By designing an Internet-based logistics warehousing management device, using the coordinated operation of components such as motors, threaded rods, and guide rods, it is possible to efficiently complete the cargo pickup task of multiple shelves by only one pickup device, solving the problem of high costs caused by multiple pickup devices in the prior art, and improving the level of automation and efficiency.

CN119750085AInactive Publication Date: 2025-04-04PUYANG VOCATIONAL & TECHN COLLEGE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411974473.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-30
Publication Date
2025-04-04
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing logistics warehousing management device requires multiple pickup devices when in use, resulting in higher costs.

Method used

An Internet-based logistics warehousing management device is designed, through the coordinated operation of the first motor, the first threaded rod, the guide rod, the connecting plate, the mounting frame, the mobile plate, the second connecting plate, the second motor, the second threaded rod, the lifting mechanism and the pickup mechanism, the cargo pickup task can be efficiently completed on multiple shelves by only one pickup device.

Benefits of technology

It greatly reduces the operating costs of enterprises and improves the automation level and operating efficiency of warehouse management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119750085A_ABST
    Figure CN119750085A_ABST
Patent Text Reader

Abstract

The invention provides an internet-based logistics warehouse management device, relates to the technical field of logistics warehouse management devices, and solves the problem of high cost caused by the use of a plurality of goods taking devices when the existing logistics warehouse management device is used, and the internet-based logistics warehouse management device comprises mounting beams mounted on the two sides of the top of a plant, a pair of mounting plates is mounted on the surface of the mounting beam, the surface of the mounting beam is sleeved with a mounting piece, a first motor is mounted on the surface of one mounting plate, a first threaded rod is mounted between the pair of mounting plates, one end of the first threaded rod is connected with the output end of the first motor, and the other end of the first threaded rod is connected with the output end of the second motor. A guide rod is mounted between the other pair of mounting plates, and a first connecting plate is mounted at the top of the mounting piece. According to the goods taking device, the task of taking goods on a plurality of goods shelves can be efficiently completed only through one goods taking device, the operation cost of an enterprise is greatly reduced, and the automation level and the operation efficiency of warehouse management are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of logistics warehousing management devices, and more specifically, particularly relates to an Internet-based logistics warehousing management device. Background Art

[0002] The Internet, also known as the international network, refers to a huge network of networks connected in series. These networks are connected by a set of common protocols to form a logically single huge international network. The Internet is often involved in logistics and warehousing.

[0003] Based on the above, the inventors have discovered the following problems: current logistics warehousing management devices are composed of a number of shelves and picking devices, and usually a picking device is required between every two shelves. These picking devices can operate 24 hours a day, and with the addition of the Internet, unmanned operation can also be achieved. Therefore, the cost of using a picking mechanism for every two shelves is relatively high.

[0004] Therefore, in view of this, the existing structure and deficiencies are studied and improved, and a logistics warehousing management device based on the Internet is provided, in order to achieve a more practical purpose. Summary of the invention

[0005] In order to solve the above technical problems, the present invention provides an Internet-based logistics warehousing management device to solve the problem that the current logistics warehousing management device needs to use multiple pickup devices when in use, which leads to high costs.

[0006] The purpose and effect of the Internet-based logistics warehousing management device of the present invention are achieved by the following specific technical means:

[0007] A logistics warehousing management device based on the Internet, comprising mounting beams installed on both sides of the top of a factory building, a pair of mounting plates installed on the surface of the mounting beam, a mounting piece sleeved on the surface of the mounting beam, a first motor installed on the surface of one of the mounting plates, a first threaded rod installed between the pair of mounting plates, one end of the first threaded rod connected to the output end of the first motor, a guide rod installed between the other pair of mounting plates, a first connecting plate installed on the top of the mounting piece, the first threaded rod and the guide rod both penetrate the first connecting plate, a through hole of the first connecting plate penetrated by the first threaded rod is provided with a thread matching the first threaded rod, a mounting frame installed between the mounting pieces, a moving plate installed on the surface of the mounting frame, a second connecting plate installed on the top of the moving plate, a second motor installed on one side of the mounting frame, a second threaded rod installed on the output end of the second motor, the second threaded rod penetrates the second connecting plate and is connected to the other side of the mounting frame, and a picking mechanism is installed at the bottom of the moving plate through a lifting mechanism.

[0008] Furthermore, the lifting mechanism includes four evenly distributed multi-stage sleeve rods installed at the bottom of the moving plate, the multi-stage sleeve rods are connected to the picking mechanism, and also includes a double hook chain electric hoist installed at the bottom of the moving plate, and the hook of the double hook chain electric hoist is connected to the picking mechanism.

[0009] Further, the picking mechanism includes a mounting platform connected to the hook of the multi-stage sleeve rod and the double hook chain electric hoist, a placement groove is provided on the surface of the mounting platform, a first mobile frame is installed in the placement groove, a first slot and a second slot are provided on both sides of the placement groove, a third motor is installed on the side of the mounting platform, the output end of the third motor extends to the first slot and a third threaded rod is installed, a third connecting plate is provided on the surface of one side of the first mobile frame, the third threaded rod penetrates the third connecting plate, a first rack is installed in the second slot, a third slot is provided on the surface of the side opposite to the third connecting plate of the first mobile frame, a gear is installed in the third slot through a rotating shaft, the gear and the third connecting plate are both located in the middle position of the side of the first mobile frame, the gear is meshed with the first rack, a second mobile frame is installed in the first mobile frame, a second rack is installed on one side of the second mobile frame, the second rack is meshed with the gear, slide grooves are provided on both sides of the first mobile frame, sliders are provided on both sides of the second mobile frame, the slider is located in the slide groove, and a placement platform is installed on the surface of the second mobile frame.

[0010] Furthermore, a hanging ring matching the hook of the double hook chain electric hoist is provided on the surface of the mounting platform, and the multi-stage sleeve rod is detachably connected to the mounting platform.

[0011] Furthermore, a plurality of rollers are disposed on the surfaces of the mounting member and the movable plate.

[0012] Furthermore, the surface of the third motor is provided with anti-slip textures.

[0013] Furthermore, a limiting mechanism is arranged inside the multi-stage sleeve rod.

[0014] Furthermore, the first moving frame and the second moving frame are made of alloy steel.

[0015] Furthermore, a plurality of reinforcing rods are installed on the surface of the mounting frame.

[0016] Compared with the prior art, the present invention has the following beneficial effects:

[0017] The present invention can efficiently complete the task of picking up goods from multiple shelves with only one picking device through the coordinated operation of the first motor, the first threaded rod, the guide rod, the connecting plate, the mounting frame, the movable plate, the second connecting plate, the second motor, the second threaded rod, the lifting mechanism and the picking mechanism, thereby greatly reducing the operating costs of the enterprise and improving the automation level and operating efficiency of warehouse management. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a three-dimensional schematic diagram of an Internet-based logistics warehousing management device of the present invention.

[0019] Figure 2 It is a bottom view schematic diagram of an Internet-based logistics warehousing management device of the present invention.

[0020] Figure 3 It is a schematic diagram of the assembly of a pickup mechanism in an Internet-based logistics warehousing management device of the present invention.

[0021] Figure 4 The present invention is a logistics warehousing management device based on the Internet Figure 3 Schematic diagram from different viewing angles.

[0022] Figure 5 The present invention is a logistics warehousing management device based on the Internet Figure 3 An enlarged schematic diagram of point A in FIG.

[0023] Figure 6 The present invention is a logistics warehousing management device based on the Internet Figure 4 An enlarged schematic diagram of point B in FIG.

[0024] In the figure, the corresponding relationship between the component names and the figure numbers is as follows:

[0025] 1. Mounting beam; 2. Mounting plate; 3. Mounting member; 4. First motor; 5. First threaded rod; 6. Guide rod; 7. Connecting plate; 8. Mounting frame; 9. Moving plate; 10. Second connecting plate; 11. Second motor; 12. Second threaded rod;

[0026] 13. Lifting mechanism; 1301. Multi-stage sleeve rod; 1302. Double hook chain electric hoist;

[0027] 14. Pick-up mechanism; 1401. Mounting table; 1402. Placement slot; 1403. First moving frame; 1404. First slot; 1405. Second slot; 1406. Third motor; 1407. Third threaded rod; 1408. Third connecting plate; 1409. First rack; 1410. Third slot; 1411. Gear; 1412. Second moving frame; 1413. Second rack; 1414. Slide; 1415. Slider; 1416. Placement table;

[0028] 15. Roller; 16. Reinforcement rod. DETAILED DESCRIPTION

[0029] The following embodiments of the present invention are described in further detail in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0030] In the description of the present invention, unless otherwise specified, "plurality" means two or more than two; the orientations or positional relationships indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0031] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0032] Example:

[0033] As attached Figure 1 To Attachment Figure 6 As shown:

[0034] The present invention provides an Internet-based logistics warehousing management device, comprising a mounting beam 1 installed on both sides of the top of a factory building, a pair of mounting plates 2 are installed on the surface of the mounting beam 1, a mounting member 3 is sleeved on the surface of the mounting beam 1, a first motor 4 is installed on the surface of one of the mounting plates 2, a first threaded rod 5 is installed between a pair of the mounting plates 2, one end of the first threaded rod 5 is connected to the output end of the first motor 4, a guide rod 6 is installed between the other pair of the mounting plates 2, a first connecting plate 7 is installed on the top of the mounting member 3, and the first threaded rod 5 and the guide rod 6 are connected to each other. They all penetrate the first connecting plate 7, and the through hole of the first connecting plate 7 penetrated by the first threaded rod 5 is provided with a thread matching the first threaded rod 5. A mounting frame 8 is installed between the mounting parts 3, and a movable plate 9 is installed on the surface of the mounting frame 8. A second connecting plate 10 is installed on the top of the movable plate 9. A second motor 11 is installed on one side of the mounting frame 8, and a second threaded rod 12 is installed on the output end of the second motor 11. The second threaded rod 12 penetrates the second connecting plate 10 and is connected to the other side of the mounting frame 8. A picking mechanism 14 is installed at the bottom of the movable plate 9 through a lifting mechanism 13.

[0035] Among them, the lifting mechanism 13 includes four evenly distributed multi-stage sleeve rods 1301 installed at the bottom of the moving plate 9, and the multi-stage sleeve rods 1301 are connected to the picking mechanism 14. It also includes a double hook chain electric hoist 1302 installed at the bottom of the moving plate 9, and the hook of the double hook chain electric hoist 1302 is connected to the picking mechanism 14.

[0036] Among them, the picking mechanism 14 includes a mounting platform 1401 connected to the hooks of the multi-stage sleeve rod 1301 and the double hook chain electric hoist 1302, the surface of the mounting platform 1401 is provided with a placement groove 1402, a first moving frame 1403 is installed in the placement groove 1402, first slots 1404 and second slots 1405 are distributed on both sides of the placement groove 1402, a third motor 1406 is installed on the side of the mounting platform 1401, the output end of the third motor 1406 extends to the first slot 1404 and a third threaded rod 1407 is installed in it, a third connecting plate 1408 is installed on the surface of one side of the first moving frame 1403, the third threaded rod 1407 passes through the third connecting plate 1408, a first rack 1409 is installed in the second slot 1405, and the first moving frame 14 03 A third slot 1410 is provided on the surface of the side opposite to the third connecting plate 1408, and a gear 1411 is installed in the third slot 1410 through a rotating shaft. The gear 1411 and the third connecting plate 1408 are both located in the middle position of the side of the first movable frame 1403, and the gear 1411 is meshed with the first rack 1409. A second movable frame 1412 is installed in the first movable frame 1403, and a second rack 1413 is installed on one side of the second movable frame 1412, and the second rack 1413 is meshed with the gear 1411. Slide grooves 1414 are provided on both sides of the first movable frame 1403, and sliders 1415 are installed on both sides of the second movable frame 1412. The slider 1415 is located in the slide groove 1414, and a placement table 1416 is installed on the surface of the second movable frame 1412.

[0037] The surface of the mounting platform 1401 is provided with a hanging ring matching the hook of the double hook chain electric hoist 1302 , and the multi-stage sleeve rod 1301 is detachably connected to the mounting platform 1401 .

[0038] Through the coordinated operation of the first motor 4, the first threaded rod 5, the guide rod 6, the connecting plate 7, the mounting frame 8, the moving plate 9, the second connecting plate 10, the second motor 11, the second threaded rod 12, the lifting mechanism 13 and the picking mechanism 14, the entire cargo picking process becomes efficient and accurate. When the warehouse management system issues an instruction to pick up specific goods, the operator first starts the first motor 4 and the second motor 11. The activation of the first motor 4 causes the first threaded rod 5 to start rotating. This rotational movement is effectively transmitted through the connecting plate 7, driving the mounting member 3 to move smoothly on the mounting beam 1. The movement of the mounting member 3 further pulls the mounting frame 8 to slide along the predetermined trajectory. At the same time, the activation of the second motor 11 also triggers the rotation of the second threaded rod 12. This rotational force is transmitted through the second connecting plate 10, driving the moving plate 9 to move accurately on the mounting frame 8, thereby ensuring that the picking mechanism 14 can be accurately positioned directly above the goods to be picked up.

[0039] Then, the double hook chain electric hoist 1302 is started, and the picking mechanism 14 slowly descends. In this process, the multi-stage sleeve rod 1301 structure plays a key role, which provides stable support and limit for the picking mechanism 14, effectively preventing any shaking during the descent process, and ensuring that the picking mechanism 14 can accurately reach the same height as the goods.

[0040] Subsequently, the start of the third motor 1406 marks the beginning of the cargo grabbing stage. The rotation of the third motor 1406 drives the rotation of the third threaded rod 1407, and this action is transmitted through the third connecting plate 1408 (its design is cleverly matched with the first slot 1404), which promotes the lateral movement of the first mobile frame 1403. The part of the first mobile frame 1403 is cleverly embedded in the second slot 1405, and such a design not only provides additional stability, but also limits its range of movement. Since the gear 1411 is closely meshed with the first rack 1409, and the gear 1411 is connected to the first mobile frame 1403 by rotation, the movement of the first mobile frame 1403 drives the gear 1411 to rotate. The rotation of the gear 1411 drives the movement of the second rack 1413 meshed with it, and then promotes the movement of the second mobile frame 1412. This series of actions will eventually accurately move the placement platform 1416 to the bottom of the cargo. The structural design of the slide groove 1414 and the slider 1415 ensures the stability and accuracy of the second moving frame 1412 during the movement.

[0041] At this time, the double hook chain electric hoist 1302 is started again to lift the mounting platform 1401, thereby smoothly lifting the goods from the shelf. Subsequently, by starting the third motor 1406 again and controlling its reverse rotation, the second mobile rack 1412 is accurately reset to ensure that the goods are securely placed at the center of the mounting platform 1401. It is worth noting that the access hole under the goods is designed as a through slot, which ensures that the second mobile rack 1412 can freely enter and exit under the goods without obstruction.

[0042] Finally, when the goods are firmly seated on the mounting platform 1401, the first motor 4, the second motor 11 and the double hook chain electric hoist 1302 are started again, and the entire picking device smoothly transfers the goods to the shelf to be transported. Since the gear 1411 and the third connecting plate 1408 are cleverly located in the center of the mounting platform 1401, the first mobile frame 1403 and the second mobile frame 1412 can flexibly move left and right. This design allows only one picking device to efficiently complete the task of picking goods from multiple shelves, greatly reducing the operating costs of the enterprise and improving the automation level and operating efficiency of warehouse management.

[0043] Wherein, a plurality of rollers 15 are disposed on the surfaces of the mounting member 3 and the movable plate 9 .

[0044] By using the roller 15, the smoothness of the movement of the mounting member 3 and the moving plate 9 can be improved.

[0045] Wherein, the surface of the third motor 1406 is provided with anti-slip textures.

[0046] By using the anti-slip texture, the stability of the goods placed on the placement table 1416 can be improved.

[0047] Wherein, a limiting mechanism is arranged inside the multi-stage sleeve rod 1301 .

[0048] By using the limiting mechanism, the sleeve rods can be prevented from disengaging.

[0049] The first moving frame 1403 and the second moving frame 1412 are made of alloy steel.

[0050] Wherein, a plurality of reinforcing rods 16 are installed on the surface of the mounting frame 8 .

[0051] By using the reinforcing rod 16 , the strength of the mounting bracket 8 can be improved.

[0052] The embodiments of the present invention are given for the purpose of illustration and description, and are not intended to be exhaustive or to limit the invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.

Claims

1. A logistics warehousing management device based on the Internet, characterized in that: The invention comprises a mounting beam (1) mounted on both sides of the top of a factory building, a pair of mounting plates (2) being mounted on the surface of the mounting beam (1), a mounting member (3) being sleeved on the surface of the mounting beam (1), a first motor (4) being mounted on the surface of one of the mounting plates (2), a first threaded rod (5) being mounted between the pair of mounting plates (2), one end of the first threaded rod (5) being connected to the output end of the first motor (4), a guide rod (6) being mounted between the other pair of mounting plates (2), a first connecting plate (7) being mounted on the top of the mounting member (3), the first threaded rod (5) and the guide rod (6) both passing through the first connecting plate (7) and being connected by a first A through hole of a first connecting plate (7) through which a threaded rod (5) passes is provided with a thread matching the first threaded rod (5); a mounting frame (8) is installed between the mounting parts (3); a movable plate (9) is installed on the surface of the mounting frame (8); a second connecting plate (10) is installed on the top of the movable plate (9); a second motor (11) is installed on one side of the mounting frame (8); a second threaded rod (12) is installed at the output end of the second motor (11); the second threaded rod (12) passes through the second connecting plate (10) and is connected to the other side of the mounting frame (8); a picking mechanism (14) is installed at the bottom of the movable plate (9) through a lifting mechanism (13).

2. The Internet-based logistics warehousing management device as claimed in claim 1, characterized in that: The lifting mechanism (13) comprises four evenly distributed multi-stage sleeve rods (1301) installed at the bottom of the moving plate (9), wherein the multi-stage sleeve rods (1301) are connected to the picking mechanism (14), and further comprises a double hook and ring chain electric hoist (1302) installed at the bottom of the moving plate (9), wherein the hook of the double hook and ring chain electric hoist (1302) is connected to the picking mechanism (14).

3. The Internet-based logistics warehousing management device as claimed in claim 2, characterized in that: The cargo-picking mechanism (14) includes a mounting platform (1401) connected to the hook of the multi-stage sleeve rod (1301) and the double hook chain electric hoist (1302), the surface of the mounting platform (1401) is provided with a placement groove (1402), a first movable frame (1403) is installed in the placement groove (1402), and a first slot (1404) and a second slot (1405) are distributed on both sides of the placement groove (1402). A third motor (1406) is installed on the side, the output end of the third motor (1406) extends to the first slot (1404) in which a third threaded rod (1407) is installed, a third connecting plate (1408) is installed on the surface of one side of the first moving frame (1403), the third threaded rod (1407) passes through the third connecting plate (1408), a first rack (1409) is installed in the second slot (1405), and the first moving frame (1403) A third slot (1410) is provided on the surface of a side opposite to the third connecting plate (1408), a gear (1411) is installed in the third slot (1410) via a rotating shaft, the gear (1411) and the third connecting plate (1408) are both located in the middle of the side of the first movable frame (1403), the gear (1411) is meshed with the first rack (1409), and a second movable frame (1412) is installed in the first movable frame (1403). A second rack (1413) is installed on one side of the second movable frame (1412), and the second rack (1413) is meshed with the gear (1411). Slide grooves (1414) are provided on both sides of the first movable frame (1403). Slide blocks (1415) are installed on both sides of the second movable frame (1412), and the slide blocks (1415) are located in the slide grooves (1414). A placement table (1416) is installed on the surface of the second movable frame (1412).

4. The Internet-based logistics warehousing management device as claimed in claim 3, characterized in that: The surface of the mounting platform (1401) is provided with a hanging ring matching the hook of the double hook chain electric hoist (1302), and the multi-stage sleeve rod (1301) is detachably connected to the mounting platform (1401).

5. The Internet-based logistics warehousing management device as claimed in claim 4, characterized in that: The surfaces of the mounting member (3) and the movable plate (9) are both provided with a plurality of rollers (15).

6. The Internet-based logistics warehousing management device as claimed in claim 5, characterized in that: The surface of the third motor (1406) is provided with anti-slip textures.

7. The Internet-based logistics warehousing management device as claimed in claim 6, characterized in that: A limiting mechanism is arranged inside the multi-stage sleeve rod (1301).

8. The Internet-based logistics warehousing management device as claimed in claim 7, characterized in that: The first movable frame (1403) and the second movable frame (1412) are made of alloy steel.

9. The Internet-based logistics warehousing management device as claimed in claim 8, characterized in that: A plurality of reinforcing rods (16) are mounted on the surface of the mounting frame (8).