Efficient multi-stage stone crushing equipment for road construction

By setting up a gear set-fitting barrier plate and rotating cylinder in an efficient multi-stage gravel equipment, the indirect drop and uniform distribution of stone is achieved, and the problem of simultaneous drop and stacking of stone in existing equipment is solved, and the crushing effect and efficiency are improved.

CN119747054AActive Publication Date: 2025-04-04安康市交通运输综合执法支队
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202510141985.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-09
Publication Date
2025-04-04
Estimated Expiration
2045-02-09

AI Technical Summary

Technical Problem

When the existing high-efficiency multi-stage gravel equipment drops on the push plate, the push plate and the transfer plate are opened at the same time, causing the stone to fall at the same time, which cannot achieve indirect drop, resulting in poor crushing effect. After the push plate is opened, the stone accumulates in the middle of the crushing roller, affecting the crushing effect.

Method used

By providing a gear set between the first barrier plate, the second barrier plate, the rotating cylinder and the loading plate, the indirect opening and closing of the stone is realized, so that the stone is indirectly dropped on the gravel mechanism, and the crushing effect is improved.

Benefits of technology

The indirect fall and uniform distribution of stone is achieved, the crushing effect of stone is improved, the excessive accumulation of stone on the secondary gravel mechanism is avoided, and the overall crushing efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119747054A_ABST
    Figure CN119747054A_ABST
Patent Text Reader

Abstract

The invention discloses efficient multi-stage stone crushing equipment for road construction, and belongs to the technical field of road construction, the efficient multi-stage stone crushing equipment comprises a stone crushing box, a feeding port is formed in the top of the stone crushing box, and a first-stage stone crushing mechanism for primarily crushing stone is fixedly mounted in the position, close to the feeding port, of the stone crushing box; according to the efficient multi-stage stone crushing equipment for road construction, stones fall onto the second-stage stone crushing mechanism to be crushed, so that the stones can be intermittently crushed conveniently, the crushing effect of the stones is improved, and excessive accumulation of the stones on the second-stage stone crushing mechanism is avoided; when a stirring frame and an impact rod move, fallen stone can be evenly distributed on a rotating cylinder and a containing plate, the stone can conveniently and evenly fall onto a second-stage stone crushing mechanism, the stone crushing effect of the second-stage stone crushing mechanism is improved, a second positioning block can move to the bottom of a first blocking plate for positioning when sliding, and therefore the stone crushing efficiency is improved. And when the first barrier plate and the second barrier plate are impacted by stones, the situation of opening can be avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of highway construction, in particular to a high-efficiency multi-stage stone crushing equipment used for highway construction. Background Art

[0002] Highway construction refers to the general term for highway network planning, highway survey and design, highway construction, maintenance, and management. During highway construction, stones need to be laid on the roadbed, but the size of the stones cannot be accurately grasped, so it is necessary to crush the stones through high-efficiency multi-stage stone crushing equipment.

[0003] The existing announcement number CN114950687B discloses a high-efficiency multi-stage stone crushing equipment for highway construction, including a stone crushing device, which is installed in a box body, a triangular block is fixedly connected to the inside of the box body, and an upper crushing roller is rotatably connected to the inside of the box body. The stone crushing device also includes: a V-shaped plate, an inclined block, a scraper, a baffle, and a lower crushing roller. The high-efficiency multi-stage stone crushing equipment for highway construction, the stones after preliminary crushing will fall on the triangular block and press the push plate to rotate, the push plate will rotate downward, at this time the pull rope is no longer straight, and the rotating plate will automatically rotate and open through the torsion spring, and the stones that slide down will pass through the opened rotating plate and fall on the V-shaped plate, thereby achieving the stone The intermittent falling of the stone can prevent too many stones from falling at one time, and then too many stones will fall on the lower crushing roller at one time, and then all the stones cannot be knocked away, thereby improving the effect of secondary crushing. However, when the stone falls on the push plate, the push plate can open the rotating plate at the same time through the pull rope. The simultaneous opening of the push plate and the rotating plate will cause the stone to fall on the V-shaped plate at the same time, and it is impossible to achieve indirect falling of the stone on the crushing roller. The small discharge port of the V-shaped plate will cause the stone to accumulate in the middle position of the crushing roller, making the stone crushing effect lower, and after the push plate is opened, the stone will first pass through the push plate and fall onto the V-shaped plate, which will lead to too low a utilization rate of the rotating plate, inconvenient indirect unloading, and poor stone crushing effect. Summary of the invention

[0004] The purpose of the present invention is to provide a high-efficiency multi-stage stone crushing equipment for highway construction, wherein the first baffle plate, the second baffle plate, the rotating cylinder and the containing plate are indirectly opened and closed through the cooperation of a gear set, and the indirect opening and closing of the first baffle plate, the second baffle plate, the rotating cylinder and the containing plate will cause the stones to indirectly fall onto the stone crushing mechanism, thereby improving the crushing effect of the stones.

[0005] In order to achieve the above-mentioned invention object, the present invention adopts the following technical scheme: The present invention provides a high-efficiency multi-stage stone crushing equipment for highway construction, comprising a stone crushing box, a feeding port is installed on the top of the stone crushing box, a primary stone crushing mechanism for primary crushing of stones is fixedly installed inside the stone crushing box near the feeding port, a diversion mechanism for batch crushing of stones is fixedly installed at the middle position of the inner side of the stone crushing box, the diversion mechanism comprises a material dividing component and a material discharging component for indirect material feeding of stones, and a uniform distribution component for uniform material discharging, a secondary stone crushing mechanism for secondary crushing of stones is installed near the bottom of the diversion mechanism of the stone crushing box, and a material discharge port is opened at the bottom of the stone crushing box near the secondary stone crushing mechanism. The flow dividing mechanism further comprises a first gear set for driving the material dividing assembly and the material discharging assembly to work, a second gear set for driving the uniform distribution assembly to rotate, and a positioning assembly for locking the material dividing assembly; The material distribution assembly includes a material distribution frame for distributing the stone to two sides, a first material distribution opening and a second material distribution opening for discharging the stone, and a first blocking plate and a second blocking plate for blocking the stone; A material distribution frame is fixedly installed on the inner side of the crushed stone box, and a first material distribution opening and a second material distribution opening are opened on the left and right sides of the material distribution frame, and a first blocking plate and a second blocking plate are rotatably installed on the inner sides of the first material distribution opening and the second material distribution opening respectively; The unloading assembly includes a discharging rack for unloading, and a rotating drum and a containing plate for containing stones; A discharging rack is fixedly installed at the center of the bottom of the discharging rack, and a rotating cylinder is rotated inside the discharging rack. The crushed stone box near the left and right sides of the discharging rack is rotatably installed with a containing plate; The uniform distribution assembly includes a reciprocating screw rod for movement, and a toggle frame and a striking rod for uniformly distributing the stone; A reciprocating screw rod is rotatably installed on the left and right sides and the middle part of the discharging frame through the installation cavity, and the end of the reciprocating screw rod passes through the inner wall of the crushing box and is connected to the second gear set. The reciprocating screw rods on the left and right sides are movably installed with a toggle frame, and the reciprocating screw rod in the middle is movably installed with a striking rod; The positioning assembly includes a first positioning block and a second positioning block for positioning the first blocking plate and the second blocking plate, and a first pushing plate and a second pushing plate for driving the first positioning block and the second positioning block to move; A first positioning block and a second positioning block are movably mounted on the bottom of the first blocking plate and the second blocking plate, respectively, and a first pushing plate and a second pushing plate are arranged on the surface of the gravel box.

[0006] Preferably, the material distributing assembly further comprises a first rotating shaft for rotating the first blocking plate, and a second rotating shaft for rotating the second blocking plate; A first rotating shaft is installed inside the first blocking plate through a mounting hole, and both ends of the first rotating shaft penetrate the inner wall of the crushed stone box and are connected to the first gear set. A second rotating shaft is installed inside the second blocking plate through a mounting hole, and both ends of the second rotating shaft penetrate the inner wall of the crushed stone box and are connected to the first gear set.

[0007] Preferably, the material discharge assembly further comprises a material discharge port and a third rotating shaft for mounting the rotating drum, a material loading trough for carrying stones and a fourth rotating shaft for rotating the holding plate; The discharging frame is provided with a discharge port, a rotating cylinder is rotatably installed inside the discharge port, a third rotating shaft is installed inside the rotating cylinder through an assembly hole, two ends of the third rotating shaft pass through the inner wall of the crushed stone box and are connected to the first gear set; A fourth rotating shaft is installed through the assembly hole inside the containing plate, and both ends of the fourth rotating shaft penetrate the inner wall of the gravel box and are connected to the first gear set.

[0008] Preferably, the blanking assembly further comprises a rotation groove for rotationally assembling the third rotating shaft and the fourth rotating shaft, and a clamping groove and a steel ball for positioning the third rotating shaft and the fourth rotating shaft; The inner wall of the crushing box near the third rotating shaft and the fourth rotating shaft is penetrated with a rotating groove, the inner wall of the rotating groove is provided with a clamping groove, and the third rotating shaft and the fourth rotating shaft are equipped with steel balls matching the clamping groove.

[0009] Preferably, the blanking assembly further comprises a first extrusion groove for movement of the steel ball, and a first extrusion spring for applying a pre-tightening force to the steel ball; The surfaces of the third rotating shaft and the fourth rotating shaft close to the card slot are provided with a first extrusion groove, a steel ball is movably installed inside the first extrusion groove, and a first extrusion spring is fixedly installed between the steel ball and the first extrusion groove.

[0010] Preferably, the uniform distribution assembly further comprises an internal threaded slider for moving the toggle frame and the impact rod, and a moving groove for moving the threaded slider; The discharging rack is provided with movable grooves on the left and right sides and the middle part near the reciprocating screw rod, and the reciprocating screw rod is rotatably installed on the inner side of the movable groove, and the surface of the reciprocating screw rod is threadedly connected with a threaded slider, and the threaded sliders on the reciprocating screw rods on the left and right sides are fixedly installed with a toggle rack.

[0011] Preferably, the uniform distribution assembly further comprises a mounting block and a second extrusion groove for assembling the impact rod, a rotating rod for rotating the impact rod, and a torsion spring for resetting the impact rod; A mounting block is fixedly installed on the side of the threaded slider on the reciprocating screw rod in the middle, a second extrusion groove is opened on the side of the mounting block, and a rotating rod is rotatably installed through the second extrusion groove; The two ends of the torsion spring are fixedly mounted on the surface of the rotating rod and the inner wall of the second extrusion groove, and the end of the impact rod is fixedly mounted on the surface of the rotating rod.

[0012] Preferably, the positioning assembly further includes a first rotating plate and a second rotating plate for pushing the first pushing plate and the second pushing plate to move up and down, and a first limiting frame for limiting the first pushing plate and the second pushing plate; The outer surface of the third rotating shaft is fixedly mounted with a first rotating plate and a second rotating plate, and the surfaces of the first rotating plate and the second rotating plate are both provided with arc-shaped notches, and the two arc-shaped notches are distributed in opposite directions; A first limiting frame is fixedly installed at the front of the gravel box, a first pushing plate and a second pushing plate are movably installed inside the first limiting frame, and arc surfaces are arranged at upper and lower ends of the first pushing plate and the second pushing plate.

[0013] Preferably, the positioning assembly further includes a slide groove for the first positioning block and the second positioning block to move, and a first pushing rod and a second pushing rod for pushing the first positioning block and the second positioning block to move; The inner walls of the gravel box close to the first positioning block and the second positioning block are penetrated with sliding grooves, the end of the first positioning block is fixedly installed with a first push rod, and the end of the second positioning block is fixedly installed with a second push rod.

[0014] Preferably, the positioning assembly further includes a second limiting frame for the movement of the first push rod and the second push rod, and a second extrusion spring and a positioning plate for resetting the first push rod and the second push rod; The surfaces of the first push rod and the second push rod are sleeved with a second limit frame, the second limit frame is fixedly installed at the front of the gravel box, and the ends of the first push rod and the second push rod away from the first positioning block and the second positioning block are fixedly installed with one end of the second extrusion spring; A positioning plate is fixedly mounted on the other end of the second extrusion spring, and a side surface of the positioning plate is fixedly mounted on the front portion of the gravel box.

[0015] Compared with the prior art, one or more of the above technical solutions have the following beneficial effects: 1. A first blocking plate is provided to open the first material distribution opening, and the stone will fall onto the rotating drum. When the stone on the rotating drum reaches a specified weight, the rotating drum rotates to pour the stone into the secondary stone crushing mechanism. While the rotating drum rotates, it can drive the containing plate to rotate and close through the cooperation of the first gear set. While the containing plate rotates and closes, it can drive the second blocking plate to rotate through the cooperation of the first gear set to open the second material distribution opening. While the second material distribution opening is opened, the second blocking plate rotates, and the first blocking plate can be driven to rotate through the cooperation of the first gear set to close the first material distribution opening. After the second material distribution opening is opened, the stone will fall onto the containing plate. When the stone on the containing plate reaches a specified weight, it can be rotated to open, so that the stone falls onto the secondary stone crushing mechanism for crushing, which is convenient for intermittent crushing of the stone, improves the crushing effect of the stone, and avoids excessive accumulation of stone on the secondary stone crushing mechanism. 2. The second gear set can drive three reciprocating screws to rotate when working. When the reciprocating screws rotate, they can respectively drive the toggle frame and the impact rod to move through the cooperation of parts. When the toggle frame and the impact rod move, the fallen stones can be evenly distributed on the rotating cylinder and the containing plate, so that the stones can evenly fall onto the secondary stone crushing mechanism, thereby improving the crushing effect of the secondary stone crushing mechanism on the stones; 3. When the end of the first push plate is squeezed, it will drive the top arc to squeeze the end of the first push rod. When the end of the first push rod is squeezed, it can drive the first positioning block at the other end to slide in the slide groove. The sliding of the first positioning block will move out of the bottom of the second blocking plate. When the end of the second push plate is squeezed, it will move upward through the top arc to push the end of the second push rod. When the end of the second push rod is pushed, the other end will drive the second positioning block to slide in the slide groove. When the second positioning block slides, it will move to the bottom of the first blocking plate for positioning, so as to avoid the opening of the first blocking plate and the second blocking plate when they are hit by stones. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0017] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention; Figure 2 It is a schematic diagram of the three-dimensional cross-sectional structure of the present invention; Figure 3 It is a front structural schematic diagram of the present invention; Figure 4 This is a three-dimensional structural diagram of the diversion mechanism of the present invention from a first viewing angle; Figure 5 It is a three-dimensional structural schematic diagram from the perspective of the diversion mechanism of the present invention; Figure 6 It is a schematic diagram of a partial three-dimensional structure of the diversion mechanism of the present invention; Figure 7 It is a schematic diagram of a three-dimensional enlarged structure of a uniformly distributed component of the present invention; Figure 8 It is a schematic diagram of a three-dimensional enlarged structure of the positioning component of the present invention; Fig. 9 The present invention Figure 2 A schematic diagram of the enlarged structure of part A; Fig.10 The present invention Figure 2 A schematic diagram of the enlarged structure of part B; In the figure: 100. Gravel box; 200, feed inlet; 300, first-level stone crushing mechanism; 400, diversion agency; 410, material distribution rack; 411, first material distribution opening; 412, first rotating shaft; 413, first blocking plate; 414, second material distribution opening; 415, second rotating shaft; 416, second blocking plate; 420, discharge rack; 421, discharge port; 422, third rotating shaft; 423, rotating cylinder; 424, loading trough; 425, fourth rotating shaft; 426, holding plate; 427, rotating trough; 428, clamping slot; 429, first extrusion slot; 4210, first extrusion spring; 4211, steel ball; 430, first gear set; 440, moving groove; 441, reciprocating screw rod; 442, internal thread slider; 443, toggle frame; 444, mounting block; 445, second extrusion groove; 446, rotating rod; 447, torsion spring; 448, impact rod; 450, second gear set; 460, first rotating plate; 461, second rotating plate; 462, first limiting frame; 463, first pushing plate; 464, second pushing plate; 465, second limiting frame; 466, first pushing rod; 467, second pushing rod; 468, second extrusion spring; 469, positioning plate; 4610, first positioning block; 4611, second positioning block; 4612, slide groove; 500, secondary stone crushing mechanism; 600. Discharge port. DETAILED DESCRIPTION

[0018] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0019] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0020] In the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.

[0021] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in this application can be understood according to specific circumstances.

[0022] In addition, the terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0023] See also Figure 1-Figure 3The present invention provides an embodiment: a high-efficiency multi-stage stone crushing equipment for highway construction, comprising a stone crushing box 100, wherein a feed port 200 is installed on the top of the stone crushing box 100, wherein a primary stone crushing mechanism 300 for primary crushing of stone is fixedly installed inside the stone crushing box 100 near the feed port 200, wherein a diverter mechanism 400 for batch crushing of stone is fixedly installed at the inner middle position of the stone crushing box 100, wherein the diverter mechanism 400 comprises a material dividing component and a material discharging component for indirect material feeding of stone, and a uniform distribution component for uniform material discharging, wherein a secondary stone crushing mechanism 500 for secondary crushing of stone is installed near the bottom of the diverter mechanism 400 of the stone crushing box 100, wherein a material discharging port 600 is provided near the bottom of the secondary stone crushing mechanism 500 of the stone crushing box 100; It should be understood that the stone to be crushed is poured into the interior of the crushing box 100 through the feed port 200. After entering the crushing box 100, the stone will fall onto the primary crushing mechanism 300. The primary crushing mechanism 300 performs primary crushing on the stone through the cooperation of the driving member and the crushing barrel. After the primary crushing, the stone will fall onto the dividing component of the diverter mechanism 400. The dividing component can indirectly transport the crushed stone to the unloading component through the cooperation of parts. When the stone falls on the unloading component, the stone can be evenly distributed on the unloading component through the work of the even distribution component. When the stone reaches the specified weight, the stone can be evenly transported to the secondary crushing mechanism 500 through the unloading component for secondary crushing. After the secondary crushing, the stone can be discharged through the discharge port 600.

[0024] like Figure 1 , Figure 4-Figure 5 As shown, the flow dividing mechanism 400 further includes a first gear set 430 for driving the material dividing component and the material discharging component to work, the first gear set 430 includes multiple sets of gears and toothed belts and other components, and a second gear set 450 for driving the uniform distribution component to rotate, the second gear set 450 includes a driving member, multiple sets of gears and toothed belts and other components, and a positioning component for locking the material dividing component; It can be imagined that the material dividing component and the material unloading component can perform indirect unloading through the cooperation of the first gear group 430, the uniform distribution component can move the stone through the cooperation of the second gear group 450, and the positioning component of the material dividing component can indirectly lock its components during indirect unloading.

[0025] like Figure 1-Figure 6 As shown, the material dividing assembly includes a material dividing frame 410 for dividing the stone material to two sides, a first material dividing opening 411 and a second material dividing opening 414 for discharging the material, and a first blocking plate 413 and a second blocking plate 416 for blocking the material; A material distribution frame 410 is fixedly installed inside the crushed stone box 100, and a first material distribution opening 411 and a second material distribution opening 414 are opened on both sides of the material distribution frame 410, and a first blocking plate 413 and a second blocking plate 416 are rotatably installed inside the first material distribution opening 411 and the second material distribution opening 414 respectively; It is worth noting that the first blocking plate 413 and the second blocking plate 416 can be opened and closed indirectly through the cooperation of the first gear set 430. When the first blocking plate 413 opens the first dispensing port 411, the second blocking plate 416 closes the second dispensing port 414, and vice versa.

[0026] like Figure 1-Figure 6 As shown, the unloading assembly includes a discharging rack 420 for unloading, and a rotating cylinder 423 and a containing plate 426 for containing stones; A discharging rack 420 is fixedly installed at the center of the bottom of the discharging rack 410, and a rotating cylinder 423 is rotated inside the discharging rack 420. A holding plate 426 is rotatably installed inside the crushed stone box 100 near the left and right sides of the discharging rack 410. It should be understood that after the first blocking plate 413 opens the first material distribution port 411, the stone will fall onto the rotating cylinder 423. When the stone on the rotating cylinder 423 reaches the specified weight, the rotating cylinder 423 will rotate to pour the stone into the secondary stone crushing mechanism 500. While the rotating cylinder 423 rotates, it can drive the holding plate 426 to rotate and close through the cooperation of the first gear set 430. While the holding plate 426 rotates and closes, it can drive the second blocking plate 416 to rotate through the cooperation of the first gear set 430 to open the second material distribution port 414. While the second material distribution port 414 is opened, the second blocking plate 416 rotates and can drive the first blocking plate 413 to rotate through the cooperation of the first gear set 430 to close the first material distribution port 411. After the second material distribution port 414 is opened, the stone will fall onto the holding plate 426. When the stone on the holding plate 426 reaches the specified weight, it can be opened.

[0027] like Figure 1-Figure 7 As shown, the uniform distribution assembly includes a reciprocating screw rod 441 for movement, and a toggle frame 443 and a striking rod 448 for uniformly distributing the stones; A reciprocating screw rod 441 is rotatably mounted on the left and right sides and the middle of the discharging frame 420 through the mounting cavity. The end of the reciprocating screw rod 441 passes through the inner wall of the crushing box 100 and is connected to the second gear set 450. A toggle frame 443 is movably mounted on the reciprocating screw rod 441 on the left and right sides, and a striking rod 448 is movably mounted on the reciprocating screw rod 441 in the middle. When the second gear set 450 is working, it can drive the three reciprocating screws 441 to rotate. When the reciprocating screw 441 rotates, it can drive the toggle frame 443 and the impact rod 448 to move respectively through the cooperation of parts. When the toggle frame 443 and the impact rod 448 move, the fallen stones can be evenly distributed on the rotating cylinder 423 and the containing plate 426.

[0028] like Figure 1-Figure 6 , Figure 8 As shown, the positioning assembly includes a first positioning block 4610 and a second positioning block 4611 for positioning the first blocking plate 413 and the second blocking plate 416, and a first pushing plate 463 and a second pushing plate 464 for driving the first positioning block 4610 and the second positioning block 4611 to move; A first positioning block 4610 and a second positioning block 4611 are movably mounted at the bottom of the first blocking plate 413 and the second blocking plate 416, respectively. A first pushing plate 463 and a second pushing plate 464 are disposed on the surface of the gravel box 100. It can be imagined that after the first baffle plate 413 is rotated and closed, the second positioning block 4611 can slide to the bottom of the first baffle plate 413 for positioning through the driving force of the upward movement of the second push plate 464. When the first baffle plate 413 is closed, the first positioning block 4610 at the bottom of the second baffle plate 416 can slide out of the bottom of the second baffle plate 416 through the driving force of the upward movement of the first push plate 463. When the first positioning block 4610 slides out of the bottom of the second baffle plate 416, the second material distribution port 414 can be opened.

[0029] like Figure 1-Figure 6 As shown, the material distributing assembly further includes a first rotating shaft 412 for rotating the first blocking plate 413, and a second rotating shaft 415 for rotating the second blocking plate 416; The first blocking plate 413 is provided with a first rotating shaft 412 through a mounting hole, and both ends of the first rotating shaft 412 penetrate the inner wall of the crushed stone box 100 and are connected to the first gear set 430. The second blocking plate 416 is provided with a second rotating shaft 415 through a mounting hole, and both ends of the second rotating shaft 415 penetrate the inner wall of the crushed stone box 100 and are connected to the first gear set 430. It can be understood that when the first gear set 430 rotates, the first rotating shaft 412 can be driven to rotate. The rotation of the first rotating shaft 412 can rotate inside the gravel box 100. When the first rotating shaft 412 rotates, the first blocking plate 413 can be driven to rotate. When the first rotating shaft 412 rotates, the second rotating shaft 415 can be driven to rotate inside the gravel box 100 through the cooperation of the first gear set 430. When the second rotating shaft 415 rotates, the second blocking plate 416 can be driven to rotate. The first rotating shaft 412 and the second rotating shaft 415 can always rotate in the same direction through the cooperation of the first gear set 430.

[0030] like Figure 1-Figure 6 , Figure 8 , Fig. 9 As shown, the material discharge assembly further includes a material discharge port 421 and a third rotating shaft 422 for installing the rotating cylinder 423, a loading trough 424 for carrying stones, and a fourth rotating shaft 425 for rotating the holding plate 426; The discharge rack 420 is provided with a discharge port 421, a rotating cylinder 423 is rotatably installed inside the discharge port 421, a third rotating shaft 422 is installed inside the rotating cylinder 423 through an assembly hole, and both ends of the third rotating shaft 422 pass through the inner wall of the crushed stone box 100 and are connected to the first gear set 430; A fourth rotating shaft 425 is installed through the assembly hole inside the containing plate 426, and both ends of the fourth rotating shaft 425 penetrate the inner wall of the gravel box 100 and are connected to the first gear set 430; It should be understood that stones can fall into the loading trough 424 through the first material distribution port 411. When the stones in the loading trough 424 reach a specified weight, the loading trough 424 can drive the rotating cylinder 423 to rotate through its own trapezoidal shape. When the rotating cylinder 423 rotates, it can drive the third rotating shaft 422 to rotate inside the crushing box 100. When the third rotating shaft 422 rotates, it can drive the fourth rotating shaft 425 to rotate through the cooperation of the first gear set 430. When the fourth rotating shaft 425 rotates, it can drive the containing plate 426 to rotate and close. When the fourth rotating shaft 425 rotates, it can drive the second rotating shaft 415 and the first rotating shaft 412 to rotate through the cooperation of the first gear set 430.

[0031] like Figure 1-Figure 4 , Figure 6 , Figure 8 , Fig. 9 As shown, the blanking assembly further includes a rotation groove 427 for rotationally assembling the third rotating shaft 422 and the fourth rotating shaft 425, and a clamping groove 428 and a steel ball 4211 for positioning the third rotating shaft 422 and the fourth rotating shaft 425; The inner wall of the gravel box 100 near the third rotating shaft 422 and the fourth rotating shaft 425 is provided with a rotation groove 427, the inner wall of the rotation groove 427 is provided with a clamping groove 428, and the third rotating shaft 422 and the fourth rotating shaft 425 are provided with a steel ball 4211 matching the clamping groove 428; It can be imagined that the weight of the stone will squeeze the steel ball 4211 through the third rotating shaft 422 and the fourth rotating shaft 425. When the stone reaches the specified weight, the steel ball 4211 will be separated from the slot 428. After the steel ball 4211 is separated from the slot 428, the third rotating shaft 422 and the fourth rotating shaft 425 can continue to rotate due to the weight of the stone.

[0032] like Figure 2 , Figure 4 , Figure 6 , Figure 8 and Fig. 9 As shown, the blanking assembly further includes a first extrusion groove 429 for the movement of the steel ball 4211, and a first extrusion spring 4210 for applying a pre-tightening force to the steel ball 4211; The third rotating shaft 422 and the fourth rotating shaft 425 have a first extrusion groove 429 on their surfaces near the slot 428. A steel ball 4211 is movably installed inside the first extrusion groove 429. A first extrusion spring 4210 is fixedly installed between the steel ball 4211 and the first extrusion groove 429. It is understandable that the first extrusion spring 4210 will exert a certain pre-tightening force on the steel ball 4211 . When the weight of the stone is greater than the pre-tightening force, the steel ball 4211 will completely slide into the inside of the first extrusion groove 429 and disengage from the slot 428 .

[0033] like Figure 3-Figure 7 As shown, the uniform distribution assembly further includes an internal threaded slider 442 for moving the toggle frame 443 and the impact rod 448, and a moving groove 440 for moving the threaded slider 442; The discharging frame 420 is provided with movable grooves 440 on both sides and the middle of the reciprocating screw rod 441, and the reciprocating screw rod 441 is rotatably installed inside the movable groove 440. The surface of the reciprocating screw rod 441 is threadedly connected with a threaded slider 442, and the threaded sliders 442 on the reciprocating screw rods 441 on the left and right sides are fixedly installed with a toggle frame 443; It is worth noting that when the reciprocating screw rod 441 rotates, it can drive the threaded slider 442 to slide in a threaded manner. When the threaded slider 442 slides in a threaded manner, it can slide in the movable groove 440. When the threaded slider 442 slides in a threaded manner, it can drive the toggle frame 443 and the impact rod 448 to move forward and backward. When the toggle frame 443 moves forward and backward, the fallen stones can be evenly distributed on the containing plate 426. When the impact rod 448 moves forward and backward, the fallen stones can be evenly distributed inside the loading trough 424.

[0034] like Figure 3 , Figure 4 , Figure 6-Figure 7 As shown, the uniform distribution assembly further includes a mounting block 444 and a second extrusion groove 445 for assembling the impact rod 448, a rotating rod 446 for rotating the impact rod 448, and a torsion spring 447 for resetting the impact rod 448; A mounting block 444 is fixedly mounted on the side of the threaded slider 442 on the middle reciprocating screw rod 441, and a second extrusion groove 445 is opened on the side of the mounting block 444. A rotating rod 446 is rotatably mounted through the second extrusion groove 445; The two ends of a torsion spring 447 are fixedly mounted on the surface of the rotating rod 446 and the inner wall of the second extrusion groove 445 , and the end of a striking rod 448 is fixedly mounted on the surface of the rotating rod 446 ; It should be understood that when the stone falls from the first material distribution port 411, it will collide and squeeze with the impact rod 448. When the impact rod 448 is squeezed, it will drive the rotating rod 446 to rotate. When the rotating rod 446 rotates, it can rotate inside the second extrusion groove 445. When the rotating rod 446 rotates, it will twist the torsion spring 447. When the impact rod 448 rotates, the striking head at its end will knock on the inner wall of the loading trough 424. When the inner wall of the loading trough 424 is knocked, it will vibrate to reduce the gap between the stones.

[0035] like Figure 1-Figure 4 , Figure 6 , Figure 8 , Fig.10 As shown, the positioning assembly further includes a first rotating plate 460 and a second rotating plate 461 for pushing the first pushing plate 463 and the second pushing plate 464 up and down, and a first limiting frame 462 for limiting the first pushing plate 463 and the second pushing plate 464; The outer surface of the third rotating shaft 422 is fixedly mounted with a first rotating plate 460 and a second rotating plate 461. The surfaces of the first rotating plate 460 and the second rotating plate 461 are both provided with arc-shaped notches, and the two arc-shaped notches are arranged oppositely. A first limiting frame 462 is fixedly installed at the front of the gravel box 100, and a first push plate 463 and a second push plate 464 are movably installed inside the first limiting frame 462. The upper and lower ends of the first push plate 463 and the second push plate 464 are both provided with arc surfaces; It can be imagined that when the third rotating shaft 422 rotates, it can drive the first rotating plate 460 and the second rotating plate 461 to rotate simultaneously. When the first rotating plate 460 rotates, its protrusion will push the end of the first push plate 463 upward. At the same time, the second rotating plate 461 rotates at the same time. When the second rotating plate 461 rotates, it will drive the arc-shaped notch and the end of the second push plate 464 to slide. When the second rotating plate 461 rotates 180°, it will drive its protrusion to squeeze the end of the second push plate 464.

[0036] like Figure 1-Figure 6 , Figure 8 , Fig.10 As shown, the positioning assembly further includes a slide groove 4612 for the first positioning block 4610 and the second positioning block 4611 to move, and a first push rod 466 and a second push rod 467 for pushing the first positioning block 4610 and the second positioning block 4611 to move; The inner wall of the gravel box 100 near the first positioning block 4610 and the second positioning block 4611 is penetrated with a sliding groove 4612, the end of the first positioning block 4610 is fixedly installed with a first push rod 466, and the end of the second positioning block 4611 is fixedly installed with a second push rod 467; When the end of the first push plate 463 is squeezed, it will drive the top arc to squeeze the end of the first push rod 466. When the end of the first push rod 466 is squeezed, it can drive the first positioning block 4610 at the other end to slide in the slide groove 4612. The sliding of the first positioning block 4610 will move out of the bottom of the second blocking plate 416. When the end of the second push plate 464 is squeezed, it will move upward through the top arc to push the end of the second push rod 467. When the end of the second push rod 467 is pushed, the other end will drive the second positioning block 4611 to slide in the slide groove 4612. When the second positioning block 4611 slides, it will move to the bottom of the first blocking plate 413 for positioning, thereby preventing the first blocking plate 413 from being opened by being hit by stones.

[0037] like Figure 1-Figure 6 , Figure 8 , Fig.10 As shown, the positioning assembly further includes a second limiting frame 465 for the first push rod 466 and the second push rod 467 to move, and a second extrusion spring 468 and a positioning plate 469 for resetting the first push rod 466 and the second push rod 467; The surfaces of the first push rod 466 and the second push rod 467 are sleeved with a second limit frame 465, and the second limit frame 465 is fixedly installed at the front of the gravel box 100. The ends of the first push rod 466 and the second push rod 467 away from the first positioning block 4610 and the second positioning block 4611 are fixedly installed with one end of the second extrusion spring 468; A positioning plate 469 is fixedly mounted on the other end of the second extrusion spring 468, and a side surface of the positioning plate 469 is fixedly mounted on the front of the gravel box 100; When the first push plate 463 and the second push plate 464 move downward out of the ends of the first push rod 466 and the second push rod 467, the other ends of the first push rod 466 and the second push rod 467 can be reset by the elastic force of the second extrusion spring 468. When the first push rod 466 is reset, it will drive the first positioning block 4610 to move to the bottom of the first blocking plate 413 for positioning. When the first push rod 466 is reset, it will drive the second positioning block 4611 to move out of the bottom of the second blocking plate 416. The second blocking plate 416 can be rotated and opened through the cooperation of the first gear set 430.

[0038] The above are only preferred specific implementation modes of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An efficient multi-stage stone crushing equipment for highway construction, comprising a stone crushing box (100), wherein a feed port (200) is installed at the top of the stone crushing box (100), a primary stone crushing mechanism (300) for primary crushing of stone is fixedly installed inside the stone crushing box (100) near the feed port (200), a diversion mechanism (400) for batch crushing of stone is fixedly installed at the middle position of the inner side of the stone crushing box (100), the diversion mechanism (400) comprises a material dividing component and a material discharging component for indirect material feeding of stone, and a uniform distribution component for uniform material discharging, a secondary stone crushing mechanism (500) for secondary crushing of stone is installed near the bottom of the diversion mechanism (400) of the stone crushing box (100), and a material discharge port (600) is opened near the bottom of the secondary stone crushing mechanism (500), characterized in that: The flow dividing mechanism (400) further comprises a first gear set (430) for driving the material dividing component and the material discharging component to work, a second gear set (450) for driving the uniform distribution component to rotate, and a positioning component for locking the material dividing component; The material distribution assembly comprises a material distribution frame (410) for distributing stone materials to two sides, a first material distribution opening (411) and a second material distribution opening (414) for discharging materials, and a first blocking plate (413) and a second blocking plate (416) for blocking materials. A material distribution frame (410) is fixedly installed on the inner side of the crushed stone box (100), and a first material distribution opening (411) and a second material distribution opening (414) are provided on both the left and right sides of the material distribution frame (410), and a first blocking plate (413) and a second blocking plate (416) are rotatably installed on the inner sides of the first material distribution opening (411) and the second material distribution opening (414), respectively; The unloading assembly comprises a discharging rack (420) for unloading materials, and a rotating drum (423) and a containing plate (426) for containing stones; A discharging rack (420) is fixedly installed at the center of the bottom of the discharging rack (410), a rotating cylinder (423) is rotated inside the discharging rack (420), and holding plates (426) are rotatably installed inside the crushed stone box (100) near the left and right sides of the discharging rack (410); The uniform distribution assembly includes a reciprocating screw rod (441) for movement, and a toggle frame (443) and an impact rod (448) for uniformly distributing the stone. A reciprocating screw rod (441) is rotatably mounted on the left and right sides and the middle of the discharging frame (420) through the mounting cavity, and the end of the reciprocating screw rod (441) passes through the inner wall of the crushing box (100) and is connected to the second gear set (450). The reciprocating screw rods (441) on the left and right sides are movably mounted with a toggle frame (443), and the reciprocating screw rod (441) in the middle is movably mounted with a striking rod (448); The positioning assembly comprises a first positioning block (4610) and a second positioning block (4611) for positioning the first blocking plate (413) and the second blocking plate (416), and a first pushing plate (463) and a second pushing plate (464) for driving the first positioning block (4610) and the second positioning block (4611) to move; A first positioning block (4610) and a second positioning block (4611) are movably mounted on the bottom of the first blocking plate (413) and the second blocking plate (416), respectively, and a first pushing plate (463) and a second pushing plate (464) are arranged on the surface of the gravel box (100).

2. The high-efficiency multi-stage stone crushing equipment for highway construction according to claim 1 is characterized in that: The material distribution assembly further comprises a first rotating shaft (412) for rotating the first blocking plate (413), and a second rotating shaft (415) for rotating the second blocking plate (416); A first rotating shaft (412) is installed in the first blocking plate (413) through a mounting hole, and both ends of the first rotating shaft (412) pass through the inner wall of the crushed stone box (100) and are connected to the first gear set (430). A second rotating shaft (415) is installed in the second blocking plate (416) through a mounting hole, and both ends of the second rotating shaft (415) pass through the inner wall of the crushed stone box (100) and are connected to the first gear set (430).

3. The high-efficiency multi-stage stone crushing equipment for highway construction according to claim 1 is characterized in that: The material discharge assembly further comprises a material discharge port (421) and a third rotating shaft (422) for mounting the rotating drum (423), a material loading trough (424) for carrying stones, and a fourth rotating shaft (425) for rotating the holding plate (426); The discharge rack (420) is provided with a discharge port (421), a rotating cylinder (423) is rotatably mounted inside the discharge port (421), a third rotating shaft (422) is installed inside the rotating cylinder (423) through an assembly hole, and both ends of the third rotating shaft (422) penetrate the inner wall of the crushed stone box (100) and are connected to the first gear set (430); A fourth rotating shaft (425) is installed through the assembly hole inside the containing plate (426), and both ends of the fourth rotating shaft (425) penetrate the inner wall of the gravel box (100) and are connected to the first gear set (430).

4. The high-efficiency multi-stage stone crushing equipment for highway construction according to claim 3 is characterized in that: The blanking assembly further comprises a rotation groove (427) for rotationally assembling the third rotating shaft (422) and the fourth rotating shaft (425), and a clamping groove (428) and a steel ball (4211) for positioning the third rotating shaft (422) and the fourth rotating shaft (425); A rotation groove (427) is formed through the inner wall of the gravel box (100) near the third rotating shaft (422) and the fourth rotating shaft (425), a clamping groove (428) is formed on the inner wall of the rotating groove (427), and steel balls (4211) matching the clamping groove (428) are installed on the third rotating shaft (422) and the fourth rotating shaft (425).

5. The high-efficiency multi-stage stone crushing equipment for highway construction according to claim 4 is characterized in that: The blanking assembly further comprises a first extrusion groove (429) for the movement of the steel ball (4211), and a first extrusion spring (4210) for applying a pre-tightening force to the steel ball (4211); A first extrusion groove (429) is provided on the surface of the third rotating shaft (422) and the fourth rotating shaft (425) close to the clamping groove (428), a steel ball (4211) is movably installed inside the first extrusion groove (429), and a first extrusion spring (4210) is fixedly installed between the steel ball (4211) and the first extrusion groove (429).

6. The high-efficiency multi-stage stone crushing equipment for highway construction according to claim 1, characterized in that: The uniform distribution assembly further comprises an internal threaded slider (442) for moving the toggle frame (443) and the impact rod (448), and a moving groove (440) for moving the threaded slider (442); The discharging frame (420) is provided with movable grooves (440) on both sides and the middle of the left and right sides close to the reciprocating screw rod (441), and a reciprocating screw rod (441) is rotatably installed inside the movable groove (440). A threaded slider (442) is threadedly connected to the surface of the reciprocating screw rod (441), and a toggle frame (443) is fixedly installed on the threaded sliders (442) on the reciprocating screw rods (441) on the left and right sides.

7. The high-efficiency multi-stage stone crushing equipment for highway construction according to claim 6 is characterized in that: The uniform distribution assembly further comprises a mounting block (444) and a second extrusion groove (445) for assembling the impact rod (448), a rotating rod (446) for rotating the impact rod (448), and a torsion spring (447) for resetting the impact rod (448); A mounting block (444) is fixedly mounted on the side of the threaded slider (442) on the middle reciprocating screw rod (441), a second extrusion groove (445) is opened on the side of the mounting block (444), and a rotating rod (446) is rotatably mounted through the second extrusion grooves (445); The two ends of a torsion spring (447) are fixedly mounted on the surface of the rotating rod (446) and the inner wall of the second extrusion groove (445), and the end of an impact rod (448) is fixedly mounted on the surface of the rotating rod (446).

8. The high-efficiency multi-stage stone crushing equipment for highway construction according to claim 3 is characterized by: The positioning assembly further comprises a first rotating plate (460) and a second rotating plate (461) for pushing the first pushing plate (463) and the second pushing plate (464) to move up and down, and a first limiting frame (462) for limiting the position of the first pushing plate (463) and the second pushing plate (464); A first rotating plate (460) and a second rotating plate (461) are fixedly mounted on the outer surface of the third rotating shaft (422); arc-shaped notches are provided on the surfaces of the first rotating plate (460) and the second rotating plate (461); and the two arc-shaped notches are arranged in opposite directions; A first limiting frame (462) is fixedly mounted on the front of the gravel box (100), a first pushing plate (463) and a second pushing plate (464) are movably mounted inside the first limiting frame (462), and arc surfaces are arranged at both upper and lower ends of the first pushing plate (463) and the second pushing plate (464).

9. The high-efficiency multi-stage stone crushing equipment for highway construction according to claim 8, characterized in that: The positioning assembly further comprises a slide groove (4612) for the first positioning block (4610) and the second positioning block (4611) to move, and a first push rod (466) and a second push rod (467) for pushing the first positioning block (4610) and the second positioning block (4611) to move; A sliding groove (4612) is provided through the inner wall of the gravel box (100) close to the first positioning block (4610) and the second positioning block (4611); a first pushing rod (466) is fixedly mounted on the end of the first positioning block (4610); and a second pushing rod (467) is fixedly mounted on the end of the second positioning block (4611).

10. The high-efficiency multi-stage stone crushing equipment for highway construction according to claim 9, characterized in that: The positioning assembly further comprises a second limiting frame (465) for the movement of the first pushing rod (466) and the second pushing rod (467), and a second extrusion spring (468) and a positioning plate (469) for resetting the first pushing rod (466) and the second pushing rod (467); The surfaces of the first push rod (466) and the second push rod (467) are both sleeved with a second limit frame (465), the second limit frame (465) is fixedly mounted on the front of the gravel box (100), and one end of a second extrusion spring (468) is fixedly mounted on the ends of the first push rod (466) and the second push rod (467) away from the first positioning block (4610) and the second positioning block (4611); A positioning plate (469) is fixedly mounted on the other end of the second extrusion spring (468), and a side surface of the positioning plate (469) is fixedly mounted on the front portion of the gravel box (100).

Citation Information

Patent Citations

  • Efficient stone crusher

    CN111408466A

  • Efficient multi-stage stone crushing equipment for road construction

    CN114950687A

  • Crusher for stone processing and crushing method

    CN118253367A

  • Mining broken stone distributing device

    CN222358596U

  • Classified landfill device and method for garbage landfills

    US20240091786A1