Super-high multi-layer autoclaved aerated concrete strip panel partition wall structure construction auxiliary device and construction method thereof
By using auxiliary devices such as winches, tilting and translating components, and lifting and protection components in the construction of super high-rise buildings, the problems of high labor intensity and low efficiency in the installation of autoclaved aerated concrete (AAC) panels have been solved, and precise installation and positioning of the panels and efficient construction have been achieved.
Patent Information
- Application Number
- CN202411626153.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-14
- Publication Date
- 2025-12-09
- Estimated Expiration
- 2044-11-14
AI Technical Summary
In the construction of super high-rise buildings, the installation of autoclaved aerated concrete (AAC) panels is labor-intensive, inefficient, and poses safety hazards.
The construction auxiliary device adopts a winch, a tilting and translating component, a lifting and protection component, and a lateral movement component. The precise installation and positioning of the strips is achieved through pulley blocks, a tilting motor, and a locking component, reducing manual operation and hoisting times.
It significantly shortens the construction cycle, reduces labor costs and safety risks, and improves construction efficiency and safety. It is suitable for super high-rise and multi-story buildings of different heights and spans.
Smart Images

Figure CN119754578B_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of prefabricated building construction, in particular to a super-high multi-layer autoclaved aerated concrete panel partition wall structure construction auxiliary device and a construction method thereof. BACKGROUND
[0002] The partition wall panel is a prefabricated panel for the non-bearing part of the building interior wall, including glass fiber reinforced cement panel, glass fiber reinforced gypsum hollow panel, autoclaved aerated concrete panel, lightweight concrete panel, composite sandwich lightweight panel, etc. Among them, the autoclaved aerated concrete lightweight wall panel is a new type of building energy-saving product, which has the advantages of light weight, good sound insulation and heat preservation effect, simple installation process, lower construction period requirement, etc., and is widely used in the interior and exterior wall panels and roofs of various buildings. However, due to the large-span and super-high space structure of the venue building, when the partition wall is made of autoclaved aerated concrete panel, the height of the panel cannot reach the top due to the size of the panel and the transportation requirements, and it needs to be designed as a layered structure and then installed in layers to meet the requirements. The design and installation method of the structure form have high technical requirements, which brings difficulties to design and construction.
[0003] In the prior art, when constructing a super-high building, the required panels are transported to each layer of space, and then workers push the panels from a lying state to a vertical state, and then continuously change the installation position of each station, which is labor-intensive, low in construction efficiency, and prone to safety accidents.
[0004] Patent "CN206205464U" discloses a prefabricated lightweight partition wall panel construction auxiliary device, which uses hoisting to adaptively hoist the bottom panel to different height spaces. However, in actual construction, since the initial lifting point position is fixed, when the panel is hoisted in the upper space and unloaded, workers still need to carry the panel and change the installation position of the panel, which takes a long time in the whole construction process, has high construction intensity, is inconvenient to operate and low in efficiency.
[0005] Therefore, it is necessary to research a super-high multi-layer autoclaved aerated concrete panel partition wall structure construction auxiliary device which is convenient to construct. SUMMARY
[0006] Therefore, the purpose of the present application is to provide a super-high multi-layer autoclaved aerated concrete panel partition wall structure construction auxiliary device, which effectively solves the problems of high labor intensity and low construction efficiency of workers.
[0007] In order to achieve the above object, the technical scheme adopted by the present application is: a kind of super high multi-layer autoclaved aerated concrete strip panel partition wall structure construction auxiliary device, including winch, overturning and translating component, lifting protection component and horizontal moving component, the overturning and translating component includes moving frame, end frame and front frame, the moving frame can be locked and fixed with steel beam under the action of locking component or unlocked;Front side of moving frame is equipped with parallelogram overturning structure, the end frame is hinged in the front side of the parallelogram overturning structure;And end frame is symmetrically provided with jack plug;The front frame is arranged on the outside of end frame, and is fixed with moving frame, so that the front side of moving frame forms a one-side opening overturning space, and the receiving interval is formed between end frame and front frame;The lifting protection component includes protection frame, lifting seat, lifting ring and pressing assembly, the protection frame is hollow in inner cavity and its side is equipped with assembly opening, when strip panel is assembled to protection frame cavity, strip panel can be tightly fixed in protection frame by pressing assembly on the rear side of protection frame;The lifting seat is fixed on the front side of protection frame, and the lifting ring is fixed on the lifting seat;The side wall of protection frame is provided with the butt joint hole matched with the inner diameter of the jack plug, so that the jack rod can be matched and assembled in the jack plug and butt joint hole, and the moving frame and protection frame can be fixed and assembled together, and under the action of parallelogram overturning structure, the protection frame in receiving interval can be overturned from the front side of moving frame to the side of moving frame;The horizontal moving component includes first pulley block, second pulley block, third pulley block and fourth pulley block, the first pulley block and the second pulley block are fixed on the steel column along the horizontal direction, the third pulley block is fixed below the second pulley block, the fourth pulley block is fixedly installed on the front frame, and the space interval is formed between each pulley block and the steel column;The free end of the rope wound on the winch is respectively wound around the first pulley block, the second pulley block along the horizontal direction, then wound around the third pulley block along the vertical direction, and then wound around the fourth pulley block along the vertical direction, and finally connected with the lifting ring on the protection frame through the lifting connection.
[0008] Further, the parallelogram overturning structure includes support arm, overturning rod, connecting shaft and overturning motor, wherein the support arm is arranged on the front side of the moving frame along the longitudinal direction, and the rear side of the support arm is welded with the moving frame, the overturning rod is installed on the front side of the support arm, the connecting shaft is fixedly installed on the support arm and the overturning rod, and the end of the connecting shaft is connected with the overturning motor, and the rear side of the overturning rod is hinged on the end frame.
[0009] Further, the front frame is in L-shaped structure, the longitudinal frame arm of the front frame is welded with the moving frame, and the transverse frame arm is parallel with the end frame, so that the receiving interval is formed between the inside of the front frame and the end frame;The fourth pulley block is fixedly installed on the outside of the middle position of the transverse frame arm on the front side, and when the rope is wound around the pulley on the fourth pulley block, the rope is vertically extended downward and connected with the lifting point on the protection frame through the lifting connection.
[0010] Further, the locking assembly comprises a top plate, a fixing base, a bolt and a spring, the fixing base is fixed in the steel beam, the bolt is vertically sleeved on the fixing base, the top of the bolt is vertically fixed with the top plate, the outer end of the top plate extends to the upper side of the accommodating interval outside the steel beam, the bottom of the bolt is matched and sleeved in the locking hole on the moving frame, and the bolt vertically extends downward.
[0011] Further, the bottom of the bolt is provided with an arc-shaped end, and an arc-shaped fillet matched with the arc-shaped end is arranged on the left side top wall of the moving frame, and the spring is sleeved on the bolt in the fixing base, and the lower part of the spring is fixed with the main body of the bolt.
[0012] Further, the pressing assembly is arranged on each guard plate on the inner side of the protection frame, and the pressing assembly comprises a screw rod and a pressing plate, wherein the screw rod is screw-mounted in the middle part of the guard plate and is perpendicular to the guard plate, the inner and outer ends of the screw rod are respectively provided with the pressing plate and a screw head, the pressing plate is rotationally connected with the fastening screw rod, and the screw head is welded on the end part of the fastening screw rod.
[0013] Further, the sleeve ring structure is fixed on the side wall of the protection frame, and the sleeve ring comprises a sleeve ring base, a rod body and a C-shaped ring, wherein the sleeve ring base is fixedly installed on the left and right side walls of the protection frame by bolts, the two sleeve ring structures are staggered in front and back, the rod body is welded on the sleeve ring base and extends outward in the transverse direction, and the end part is welded with the C-shaped ring.
[0014] Further, the positioning and guiding assembly further comprises a positioning plate and a guiding rope, the positioning plate is provided below with a rope wheel, the rope wheel is wound with the guiding rope, the guiding rope comprises a guiding section and a positioning section, the guiding section is connected to the upper and lower sides of the positioning section, and the outer diameter of the positioning section is smaller than that of the guiding section.
[0015] The application further provides a construction method of the super-high multi-layer autoclaved aerated concrete batten partition wall structure, and the construction auxiliary device of the super-high multi-layer autoclaved aerated concrete batten partition wall structure is applied to any one of the above claims, and the construction method comprises the following steps.
[0016] S1, steel partition wall structure construction; the steel partition wall structure comprises steel columns arranged at intervals in the vertical direction and steel beams fixed between the steel columns in the transverse direction, and the bottom of each steel column is arranged on a concrete counterfort, and the batten partition wall is arranged in each unit cell of each layer and is fixed to the steel beams through fasteners in the upward and downward directions;
[0017] S2, one-layer unit construction; the pulley blocks are respectively fixed and installed on the steel columns at the top of the one layer and the front frame, and the moving frame is placed in the space to be constructed, and the construction method comprises the following steps.
[0018] S21, install the strip plate and make the strip plate tightly compressed in the protection frame through the compression assembly; then directly combine and fix the butt joint hole on the protection frame with the insertion hole on the moving frame through the insertion rod; and make the moving frame located at the initial position at the left side of a layer;
[0019] S22, drive the winch to tighten, under the cooperation of the winch and the pulley block, the strip plate can be transported from left to right to the assembly position, after the moving frame reaches the assembly position, then release the winch rope, drive the turnover motor, drive the end frame and the protection frame to make horizontal turnover motion through the parallelogram-shaped turnover structure, turn over the protection frame and the strip plate to the construction unit space;
[0020] S23, the worker screws the fastening screw, loosens the pressing plate, removes the strip plate from the protection frame, and connects and fixes the strip plate with the steel beam through the fastening piece;
[0021] S24, drive the parallelogram-shaped turnover structure to reverse rotation to reset the protection frame to the containing interval, and the worker pushes the moving frame to move to the initial position;
[0022] Repeat the above steps S21-S24 to continue to hoist and install the strip plate of the next working position until the construction of a layer is completed;
[0023] S3, two-layer unit construction; disassemble and reassemble the construction auxiliary device to the two-layer construction unit, fix and install four groups of pulley blocks respectively at the specified positions of the two-layer unit grid steel columns, including:
[0024] S31, place the moving frame in the space to be constructed, lock it to the initial position close to the left side steel column through the locking assembly, and drive the winch to release, so that the rope is sequentially wound around the pulley block and connected with the lifting point on the protection frame for hoisting;
[0025] S32, place the autoclaved aerated concrete strip plate into the assembly cavity of the protection frame, and tightly fix it using the compression assembly; the winch retracts, hoists the protection frame into the containing interval on the front side of the moving frame; at the same time, the C-shaped ring on both sides of the protection frame is sleeved on the guide rope, and moves upward along the guide rope as the hoisting height rises;
[0026] S33, butt joint the butt joint holes on the protection frame and the end frame, and fix them using the insertion rod, at the same time, the top of the strip plate presses the top plate of the locking assembly, so that the moving frame is unlocked from the steel beam;
[0027] Repeat the above steps S22-S24 to continue to hoist and install the strip plate of the next working position until the construction of the second layer is completed;
[0028] S4, disassemble and reassemble the above construction auxiliary device to the high-rise construction unit, repeat the above step S3 until the construction of each layer is completed, then disassemble the construction auxiliary device.
[0029] S5. Assemble the reserved strip positions for the initial positions of the moving frames of each construction unit.
[0030] Furthermore, after the construction of each floor and each unit is completed, when assembling the reserved strips at the initial position of the mobile frame of each construction unit, the first pulley group is installed on the steel column of the highest floor, and the strips are directly hoisted to the corresponding positions of each floor. Workers can then adapt and assemble them according to the dimensions of the reserved space.
[0031] The beneficial effects of the above technical solution are: the construction auxiliary device and construction method for ultra-high multi-layer autoclaved aerated concrete strip partition wall structure provided by the present invention have a unified initial hoisting position for the strip panels, eliminating the need to repeatedly change the hoisting starting point, reducing the number of hoisting operations and the number of times the initial hoisting position of the strip panels needs to be manually moved, and significantly shortening the construction cycle.
[0032] The flipping action of the parallelogram-shaped flipping structure in this invention allows the strip to be flipped and unloaded without changing its orientation, simplifying the transfer process of the strip from the mobile frame to the construction space, realizing the precise installation and positioning of the strip at high altitudes, reducing the complexity of manual operation, reducing the time and frequency of manual work at heights, and lowering safety risks.
[0033] Furthermore, components such as pulley blocks and mobile frames can be disassembled and reassembled, facilitating flexible use in different construction spaces. This makes them suitable for super high-rise and multi-story buildings of varying heights and spans, reducing labor costs and material waste, and lowering overall construction costs.
[0034] In this invention, the movable frame is securely locked by matching and inserting a pin with the movable frame; at the same time, the top plate of the locking assembly is pressed against the top of the strip plate, which unlocks the movable frame from the steel beam, achieving automatic unlocking. This ensures the stability of the movable frame during transportation, simplifies the unlocking process, reduces manual operation, and improves construction efficiency. Attached Figure Description
[0035] Figure 1 A schematic diagram illustrating the construction process of an autoclaved aerated concrete (AAC) panel partition wall structure.
[0036] Figure 2 This is a schematic diagram of the assembly structure of a steel partition wall;
[0037] Figure 3 This is a front view schematic diagram of the transverse component;
[0038] Figure 4 This is a schematic diagram of the assembly and connection structure of the movable frame and the protective frame;
[0039] Figure 5 This is a schematic diagram of the assembly structure of the first pulley block;
[0040] Figure 6 This is a three-dimensional structural diagram of the mobile frame;
[0041] Figure 8 This is a top view of the mobile frame structure.
[0042] Figure 9 for Figure 7 Enlarged structural diagram at point A;
[0043] Figure 10 This is a three-dimensional structural diagram of the protective frame;
[0044] Figure 11 This is a schematic diagram of the clamping assembly on the protective frame;
[0045] Figure 12 This is a magnified structural diagram of point B in his 10th section;
[0046] Figure 13 A front view schematic diagram of the positioning guide component.
[0047] Reference numerals: 1-Steel partition wall structure, 11-Steel column, 12-Steel beam, 13-Autoclaved aerated concrete (AAC) panel partition wall, 14-Concrete curb, 2-Windmill, 3-Transverse moving assembly, 31-First pulley block, 311-Base plate, 312-Support arm, 313-Front plate, 314-Pulley frame, 315-Fixed pulley, 32-Second pulley block, 33-Third pulley block, 34-Fourth pulley block, 4-Tilting and translating assembly, 41-Moving frame. 42-Roller, 43-Support arm, 44-Tilting rod, 45-Connecting shaft, 46-Tilting motor, 47-End frame, 48-Insertion hole, 49-Front frame, 5-Lifting protection assembly, 51-Protective frame, 52-Lifting seat, 53-Lifting ring, 54-Guard plate, 541-Screw, 542-Pressure plate, 543-Turning head, 55-Cavity, 56-Loop, 561-Loop seat, 562-Rod body, 563-C-ring, 57-Mating hole, 6-Positioning guide assembly, 61-Positioning plate, 62-Guide section, 63-Positioning section, 8-Locking assembly, 81-Top plate, 82-Fixed seat, 83-Pin, 84-Arc-shaped end, 85-Spring, 9-Accommodation interval. Detailed Implementation
[0048] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments:
[0049] Embodiment 1, the embodiment aims to provide a kind of super high multilayer autoclaved aerated concrete slab partition wall structure construction auxiliary device, for assisting the safe construction of multilayer slab, without repeatedly changing hoisting starting point, can effectively improve construction efficiency, reduce construction difficulty.In the construction process of super high multilayer building, autoclaved aerated concrete slab is widely used in the construction of partition wall structure as a kind of light weight, high strength building material.However, due to its large volume, not light weight, and need to be installed accurately in high altitude, the traditional dependence on manual handling and simple hoisting mode affects the construction quality and safety.In view of the problems of existing construction auxiliary device, such as high construction intensity, weak adaptability and inconvenient operation, the embodiment provides a kind of super high multilayer autoclaved aerated concrete slab partition wall structure construction auxiliary device, which can be hoisted to the front side of the moving frame specified position under the action of pulley block, so that the protection frame of assembled slab and the moving frame are combined together, then the locking of moving frame is released, the moving frame and protection frame are driven by winch and sliding group, and then the slab is transversely translated to the waiting assembly position, the turnover rod is driven to make the slab be turned over to the construction unit space, and after unloading, the worker can complete the slab installation of the station by simple alignment and fixing operation.
[0050] As Figures 1-3 shown, since the span of super high space building such as venue is large, when carrying out slab construction, the embodiment selects to set partition wall as multilayer structure, then installs layer by layer, and adopts profile steel as the structure of partition wall beam and column, specifically Figure 1 and Figure 2 , the profile steel partition wall structure in the embodiment includes steel column 11 arranged vertically and spaced, and steel beam 12 fixed between steel columns in horizontal direction, and each steel column bottom is arranged on concrete counterfort 14, and autoclaved aerated concrete slab partition wall 13 is installed in each unit cell of each layer, and is fixed with steel beam through fastener up and down, wherein steel beam 12 can adopt I-beam structure.
[0051] Such profile steel partition wall structure arrangement in the embodiment can effectively solve the problems of insufficient slab height and large stress, and by using profile steel (steel column and steel beam) as the main support structure of partition wall, the stability and carrying capacity of the whole partition wall system can be significantly improved, and the stress distribution of the whole structure is optimized, so that the upper load can be effectively transmitted to the steel column below, thereby avoiding the structure damage caused by excessive local stress of partition wall.
[0052] As Figure 3 and Figure 4As shown, when the two-layer, three-layer or even higher-layer strip construction is carried out, the construction auxiliary tool in the embodiment can be used, so as to effectively reduce the manual construction strength and significantly improve the construction efficiency. The super-high multi-layer autoclaved aerated concrete strip partition wall structure construction auxiliary device provided by the embodiment comprises a winch 2, a horizontal moving assembly 3, a turnover and translation assembly 4, a lifting protection assembly 5 and a locking assembly 8. The embodiment takes the right side construction unit of the second layer as an example for introduction.
[0053] Referring to Figure 3 and Figure 5 , the horizontal moving assembly 3 comprises a first pulley set 31, a second pulley set 32, a third pulley set 33 and a fourth pulley set 34. Each pulley set has the same structure and is a fixed pulley structure for providing winding guidance for the rope on the winch. The first pulley set 31 and the second pulley set 32 are fixed at the intersection of the second layer steel beam and the steel column. The third pulley set is fixed to the steel beam below the second pulley set. The fourth pulley set is arranged on the front frame of the moving frame. The planes where the four pulley sets are located are located on the front side of the plane where the steel beam is located, so that a space is formed between each pulley and the steel beam, and the lifting protection assembly drives the strip to be hoisted and lifted in the space. The embodiment takes the first pulley set as an example to introduce the specific installation mode of the pulley set.
[0054] As shown in Figure 5 , the first pulley set 31 comprises a bottom plate 311, a support arm 312, a front plate 313, a pulley frame 314 and a fixed pulley 315. The bottom plate 311 is fixed on the front wall of the steel column by bolts. The support arm 312 is fixed on the bottom plate by welding and extends outward in the longitudinal direction. The end of the support arm is welded to the front plate 313. The pulley frame 314 is fixed on the rear side of the front plate 313 by bolts. The fixed pulley 315 is rotatably installed on the pulley frame 314. On the one hand, the end of the rope that is sequentially wound around each pulley can be connected to the protection frame for hoisting, so that the protection frame and the strip in the inner cavity of the protection frame can be hoisted and lifted into the accommodating space 9 by winding the winch. On the other hand, when the protection frame 51 is hoisted into the accommodating space and assembled with the moving frame, the moving frame and the protection frame can be pulled to the right and translated to the right side in the horizontal direction by winding the winch 2, as shown in Figure 5 , so that the moving frame, the protection frame and the strip in the protection frame are moved towards the second pulley set, and the strip is transported to the assembly position of the unit.
[0055] As shown in Figures 6-8 , the turnover and translation assembly 4 comprises a moving frame 41, a parallelogram-shaped turnover structure, a turnover motor 46, an end frame 47 and a front frame 49, etc. The moving frame 41 is arranged in the unit cell between the upper and lower steel beams. The top and bottom of the moving frame are respectively provided with moving wheels 42, so that the moving frame moves left and right in the assembly unit cell. As shown in Figure 6 and Figure 7As shown, the front side of the moving frame is provided with a parallelogram-shaped turnover structure, and the front side of the parallelogram-shaped turnover structure forms a one-side-opened turnover space, wherein the end frame is arranged in the turnover space, specifically, the front end of the parallelogram-shaped turnover structure is hingedly connected with the end frame 47, and the front frame is arranged on the front side of the end frame and forms a containing space 9 with the end frame 47, which is used for hoisting the protection frame into the containing space.
[0056] Specifically, the parallelogram-shaped turnover structure in the embodiment includes a support arm 43, a turnover rod 44, a connecting shaft 45 and a turnover motor 46, wherein the support arm 43 is arranged on the front side of the moving frame in the longitudinal direction, and the back side thereof is welded and fixed with the moving frame. In the embodiment, four groups of support arms are arranged to form four end points of a rectangular structure. The turnover rod 44 is correspondingly arranged on the front side of the support arm, the connecting shaft 45 is fixedly sleeved with the turnover rod through the upper and lower ends of the support arm, and the end portion is drivingly connected with the turnover motor 46. The back side of the turnover rod is hingedly connected with the end frame 47, so that when the turnover motor is driven to work, it can drive the end frame on the front side to synchronously make a horizontal turnover movement, so as to turn the end frame from the front side of the moving frame to the right side of the moving frame.
[0057] As shown in Figure 6 , the end frame is symmetrically provided with a through insertion hole 48, which is used for, after the protection frame is hoisted into the containing space, inserting and fixing the insertion rod through the insertion hole on the end frame and the butt joint hole on the protection frame, so as to fixedly combine the end frame and the protection frame together, so that when the end frame is turned by the parallelogram-shaped turnover structure, the protection frame and the slats in the protection frame can be simultaneously driven to make a turnover movement in the turnover space, so as to horizontally turn the slats to the waiting assembly position, effectively simplifying the manual operation and improving the construction efficiency.
[0058] As shown in Figure 6 and Figure 8 , the front frame is arranged on the front side of the end frame. In the embodiment, the front frame has an L-shaped structure, the longitudinal frame arm thereof is welded and fixed with the moving frame, and the transverse frame arm is parallel to the end frame, that is, the inner side of the front frame and the end frame form a containing space 9 for assembling the protection frame. The fourth sliding group 34 is fixedly arranged on the outer side of the middle portion of the transverse frame arm on the front side, and the rope is vertically downwardly extended after being wound around the pulley on the fourth pulley group and is hoisted and connected with the lifting point on the protection frame.
[0059] Further, the locking assembly is further arranged above the moving frame in the embodiment, which is used for controlling the locking and fixing or unlocking of the moving frame and the steel beam. That is, when the slats need to be vertically hoisted into the containing space, the moving frame is locked and fixed at the left initial position by the locking assembly at this time. After the slats are hoisted into the containing space and the protection frame is combined and fixed with the end frame on the moving frame, the locking assembly needs to be unlocked at this time, and the horizontal moving assembly is driven to wind the hoisting machine to pull the moving frame to drive the slats to move rightward to the waiting assembly position.
[0060] The locking assembly described above can be locked and fixed by detachable jacks or bolts and nuts, which are tightly pressed on the top surface of the moving frame through the assembly holes on the I-beam, so that the moving frame is locked and fixed, or is removed when moving is needed; or a locking and unlocking method provided in the embodiment is used.
[0061] As shown in Figure 7 and Figure 9 , the locking assembly provided in the embodiment includes a top plate 81, a fixed seat 82, a bolt 83 and a spring 85, wherein the fixed seat 82 is in a U-shaped structure, the bottom of which is fixed in the I-beam by bolts, and the opening faces outward, the bolt 83 is vertically sleeved on the fixed seat, the top of which is vertically fixed with the top plate 81, the outer end of which extends to above the accommodating interval of the I-beam, the bottom of the bolt is matched and inserted into the locking hole (as shown by the dashed part in Figure 9 ) on the moving frame, and vertically extends downward. The bottom of the bolt is provided with an arc-shaped end 84, and the left side top wall of the moving frame is provided with an arc-shaped corner matching the arc-shaped end 84, and the spring 85 is sleeved on the bolt in the fixed seat 82, the lower part of which is fixed with the bolt body.
[0062] The locking assembly provided in the embodiment is arranged in this way, the bolt is matched and inserted into the locking hole of the moving frame in the natural state under the action of the spring, so that the moving frame is fixed with the steel beam, when the strip is hoisted to the accommodating interval, the strip is hoisted upward in the accommodating interval, so that the top of the strip presses and pushes the top plate 81 upward, which moves upward, and drives the bolt to move vertically upward out of the locking hole, and the top plate is pressed and pushed above the I-beam to contact with the top wall in the I-beam, at this time the spring is compressed, and the moving frame is also unlocked with the steel beam, under the action of the pulley block, the moving frame drives the strip to move to the right side, until the strip moves to the right side to separate from the pressing of the top plate, the spring rebounds and drives the bolt to reset downward; when the strip is installed and the moving frame is reset, the left side of the top wall of the moving frame is in an arc-shaped structure, which can be slidably matched with the arc-shaped end of the bottom of the bolt, so that the spring is compressed, the arc-shaped end of the bottom of the bolt moves along the top surface of the moving frame until it is inserted into the locking hole on the moving frame, and the locking and fixing of the moving frame and the steel beam are completed again, so that the hoisting and transportation of the strip at the next station are facilitated.
[0063] As shown in Figures 10-12 , the lifting protection assembly 5 includes a protection frame 51, a lifting seat 52, a lifting ring 53 and a pressing assembly, wherein the protection frame forms an assembly cavity 55 with one side open, the lifting seat 52 is fixed on the outer side of the protection frame, the lifting ring 53 is fixed on the lifting seat to form a lifting point for connecting the rope hoisting, and the side wall of the protection frame is also provided with a butt joint hole 57 matching the insertion hole on the end frame for fixed insertion of the insertion rod.
[0064] The pressing assembly is arranged on each guard plate 54 corresponding to the inner side of the protection frame. In the embodiment, the pressing assembly comprises a screw rod 541 and a pressing plate 542. The screw rod 541 is screw-mounted in the middle of the guard plate 54 and is perpendicular to the guard plate. The inner and outer ends of the screw rod are respectively provided with the pressing plate 542 and a screw head 543. The pressing plate 542 is rotationally connected to the fastening screw rod through a rotating pair such as a bearing. The screw head is welded to the end of the fastening screw rod. Thus, when the autoclaved aerated concrete strip board is installed into the cavity of the protection frame 51, the top of the strip board extends out of the protection frame. Then, the screw head 543 on the fastening screw rod is manually rotated to tightly press the strip board in the cavity of the protection frame. Thus, the protection frame and the strip board can be hoisted into the containing interval 9 in the turnover space, facilitating the transportation of the strip board.
[0065] Working principle description; the super-high multi-layer autoclaved aerated concrete strip board partition wall structure construction auxiliary device provided in the embodiment is actually used. After the profile steel partition wall structure is assembled according to the existing construction process, the construction of the autoclaved aerated concrete strip board partition wall structure is carried out in layers. When the upper layer is constructed, the second layer is taken as an example to introduce the working principle. The step can be adopted when the third layer or higher layer is constructed, as shown in Figure 2 (a) is defined as the first assembly point, and (b) is defined as the second assembly point in the rightmost assembly position in each assembly cell, and the construction is sequentially carried out; specifically including:
[0066] First, four groups of pulley blocks are respectively fixedly installed at the specified positions of the second layer unit cell steel columns to ensure the structural stability of the pulley blocks. The movable frame is placed in the second layer space to be constructed, and the latch of the locking assembly is matched and fixedly installed with the movable frame, so that the movable frame is locked to the position close to the left side steel column in the second layer. At this time, it is the initial position for construction.
[0067] The hoist is driven to be loosened, and the free end is vertically downwardly extended to be hoisted and connected with the lifting point on the protection frame after the rope is sequentially wound around the pulleys of the first pulley block to the fourth pulley block, to ensure the stability of the connection. Then, the autoclaved aerated concrete strip board is placed in the assembly cavity of the protection frame, and the strip board is tightly fixed in the protection frame by using the pressing assembly.
[0068] Then, the hoist is driven to be wound by the controller. The direction of the force is shown by the arrow in Figure 5 Under the cooperation of the hoist and the pulley block, the protection frame is first hoisted into the containing interval in front of the movable frame. After the butt joint holes on the protection frame are matched and aligned with the butt joint holes on the end frame, the hoist is controlled to stop the winding action, and the insertion rod is inserted into the two holes, so that the protection frame and the end frame are combined and fixed together.
[0069] Meanwhile, the top of the strip pushes the top plate of the locking assembly upward, causing the top plate to move upward, thus unlocking the moving frame and the steel beam, and continuing to drive the winch to wind, causing the moving frame (with the protection frame and the strip) to move horizontally to the position to be assembled;
[0070] After the moving frame moves to the position to be assembled (b), the winch is driven to relax the rope, and the overturning motor is driven to drive the end frame and the protection frame to make a horizontal overturning motion through the parallelogram-shaped overturning structure. The overturning process is shown in Figure 8 Thus, the protection frame and the strip are horizontally overturned into the construction unit space, so that the bottom steel beam serves as a support for the protection frame, and the right-side insertion rod inserted into the protection frame and the end frame is pulled out, facilitating the removal of the strip;
[0071] Further, the above horizontal overturning motion is a non-directional overturning action, that is, through the overturning action of the parallelogram-shaped overturning structure, the strip can be overturned to the right from the original containing interval on the front side of the moving frame without changing the direction of the strip;
[0072] The workers in the second-floor space loosen the strip by screwing the fastening screw, remove the strip from the side opening of the protection frame, and then fasten the strip to the upper and lower steel beams through the fasteners on the upper and lower sides of the strip (the structure and principle of the fasteners are prior art and are not described here). After the strip is removed, the protection frame is reset to the containing interval 9 through the parallelogram-shaped overturning structure, and the workers drive the moving frame to the initial position.
[0073] In addition, when the strip is hoisted into the containing interval, the strip is heavy, so the rope drives the moving frame to move in the unit space through the winding operation of the winch. After the strip is assembled, the mass on the moving frame is light, and the rope is in a relaxed state, so the moving frame can be reset by workers. After the moving frame is moved to the left initial position, the protection frame is lowered, and the construction operation of the next work station is continued, so that the initial hoisting position of the strip does not need to be changed back and forth, improving the construction efficiency.
[0074] In addition, during the construction of the first floor, the protection frame can be directly combined and fixed with the moving frame without hoisting operation, and the strip can be installed in the protection frame. Under the cooperation of the winch and the pulley block, the strip can be transported from left to right to the assembly position, and then each strip can be installed in sequence from right to left. When a higher layer or another unit space in the same layer needs to be installed, the pulley blocks are removed and moved together with the moving frame to another assembly space, and the above steps are repeated for installation until all the layers and unit spaces are completely assembled.
[0075] Finally, it should be noted that, as shown in Figure 2 After the assembly of each layer is completed, only position f is left to be completed. At this time, the first pulley block is installed on the steel column of the highest layer, and the strip plate is directly hoisted to the corresponding position of each layer. Workers can adapt and assemble it according to the size of the reserved space.
[0076] The super-high multi-layer autoclaved aerated concrete strip panel partition wall structure construction auxiliary device provided by the embodiment improves the adaptability and reusability of the device, reduces transportation and storage costs, facilitates maintenance and replacement of damaged parts, reduces waiting time and repetitive labor of manual operation, significantly improves construction speed, reduces safety risks faced by workers, and improves overall construction safety.
[0077] In embodiment 2, on the basis of embodiment 1, a positioning and guiding assembly is provided to avoid rotation of the protection frame during hoisting of the strip plate, thereby guiding the upward movement of the protection frame.
[0078] As shown in Figure 1 and Figure 13 A loop structure for sleeving the guide rope is fixed on the side wall of the protection frame. As shown in the figure, the loop includes a loop seat 561, a rod body 562, and a C-shaped ring 563. The loop seat is fixedly installed on the left and right side walls of the protection frame by bolts, and the two loop structures are staggered in front and back. The rod body 562 is welded to the loop seat and extends outward in the transverse direction, and the end is welded to the C-shaped ring 563.
[0079] The positioning and guiding assembly in this embodiment includes a positioning plate 61 and a guide rope. The guide rope includes a guide section 62 and a positioning section 63. As shown in Figure 13 The positioning plate 61 is detachably installed on the top of the highest layer by bolts. A rope wheel is installed below the positioning plate, and a guide rope is wound around the rope wheel. The positioning section 63 is located in the middle, and the guide sections are connected to the upper and lower sides of the positioning section. The outer diameter of the positioning section is smaller than that of the guide section. In actual application, the guide rope extends vertically downward to the ground, and the length of the positioning section is approximately equal to the distance between the upper and lower steel beams of the unit to be assembled. By controlling the rotation of the rope wheel, the positioning section can be positioned at the current side of the unit to be assembled.
[0080] Further, the two guide ropes respectively hang down into the accommodation interval. When the strip plate is assembled into the protection frame, the C-shaped rings on the left and right sides of the strip plate respectively sleeve the guide sections 62 of the two guide ropes, and move upward along the guide sections during the upward movement of the protection frame. When the protection frame is hoisted to the assembly unit, the C-shaped rings move from the guide sections to the positioning sections of the guide ropes. Since the inner diameter of the C-shaped ring is larger than that of the positioning section, the guide rope provides an auxiliary positioning function for the protection frame during its upward movement in the accommodation interval.
[0081] The positioning and guiding assembly provided by the embodiment ensures that the protection frame does not rotate during the ascending process by fixing the sleeve ring structure on the side wall of the protection frame and sleeving the guiding rope; the guiding section and the positioning section of the guiding rope are designed, and the cooperation of the C-shaped ring and the guiding rope jointly provides a stable ascending path for the protection frame, thereby improving the construction efficiency and having high adaptability; by winding the driving rope wheel, the positioning section can be adaptively arranged at the front side of the corresponding assembly unit, thereby being applicable to super-high multi-story buildings of different heights and spans.
[0082] In the embodiments 1 and 2, the embodiment 3 provides a construction method of the super-high multi-story autoclaved aerated concrete panel partition wall structure, and specifically includes the following steps:
[0083] S1, according to the existing construction process, first, the steel partition wall structure (including steel columns, steel beams, etc.) is assembled in the super-high multi-story building;
[0084] S2, one-story construction; according to the construction requirement, the pulley blocks are respectively fixed and installed on the steel columns at the top of the first floor and the front frame, and the moving frame is placed in the space to be constructed;
[0085] S3, the panel is installed in the protection frame, and the compression plate is fixed and compressed on the panel by screwing the fastening screw; then the butt joint hole on the protection frame is directly inserted into the insertion hole on the moving frame through the insertion rod to be assembled and fixed together; and the moving frame is located at the initial position on the left side of the first floor;
[0086] S4, drive the winch to tighten, under the cooperation of the winch and the pulley block, the panel can be transported from left to right to the assembly position, after the moving frame reaches the assembly position, then the winch rope is loosened, and the overturning motor is driven, the end frame and the protection frame are driven to make horizontal overturning motion through the parallelogram-shaped overturning structure, the protection frame and the panel are overturned into the construction unit space;
[0087] S5, the worker screws the fastening screw, loosens the compression plate, removes the panel from the protection frame, and connects and fixes the panel with the steel beam through the fastening member;
[0088] S6, drive the parallelogram-shaped overturning structure to rotate reversely to reset the protection frame to the containing interval, and the worker pushes the moving frame to move to the initial position; repeat the above steps S3-S5 to continue to hoist and install the panel of the next working position, until the construction of the first floor is completed;
[0089] S7, two-story construction; the pulley blocks and the moving frame are disassembled and reassembled in the two-story construction unit, and the four pulley blocks are respectively fixed and installed at the specified positions of the two-story unit steel columns to ensure the stability of the structure;
[0090] S8, place the mobile frame in the space to be constructed, and lock it to the initial position near the left steel column through the locking assembly; and drive the winch to loosen, so that the rope is sequentially wound around the pulley block and connected with the lifting point on the protection frame for hoisting;
[0091] S9, place the autoclaved aerated concrete strip panel into the assembly cavity of the protection frame, and tightly fix it using the pressing assembly; the winch is wound, and the protection frame is hoisted into the containing interval on the front side of the mobile frame; at the same time, the C-shaped ring on both sides of the protection frame is sleeved on the guide rope, and moves upward along the guide rope as the hoisting height rises;
[0092] S10, butt joint the protection frame with the butt joint hole on the end frame, and fix it by inserting the inserting rod, at the same time, the top of the strip panel presses the top plate of the locking assembly, so that the mobile frame is unlocked from the steel beam;
[0093] S11, continue to drive the winch to wind, so that the mobile frame (with the protection frame and the strip panel) moves along the transverse direction to the position to be assembled; after the mobile frame reaches the left station of the position to be assembled, the winch rope is loosened;
[0094] S12, drive the overturning motor to drive the end frame and the protection frame to make a horizontal overturning motion through the parallelogram-shaped overturning structure, so that the strip panel is overturned from the front side to the construction unit space on the right side of the mobile frame; repeat the above steps S5-S6, continue to hoist and install the strip panel of the next station, until the construction of the second floor is completed;
[0095] S13, when it is necessary to install a higher layer or another unit space of the same layer, remove the pulley block and translate it to another assembly space, and operate according to the above steps S7-S12; for the last assembly position (such as Figure 2 f) of each layer, the pulley block can be installed on the highest layer, and the strip panel can be directly hoisted to the corresponding position.
[0096] The above-described embodiments of the present application do not constitute a limitation on the protection scope of the present application, and the basic concept of the present application is to hoist the strip panel to the designated position on the front side of the mobile frame under the action of the winch and the pulley block, to combine the protection frame for assembling the strip panel with the mobile frame, then to contact the locking of the mobile frame, to drive the mobile frame, the protection frame and the strip panel to transversely translate to the position to be assembled through the winch and the pulley block, to drive the overturning rod to overturn the strip panel into the construction unit space, and to complete the installation of the strip panel of the station by the simple alignment and fixing operation of the worker after unloading, so that the initial hoisting position of the strip panel is uniform, and it is not necessary to repeatedly change the hoisting starting point, thereby effectively reducing the labor intensity of construction, improving the construction efficiency, and ensuring the construction quality and safety. Any modification, equivalent replacement and improvement within the spirit and principles of the present application shall be included in the protection scope of the claims of the present application.
Claims
1. An auxiliary device for construction of super-high multi-layer autoclaved aerated concrete panel partition wall structure, characterized in that: it comprises a winch, a turnover and translation assembly, a lifting protection assembly and a horizontal translation assembly, the turnover and translation assembly comprises a moving frame, an end frame and a front frame, the moving frame is capable of being locked and fixed with the steel beam or being unlocked under the action of a locking assembly, the front side of the moving frame is provided with a parallelogram-shaped turnover structure, the end frame is hinged to the front side of the parallelogram-shaped turnover structure, and symmetrically provided on the end frame are insertion holes, the front frame is arranged outside the end frame and is fixed with the moving frame, so that a one-side-opened turnover space is formed on the front side of the moving frame, and a containing interval is formed between the end frame and the front frame, the lifting protection assembly comprises a protection frame, a lifting seat, a lifting ring and a pressing assembly, the protection frame is hollow in the inner cavity and is provided with an assembly opening on the side edge, when the panel is assembled to the cavity of the protection frame, the panel is tightly fixed in the protection frame by the pressing assembly on the rear side of the protection frame, the lifting seat is fixed on the front side of the protection frame, and the lifting ring is fixed on the lifting seat, a butt joint hole matched with the inner diameter of the insertion hole is formed on the side wall of the protection frame, so that the insertion rod is matched and assembled in the insertion hole and the butt joint hole, the moving frame and the protection frame are fixed and assembled together, and under the action of the parallelogram-shaped turnover structure, the protection frame in the containing interval can be turned over from the front side of the moving frame to the side of the moving frame, the horizontal translation assembly comprises a first pulley set, a second pulley set, a third pulley set and a fourth pulley set, the first pulley set and the second pulley set are fixed on the steel column in a horizontal interval, the third pulley set is fixed below the second pulley set, the fourth pulley set is fixed and mounted on the front frame, and a space interval is formed between each pulley set and the steel column, the free end of the rope wound on the winch is respectively passed through the first pulley set, the second pulley set, the third pulley set and the fourth pulley set in a horizontal direction, and then is vertically lowered and connected with the lifting ring on the protection frame, the parallelogram-shaped turnover structure comprises a support arm, a turnover rod, a connecting shaft and a turnover motor, the support arm is arranged on the front side of the moving frame in a longitudinal direction, the rear side of the support arm is welded and fixed with the moving frame, the turnover rod is correspondingly mounted on the front side of the support arm, the connecting shaft is fixedly sleeved with the turnover rod at the upper and lower ends penetrating the end portions of the support arm, the end portion is in transmission connection with the turnover motor, and the rear side of the turnover rod is hinged to the end frame, the front frame is in L-shaped structure, the longitudinal frame arm is welded and fixed with the moving frame, the transverse frame arm is parallel with the end frame, so that the containing interval is formed between the inner side of the front frame and the end frame, and the fourth pulley set is fixedly mounted on the outer side of the middle portion of the transverse frame arm on the front side, when the rope is wound around the pulley on the fourth pulley set and vertically extended downward, the rope is connected with the lifting point on the protection frame, the locking assembly comprises a top plate, a fixed seat, a bolt and a spring, the fixed seat is fixed in the steel beam, the bolt is vertically sleeved on the fixed seat, the top plate is vertically fixed on the top of the bolt, the outer end of the top plate extends to above the containing interval outside the steel beam, and the bottom of the bolt is matched and assembled in the locking hole on the moving frame and vertically extended downward. 2. The super high multi-layer autoclaved aerated concrete panel partition wall structure construction auxiliary device according to claim 1, characterized in that: 3. The super high multi-layer autoclaved aerated concrete panel partition wall structure construction auxiliary device according to claim 2, characterized in that: The bottom of the bolt is provided with an arc-shaped end corresponding to an arc-shaped round corner on the left side top wall of the moving frame. A spring is sleeved on the bolt in the fixed seat, and the lower part is fixed with the bolt body.
4. The super high multi-layer autoclaved aerated concrete panel partition wall structure construction auxiliary device according to claim 1, characterized in that: The pressing assembly is arranged on each guard plate on the inner side of the protection frame. The pressing assembly includes a screw rod and a pressing plate. The screw rod is threadedly installed in the middle of the guard plate and is perpendicular to the guard plate. The inner and outer ends of the screw rod are respectively provided with a pressing plate and a screw head. The pressing plate is rotationally connected with the fastening screw rod, and the screw head is welded on the end of the fastening screw rod.
5. The super high multi-layer autoclaved aerated concrete panel partition wall structure construction auxiliary device according to claim 1, characterized in that: A sleeve ring structure is fixed on the side wall of the protection frame. The sleeve ring includes a sleeve ring seat, a rod body and a C-shaped ring. The sleeve ring seat is fixedly installed on the left and right side walls of the protection frame by bolts. The two sleeve ring structures are staggered in front and back. The rod body is welded on the sleeve ring seat and extends outward in the transverse direction. The end is welded with a C-shaped ring.
6. The super high multi-layer autoclaved aerated concrete panel partition wall structure construction aid device according to claim 1, characterized in that: It also includes a positioning and guiding assembly, which includes a positioning plate and a guide rope. The positioning plate is installed below the rope wheel, and the guide rope is wound on the rope wheel. The guide rope includes a guide section and a positioning section. The guide section is connected to the upper and lower sides of the positioning section, and the outer diameter of the positioning section is smaller than that of the guide section.
7. A construction method of an ultra-high multi-layer autoclaved aerated concrete panel partition wall structure, using the construction auxiliary device of the ultra-high multi-layer autoclaved aerated concrete panel partition wall structure according to any one of claims 1-6, characterized in that: The steps include: S1, construction of steel partition wall structure; the steel partition wall structure includes steel columns arranged vertically at intervals and steel beams fixed between the steel columns in the transverse direction. The bottom of each steel column is arranged on the concrete counterfort, and the strip plate partition wall is installed in each unit cell of each layer and is fixed to the steel beam by fasteners from top to bottom; S2, construction of a single unit; the pulley block is fixedly installed on the steel column at the top of the first layer and the front frame, respectively. The moving frame is placed in the space to be constructed, including: S21, install the strip plate and tightly press it in the protection frame by the pressing assembly. Then directly insert the plug rod into the plug hole of the moving frame to fix them together. The moving frame is located at the initial position on the left side of the first layer; S22, drive the winch to tighten. Under the cooperation of the winch and the pulley block, the strip plate is transported from left to right to the assembly position. After the moving frame reaches the assembly position, the winch rope is loosened, and the overturning motor is driven. The protection frame and the strip plate are overturned to the construction unit space through the horizontal overturning movement of the parallelogram-shaped overturning structure; S23, workers tighten the fastening screw rod, loosen the pressing plate, remove the strip plate from the protection frame, and connect and fix it to the steel beam by fasteners; S24, drive the parallelogram-shaped overturning structure to rotate in reverse to reset the protection frame to the containing interval. Workers push the moving frame to move to the initial position; Repeat the above steps S21-S24 to continue hoisting and installing the strip plate of the next work station until the construction of the first layer is completed; S3, construction of a second unit; the construction auxiliary device is disassembled and reinstalled in the second layer construction unit. Four pulley blocks are fixedly installed at the specified positions of the steel columns of the second unit cell, respectively, including: S31, place the moving frame in the space to be constructed and lock it to the initial position near the left side steel column by the locking assembly. Drive the winch to loosen the rope, which is wound around the pulley block and connected with the lifting point of the protection frame. S32, the strip board is put into the assembly cavity of the protection frame, and the strip board is tightly fixed by using the compression assembly; the winch is wound, the protection frame is hoisted to the containing interval on the front side of the moving frame; meanwhile, the C-shaped ring on both sides of the protection frame is sleeved on the guide rope, and moves upward along the guide rope as the hoisting height rises; S33, the protection frame is butt jointed with the butt joint hole on the end frame, and is fixed by using the insertion rod, and the top of the strip board presses the top plate of the locking assembly, so that the moving frame is unlocked from the steel beam; The steps S22-S24 are repeated, the strip board of the next station is hoisted and installed, and the construction of the second floor is continued; S4, the construction auxiliary device is disassembled and reinstalled to the high-level construction unit, the step S3 is repeated, and the construction of each floor is completed, and the construction auxiliary device is disassembled. S5, the reserved strip board position of the initial position of the moving frame of each construction unit is assembled.
8. The construction method of super-high multi-layer autoclaved aerated concrete panel partition wall structure according to claim 7, characterized in that: After the construction of each unit of each floor is completed, when the reserved strip board of the initial position of the moving frame of each construction unit is assembled, the first pulley block is installed on the steel column of the highest floor, the strip board is directly hoisted to the corresponding position of each floor, and the worker can adapt and assemble according to the size of the reserved space.
Citation Information
Patent Citations
Assembled light partition wall slat construction auxiliary device
CN206205464U
Overturning method of large face plate material and large unit plate of large-sized curtain
CN110616900A
Partition board mounting and positioning system
CN117605301A