, and the protrusion on the toggle rod 29 and the toggle frame 30 can be used to drive the paddle plate 34 to move, and at the same time, the movement of the bevel gear 35 has a hysteresis, that is, the cleaning component is retracted to a certain angle first and then the bevel gear 35 moves, thereby ensuring that the cleaning component can be used normally.

[0041] A sliding groove 40 is provided in the middle of the frame 1, and sliding pins 41 located in the sliding groove 40 are fixedly connected on the front and rear sides of the middle of the conveying frame 4. The water spray assembly 5 includes a spray pipe 42, and the front and rear sides of the spray pipe 42 are fixedly connected with mounting frames 43 respectively. The mounting frame 43 is slidably connected to the frame 1, and a cross bar 44 is fixedly connected to the upper end of the mounting frame 43. The lower end of the cross bar 44 can contact the upper side of the sliding pin 41 on its corresponding side. An L-shaped push-pull rod 45 is slidably connected to the front end of the front mounting frame 43, and a swing groove 46 is provided at the right end of the push-pull rod 45. A swing pin 47 located in the swing groove 46 is fixedly connected to the upper end of the spray pipe 42, and a clamping plate 48 is fixedly connected to the other end of the push-pull rod 45. A clamping groove 49 is provided on the clamping plate 48, and the clamping groove 49 cooperates with the deflection disk 16.

[0042] As shown in the figure, the sliding groove 40, the sliding pin 41, the mounting frame 43, the spray pipe 42 and the cross bar 44 are arranged so that after the lifting frame 3 drives the conveying frame 4 to move up to a certain distance, the sliding pin 41 contacts the cross bar 44, which can drive the cross bar 44 to rise synchronously, and the spray pipe 42 can be retracted into the frame 1 to avoid affecting the movement of the frame 1 when not in use. At the same time, when the conveying frame 4 descends, the spray pipe 42 follows the decline driven by its own gravity until it descends to the limit position of its own lower end and stops, thereby realizing lifting and lowering. The push-pull rod 45, the swing groove 46, the swing pin 47, the clamping plate 48 and the clamping groove 49 are arranged so that when the spray pipe 42 descends, the clamping groove 49 is combined with the deflection plate 16. At this time, the rotation of the deflection plate 16 can drive the push-pull rod 45 to move left and right, thereby realizing the swing drive of the spray pipe 42.

[0043] A water tank 50 is fixedly connected to the upper end of the frame 1 , and the water tank 50 is connected to the spray pipe 42 via a water hose 51 .

[0044] As shown in the figure, a water tank 50 and a water hose 51 are provided so that the water tank 50 can provide water to the spray pipe 42 through the water hose 51 . A water pump is provided in the water tank 50 , and the water pump can provide power for the water flow.

[0045] The coating assembly 7 includes a placement frame 52, and a film roll 8 is located in the placement frame 52. The front and rear sides of the placement frame 52 are respectively slidably connected with fixed shafts 53 through compression springs. The front and rear sides of the film roll 8 are respectively sleeved with the fixed shafts 53 on the corresponding sides. A rotating rod 54 is provided in the middle of the placement frame 52. The front and rear sides of the placement frame 52 are respectively provided with movable grooves 55. The front and rear sides of the rotating rod 54 are respectively fixedly connected with movable pins 56 located in the movable grooves 55 on the corresponding sides. A T-shaped balancing frame 57 is rotatably connected to the movable pin 56. The balancing frame 57 is slidably connected to the placement frame 52. A reset spring located between the balancing frame 57 and the placement frame 52 is sleeved on the balancing frame 57. The front end of the movable pin 56 on the front side is fixedly connected with a bevel gear 1 58. The front side of the placement frame 52 is fixedly connected with a rotating motor 59. The output end of the rotating motor 59 is fixedly connected with a telescopic rod 60. The lower end of the telescopic rod 60 is fixedly connected with a bevel gear 2 61 that can mesh with the bevel gear 1 58. The bevel gear 2 61 is rotatably connected to the balancing frame 57 on the front side.

[0046] As shown in the figure, a placement rack 52, a fixed shaft 53 and a film roll 8 are provided so that the placement rack 52 can be used to fix the film roll 8 and it is convenient to replace the film roll 8. A rotating rod 54, a movable groove 55, a movable pin 56, a balancing rack 57 and a reset spring are provided so that the balancing rack 57 and the reset spring can be used to make the rotating rod 54 always in contact with the outer wall of the film roll 8, ensuring that the film roll 8 can always be rotated by the rotating rod 54 to drive the output film. A bevel gear 1 58, a rotating motor 59, a bevel gear 2 61 and a telescopic rod 60 are provided so that the rotating motor 59 can be used to drive the bevel gear 1 58 and the bevel gear 2 61 to rotate via the telescopic rod 60, thereby driving the rotating rod 54 to rotate, thereby achieving the purpose of rotating the film roll 8.

[0047] The film laying assembly 9 includes a U-shaped lower pressure frame 62, which is hinged to the frame 1. Two left and right opposite clamping rods 63 are rotatably connected to the lower side of the lower pressure frame 62. The left clamping rod 63 can contact the ground, and the right clamping rod 63 is slightly higher than the left clamping rod 63. Lower pressure grooves 64 are respectively provided on the front and rear sides of the lower pressure frame 62. The middle part of the frame 1 is slidably connected with push rods 65 located in the corresponding side lower pressure grooves 64 on the front and rear sides. The middle part of the conveying frame 4 is fixedly connected with straight plates 66 on the front and rear sides respectively. Push grooves 67 are provided on the straight plates 66. Push pins 68 located in the corresponding side push grooves 67 are respectively fixedly connected on the front and rear sides of the upper side of the push rod 65.

[0048] As shown in the figure, the lower pressure frame 62, the clamping rod 63, the lower pressure groove 64, the pushing rod 65, the straight plate 66, the pushing groove 67 and the pushing pin 68 are arranged so that the lower pressure frame 62 can be driven to swing by the lifting and lowering of the conveying frame 4, that is, when the conveying frame 4 rises, the left end of the lower pressure frame 62 swings upward, and when the conveying frame 4 moves downward, the left end of the lower pressure frame 62 swings downward, so as to achieve the purpose of pressing down the film for laying. At the same time, the clamping rod 63 on the left side touches the ground and can roll on the ground while driving the film output, and the clamping rod 63 on the right side can play the role of clamping the film together with the clamping rod 63 on the left side. Auxiliary wheels can be optionally arranged on the front and rear sides of the clamping rod 63 on the left side to contact the ground, so as to protect the film.

[0049] The pressure cover assembly 10 includes two front and rear opposite feeding pipes 69, the left end of the feeding pipe 69 is fixedly connected to the discharge pipe 70, the right side of the feeding pipe 69 is hinged to the lower end of the earth and rock bin 6, the front and rear sides of the earth and rock bin 6 are connected to the feeding pipe 69 through a guide hose respectively, the horizontal height of the discharge pipe 70 is higher than the clamping rod 63, the distance between the front and rear outlets of the two discharge pipes 70 is less than the length of the clamping rod 63, a connecting frame 71 is opened on the lower side of the feeding pipe 69, and the front and rear sides of the lower pressure frame 62 are respectively fixedly connected with connecting pins 72 located in the corresponding side connecting frames 71.

[0050] As shown in the figure, a feeding pipe 69, a discharging pipe 70 and a guide hose are provided to transport soil and rocks to the ground covered with a film, and to press the film. An auger can be provided in the feeding pipe 69 to facilitate soil and rock transportation and avoid the problem of jamming. The lower side wall of the soil and rock bin 6 is high in the middle and low on the front and rear sides to facilitate material unloading. The distance between the outlets of the front and rear two discharging pipes 70 is provided to be less than the length of the clamping rod 63 to ensure that the soil and rocks can be covered on the laid film, thereby ensuring that the pressing can be achieved normally.

[0051] When the present invention is in use, the frame 1 starts to travel, the driving motor 17 and the rotating motor 59 are started, the driving motor 17 drives the cleaning component to clean the ground, and at the same time drives the spray pipe 42 to swing and spray through the deflection plate 16, the cleaning component gathers the soil and rocks to the center, and then drives them into the soil and rock bin 6 by the conveyor belt, the rotating motor 59 drives the rotating rod 54 to rotate, and then drives the film roll 8 to rotate, and the film is continuously output and then laid by the film laying component 9, and then the feeding pipe 69 and the discharging pipe 70 in the capping component 10 can be used to cover the soil and rocks on the film to achieve film laying and capping; After the road maintenance is completed, the hydraulic rod 18 is started, and the hydraulic rod 18 drives the transmission rod 14 to connect with the spur gear 12 on the rear side through the moving ring 19, and then the driving motor 17 is started, and the spur gear 12 on the rear side drives the lifting plate to rise through the rack 15. During the rising process of the lifting plate, the cleaning components on both sides swing under the drive of the toggle groove 28 and the toggle rod 29, and gradually become a vertical state. At the same time, the lifting plate drives the output frame to rise, and during the rising process of the output frame, the spray component is retracted into the frame 1. At the same time, under the action of the straight plate 66, the pushing groove 67 and the pushing rod 65, the left end of the film laying component 9 is driven to swing upward, and during the upward swing of the film laying component 9, the pressure cover component 10 is driven to swing upward synchronously, so as to avoid the frame 1 from colliding with the ground when traveling in other places and causing damage.

[0052] In the present invention, the driving motor 17, the hydraulic rod 18 and the rotating motor 59 are all prior art and will not be described in detail here.

[0053] The specific embodiments described herein are merely examples of the spirit of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in similar ways, but they will not deviate from the spirit of the present invention or exceed the scope defined by the appended claims.

Claims

1. A maintenance device for a road under construction, comprising a frame (1), characterized in that: The right end of the vehicle frame (1) is fixedly connected to a fixed frame (2), a driving component is provided on the right side of the fixed frame (2), a lifting frame (3) is provided on the right side of the driving component, cleaning components are provided on the front and rear sides of the lifting frame (3), the driving component can drive the cleaning component to be lifted and lowered and clean the ground, a conveying frame (4) is provided in the middle of the lifting frame (3), the conveying frame (4) can be lifted and lowered following the cleaning component, a liftable water spraying component (5) is provided on the lower side of the vehicle frame (1), the driving component can drive the water spraying component (5) to swing, a soil and stone bin (6) is provided on the left side of the vehicle frame (1), the conveying frame (4) is connected to the soil and stone bin (6), a film covering component (7) is provided on the left side of the vehicle frame (1), a film roll (8) is provided in the middle of the film covering component (7), a film laying component (9) is provided on the lower side of the film covering component (7), and a capping component (10) is provided on the front and rear sides of the lower end of the soil and stone bin (6), the film covering component (7) comprises A placing frame (52) is provided, wherein the front and rear sides of the placing frame (52) are respectively slidably connected with fixed shafts (53) via compression springs, and the front and rear sides of the film roll (8) are respectively sleeved with the fixed shafts (53) on the corresponding sides thereof, and a rotatable rotating rod (54) is provided in the middle of the placing frame (52), and the rotating rod (54) can maintain contact with the film roll (8) and drive the film roll to rotate to transport the film, and the film laying component (9) comprises a lower pressing frame (62) that can swing up and down, the lower pressing frame (62) is hinged to the frame (1), and the lower side of the lower pressing frame (62) is rotatably connected to two clamping rods (63) opposite to each other on the left and right, and the pressure cover component (10) comprises two feeding pipes (69) opposite to each other on the front and back, the right side of the feeding pipe (69) is hinged to the lower end of the soil and rock bin (6), and the left end of the feeding pipe (69) is fixedly connected with a discharge pipe (70), and the discharge pipe (70) can press the soil and rock in the soil and rock bin (6) onto the film laid on the ground.

2. A maintenance device for road construction according to claim 1, characterized in that: The driving assembly comprises a rotating rod (11), the front and rear sides of the rotating rod (11) are respectively rotatably connected to spur gears (12), the opposite ends of the two spur gears (12) are respectively provided with a plurality of connecting grooves (13) evenly distributed along the circumferential direction thereof, a hexagonal prism is fixedly connected to the middle of the rotating rod (11), a transmission rod (14) is slidably connected to the hexagonal prism, the front and rear sides of the transmission rod (14) are respectively fixedly connected to connecting pins corresponding to the connecting grooves (13) on the corresponding sides thereof, a rack (15) meshing with the spur gear (12) on the rear side is fixedly connected to the rear side of the left end of the lifting frame (3), and a deflection plate (16) is fixedly connected to the front end of the rotating rod (11).

3. A maintenance device for road construction according to claim 2, characterized in that: The upper end of the vehicle frame (1) is fixedly connected to a drive motor (17) coaxial with the rotating rod (11); the output end of the drive motor (17) is fixedly connected to the front end of the deflection plate (16); the lower end of the fixed frame (2) is fixedly connected to a hydraulic rod (18); the output end of the hydraulic rod (18) is fixedly connected to a moving ring (19); and the moving ring (19) is rotationally connected to the transmission rod (14).

4. A maintenance device for road construction according to claim 1, characterized in that: The cleaning assembly includes a connecting shaft (20). The connecting shaft (20) is fixedly connected to the lifting frame (3). The right end of the connecting shaft (20) is rotatably connected to a rolling shaft (21). A support plate (22) is rotatably connected to the outer wall of the rolling shaft (21). A collision prevention plate (23) is hinged to the lower side of the support plate (22). A driven shaft is rotatably connected to one side of the outer wall of the support plate (22). The driven shaft and the rolling shaft (21) are connected by a first belt in transmission. A plurality of cleaning plates (24) evenly distributed along its outer wall are fixedly connected to the first belt. Arc-shaped grooves (25) are respectively formed on the front and rear sides of the lifting frame (3). A support rod (26) that can be inserted into the corresponding arc-shaped groove (25) is fixedly connected to the left end of the support plate (22).

5. A maintenance device for road construction according to claim 2, characterized in that: The right end of the fixed frame (2) is fixedly connected to a fixing plate (27) located on the right side of the lifting frame (3). Two symmetrically arranged front and rear J-shaped拨动 grooves (28) are formed on the fixing plate (27). A拨动 rod (29) is slidably connected in the拨动 groove (28). One end of the拨动 rod (29) is fixedly connected to a拨动 frame (30). A拨动 pin (31) located in the corresponding拨动 frame (30) is fixedly connected to the rear end of the support plate (22). A sleeve rod (32) is rotatably connected to the front end of the lifting frame (3). A polygonal prism (33) is slidably connected to the left and right sides of the sleeve rod (32). A拨板 (34) is rotatably connected to the polygonal prism (33). The拨板 (34) is slidably connected to the拨动 rod (29). The other end of the polygonal prism (33) is fixedly connected to a bevel gear (35). A helical gear (36) that can mesh with the corresponding bevel gear (35) is fixedly connected to the right end of the rolling shaft (21). An auxiliary shaft (37) is rotatably connected in the lifting frame (3). A combined gear (38) that can mesh with the front straight gear (12) is rotatably connected to the upper side of the lifting frame (3). The sleeve rod (32), the auxiliary shaft (37), and the combined gear (38) are connected by a second belt (39) in transmission.

6. A maintenance device for road construction according to claim 2, characterized in that: A sliding groove (40) is formed in the middle of the vehicle frame (1). Sliding pins (41) located in the sliding groove (40) are respectively fixedly connected to the front and rear sides of the middle of the conveying frame (4). The water spraying assembly (5) includes a spray pipe (42). Mounting frames (43) are respectively fixedly connected to the front and rear sides of the spray pipe (42). The mounting frames (43) are slidably connected to the vehicle frame (1). A cross bar (44) is fixedly connected to the upper end of the mounting frame (43). The lower end of the cross bar (44) can contact the upper side of the corresponding sliding pin (41). An L-shaped push-pull rod (45) is slidably connected to the front end of the front mounting frame (43). A swinging groove (46) is formed at the right end of the push-pull rod (45). A swinging pin (47) located in the swinging groove (46) is fixedly connected to the upper end of the spray pipe (42). The other end of the push-pull rod (45) is fixedly connected to a clamping plate (48). A clamping groove (49) is formed on the clamping plate (48). The clamping groove (49) cooperates with the eccentric turntable (16).

7. A maintenance device for road construction according to claim 6, characterized in that: A water tank (50) is fixedly connected to the upper end of the vehicle frame (1). The water tank (50) is communicated with the spray pipe (42) through a water guiding hose (51).

8. A maintenance device for road construction according to claim 1, characterized in that: The placement frame (52) is provided with movable grooves (55) on both the front and rear sides, respectively, and movable pins (56) located in the movable grooves (55) on the corresponding sides are fixedly connected to the front and rear sides of the rotating rod (54), respectively, and a T-shaped balancing frame (57) is rotatably connected to the movable pin (56), and the balancing frame (57) is slidably connected to the placement frame (52), and a return spring located between the balancing frame (57) and the placement frame (52) is sleeved on the balancing frame (57), and a bevel gear 1 (58) is fixedly connected to the front end of the movable pin (56) on the front side, and a rotating motor (59) is fixedly connected to the front side of the placement frame (52), and a telescopic rod (60) is fixedly connected to the output end of the rotating motor (59), and a bevel gear 2 (61) that can mesh with the bevel gear 1 (58) is fixedly connected to the lower end of the telescopic rod (60), and the bevel gear 2 (61) is rotatably connected to the front side of the balancing frame (57).

9. A maintenance device for road construction according to claim 1, characterized in that: The clamping rod (63) on the left side can be in contact with the ground, and the clamping rod (63) on the right side is slightly higher than the clamping rod (63) on the left side. The lower pressing frame (62) is provided with lower pressing grooves (64) on the front and rear sides respectively. The middle part of the vehicle frame (1) is slidably connected with push rods (65) on the front and rear sides respectively located in the lower pressing grooves (64) on the corresponding sides. The middle part of the conveying frame (4) is fixedly connected with straight plates (66) on the front and rear sides respectively. The straight plates (66) are provided with push grooves (67). The upper front and rear sides of the push rod (65) are fixedly connected with push pins (68) located in the push grooves (67) on the corresponding sides respectively.

10. A maintenance device for road construction according to claim 1, characterized in that: A connecting frame (71) is provided at the lower side of the feeding pipe (69), and the front and rear sides of the lower pressure frame (62) are respectively fixedly connected with connecting pins (72) located in the connecting frames (71) on the corresponding sides. The front and rear sides of the soil and rock bin (6) are respectively connected to the feeding pipe (69) on the corresponding sides via a guide hose. The horizontal height of the discharge pipe (70) is higher than the clamping rod (63), and the distance between the front and rear discharge pipes (70) is less than the length of the clamping rod (63).