Mass concrete pouring equipment

By designing an automated pouring crane and pouring pipe system, combined with the cooperation of hydraulic rods and vibrators, the problems of low manual pouring efficiency and difficulty in disassembling the pouring pipes in the existing technology are solved, and an efficient and continuous concrete pouring process is achieved.

CN119737054AActive Publication Date: 2025-04-01SHANGHAI BAOYE GRP CORP
View PDF 14 Cites 0 Cited by

Patent Information

Application Number
CN202411754022.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-02
Publication Date
2025-04-01
Estimated Expiration
2044-12-02

AI Technical Summary

Technical Problem

Existing large-volume concrete pouring equipment requires manual layering and vibration, resulting in high equipment and labor costs, low construction efficiency, and difficult to disassemble and connect the pouring pipes, making it easy to cause blockage.

Method used

A device including a casting crane and a casting pipe was designed, and the limit sleeve was driven to rise through a hydraulic rod to vibrate the vibrating rod to achieve automatic casting. At the same time, structures such as arc strips and snap rings are adopted to achieve rapid docking and disassembly of the cast pipes to avoid blockage.

Benefits of technology

It improves the efficiency and quality of large-volume concrete pouring, reduces labor and equipment costs, achieves continuity of the pouring process, and effectively prevents blockage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119737054A_ABST
    Figure CN119737054A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of concrete construction, and discloses mass concrete pouring equipment which comprises a pouring crane and a pouring pipe, a material conveying pipe is arranged outside the pouring crane, two first hydraulic rods are fixedly connected to the outside of the pouring pipe, and the driving ends of the two first hydraulic rods are fixedly connected with limiting sleeves. Four protruding strips are fixedly connected to the outer portion of the limiting sleeve, rotating rods are rotationally connected to the upper sides and the lower sides of the outer portions of the protruding strips, connecting strips are fixedly connected to the ends, away from the pouring pipe, of the two rotating rods, and supporting plates are fixedly connected to the sides, away from the rotating rods, of the connecting strips. According to the concrete pouring device, vibration operation is conducted synchronously in the pouring process, and a concrete pouring area is covered more comprehensively through the multiple vibration rods with the adjustable intervals. In addition, the equipment can also be used for quickly butting and replacing the pouring pipe, and the pouring pipe orifice is dredged by utilizing high-frequency vibration of the dredging barrel, so that blockage is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of concrete construction, in particular to large-volume concrete pouring equipment. Background Art

[0002] Mass concrete refers to large-volume concrete whose geometric dimensions are not less than one meter. When pouring, this kind of large-volume concrete is prone to shrinkage due to temperature changes caused by material hydration, which makes it easy for large-volume concrete to crack. Therefore, when pouring large-volume concrete, the layered pouring method is often used to effectively dissipate the temperature inside the concrete quickly and reduce the risk of cracks after solidification. Among them, the main method of concrete pouring is to build a formwork for the shaping pouring area. The commonly used pouring method nowadays is to directly pour the material from the discharge pipe at the rear of the concrete tanker into the built formwork for pouring.

[0003] Some existing concrete pump trucks use a process of manually paving and vibrating the concrete layer by layer. This process requires a lot of manpower and mechanical equipment, which increases equipment and labor costs. In addition, the paving of each area is not balanced due to manual operation, which will affect the effect of layered pouring. In addition, the pump pouring pipe and the feed pipe of the concrete pump truck are usually locked with clamp bolts, which makes it difficult to disassemble and connect the pouring pipe, further reducing the construction efficiency. In addition, the existing concrete pouring port is composed of a funnel structure. The funnel is lifted by an external lifting device, and the lower end is aligned with the position to be poured. The concrete enters the inner side of the funnel. When the funnel is blocked by concrete, the lifting device is required to shake the funnel up and down to restore the funnel to be unobstructed. This pouring method encounters some relatively narrow spaces. There is no position to accommodate the lifting device, which makes pouring very troublesome. After pouring the concrete for a period of time, the concrete is easy to solidify, causing the pipe mouth to be blocked. For this reason, in view of the above problems, a large-volume concrete pouring equipment is proposed to solve the above problems. Summary of the invention

[0004] In order to make up for the above shortcomings, the present invention provides large-volume concrete pouring equipment, aiming to improve the problems that the pouring equipment in the prior art requires manual pouring and then vibration, resulting in low efficiency of large-volume concrete pouring, difficulty in quickly disassembling and installing the pouring pipe, and easy blockage of the pouring pipe mouth.

[0005] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: large-volume concrete pouring equipment, including a pouring crane and a pouring pipe, a conveying pipe is arranged on the outside of the conveying pouring crane, two hydraulic rods are fixedly connected to the outside of the pouring pipe, the driving ends of the two hydraulic rods are fixedly connected to the limiting sleeve, the outside of the limiting sleeve is fixedly connected to four convex strips, the upper and lower sides of the outside of the convex strips are rotatably connected to rotating rods, the ends of the two rotating rods away from the pouring pipes are fixedly connected to connecting strips, the side of the connecting strip away from the rotating rod is fixedly connected to a support plate, the side of the support plate away from the rotating rod is fixedly connected to a motor, the driving end of the motor is fixedly connected to a vibrating rod, and the outer bottom end of the pouring pipe is provided with a limiting component for indirectly limiting the vibrating rod.

[0006] As a further description of the above technical solution: the limiting assembly includes a limiting plate, the middle inner wall of the limiting plate is fixedly connected to the outer bottom end of the casting pipe, and four sliding grooves are opened on the top of the limiting plate.

[0007] As a further description of the above technical solution: the outside of the feed pipe is fixedly connected with two arc-shaped bars 1, the front end of the arc-shaped bar 1 is fixedly connected with a connecting block, the right side of the connecting block is fixedly connected with a hydraulic rod 2, the driving end of the hydraulic rod 2 is fixedly connected with a clamping ring, the left ends of the two arc-shaped bars 1 are fixedly connected with a central axis, the outside of the central axis is rotatably connected with two arc-shaped bars 2, the front end of the arc-shaped bar 2 is fixedly connected with a hook, the bottom end of the feed pipe is fixedly connected with a docking ring, and the top end of the casting pipe is fixedly connected to a docking sleeve.

[0008] As a further description of the above technical solution: the bottom end of the casting pipe is fixedly connected to a club cover on the outside, the middle part of the club cover is fixedly connected to a sleeve, the middle part of the bottom end of the sleeve is rotatably connected to a wheel rod, the end of the wheel rod away from the club cover is fixedly connected to a connecting roller, the top end of the connecting roller is rotatably connected to a transmission rod, the top end of the transmission rod is externally fixedly connected to a pull plate, the inside of the sleeve is slidably connected to a limiting ring, and the middle part of the limiting ring is fixedly connected to a clearing cylinder.

[0009] As a further description of the above technical solution: the inside of the bottom end of the conveying pipe is engaged with the outside of the top end of the casting pipe, and the inside of the limiting sleeve is slidably connected to the outside of the casting pipe.

[0010] As a further description of the above technical solution: the outside of the vibrating rod is slidably connected to the inner wall of the slide groove, the bottom end of the support plate is slidably connected to the top end of the limit plate, and the top end of the vibrating rod is fixedly connected to the bottom end of the support plate on the side away from the convex strip.

[0011] As a further description of the above technical solution: the outside of the clamping ring is engaged with the outside of the hook, the outside of the arc strip one is in contact with the outside of the casting pipe, the outside of the arc strip two is in contact with the outside of the feed pipe, and the outside of the arc strip two is in contact with the outside of the casting pipe.

[0012] As a further description of the above technical solution: a plurality of clamping blocks are fixedly connected to the outside of the middle part of the two arc-shaped strips, the outside of the docking ring is engaged with the inner wall of the clamping block, and the outside of the docking sleeve is engaged with the inner wall of the clamping block.

[0013] As a further description of the above technical solution: a plurality of central axes are fixedly connected to the outside of the middle parts of the two arc-shaped strips one, a plurality of clamping blocks two are fixedly connected to the outside of the middle parts of the two arc-shaped strips one, the outside of the docking ring is engaged with the inner wall of the clamping block two, and the outside of the docking sleeve is engaged with the inner wall of the clamping block two.

[0014] As a further description of the above technical solution: a spring 1 is sleeved on the outside of the transmission rod, the top end of the spring 1 is fixedly connected to the bottom end of the pull plate, the bottom end of the spring 1 is fixedly connected to the bottom end of the inner wall of the dredging cylinder, a spring 2 is sleeved on the outside of the dredging cylinder, the bottom end of the spring 2 is fixedly connected to the top end of the inner wall of the sleeve, and the bottom end of the spring 2 is fixedly connected to the top end of the limiting ring.

[0015] The present invention has the following beneficial effects: 1. In the present invention, the pouring process of concrete is to start the conveying system by a crane, so that the concrete flows out from the conveying pipeline through the pouring pipe to irrigate the designated position. At the same time, according to the flow rate of the concrete in the pouring pipe, the hydraulic rod will be started to drive the limit sleeve to rise. This action in turn pulls the support plate, so that the activated vibrating rod adjusts the spacing with the pouring pipe as the center. In this way, the vibration operation can be carried out while pouring. It solves the shortcomings of the prior art that a large amount of equipment and manpower are required for multiple pouring processes, so that the equipment fully covers the concrete pouring area, reducing the generation of internal pores and defects.

[0016] 2. In the present invention, the pouring pipe is initially connected by inserting it into the feed pipe. Then, the arc strip 2 is aligned with the arc strip 1, the docking ring of the feed pipe is wrapped, and the docking sleeve of the pouring pipe is closed. Finally, the clamping ring is clamped to the outside of the clamping hook and locked by starting the hydraulic rod 2, so as to achieve quick docking. This design makes the pouring process of concrete more continuous. When the pouring pipe needs to be replaced or extended, the device can quickly complete the docking operation, avoiding the problem of concrete interruption caused by too long connection time, and ensuring the continuity of the pouring work.

[0017] 3. In the present invention, the concrete at the outlet of the pouring pipe impacts the wheel rod and cooperates with the vibration of the vibrating rod to drive the bottom of the pouring pipe to vibrate, so that the multiple vibrations drive the roller to pull the pull plate to reciprocate up and down. This process, combined with the action of spring 2 and spring 1, increases the up and down sliding amplitude and frequency of the dredging cylinder. Through this design, it is ensured that the concrete can be poured continuously and evenly, avoiding construction delays caused by blockage. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a three-dimensional schematic diagram of the large-volume concrete pouring equipment proposed by the present invention.

[0019] Figure 2 This is a schematic structural diagram of the pouring pipe of the large-volume concrete pouring equipment proposed by the present invention.

[0020] Figure 3 This is a schematic structural diagram of the limit plate of the large-volume concrete pouring equipment proposed by the present invention.

[0021] Figure 4 This is a schematic structural diagram of the hydraulic rod 2 of the large-volume concrete pouring equipment proposed by the present invention.

[0022] Figure 5 This is a schematic structural diagram of the hook of the large-volume concrete pouring equipment proposed by the present invention.

[0023] Figure 6 This is a schematic structural diagram of the dredging cylinder of the large-volume concrete pouring equipment proposed by the present invention.

[0024] Legend: 1. Casting crane; 2. Feed pipe; 3. Casting pipe; 4. Hydraulic rod one; 5. Limit sleeve; 6. Convex strip; 7. Turn rod; 8. Connecting strip; 9. Support plate; 10. Limit plate; 11. Slide; 12. Motor; 13. Vibrating rod; 14. Arc strip one; 15. Connecting block; 16. Hydraulic rod two; 17. Snap ring; 18. Block one; 19. Center axis; 20. Arc strip two; 21. Hook; 22. Block two; 23. Docking ring; 24. Docking sleeve; 25. Ball bar cover; 26. Sleeve; 27. Turntable rod; 28. Connecting roller; 29. ​​Transmission rod; 30. Pull plate; 31. Spring one; 32. Limit ring; 33. Clearing cylinder; 34. Spring two. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] Reference Figures 1 to 3 The present invention provides an embodiment: a large-volume concrete pouring device, including a pouring crane 1 and a pouring pipe 3. A delivery pipe 2 is arranged outside the delivery pouring crane 1. The bottom of the delivery pipe 2 is engaged with the top of the pouring pipe 3. The delivery pouring crane 1 is the core part of the whole device and is responsible for delivering the mixed concrete to the required position. The delivery pouring crane 1 delivers concrete to the pouring pipe 3 through the delivery pipe 2, and then irrigates the position to be poured through the boom.

[0027] refer to Figure 2 , Figure 3 The outside of the pouring pipe 3 is fixedly connected with two hydraulic rods 14, and the two hydraulic rods 14 are connected to the outside bottom of the pouring pipe 3. The driving ends of the two hydraulic rods 14 are fixedly connected to the limit sleeve 5, which is used to drive the limit sleeve 5 to rise or fall. The inside of the limit sleeve 5 is slidably connected to the outside of the pouring pipe 3, and the two hydraulic rods 14 drive the limit sleeve 5 to rise or fall outside the pouring pipe 3, thereby adjusting the spacing of the bottom connection parts.

[0028] Four convex strips 6 are fixedly connected to the outside of the limiting sleeve 5, and the upper and lower sides of the outer sides of the convex strips 6 are rotatably connected to the rotating rods 7. The convex strips 6 are used to locate the position of the rotating rods 7 and increase the connection between the limiting sleeve 5 and the rotating rods 7. The ends of the two rotating rods 7 away from the pouring pipe 3 are fixedly connected to the connecting strips 8, and the connecting strips 8 move with the limiting sleeve 5 as support through the rotating rods 7. The side of the connecting strip 8 away from the rotating rods 7 is fixedly connected to the support plate 9. The support plate 9 can be driven to translate by the hydraulic rod 4 that can be activated through the connecting strips 8.

[0029] The side of the support plate 9 away from the rotating rod 7 is fixedly connected with a motor 12, and the driving end of the motor 12 is fixedly connected with a vibrating rod 13. The support plate 9 is the base for the installation of the motor 12 and the vibrating rod 13. When the support plate 9 moves, it will drive the motor 12 and the vibrating rod 13 to move together. The outside of the vibrating rod 13 is slidably connected to the inner wall of the slide 11, and the top of the vibrating rod 13 is fixedly connected to the bottom end of the side of the support plate 9 away from the convex strip 6. The vibrating rod 13 is driven by the support plate 9 to slide in the slide 11, so that the vibrating rod 13 can adjust the spacing with the casting pipe 3 as the center. When the vibrating rod 13 is working, the density and quality of the concrete can be improved.

[0030] The outer bottom end of the pouring pipe 3 is provided with a limiting assembly for indirectly limiting the vibrating rod 13, and the limiting assembly includes a limiting plate 10, the inner wall of the middle part of the limiting plate 10 is fixedly connected to the outer bottom end of the pouring pipe 3, the bottom end of the support plate 9 is slidably connected to the top of the limiting plate 10, and four chute grooves 11 are opened at the top of the limiting plate 10. The limiting plate 10 is used to indirectly limit the limiting assembly of the vibrating rod 13. The chute 11 opened in the middle is used to limit the spacing of the vibrating rod 13.

[0031] refer to Figure 4 , Figure 5 , the outside of the feed pipe 2 is fixedly connected with two arc-shaped bars 14, and the two arc-shaped bars 14 are fixed in the opening position of the feed pipe 2. The outside of the arc-shaped bar 14 is in contact with the outside of the casting pipe 3, and the arc-shaped bar 14 wraps and engages with the outside of the casting pipe 3. The front ends of the two arc-shaped bars 14 are fixedly connected with a connecting block 15, and one end of the two arc-shaped bars 14 is fixed together by the connecting block 15. The right side of the connecting block 15 is fixedly connected with a hydraulic rod 2 16, and the connecting block 15 supports the hydraulic rod 2 16, and the hydraulic rod 2 16 is tilted and fixed to the middle part of the connecting block 15. The driving end of the hydraulic rod 2 16 is fixedly connected with a clamping ring 17, and the hydraulic rod 2 16 pushes the clamping ring 17 to lock the hook 21, thereby realizing rapid docking of the casting pipe 3 and the feed pipe 2.

[0032] The outside of the snap ring 17 is engaged with the outside of the hook 21, and the snap ring 17 is sleeved on the outside of the hook 21 to fix the arc-shaped bar 14 and the connecting block 15 together. The left ends of the two arc-shaped bars 14 are fixedly connected with the central shaft 19, which is designed to fix the two arc-shaped bars 14 on the one hand and the two arc-shaped bars 20 on the other hand. The outside of the central shaft 19 is rotatably connected to the two arc-shaped bars 20, and the central shaft 19 is a component fixed to the left ends of the two arc-shaped bars 14, and is used to rotatably connect the two arc-shaped bars 20.

[0033] The outside of the arc strip 20 contacts the outside of the feed pipe 2, and the arc strip 20 contacts the feed pipe 2 to achieve quick docking of the pouring pipe 3 and the feed pipe 2. The outside of the arc strip 20 contacts the outside of the pouring pipe 3, and the arc strip 20 wraps the top of the pouring pipe 3. The front end of the arc strip 20 is fixedly connected with a hook 21, and the hook 21 is used to lock the clamp 17. The bottom end of the feed pipe 2 is fixedly connected with a docking ring 23, and the diameter of the docking ring 23 is larger than the top of the feed pipe 2. The top of the pouring pipe 3 is fixedly connected with a docking sleeve 24, and the docking sleeve 24 and the docking ring 23 have the same diameter.

[0034] The middle parts of the two arc-shaped bars 14 are fixedly connected with a plurality of clamping blocks 18 on the outside. The design of the clamping blocks 18 is to increase the connection between the two arc-shaped bars 14 and to increase the clamping force of the arc-shaped bars 14. The outside of the docking ring 23 is engaged with the inner wall of the clamping block 18, and the outside of the docking sleeve 24 is engaged with the inner wall of the clamping block 18. The middle parts of the two arc-shaped bars 14 are fixedly connected with a plurality of central shafts 19 on the outside. The clamping block 18 wraps the docking ring 23 and the docking sleeve 24. The middle parts of the two arc-shaped bars 14 are fixedly connected with a plurality of clamping blocks 22 on the outside. The outside of the docking ring 23 is engaged with the inner wall of the clamping block 22, and the outside of the docking sleeve 24 is engaged with the inner wall of the clamping block 22. The clamping block 22 wraps the docking ring 23 and the docking sleeve 24.

[0035] refer to Figure 6 The bottom of the pouring pipe 3 is fixedly connected to a ball bar cover 25, which is a hemispherical bar cover and fixed in a protruding manner at the mouth of the pouring pipe 3. The middle of the ball bar cover 25 is fixedly connected to a sleeve 26, and the middle of the sleeve 26-ball bar cover 25 is used to support the mouth of the pouring pipe 3, and the top of the pouring pipe 3 is spherical and coated with a lubricating coating on the outside, so that concrete will not hang on the wall. The middle of the bottom of the sleeve 26 is rotatably connected to a wheel rod 27, which is composed of a round rod and a horizontal wheel.

[0036] The end of the wheel rod 27 away from the club cover 25 is fixedly connected to a connecting roller 28. The wheel rod 27 rotates to pull the connecting roller 28 to rotate 360 ​​degrees along the round rod of the wheel rod 27. The top of the connecting roller 28 is rotatably connected to a transmission rod 29. The top of the transmission rod 29 is fixedly connected to a pull plate 30. The wheel rod 27 pulls the transmission rod 29 through the connecting roller 28 to slide up and down along the inner wall of the dredging tube 33. The outer part of the transmission rod 29 is sleeved with a spring 1 31, which is sleeved at the bottom end of the inner wall of the dredging tube 33.

[0037] The top of spring 1 31 is fixedly connected to the bottom of the pull plate 30, and the bottom of spring 1 31 is fixedly connected to the bottom of the inner wall of the dredging cylinder 33. When the pull plate 30 is driven downward by the transmission rod 29, it will be pulled, squeezed and pushed to push the dredging cylinder 33 downward synchronously, and then the dredging cylinder 33 and the pull plate 30 will be driven to reset by its own elastic force, thereby increasing the up and down sliding amplitude and frequency of the dredging cylinder 33. The inner sliding connection of the sleeve 26 is provided with a limit ring 32, and the middle part of the limit ring 32 is fixedly connected with the dredging cylinder 33. The limit ring 32 is fixed to the outside of the dredging cylinder 33 to limit the linear sliding of the dredging cylinder 33. The outer sleeve of the clearing cylinder 33 is provided with a spring 2 34, the bottom end of the spring 2 34 is fixedly connected to the top end of the inner wall of the sleeve 26, and the bottom end of the spring 2 34 is fixedly connected to the top end of the limit ring 32. When the clearing cylinder 33 is indirectly driven downward by the pull plate 30, the spring 2 34 will be pulled. When the pull plate 30 is reset, the elastic force of the spring 2 34 will increase the sliding amplitude and frequency of the clearing cylinder 33 again, so as to achieve high-frequency vibration of the clearing cylinder 33 to clear the outlet of the casting pipe 3.

[0038] Working principle: When in use, the mixed concrete is transported from the feeding pipe 2 to the pouring pipe 3 by the started pouring crane 1, and the position to be poured is irrigated in cooperation with the boom of the pouring crane 1. During the pouring process, the user can adjust the spacing of the vibrating rods 13 around the outlet of the pouring pipe 3 according to the flow rate of the concrete flowing out of the pouring pipe 3, so as to ensure that the concrete at the pouring positions of the pouring pipe 3 at different positions can be fully vibrated, thereby improving the density and quality of the concrete and reducing the generation of internal pores and defects.

[0039] Regarding the spacing adjustment of the motor 12, the limit sleeve 5 can be driven to rise by starting the hydraulic rod 4, so that the support plate 9 is pulled to move horizontally along the inner wall of the slide groove 11 toward the limit sleeve 5 through the rotating rod 7 connected to the limit sleeve 5. When the support plate 9 moves linearly, the support plate 9 fixes the slide groove 11 and presses the slide groove 11 to slide synchronously, so as to adjust the spacing between the vibrating rods 13, so that when the pouring pipe 3 is poured, the vibrating rod 13 can cover the concrete pouring area more comprehensively, ensuring that the concrete at different positions can be fully vibrated, thereby improving the density and quality of the concrete and reducing the generation of internal pores and defects.

[0040] In addition, when the user needs to dock the pouring pipe 3 and the conveying pipe 2, the pouring pipe 3 can be inserted into the conveying pipe 2, and then the arc bar 20 is rotated to align with the arc bar 14, so that the arc bar 20 and the arc bar 14 can wrap the docking ring 23 of the conveying pipe 2 and the docking sleeve 24 of the pouring pipe 3, and then the clamping ring 17 is clamped to the outside of the clamping hook 21, and the hydraulic rod 2 16 is started to lock, so that the pouring process of concrete can be more continuous. When replacing or extending the pouring pipe 3, the docking can be completed quickly, avoiding the interruption of concrete caused by too long connection time, and ensuring the continuity of pouring.

[0041] When the roller 28 is rotated, the spring 1 31 is pulled by the pull plate 30 to make a reciprocating motion up and down. When the pull plate 30 moves up and down, it will first be compressed by the pull plate 30 pulling the spring 1 31, and then stretched by the pulling spring 2 34 of the dredging cylinder 33 and the limit ring 32. In this way, when the roller 28 is rotated and reset, the spring 1 31 will drive the pull plate 30 to slide quickly inside the dredging cylinder 33 through its own elastic force. Due to the rapid sliding of the pull plate 30, the pull plate 30 will rub against the inside of the dredging cylinder 33 and cooperate with the elastic pulling of the spring 2 34, drive the dredging cylinder 33 to retract and contract at the outlet of the casting pipe 3 multiple times, so as to impact the concrete at the outlet of the casting pipe 3, and effectively prevent the outlet of the casting pipe 3 from being blocked.

[0042] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A large volume concrete pouring device, comprising a pouring crane (1) and a pouring pipe (3), characterized in that: A material conveying pipe (2) is arranged on the outside of the conveying and pouring crane (1); two hydraulic rods (4) are fixedly connected to the outside of the pouring pipe (3); the driving ends of the two hydraulic rods (4) are fixedly connected to a limiting sleeve (5); the outside of the limiting sleeve (5) is fixedly connected to four convex strips (6); the upper and lower sides of the outside of the convex strips (6) are rotatably connected to a rotating rod (7); the ends of the two rotating rods (7) away from the pouring pipe (3) are fixedly connected to a connecting strip (8); the side of the connecting strip (8) away from the rotating rod (7) is fixedly connected to a supporting plate (9); the side of the supporting plate (9) away from the rotating rod (7) is fixedly connected to an electric motor (12); the driving end of the electric motor (12) is fixedly connected to a vibrating rod (13); and the bottom end of the outside of the pouring pipe (3) is provided with a limiting component for indirectly limiting the vibrating rod (13).

2. The large volume concrete pouring equipment according to claim 1 is characterized in that: The limiting assembly comprises a limiting plate (10), the middle inner wall of the limiting plate (10) is fixedly connected to the outer bottom end of the casting pipe (3), and the top end of the limiting plate (10) is provided with four sliding grooves (11).

3. The large volume concrete pouring equipment according to claim 1 is characterized in that: The outside of the material conveying pipe (2) is fixedly connected to two arc-shaped bars (14), the front end of the arc-shaped bar (14) is fixedly connected to a connecting block (15), the right side of the connecting block (15) is fixedly connected to a hydraulic rod (16), the driving end of the hydraulic rod (16) is fixedly connected to a clamping ring (17), the left ends of the two arc-shaped bars (14) are fixedly connected to a central shaft (19), the outside of the central shaft (19) is rotatably connected to two arc-shaped bars (20), the front end of the arc-shaped bar (20) is fixedly connected to a clamping hook (21), the bottom end of the material conveying pipe (2) is fixedly connected to a docking ring (23), and the top end of the casting pipe (3) is fixedly connected to a docking sleeve (24).

4. The large volume concrete pouring equipment according to claim 1, characterized in that: The bottom end of the casting pipe (3) is fixedly connected to a club cover (25) on the outside, the club cover (25) is fixedly connected to a sleeve (26) in the middle, the bottom end of the sleeve (26) is rotatably connected to a wheel rod (27) in the middle, the wheel rod (27) is fixedly connected to a connecting roller (28) at one end away from the club cover (25), the top of the connecting roller (28) is rotatably connected to a transmission rod (29), the top of the transmission rod (29) is fixedly connected to a pull plate (30) on the outside, the sleeve (26) is slidably connected to a limit ring (32) in the inside, and a clearing tube (33) is fixedly connected to the middle of the limit ring (32).

5. The large volume concrete pouring equipment according to claim 2, characterized in that: The interior of the bottom end of the material conveying pipe (2) is engaged with the exterior of the top end of the casting pipe (3), and the interior of the limiting sleeve (5) is slidably connected to the exterior of the casting pipe (3).

6. The mass concrete pouring equipment according to claim 2, characterized in that: The outside of the vibrating rod (13) is slidably connected to the inner wall of the slide groove (11), the bottom end of the support plate (9) is slidably connected to the top end of the limit plate (10), and the top end of the vibrating rod (13) is fixedly connected to the bottom end of the support plate (9) on a side away from the convex strip (6).

7. The large volume concrete pouring equipment according to claim 3 is characterized in that: The outside of the clamping ring (17) is engaged with the outside of the hook (21), the outside of the arc strip 1 (14) is in contact with the outside of the casting pipe (3), the outside of the arc strip 2 (20) is in contact with the outside of the feed pipe (2), and the outside of the arc strip 2 (20) is in contact with the outside of the casting pipe (3).

8. The large volume concrete pouring equipment according to claim 3, characterized in that: A plurality of clamping blocks (18) are fixedly connected to the outside of the middle parts of the two arc-shaped strips (14), the outside of the docking ring (23) is engaged with the inner wall of the clamping block (18), and the outside of the docking sleeve (24) is engaged with the inner wall of the clamping block (18).

9. The large volume concrete pouring equipment according to claim 3, characterized in that: A plurality of central shafts (19) are fixedly connected to the outside of the middle parts of the two arc-shaped strips (14); a plurality of clamping blocks (22) are fixedly connected to the outside of the middle parts of the two arc-shaped strips (14); the outside of the docking ring (23) is engaged with the inner wall of the clamping block (22); and the outside of the docking sleeve (24) is engaged with the inner wall of the clamping block (22).

10. The mass concrete pouring equipment according to claim 4, characterized in that: The transmission rod (29) is externally sleeved with a spring 1 (31), the top end of the spring 1 (31) is fixedly connected to the bottom end of the pull plate (30), the bottom end of the spring 1 (31) is fixedly connected to the bottom end of the inner wall of the dredging tube (33), the external sleeve of the dredging tube (33) is provided with a spring 2 (34), the bottom end of the spring 2 (34) is fixedly connected to the top end of the inner wall of the sleeve (26), and the bottom end of the spring 2 (34) is fixedly connected to the top end of the limiting ring (32).

Citation Information

Patent Citations

  • Concrete pump achieving effect that cams drive hopper and fence to vibrate

    CN106640128A

  • Concrete spreader discharging protection device

    CN109653507A

  • Integrated pumping and vibrating device of concrete construction

    CN110173119A

  • Vibrating equipment for concrete pouring

    CN114809644A

  • Three-dimensional vibratory screening filter

    CN116493254A