High-standard swimming pool structure and swimming pool brick paving construction method

Through the deepening design of high-standard swimming pool construction methods and B I M technology, combined with special seam-filling equipment, the problems of inconsistent structure of existing swimming pools and high seam-filling difficulties are solved, and efficient and standardized construction results are achieved.

CN119711804AActive Publication Date: 2025-03-28CHINA MCC17 GRP CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411910913.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-23
Publication Date
2025-03-28
Estimated Expiration
2044-12-23

AI Technical Summary

Technical Problem

The existing standard swimming pool has inconsistent structure, the waterproof system is difficult to achieve, and the anti-leakage construction is difficult. The joint filling treatment after laying the pool wall bricks is time-consuming and the quality is poor, making it difficult to meet the high-standard construction needs.

Method used

The high-standard swimming pool construction method is adopted, including the establishment of overflow ditch, sewage ditch and foot resting platform and other structural mechanisms, and the design is deepened through B I M technology, finely typesetting the swimming pool bricks, and efficiently filling and cleaning with special caulking equipment.

Benefits of technology

It realizes the standardization of swimming pool structure and the efficiency of construction, simplifies the joint filling process, improves construction efficiency and quality, and can meet the requirements of international standards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119711804A_ABST
    Figure CN119711804A_ABST
Patent Text Reader

Abstract

The invention discloses a high-standard swimming pool structure and a swimming pool brick paving construction method, and relates to the technical field of swimming pool construction. The construction mechanism comprises an overflow ditch, a drainage ditch, a footrest, a pool bottom overflow port, a swimming pool ladder, a starting platform and a swimming marker line; through the high-standard swimming pool structure and the swimming pool brick paving construction method based on the BIM technology, the problems that the leakage prevention difficulty of a standard swimming pool is large, and the paving difficulty of a swimming pool brick surface layer is large can be effectively solved, and the angle and position of a joint filling seat are adjusted through a movable seat, a supporting seat, a first rotating motor, a mounting piece and a rolling wheel; a second rotating motor, a tool base and a dust removing tool are used for cleaning joints, a second motor, a rotating block and a joint filling base adjust the angle of a special joint filling agent, a hydraulic cylinder, a reinforcing rod, a reinforcing piece and a cleaning tool are used for cleaning ceramic tiles, and joint cleaning, joint filling and joint filling agent cleaning can be conducted on the corners of the pool wall bricks in an all-around mode.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of swimming pool construction, and in particular relates to a high-standard swimming pool structure and a swimming pool brick paving construction method. Background Art

[0002] With the acceleration of urbanization and people's pursuit of quality of life, they hope to have a healthy physique and the demand for physical exercise is becoming more and more obvious, resulting in the continuous emergence of sports venues in modern cities. As one of the important cultural and sports facilities, the construction of standard swimming pool facilities has also increased in recent years, which has broad market prospects.

[0003] In the prior art, standard swimming pools are not uniform in structure, the waterproof system of swimming pools is difficult to implement, and anti-leakage construction is difficult. International standard swimming pools have high standards for pool wall size and surface paving, and the construction is difficult, especially the caulking after the pool wall tiles are laid. If caulking is done manually, it will take a lot of time and labor, and the existing caulking equipment will encounter dead corners when caulking the corners of the pool wall tiles, affecting the caulking quality, and before and after caulking, the corners of the pool wall tiles need to be manually cleaned and the caulking agent cleaned, which increases the operating steps of the caulking operation, reduces the efficiency of swimming pool construction, and cannot meet people's needs. Summary of the invention

[0004] The present invention aims to solve at least one of the technical problems existing in the prior art; to this end, the present invention proposes a high-standard swimming pool structure and a swimming pool brick paving construction method.

[0005] A high-standard swimming pool structure and a swimming pool brick paving construction method, comprising a swimming pool body and a construction mechanism arranged on the swimming pool body; the construction mechanism comprises an overflow ditch arranged on the upper end surface of the swimming pool body, a drainage ditch arranged outside the overflow ditch and a footrest arranged inside the overflow ditch; the construction mechanism also comprises a plurality of groups of pool bottom overflow outlets arranged on the inner bottom surface of the swimming pool body, a plurality of groups of swimming pool escalators arranged on the swimming pool body, a plurality of groups of starting platforms symmetrically and parallelly arranged on the upper end surface of the swimming pool body and a plurality of groups of swimming marking lines; wherein the overflow ditch and the drainage ditch are both provided with PVC grille covers.

[0006] As a further solution of the present invention: the swimming pool main body is composed of pool bank bricks, pool wall bricks, pool bottom bricks, lane marking lines, and lane dividing lines. The length dimension of the swimming pool main body is set to 50m, the width dimension of the swimming pool main body is set to 25m, and the depth dimension of the swimming pool main body is set to 1.2m-1.8m.

[0007] As a further solution of the present invention: the specifications of the pool wall tiles and the pool bottom tiles are set to 244mm×119mm×9mm white special pool tiles, the specifications of the pool bank tiles are set to 244×244mm×9mm white special ground anti-slip tiles, and the swimming lane marking lines are dark blue special pool tiles, wherein the brick joints of the pool bank bricks, pool wall bricks and pool bottom bricks are all set to 6mm.

[0008] As a further solution of the present invention: the spacing between the overflow outlets at the bottom of the pool is set to 2.5m*2.5m, the centers of the overflow outlets at the bottom of the pool are set at the intersection of four pool wall tiles, the overflow ditch specifications are set to 350mm×300mm, the drainage ditch specifications are set to 250mm×300mm, and the swimming pool escalator and swimming marking line materials are set to 304 stainless steel.

[0009] As a further solution of the present invention: a high-standard swimming pool tile paving construction method, the specific steps are as follows:

[0010] Step A: Deepen the design with BIM technology and carefully lay out the swimming pool tiles;

[0011] Step B: Base treatment;

[0012] Step C: Laying out bricks;

[0013] Step D: Pool tile paving;

[0014] Step E: Clean the seams and fill them with caulking agent;

[0015] Step F: Cleaning and maintenance;

[0016] Step G: Acceptance.

[0017] As a further solution of the present invention: in the step A, the regulations of the International Swimming Federation and the relevant standards of the domestic swimming competition manual are sorted out and familiarized, the basic data of site conditions and swimming pool design parameters are collected, and the main structure three-dimensional model of the swimming pool is constructed using BIM software. The main structure three-dimensional model includes the basic shapes of the swimming pool wall, bottom and related ancillary facilities, and the accurate coordinate system and elevation information of each part are determined. The swimming pool bricks are preliminarily arranged in the BIM model and the brick seam width, alignment method and overall aesthetics are considered. Detailed modeling is performed for the complex parts of the rest platform, drainage ditch and access passage, and the size, shape and connection method of each node with other structures are accurately determined. The collision points in the model are automatically detected by BIM software, and potential conflict problems are analyzed and resolved. The brick layout and node design are adjusted according to the collision detection results, and repeated verification is performed until all requirements and standards are met, and construction drawings containing detailed annotations and instructions are output. The construction drawings include plan views, elevation views, section views and node details.

[0018] As a further solution of the present invention: in the step B, after the waterproof layer is made on the pool wall, if the leveling layer is too thick, it is necessary to use a wire mesh to prevent the mortar layer from falling off and cracking. In addition, a closed water test should be carried out after the waterproof layer is completed, and the time shall not be less than 36 hours. In the step C, dividing lines are popped up every 1m from the four corners, and handrail bricks can be placed every 1m as a mark. Vertical dividing lines are placed on the pool wall according to the handrail position dividing lines (other colors can be used). When the pool bottom dividing lines are placed, 1 m×lm mesh dividing line to facilitate subsequent tile laying. According to the tile layout design, 4 tiles / m are placed in the long side direction of the swimming pool, 8 tiles / m are placed in the short side direction, the brick seam is 6mm, and 32 swimming pool tiles are used for each square. In the step D, the pool wall tiles should be constructed first, and then the pool bottom tiles. The anti-slip tiles in the pool bank area and the pool tiles are constructed at the same time. The pool bottom is laid in accordance with the principle of first laying the center tiles of the swimming lane, then the tiles on both sides, and finally the special parts. The swimming pool tiles are bonded with special swimming pool tile adhesives. During the laying, each Check the X and Y axis grid lines once every 2-3 meters to prevent accumulated errors; the non-slip surface of the pool bank should be sloped outward to allow the flushing water to flow to the peripheral drainage ditch. In step E, the tiles can be caulked at least two days after pasting. Use caulking equipment to caulk the pool wall tiles. Special caulking equipment must use special caulking agents when caulking. The adhesive and caulking agents stuck on the surface of the tiles must be removed immediately. The paving must be uniform in color, and the gaps must be full and straight without empty or insufficient filling, otherwise it is easy to scratch people, or the gaps leak and cause the tiles to fall off, etc. The problem is that in the step F, after the caulking is completed, the garbage on the tiles is cleaned in time and the maintenance measures are strengthened, the pool wall tiles are covered with a film for maintenance, and the pool bottom tiles and pool bank tiles are sprinkled with water for maintenance for no less than 7 days. In the step G, the allowable deviations of the pool bottom tiles and pool bank tiles are: surface flatness 2mm; seam grid straightness 3mm; joint height difference 0.5mm; tile gap width ≯2mm; pool wall tiles allowable deviations: surface flatness 2mm; facade verticality 2mm; outside corner squareness 2mm; joint straightness 2mm; joint height 0.5mm.

[0019] As a further solution of the present invention: the caulking equipment includes a moving seat that moves on the inner bottom surface of the swimming pool body, a support seat detachably connected to the moving seat, and a caulking mechanism installed on the support seat, the bottom end of the moving seat is equipped with a moving wheel for moving, a first rotating motor is installed inside the moving seat, a mounting piece detachably connected to the first rotating motor is arranged at the center of the lower end surface of the support seat, the first rotating motor controls the support seat to rotate on the moving seat through the mounting piece, the lower end surface of the support seat is provided with a plurality of groups of rollers for rolling in a circular array, the upper end surface of the moving seat is provided with a rolling groove matching the roller, and the movement of the roller in the rolling groove can assist the support seat to rotate.

[0020] As a further solution of the present invention: the caulking mechanism includes a rotating seat detachably mounted on a side of the supporting seat, a motor box rotatably connected to the rotating seat, a first motor detachably arranged inside the motor box, and a rotating rod arranged on the outer wall of the motor box and connected to the first motor; a lifting motor and a screw transmission device for controlling the lifting of the rotating seat are arranged inside the supporting seat; the screw transmission device is connected to the rotating seat; the lifting motor controls the screw transmission device to work, thereby controlling the lifting of the rotating seat; a box cover for sealing the first motor is installed on the motor box; the first motor controls the rotating rod to rotate; a rotating block connected to the lower end surface of the motor box is rotatably arranged on the rotating seat; and the rotating The outer surface of the movable seat is provided with a second motor for controlling the rotation of the rotating block, and the second motor controls the motor box to rotate through the rotating block, thereby controlling the caulking seat to adjust the angle, and the caulking mechanism also includes a caulking seat vertically connected to one end of the rotating rod, two groups of lasers detachably mounted on the outer side of the caulking seat, and a dust cleaning seat and a fixed seat matched with the lasers, and the two groups of lasers are aligned with the dust cleaning seat and the fixed seat respectively, so that the dust cleaning tool can perform accurate cleaning and the special caulking agent can be used for caulking; wherein, a groove is provided at one end of the dust cleaning seat, and a tool seat is rotatably mounted in the dust cleaning seat, and the vertical section of the tool seat is a square structure, and a plurality of groups of the dust cleaning tools are respectively arranged on the tool seat. On the upper, lower, left and right sides of the tool seat, several groups of cleaning knives are detachably mounted on the tool seat, one side of the cleaning seat is provided with a second rotating motor for controlling the rotation of the tool seat, the second rotating motor adjusts different types of cleaning knives through the tool seat to rotate, so as to clean the brick joints, the other side of the cleaning seat is provided with a first electric telescopic rod for limiting the tool seat, the output shaft of the first electric telescopic rod passes through the cleaning seat and is provided with a limiting rod connected to the tool seat, several groups of limiting holes connected to the limiting rods are provided in a circular array on the tool seat, and several groups of the limiting holes correspond one by one to several groups of cleaning knives respectively; an ash absorber arranged below the cleaning seat is installed on the caulking seat A tube is provided below the tool seat, a suction nozzle connected with the ash suction pipe is provided, and the other end of the ash suction pipe is provided with a telescopic hose, and an ash suction device connected with the telescopic hose is provided inside the support seat, and the ash suction device sucks away the ash cleaned by the cleaning tool through the suction nozzle, the ash suction pipe and the telescopic hose, and there is no need for staff to clean it; a connecting groove connected with the fixing seat is provided on the caulking seat, and a fixing groove that is fitted with a special caulking agent is provided on the fixing seat, and a second electric telescopic rod is provided at the upper end of the caulking seat, and the output shaft of the second electric telescopic rod extends into the inner side of the fixing groove and is provided with a fixing block for fixing the special caulking agent, and the fixing block and the fixing seat can fix the special caulking agent.

[0021] As a further solution of the present invention: the caulking mechanism also includes a cleaning seat detachably mounted on the other side of the support seat, a cleaning tool movably arranged on one side of the cleaning seat and several groups of hydraulic cylinders detachably mounted on the upper end of the cleaning seat and controlling the movement of the cleaning tool, the cleaning tool being provided with a handle seat, and one side of the cleaning tool being provided as a vertical surface; wherein, a reinforcing rod detachably connected to an output shaft of the hydraulic cylinder is movably arranged inside the cleaning seat, a reinforcing member vertically connected to one side of the cleaning tool is provided at the bottom end of the reinforcing rod, several groups of movable grooves matching the reinforcing members are symmetrically provided on the cleaning seat, and the reinforcing member is composed of a straight rod and a cylinder vertically connected to the straight rod.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] (1) The present invention uses a high-standard swimming pool structure and a swimming pool tile paving construction method based on BIM technology to make the structure simple, the construction operability strong, safe and reliable, and the overall effect is more neat and beautiful, with significant benefits. It can effectively solve the problems of inconsistent standard swimming pool structures, difficulty in preventing leakage, and difficulty in paving the surface of swimming pool tiles. The movable seat, support seat, first rotating motor, mounting part and roller adjust the angle and position of the caulking seat, the second rotating motor, tool seat and cleaning tool clean the seams, the second motor, rotating block and caulking seat adjust the angle of the special caulking agent, the hydraulic cylinder, reinforcing rod, reinforcing part and cleaning tool clean the tiles, so that the corners of the pool wall tiles can be cleaned, caulked and the caulking agent can be cleaned in all directions, thereby improving the efficiency of swimming pool construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0025] Figure 2 It is a partial structural diagram of a standard swimming pool and pool wall tiles in the present invention.

[0026] Figure 3 It is a partial structural diagram of the pool wall bricks and swimming lane marking lines in the present invention.

[0027] Figure 4 The present invention is a flow chart of the construction method for paving swimming pool tiles.

[0028] Figure 5 It is a partial structural diagram of the caulking mechanism in the present invention.

[0029] Figure 6 It is a partial structural diagram of the support seat and the first rotating motor in the present invention.

[0030] Figure 7 It is a partial structural diagram of the suction nozzle and the dust suction device in the present invention.

[0031] Figure 8 It is a partial structural diagram of the rotating seat and the motor box in the present invention.

[0032] Fig. 9 It is a partial structural diagram of the tool holder and the first electric telescopic rod in the present invention.

[0033] Fig.10 It is a partial structural diagram of the cleaning tool and hydraulic cylinder in the present invention.

[0034] In the figure: 1. Standard swimming pool; 2. Overflow ditch; 3. Drainage ditch; 4. Resting platform; 5. Pool bottom overflow; 6. Pool ladder; 7. Starting platform; 8. Swimming line; 9. Pool bank bricks; 10. Pool wall bricks; 11. Pool bottom bricks; 12. Lane marking line; 13. Lane dividing line; 14. PVC grille cover; 15. Moving seat; 16. Support seat; 17. First rotating motor; 18. Mounting piece; 19. Roller; 20. Rotating seat; 21. Motor box; 22. First motor; 23. Rotating rod; 24, rotating block; 25, second motor; 26, caulking seat; 27, laser; 28, cleaning seat; 29, fixed seat; 30, tool seat; 31, cleaning tool; 32, second rotating motor; 33, first electric telescopic rod; 34, limit rod; 35, ash suction pipe; 36, suction nozzle; 37, telescopic hose; 38, ash suction equipment; 39, second electric telescopic rod; 40, fixed block; 41, cleaning seat; 42, cleaning tool; 43, hydraulic cylinder; 44, reinforcing rod; 45, reinforcing member. DETAILED DESCRIPTION

[0035] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] Embodiment 1

[0037] See also Figure 1 - Figure 3 The present application provides a high-standard swimming pool structure and a swimming pool brick paving construction method, including a swimming pool body 1 and a construction mechanism arranged on the swimming pool body 1; the construction mechanism includes an overflow ditch 2 arranged on the upper end surface of the swimming pool body 1, a drainage ditch 3 arranged outside the overflow ditch 2 and a resting platform 4 arranged inside the overflow ditch 2; the construction mechanism also includes several groups of pool bottom overflow outlets 5 arranged on the inner bottom surface of the swimming pool body 1, several groups of swimming pool escalators 6 arranged on the swimming pool body 1, several groups of starting platforms 7 symmetrically and parallelly arranged on the upper end surface of the swimming pool body 1, and several groups of swimming marking lines 8; wherein, PVC grille covers 14 are arranged on the overflow ditch 2 and the drainage ditch 3.

[0038] The swimming pool body 1 in the present invention is composed of pool bank bricks 9, pool wall bricks 10, pool bottom bricks 11, lane marking lines 12, and lane dividing lines 13. The length dimension of the swimming pool body 1 is set to 50m, the width dimension of the swimming pool body 1 is set to 25m, and the depth dimension of the swimming pool body 1 is set to 1.2m-1.8m.

[0039] In the present invention, the specifications of the pool wall bricks 10 and the pool bottom bricks 11 are set to 244mm×119mm×9mm white pool-specific ceramic tiles, the specifications of the pool bank bricks 9 are set to 244×244mm×9mm white special ground anti-slip bricks, and the swimming lane marking lines 12 are dark blue pool-specific ceramic tiles, wherein the brick joints of the pool bank bricks 9, the pool wall bricks 10 and the pool bottom bricks 11 are all set to 6mm.

[0040] In the present invention, the spacing between the pool bottom overflow outlets 5 is set to 2.5m*2.5m, the centers of the pool bottom overflow outlets 5 are all set at the intersection of four pool wall tiles 10, the overflow ditch 2 is set to 350mm×300mm, the sewage ditch 3 is set to 250mm×300mm, and the swimming pool escalator 6 and the swimming marking line 8 are both set to 304 stainless steel.

[0041] Embodiment 2

[0042] Reference Figure 1 - Figure 4 , which is the second embodiment of the present invention, wherein a high-standard swimming pool tile paving construction method in the present invention comprises the following specific steps:

[0043] Step A: Deepen the design with BIM technology and carefully lay out the swimming pool tiles;

[0044] Step B: Base treatment;

[0045] Step C: Laying out bricks;

[0046] Step D: Pool tile paving;

[0047] Step E: Clean the seams and fill them with caulking agent;

[0048] Step F: Cleaning and maintenance;

[0049] Step G: Acceptance.

[0050] In step A of the present invention, the regulations of the International Swimming Federation and the relevant standards of the domestic swimming competition manual are sorted out and familiarized, the basic data of site conditions and swimming pool design parameters are collected, and the main structure three-dimensional model of the swimming pool is constructed using BIM software. The main structure three-dimensional model includes the basic shape of the swimming pool wall, bottom and related ancillary facilities, and the accurate coordinate system and elevation information of each part are determined. The swimming pool bricks are preliminarily arranged in the BIM model and the brick seam width, alignment method and overall aesthetics are considered. Detailed modeling is performed for the complex parts of the footrest platform 4, drainage ditch and access passage, and the size, shape and connection method of each node with other structures are accurately determined. The collision points in the model are automatically detected by BIM software, and potential conflict problems are analyzed and resolved. The brick layout and node design are adjusted according to the collision detection results, and verification is repeated until all requirements and standards are met. The construction drawings containing detailed annotations and instructions are output, and the construction drawings include plan views, elevation views, section views and node detail views.

[0051] In step B of the present invention, after the waterproof layer is completed on the pool wall, if the leveling layer is too thick, generally not more than 20 mm, it is necessary to adopt a wire mesh to prevent the mortar layer from falling off and cracking. In addition, a closed water test should be carried out after the waterproof layer is completed, and the time shall not be less than 36 hours. In step C, dividing lines are popped up every 1m from the four corners, and handrail bricks can be placed every 1m as a mark. Vertical dividing lines are placed on the pool wall according to the handrail position dividing lines (other colors can be used). When the pool bottom dividing lines are placed, a 1m×lm mesh will be formed. shaped dividing line to facilitate subsequent tile laying. According to the tile layout design, 4 tiles / m are placed in the long side of the swimming pool, 8 tiles / m are placed in the short side, the brick seam is 6mm, and 32 swimming pool tiles are used for each square. In step D, the pool wall tiles 10 should be constructed first, and then the pool bottom tiles 11 should be constructed. The anti-slip tiles in the pool bank area and the pool tiles should be constructed at the same time. The pool bottom should be laid in accordance with the principle of laying the center tiles of the swimming lane first, then the tiles on both sides, and finally the special parts. The swimming pool tiles are bonded with special swimming pool tile adhesives. Every 2-3 meters during laying. Check the X and Y axis grid lines once to prevent accumulated errors; the non-slip surface of the pool bank should be sloped outward to allow the flushing water to flow to the peripheral drainage ditch 3. In step E, the tiles can be caulked at least two days after pasting. Use caulking equipment to caulk the pool wall tiles 10. Special caulking equipment must use special caulking agents when caulking. The adhesive and caulking agents stuck on the surface of the tiles must be removed immediately. The paving must be uniform in color, and the gaps must be full and straight without empty filling or insufficient filling, otherwise it is easy to scratch people, or the gaps leak and cause the tiles to fall off. Step In step F, after caulking, the garbage on the tiles is cleaned in time and maintenance measures are strengthened. The pool wall tiles 10 are covered with a film for maintenance, and the pool bottom tiles 11 and the pool bank tiles 9 are sprinkled with water for maintenance for no less than 7 days. In step G, the allowable deviations of the pool bottom tiles 11 and the pool bank tiles 9 are: surface flatness 2mm; seam grid straightness 3mm; joint height difference 0.5mm; tile gap width ≯2mm; pool wall tiles 10 allowable deviations: surface flatness 2mm; facade verticality 2mm; external angle squareness 2mm; joint straightness 2mm; joint height 0.5mm.

[0052] Embodiment 3

[0053] Reference Figure 5 - Fig.10, which is the second embodiment of the present invention, wherein the caulking equipment in the present invention includes a moving seat 15 that moves on the inner bottom surface of the swimming pool body 1, a support seat 16 that is detachably connected to the moving seat 15, and a caulking mechanism installed on the support seat 16, the bottom end of the moving seat 15 is equipped with a moving wheel for moving, a first rotating motor 17 is installed inside the moving seat 15, a mounting member 18 that is detachably connected to the first rotating motor 17 is arranged at the center of the lower end surface of the support seat 16, the first rotating motor 17 controls the support seat 16 to rotate on the moving seat 15 through the mounting member 18, the lower end surface of the support seat 16 is provided with a plurality of groups of rollers 19 for rolling in a circular array, the upper end surface of the moving seat 15 is provided with a rolling groove matching the roller 19, and the roller 19 moves in the rolling groove to assist the support seat 16 to rotate.

[0054] The caulking mechanism of the present invention comprises a rotating seat 20 detachably mounted on one side of a supporting seat 16, a motor box 21 rotatably connected to the rotating seat 20, a first motor 22 detachably arranged inside the motor box 21, and a rotating rod 23 arranged on the outer wall of the motor box 21 and connected to the first motor 22. A lifting motor and a screw transmission device for controlling the lifting of the rotating seat 20 are arranged inside the supporting seat 16. The screw transmission device is connected to the rotating seat 20. The lifting motor controls the screw transmission device to work, thereby controlling the lifting of the rotating seat 20. A box cover for sealing the first motor 22 is installed on the motor box 21. The first motor 22 controls the rotating rod 23 to rotate. The rotating seat 2 0 is rotatably provided with a rotating block 24 connected to the lower end surface of the motor box 21, and the outer surface of the rotating seat 20 is provided with a second motor 25 for controlling the rotation of the rotating block 24. The second motor 25 controls the motor box 21 to rotate through the rotating block 24, thereby controlling the caulking seat 26 to adjust the angle. The caulking mechanism also includes a caulking seat 26 vertically connected to one end of the rotating rod 23, two groups of lasers 27 detachably mounted on the outer side of the caulking seat 26, and a dust cleaning seat 28 and a fixed seat 29 matched with the laser 27. The two groups of lasers 27 are aligned with the dust cleaning seat 28 and the fixed seat 29 respectively, so that the dust cleaning tool 31 can perform accurate dust cleaning and special caulking agent for caulking; A groove is provided at one end of the cleaning seat 28, a tool seat 30 is rotatably installed in the cleaning seat 28, the vertical section of the tool seat 30 is a square structure, a plurality of groups of cleaning knives 31 are respectively arranged on the upper, lower, left and right sides of the tool seat 30, and a plurality of groups of cleaning knives 31 are detachably installed on the tool seat 30, a second rotating motor 32 for controlling the rotation of the tool seat 30 is provided on one side of the cleaning seat 28, the second rotating motor 32 adjusts the cleaning knives 31 of different models through the tool seat 30 to rotate, so as to clean the brick joints, and a first electric telescopic rod 33 for limiting the tool seat 30 is provided on the other side of the cleaning seat 28, and the output shaft of the first electric telescopic rod 33 passes through the cleaning seat The caulking seat 26 is provided with an ash suction pipe 35 arranged below the ash cleaning seat 28, a suction nozzle 36 connected to the ash suction pipe 35 is arranged below the tool seat 30, and a telescopic hose 37 is arranged at the other end of the ash suction pipe 35, and an ash suction device 38 connected to the telescopic hose 37 is arranged inside the support seat 16, and the ash suction device 38 sucks away the ash cleaned by the ash cleaning tool 31 through the suction nozzle 36, the ash suction pipe 35 and the telescopic hose 37, and no staff is required to clean it;The caulking seat 26 is provided with a connection groove connected to the fixing seat 29, and the fixing seat 29 is provided with a fixing groove fitted with the special caulking agent. The upper end of the caulking seat 26 is provided with a second electric telescopic rod 39, and the output shaft of the second electric telescopic rod 39 extends into the inner side of the fixing groove and is provided with a fixing block 40 for fixing the special caulking agent. The fixing block 40 and the fixing seat 29 can fix the special caulking agent. ;

[0055] The caulking mechanism in the present invention also includes a cleaning seat 41 that is detachably mounted on the other side of the support seat 16, a cleaning tool 42 that is movably mounted on one side of the cleaning seat 41, and several groups of hydraulic cylinders 43 that are detachably mounted on the upper end of the cleaning seat 41 and control the movement of the cleaning tool 42. One side of the cleaning seat 41 is flush with one side of the support seat 16, one end of the cleaning tool 42 extends out of one side of the cleaning seat 41, a handle seat is provided on the cleaning tool 42, a lifting motor and a screw transmission device can control the cleaning seat 41 to rise and fall on the support seat 16, and one side of the cleaning tool 42 is set as a vertical surface; wherein, the cleaning seat 41 is internally movably provided with a reinforcing rod 44 that is detachably connected to the output shaft of the hydraulic cylinder 43, the bottom end of the reinforcing rod 44 is provided with a reinforcing member 45 that is vertically connected to one side of the cleaning tool 42, and the cleaning seat 41 is symmetrically provided with several groups of movable grooves that match the reinforcing member 45, and the reinforcing member 45 is composed of a straight rod and a cylinder vertically connected to the straight rod.

[0056] In summary, the moving seat 15 drives the supporting seat 16 to move to the corner, the first rotating motor 17 is started, and the mounting member 18 is driven to rotate, and the mounting member 18 drives the supporting seat 16 to rotate, and the supporting seat 16 drives the roller 19 to move in the rolling groove, so as to adjust the angle of the supporting seat 16, and the supporting seat 16 drives the caulking mechanism to adjust the angle, and the second motor 25 is started, and the rotating block 24 is driven to rotate, and the rotating block 24 drives the motor box 21 to rotate, and the motor box 21 drives the cleaning tool 31 and the special caulking agent to adjust the angle through the rotating rod 23, and the second rotating motor 32 is started, and the tool seat 30 is driven to rotate, and the tool seat 30 drives the cleaning tool 31 to rotate, so that the cleaning tool 31 is aligned with the brick joint, and the first electric telescopic rod 33 is started, and the limit rod 34 is driven to move, and the limit rod 34 limits the tool seat 30, and the lifting motor is started, and the screw The transmission device controls the lifting of the cleaning tool 31, and the cleaning tool 31 performs cleaning, and the ash suction device 38 is started, and the suction nozzle 36, the ash suction pipe 35 and the telescopic hose 37 cooperate to suck away the ash cleaned by the cleaning tool 31. When the cleaning is completed, the first motor 22 is started to drive the rotating rod 23 to rotate, and the rotating rod 23 drives the caulking seat 26 to adjust the angle, and the caulking seat 26 drives the cleaning seat 28 and the fixed seat 29 to rotate, and the special caulking agent is aligned with the brick joints for caulking. After the caulking is completed, the position of the special tool is adjusted to compact the caulking agent. After the special caulking agent is used up, the second electric telescopic rod 39 is started to drive the fixed block 40 to move, so that the fixed block 40 is separated from the special caulking agent, so as to replace the special caulking agent, and the special caulking agent is connected to the fixed seat 29. The second electric telescopic rod 39 controls the fixed block 40 to fix the special caulking agent;

[0057] After the caulking is completed, start the moving seat 15 to control the supporting seat 16 to rotate to the area to be cleaned, fit the cleaning tool 42 with the outer surface of the tile, start the hydraulic cylinder 43, drive the reinforcing rod 44 to move up and down continuously, the reinforcing rod 44 drives the reinforcing member 45 to move, the reinforcing member 45 drives the cleaning tool 42 to move, clean the caulking agent adhered to the tile, start the lifting motor, control the cleaning seat 41 to rise and fall through the screw transmission device, and clean the caulking agent at different positions.

[0058] Embodiment 4

[0059] Reference Figure 1 - Fig.10 , this embodiment is obtained by combining embodiment 1, embodiment 2 and embodiment 3.

[0060] Collect basic data on site conditions and swimming pool design parameters, use BIM software to build a three-dimensional model of the main structure of the swimming pool, output the construction drawings of the swimming pool, and carry out swimming pool construction. Pave the pool bank bricks 9, pool wall bricks 10, pool bottom bricks 11, lane marking lines 12, and lane dividing lines 13. After paving, the moving seat 15, the supporting seat 16, the first rotating motor 17, the mounting part 18 and the roller 19 adjust the angle and position of the caulking seat 26, the second rotating motor 32, the tool seat 30 and the cleaning tool 31 clean the seams, the second motor 25, the rotating block 24 and the caulking seat 26 adjust the angle of the special caulking agent, caulk the tiles, the hydraulic cylinder 43, the reinforcing rod 44, the reinforcing part 45 and the cleaning tool 42 clean the tiles, and after cleaning, the swimming pool body 1 is maintained, and acceptance is carried out after the maintenance is completed.

[0061] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. A high-standard swimming pool structure, characterized in that: It comprises a swimming pool body (1) and a structural mechanism arranged on the swimming pool body (1); The structural mechanism comprises an overflow ditch (2) arranged on the upper end surface of the swimming pool body (1), a drainage ditch (3) arranged outside the overflow ditch (2), and a resting platform (4) arranged inside the overflow ditch (2); The structural mechanism also includes a plurality of pool bottom overflow ports (5) arranged on the inner bottom surface of the swimming pool body (1), a plurality of pool ladders (6) arranged on the swimming pool body (1), a plurality of starting platforms (7) symmetrically and parallelly arranged on the upper end surface of the swimming pool body (1), and a plurality of swimming marking lines (8); Wherein, the overflow ditch (2) and the sewage ditch (3) are both provided with PVC grille cover plates (14).

2. A high standard swimming pool structure according to claim 1, characterized in that: The swimming pool body (1) is composed of pool bank bricks (9), pool wall bricks (10), pool bottom bricks (11), swimming lane marking lines (12), and swimming lane dividing lines (13). The length dimension of the swimming pool body (1) is set to 50m, the width dimension of the swimming pool body (1) is set to 25m, and the depth dimension of the swimming pool body (1) is set to 1.2m-1.8m.

3. A high standard swimming pool structure according to claim 2, characterized in that: The pool wall bricks (10) and the pool bottom bricks (11) are both 244 mm × 119 mm × 9 mm white special pool tiles, the pool bank bricks (9) are 244 mm × 244 mm × 9 mm white special ground non-slip bricks, and the lane marking lines (12) are dark blue special pool tiles, wherein the brick joints of the pool bank bricks (9), the pool wall bricks (10) and the pool bottom bricks (11) are all 6 mm.

4. A high standard swimming pool structure according to claim 3, characterized in that: The spacing between the pool bottom overflow outlets (5) is set to 2.5m*2.5m, the centers of the pool bottom overflow outlets (5) are all set at the intersection of four pool wall tiles (10), the overflow ditch (2) is set to 350mm×300mm, the drainage ditch (3) is set to 250mm×300mm, and the swimming pool ladder (6) and swimming marking line (8) are both made of 304 stainless steel.

5. A high-standard swimming pool tile paving construction method, characterized in that: A high-standard swimming pool structure according to any one of claims 1-4, the specific steps are as follows: Step A: Deepen the design with BIM technology and carefully lay out the swimming pool tiles; Step B: Base treatment; Step C: Laying out bricks; Step D: Pool tile paving; Step E: Clean the seams and fill them with caulking agent; Step F: Cleaning and maintenance; Step G: Acceptance.

6. A high-standard swimming pool tile paving construction method according to claim 5, characterized in that: In the step A, the regulations of the International Swimming Federation and the relevant standards of the domestic swimming competition manual are sorted out and familiarized, the basic data of site conditions and swimming pool design parameters are collected, and the main structure three-dimensional model of the swimming pool is constructed using BIM software. The main structure three-dimensional model includes the basic shape of the swimming pool wall, bottom and related auxiliary facilities, and the accurate coordinate system and elevation information of each part are determined. The swimming pool bricks are preliminarily arranged in the BIM model and the brick seam width, alignment method and overall aesthetics are considered. Detailed modeling is performed for the complex parts of the rest platform (4), drainage ditch and access passage, and the size, shape and connection method of each node with other structures are accurately determined. The collision points in the model are automatically detected using BIM software, and potential conflict problems are analyzed and resolved. The brick layout and node design are adjusted according to the collision detection results, and repeated verification is performed until all requirements and standards are met. The construction drawings containing detailed annotations and instructions are output, and the construction drawings include plan views, elevation views, section views and node detail views.

7. A high-standard swimming pool tile paving construction method according to claim 5, characterized in that: In step B, after the waterproof layer is made on the pool wall, if the leveling layer is too thick, it is necessary to use a wire mesh to prevent the mortar layer from falling off and cracking. In addition, a closed water test should be carried out after the waterproof layer is completed, and the time shall not be less than 36 hours. In step C, dividing lines are popped out every 1m from the four corners, and handrail bricks can be placed every 1m as a mark. Vertical dividing lines are laid out on the pool wall according to the handrail position dividing lines. When the pool bottom dividing lines are laid out, a 1m×1m mesh dividing line will be formed. According to the brick arrangement diagram, 4 bricks / m are placed in the long side direction of the swimming pool, 8 bricks / m are placed in the short side direction, the brick seam is 6mm, and 32 swimming pool bricks are used for each square. In step D, the pool wall bricks (10) should be constructed first, and then the pool bottom bricks (11) should be constructed. The anti-slip bricks in the pool bank area and the pool tiles are constructed at the same time. The pool bottom is paved in accordance with the construction principle of first laying the center tiles of the swimming lane, then the tiles on both sides, and finally the special parts. The swimming pool bricks are made of special The pool tiles are bonded with a swimming pool tile adhesive, and the X and Y axis grid lines are checked once every 2-3 meters during paving; the anti-skid surface of the pool bank should be sloped outward so that the flushing water flows to the peripheral drainage ditch (3); in the step E, the tiles can be caulked at least two days after pasting, and the pool wall tiles (10) are caulked using caulking equipment. When the special caulking equipment is used for caulking, a special caulking agent must be used, and the adhesive and caulking agent stuck on the surface of the tiles must be removed immediately; in the step F, after the caulking is completed, the garbage on the tiles is cleaned in time and maintenance measures are strengthened. The pool wall tiles (10) are covered with a film for maintenance, and the pool bottom tiles (11) and the pool bank tiles (9) are watered for maintenance for no less than 7 days. In the step G, the pool bottom tiles (11) and the pool bank tiles (9) are allowed to have the following deviations: surface flatness 2mm; seam grid straightness 3mm; joint height difference 0.5mm; tile gap width ≯2mm; pool wall tiles (10) are allowed to have the following deviations: surface flatness 2mm; verticality 2mm; The external corner is square 2mm; the joint is straight 2mm; the joint height is 0.5mm.

8. A high-standard swimming pool tile paving construction method according to claim 7, characterized in that: The caulking device comprises a movable seat (15) that moves on the inner bottom surface of a swimming pool body (1), a support seat (16) that is detachably connected to the movable seat (15), and a caulking mechanism installed on the support seat (16); a first rotating motor (17) is installed inside the movable seat (15); a mounting member (18) that is detachably connected to the first rotating motor (17) is arranged at the center of the lower end surface of the support seat (16); a plurality of groups of rolling rollers (19) are arranged in a circular array on the lower end surface of the support seat (16); and a rolling groove that matches the rollers (19) is arranged on the upper end surface of the movable seat (15).

9. A high-standard swimming pool tile paving construction method according to claim 8, characterized in that: The caulking mechanism comprises a rotating seat (20) detachably mounted on a side surface of a support seat (16), a motor box (21) rotatably connected to the rotating seat (20), a first motor (22) detachably mounted inside the motor box (21), and a rotating rod (23) disposed on the outer wall of the motor box (21) and connected to the first motor (22); a rotating block (24) rotatably mounted on the rotating seat (20) and connected to the lower end surface of the motor box (21); a second motor (25) for controlling the rotating block (24) to rotate is disposed on the outer surface of the rotating seat (20); the caulking mechanism further comprises a caulking seat (26) vertically connected to one end of the rotating rod (23), two groups of lasers (27) detachably mounted on the outer side surface of the caulking seat (26), a dust cleaning seat (28) and a fixing seat (29) matched with the lasers (27); A groove is provided at one end of the cleaning seat (28); a tool seat (30) is rotatably mounted in the cleaning seat (28); a plurality of groups of cleaning knives (31) are detachably mounted on the tool seat (30); a second rotating motor (32) for controlling the tool seat (30) to rotate is provided on one side of the cleaning seat (28); a first electric telescopic rod (33) for limiting the tool seat (30) is provided on the other side of the cleaning seat (28); an output shaft of the first electric telescopic rod (33) passes through the cleaning seat (28) and is provided with a limiting rod (34) connected to the tool seat (30); The caulking seat (26) is provided with an ash suction pipe (35) arranged below the ash cleaning seat (28); a suction nozzle (36) connected to the ash suction pipe (35) is arranged below the tool seat (30); a telescopic hose (37) is arranged at the other end of the ash suction pipe (35); and an ash suction device (38) connected to the telescopic hose (37) is arranged inside the support seat (16); The caulking seat (26) is provided with a connecting groove connected to the fixing seat (29), the fixing seat (29) is provided with a fixing groove fitted with a special caulking agent, and a second electric telescopic rod (39) is provided at the upper end of the caulking seat (26), the output shaft of the second electric telescopic rod (39) extends into the inner side of the fixing groove and is provided with a fixing block (40) for fixing the special caulking agent.

10. A high-standard swimming pool tile paving construction method according to claim 9, characterized in that: The caulking mechanism further comprises a cleaning seat (41) detachably mounted on the other side of the support seat (16), a cleaning knife (42) movably arranged on one side of the cleaning seat (41), and a plurality of groups of hydraulic cylinders (43) detachably mounted on the upper end of the cleaning seat (41) and controlling the movement of the cleaning knife (42); The cleaning seat (41) is provided with a reinforcing rod (44) detachably connected to the output shaft of the hydraulic cylinder (43), the bottom end of the reinforcing rod (44) is provided with a reinforcing member (45) vertically connected to a side surface of the cleaning tool (42), and the cleaning seat (41) is symmetrically provided with a plurality of groups of movable grooves matching the reinforcing member (45).

Citation Information

Patent Citations

  • Safe ecological swimming pool for fitness

    CN112854838A

  • Swimming pool brick paving construction method for natatorium

    CN115478720A

  • High-altitude cantilever glass swimming pool construction and full-life monitoring and early warning method

    CN116146001A

  • Whole swimming pool of pin -connected panel

    CN205840414U

  • Natatorium with independently distributed drainage ditches and overflow ditches

    CN209293497U