A coke side furnace protection iron piece track site crane lifting structure and method

By designing a crane lifting structure for the iron track site of the coke side furnace guard iron parts, the problem of the crane being unable to be supported after entering the site during coke oven installation is solved, the construction efficiency and cost are significantly reduced, and the construction environmental protection requirements are met.

CN119735092APending Publication Date: 2025-04-01CHINA THIRD METALLURGICAL GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411721885.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-28
Publication Date
2025-04-01

AI Technical Summary

Technical Problem

During the coke oven installation process, the installation of the iron parts of the coke side furnace guard is limited by the width and height of the coke quenching vehicle track, which makes it difficult for the crane to enter the site and support, resulting in problems such as difficult construction, long construction period and high cost.

Method used

A focal side furnace iron piece track site crane lifting structure is designed, including the site track consisting of several rail beams and lower substrates, equipped with lifting structures and slope structures. By adjusting the height and setting the slope structure, the effective lifting and support of the crane is achieved.

Benefits of technology

Through this structure, the problem of the inability to support the crane after entering the site is solved, the construction period is shortened, the cost is reduced, and the construction efficiency and safety is improved, the construction environmental protection requirements are met, and the dust is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119735092A_ABST
    Figure CN119735092A_ABST
Patent Text Reader

Abstract

The invention discloses a coke side furnace protection iron track site crane lifting structure, comprising a site track, wherein the site track is composed of a plurality of rail beams and a lower base plate, wherein the plurality of rail beams are arranged on the upper side of the lower base plate, and a lower cover plate is installed on the inner side of the rail beam and on the lower base plate. The invention relates to the coke side furnace protection technical field. The coke side furnace protection iron track site crane lifting structure focuses on solving a series of problems in the installation process of coke oven protection equipment, that is, after the crane enters the site due to the width and height of the site after the crane enters the site on the coke side quenching car track, the cost and construction period are greatly reduced after the problem is solved by this system, and a large amount of cost can be saved. In addition, when the patent is used for construction, the construction difficulty is smaller and the construction efficiency is faster. At the same time, the problem that the construction site and engineering vehicles cannot enter the site is solved. After the patent is constructed, the national environmental protection requirements for related construction can be met and a large amount of dust can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coke side furnace protection, and in particular to a coke side furnace protection iron piece track site crane lifting structure. Background Art

[0002] In the past, during the installation of coke ovens, when installing the iron parts on the coke side of the coke oven, it was necessary to stand a truck crane inside the quenching car track on the coke side. Due to the complexity of the process, the space on the coke side of the coke oven is extremely insufficient. For example, there are two quenching car tracks and a coke platform on the coke side for wet quenching, and two coke blocking car tracks and a quenching car track for dry quenching. As a result, there is no space outside the coke side track to transport and place the iron parts for the furnace protection equipment, and most lifting machinery and equipment cannot be supported and set up after entering the site.

[0003] In the past, after the coke oven was built, the next construction process required was the installation and debugging of the furnace protection iron parts. In the previous construction process, when installing to the coke side of the coke oven, a truck crane was required to enter the inside of the quenching car track on the coke side of the coke oven. The crane model is generally 25-75t. Taking a 25t crane as an example, the outrigger width is 6m, and the center distance between the inner and outer rails of the quenching car is 4 meters (the center distance between the inner and outer rails of the 6.25m, 6.75m, and 7.65m models of coke ovens is 4m). The crane leg width is insufficient, and the quenching car track is a pedestal track foundation. The height difference from the pedestal surface to the upper surface of the track beam is 700mm-2100mm (the height difference varies depending on the different design heights of the ground, and the final ground is generally 700mm), and the crane leg height is also limited. The outside of the inner track of the quenching car on the coke side of the coke oven is the flue on the coke side of the coke oven, which is less than one meter away. The outside of the outer track of the quenching car is the coke blocking car track or coke platform, which is less than 3 meters away from the outer track. The height difference between the flue, coke blocking car track, coke platform and the track is more than 3.5 meters, and the extended width varies from 4 to 10 meters. It is impossible to place equipment and materials, and vehicles cannot pass, so operations can only be carried out between the inner and outer tracks of the quenching car.

[0004] At present, a 25-75t truck crane is first placed between the inner and outer rails of the coke quenching car to set up the legs at the lifting operation point. After the truck crane is set up, the truck carrying the furnace protection iron parts equipment is placed on the plate for lifting. However, the width and height of the coke oven quenching car track are limited, and even a crane of at least 25t cannot be set up, so this patent is used to solve the problem. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a coke side furnace protection iron piece track yard crane lifting structure, which solves the problem that the existing crane is not easy to enter the track.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: a coke side furnace protection ironwork track site crane lifting structure, including a site track, the site track is composed of a plurality of rail beams and a lower base plate, the plurality of rail beams are arranged on the upper side of the lower base plate, a lower cover plate is installed on the inner side of the rail beam and located on the lower base plate, an upper cover plate is provided on the lower cover plate, a pair of lifting structures are provided between the lower cover plate and the upper cover plate, and slope structures are provided between the upper cover plate and the lower cover plate and at both ends.

[0007] Preferably, the lifting structure includes an outer web and an inner web, the outer web is arranged on the lower side of the upper cover plate, the inner web is arranged on the inner side of the outer web, the inner web is connected to the lower cover plate, and the inner web and the outer web are provided with a plurality of height adjustment openings distributed in a rectangular array, and adjusting high-strength bolts are inserted between the corresponding height adjustment openings on the inner web and the height adjustment openings on the outer web.

[0008] Preferably, the slope structure includes a slope lower plate, which is connected to the lower cover plate, a slope upper plate is installed on the slope lower plate, and the slope upper plate is connected to the upper cover plate. A slope reinforcement plate is provided between the slope lower plate and the slope upper plate, and the slope upper plate, the slope lower plate and the slope reinforcement plate are arranged in a triangle or A shape.

[0009] Preferably, cylinders are installed on both sides of the left and right sides of the lower plate of the ramp, an internal thread is opened in the cylinder, a screw is spirally installed in the cylinder, a foot is installed at the lower end of the screw, a pulley is installed on the outer ring surface of the cylinder, and the pulley is connected to the lower plate of the ramp.

[0010] Preferably, anti-skid pads are embedded on both the front and rear sides of the top of the upper cover plate, and the anti-skid pads are provided with anti-skid grooves.

[0011] Preferably, a method for lifting a coke side furnace protection ironwork track site crane lifting structure comprises the following steps: 1) Set up a lifting structure next to the rail beam according to the wheelbase of the crane; 2) Setting a new lifting structure on the front side of the lower substrate, the new lifting structure corresponding to the lifting structure set in step 1); 3) Adjust the lifting structure set in step 1) so that its upper surface is flush with the upper surface of the rail beam; 4) adjusting the lifting structure set in step 2) so that its upper surface is flush with the upper surface of the lower substrate; 5) Fix the slope structure to the front side of the lifting structure.

[0012] Preferably, the step 5) comprises: Fix the lifting structure to the front side of the slope structure by welding or hooking; The length of the lower plate of the slope platform of the slope structure on the upper side is set to L, the length of the upper plate of the slope platform of the slope structure on the lower side is set to L1, the horizontal distance between the slope structure on the upper side and the slope structure on the lower side is set to L2, and the value range of the length L is L2<=L<=L1+L2; Among them, L=L1+L2 is the optimal length; Set the upper plate of the ramp according to the height of the lifting structure and the length of the lower plate of the ramp, and make the angle of the upper plate of the ramp the same as that of the lower plate of the ramp to complete the setting. Beneficial Effects

[0013] The present invention provides a coke side furnace protection iron piece track site crane lifting structure. It has the following beneficial effects: the coke side furnace protection iron piece track site crane lifting structure focuses on solving a series of problems in the process of installing the coke oven protection equipment, after the crane enters the site of the coke side quenching car track, due to the width and height of the site, the crane cannot be supported. After solving this problem through this system, the cost and construction period are greatly reduced, and a large amount of cost can be saved. When the patent is used for construction, the construction difficulty is smaller and the construction efficiency is faster. At the same time, the problem that the construction site and engineering vehicles cannot enter the site is solved. After the patent is constructed, it also meets the national environmental protection requirements for related construction and can reduce a large amount of dust. The patent thoroughly solves the problem that the coke side furnace protection iron piece cannot enter the site for installation during the installation of the coke oven furnace protection iron piece, and the installation measures are expensive and wasteful. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a structural schematic diagram of the present invention.

[0015] Figure 2 It is a schematic diagram of the right view structure of the present invention.

[0016] Figure 3 It is a schematic diagram of the track assembly structure of the present invention.

[0017] In the figure: 1. rail beam; 2. lower base plate; 3. lower cover plate; 4. upper cover plate; 5. outer web plate; 6. inner web plate; 7. height adjustment opening; 8. high-strength adjustment bolts; 9. ramp lower plate; 10. ramp upper plate; 11. ramp reinforcement plate; 12. cylinder; 13. screw; 14. foot pad; 15. anti-slip pad; 16. pulley. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0019] By those skilled in the art, the components in this case are connected in sequence. The specific connection and operation sequence should refer to the following working principle. The detailed connection means are well-known technologies in the field. The following mainly introduces the working principle and process.

[0020] See also Figure 1-3 The present invention provides a technical solution: a coke side furnace protection iron track field crane lifting structure, including a field track, the field track is composed of a plurality of rail beams 1 and a lower base plate 2, the plurality of rail beams 1 are arranged on the upper side of the lower base plate 2, a lower cover plate 3 is installed on the inner side of the rail beam 1 and located on the lower base plate 2, an upper cover plate 4 is arranged on the lower cover plate 3, a pair of lifting structures are arranged between the lower cover plate 3 and the upper cover plate 4, and slope structures are arranged between the upper cover plate 4 and the lower cover plate 3 and at both ends.

[0021] Embodiment 1: The lifting structure comprises an outer web 5 and an inner web 6, wherein the outer web 5 is arranged on the lower side of the upper cover plate 4, and the inner web 6 is arranged on the inner side of the outer web 5, and the inner web 6 is connected to the lower cover plate 3, and a plurality of height adjustment openings 7 distributed in a rectangular array are provided on the inner web 6 and the outer web 5, and an adjustment high-strength bolt 8 is inserted between the height adjustment openings 7 on the inner web 6 and the height adjustment openings 7 on the outer web 5 at corresponding positions; Specifically, during the installation of the iron parts equipment for the coke side protection of the coke oven, due to the relationship between the site width and the height difference of the track, the inside of the track of the quenching car needs to be filled with backfill soil to the height of the upper surface of the track. The backfill width should be 2m wider than the outside of the track, and the total width is 8 meters. The backfill length is determined by the number of coke oven holes. For example, the backfill length of a 70-hole coke oven is about 140m. The backfill volume calculated by the above data is huge, and after the equipment is installed, all the backfill soil inside needs to be removed. The removal is difficult and the cost of removal is huge. The work itself has no work benefits and will cause huge cost waste. Through this patent, there is no need to backfill this part, so that the car crane can stand in place, and the transport vehicle can pass normally, and the lifting device is convenient and flexible to move; The I-beam is modified into T-steel, two T-steel cover plates are butt-jointed, multiple rows of holes are opened on the web of the T-steel, and another group of this item is made as a base. High-strength bolts are used as adjusting connectors, and the multiple rows of holes on the web are high-strength bolt height-adjusting sockets to adjust the height of the lower base and the upper pedestal. Ramps are set up on both sides for the passage of car cranes. The size of the adjustment platform is adjusted according to the vehicle model, and the platform height is adjusted using adjustment holes and adjustment bolts.

[0022] Embodiment 2: The slope structure includes a slope lower plate 9, which is connected to the lower cover plate 3, and a slope upper plate 10 is installed on the slope lower plate 9, and the slope upper plate 10 is connected to the upper cover plate 4. A slope reinforcement plate 11 is provided between the slope lower plate 9 and the slope upper plate 10, and the slope upper plate 10, the slope lower plate 9 and the slope reinforcement plate 11 are arranged in a triangle or A shape; Specifically, generally, the position of the upper cover plate 4 is adjusted first, and then the ramp upper plate 10 of corresponding length is selected and fixed between the ramp lower plate 9 and the upper cover plate 4 by welding or hooking.

[0023] Cylinders 12 are installed on both sides of the ramp lower plate 9. The cylinder 12 has an internal thread. A screw 13 is spirally installed in the cylinder 12. A foot 14 is installed at the lower end of the screw 13. A pulley 16 is installed on the outer ring surface of the cylinder 12. The pulley 16 is connected to the ramp lower plate 9. Specifically, this structure assists the device to move forward and backward, and when no movement is required, the foot 14 can be screwed out.

[0024] Embodiment 3: Anti-skid pads 15 are embedded on both the front and rear sides of the top of the upper cover plate 4, and the anti-skid pads 15 are provided with anti-skid patterns; Specifically, after the furnace guard is pushed up, wedge-shaped pads are inserted at both sides of the bottom of the furnace guard to prevent the furnace guard from being in a wrong position, and the anti-skid pads 15 ensure that the pads are not in a wrong position.

[0025] A method for lifting a coke side furnace protection iron piece track site crane lifting structure comprises the following steps: 1) A lifting structure is arranged beside the rail beam 1 according to the wheelbase of the crane; 2) Setting a new lifting structure on the front side of the lower substrate 2, the new lifting structure corresponding to the lifting structure set in step 1); 3) adjusting the lifting structure provided in step 1) so that its upper surface is flush with the upper surface of the rail beam 1; 4) adjusting the lifting structure provided in step 2) so that its upper surface is flush with the upper surface of the lower substrate 2; 5) Fix the slope structure to the front side of the lifting structure.

[0026] The step 5) comprises: Fix the lifting structure to the front side of the slope structure by welding or hooking; The length of the lower plate 9 of the slope structure on the upper side is set to L, the length of the upper plate 10 of the slope structure on the lower side is set to L1, the horizontal distance between the slope structure on the upper side and the slope structure on the lower side is set to L2, and the value range of the length L is L2<=L<=L1+L2; Among them, L=L1+L2 is the optimal length; The ramp upper plate 10 is set according to the height of the lifting structure and the length of the ramp lower plate 9, and the angle of the upper ramp upper plate 10 is the same as that of the lower ramp upper plate 10 to complete the setting. It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".

[0027] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A coke side furnace protection ironwork track field crane lifting structure, comprising a field track, wherein the field track is composed of a plurality of rail beams (1) and a lower base plate (2), wherein the plurality of rail beams (1) are arranged on the upper side of the lower base plate (2), and characterized in that: A lower cover plate (3) is installed on the inner side of the rail beam (1) and located on the lower base plate (2); an upper cover plate (4) is provided on the lower cover plate (3); a pair of lifting structures are provided between the lower cover plate (3) and the upper cover plate (4); and slope structures are provided between the upper cover plate (4) and the lower cover plate (3) and located at both the front and rear ends.

2. The coke side furnace protection ironwork track yard crane lifting structure according to claim 1 is characterized in that The lifting structure comprises an outer web (5) and an inner web (6), wherein the outer web (5) is arranged on the lower side of the upper cover plate (4), and the inner web (6) is arranged on the inner side of the outer web (5), and the inner web (6) is connected to the lower cover plate (3). The inner web (6) and the outer web (5) are both provided with a plurality of height adjustment openings (7) distributed in a rectangular array, and an adjustment high-strength bolt (8) is inserted between the height adjustment openings (7) on the inner web (6) and the height adjustment openings (7) on the outer web (5) at corresponding positions.

3. The coke side furnace protection ironwork track yard crane lifting structure according to claim 1 is characterized in that The slope structure comprises a slope platform lower plate (9), the slope platform lower plate (9) is connected to the lower cover plate (3), a slope platform upper plate (10) is installed on the slope platform lower plate (9), the slope platform upper plate (10) is connected to the upper cover plate (4), a slope platform reinforcement plate (11) is provided between the slope platform lower plate (9) and the slope platform upper plate (10), and the slope platform upper plate (10), the slope platform lower plate (9) and the slope platform reinforcement plate (11) are arranged in a triangle or A shape.

4. The coke side furnace protection ironwork track yard crane lifting structure according to claim 3 is characterized in that A cylinder (12) is installed on both sides of the left and right sides of the lower plate (9) of the ramp, an internal thread is provided in the cylinder (12), a screw (13) is spirally installed in the cylinder (12), a pad (14) is installed at the lower end of the screw (13), a pulley (16) is installed on the outer ring surface of the cylinder (12), and the pulley (16) is connected to the lower plate (9) of the ramp.

5. The coke side furnace protection ironwork track yard crane lifting structure according to claim 1 is characterized in that The top and rear sides of the upper cover plate (4) are both embedded with anti-skid pads (15), and the anti-skid pads (15) are provided with anti-skid patterns.

6. The method for lifting the coke side furnace protection ironwork track site crane lifting structure according to claim 1, characterized in that , including the following steps: 1) Arranging a lifting structure beside the rail beam (1) according to the wheelbase of the crane; 2) Arranging a new lifting structure on the front side of the lower base plate (2), the new lifting structure corresponding to the lifting structure arranged in step 1); 3) adjusting the lifting structure provided in step 1) so that its upper surface is flush with the upper surface of the rail beam (1); 4) adjusting the lifting structure provided in step 2) so that its upper surface is flush with the upper surface of the lower substrate (2); 5) Fix the slope structure to the front side of the lifting structure.

7. The method for lifting the coke side furnace protection ironwork track site crane lifting structure according to claim 6, characterized in that , the step 5) comprises: Fix the lifting structure to the front side of the slope structure by welding or hooking; The length of the lower plate (9) of the slope platform of the slope structure located on the upper side is set to L, the height of the upper plate (10) of the slope platform of the slope structure located on the lower side is set to L1, the horizontal distance between the slope structure located on the upper side and the slope structure located on the lower side is set to L2, and the value range of the length L is L2<=L<=L1+L2; Among them, L=L1+L2 is the optimal length; The ramp platform upper plate (10) is arranged according to the height of the lifting structure and the length of the ramp platform lower plate (9), and the angle of the upper ramp platform upper plate (10) and the lower ramp platform upper plate (10) are made the same; Complete the setting of lifting structure and slope structure.