Equipment installation correction construction method and special correction device thereof
By using a correction device with a small space occupancy during the installation of the equipment, and using the combined actions of the pull rod, the pin and the hand rod, the problems of troublesome and high space requirements in the existing technology are solved, and efficient and accurate equipment position adjustment is achieved.
Patent Information
- Application Number
- CN202510201553.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-24
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2045-02-24
AI Technical Summary
The existing equipment installation and calibration construction method is troublesome to operate. It is necessary to assume that the reverse chain connection point needs to be connected, and there is sufficient space around the equipment. It cannot be adjusted under some special conditions, the accuracy is not easy to control, and it takes a long time.
A correction device with a small space occupancy is adopted, including a tie rod, a top rod and a hand rod. By installing a tie rod in the gap between the base plate of the equipment and the foundation, the position and direction of the equipment are finely adjusted using the rotational movement of the top rod and the hand rod.
It significantly improves construction efficiency, is simple and flexible in operation, is suitable for various equipment installation scenarios, effectively improves installation accuracy, shortens the correction cycle, and creates conditions for project fulfillment.
Smart Images

Figure CN119755474A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of equipment installation construction, and in particular relates to an equipment installation correction construction method. Background Art
[0002] With the development of electrical and automation technology, the accuracy of equipment installation has become increasingly important, playing an important role in ensuring equipment operation, increasing equipment service life, ensuring safe production, and improving production efficiency.
[0003] The installation and construction of the equipment includes two aspects of precision calibration. One is whether the bottom surface of the equipment on the vertical plane is on the same level. The other is that the position of the equipment on the horizontal plane needs to be finely adjusted.
[0004] In traditional equipment installation and correction construction, the layout must be done in advance first; then the elevation is set, and the horizontal position is fine-tuned by positioning and adjusting the pads. Specifically, the position and height of each pad in the composite pad group are measured using a level and other measuring equipment. The construction accuracy of each pad ensures the equipment installation elevation; In order to ensure the position accuracy of the equipment on the basic plane, fall chains are usually set in the four directions of the equipment. The fall chains are pulled and acted on the equipment to adjust the installation accuracy of the equipment on the plane.
[0005] The existing fall chain adjustment method is cumbersome to operate, and requires an assumed fall chain connection point, requiring sufficient space around the equipment to install the fall chain mechanism. Under some special conditions, the fall chain cannot be pulled and installed due to environmental limitations. The adjustment operation is inconvenient and the accuracy is not easy to control. Equipment calibration takes a long time. Summary of the invention
[0006] In view of the above-mentioned deficiencies of the prior art, the present invention provides a construction method which occupies little space and can quickly and efficiently adjust the position of equipment on a foundation plane.
[0007] To achieve the above object, the technical solution adopted by the present invention is: A method for equipment installation and correction construction, the construction process is as follows: The first step is to lay out the equipment foundation surface in advance after the equipment foundation construction is completed, set the shim group according to the laid out line, use the level detection equipment to detect the elevation of the top plane of the shim group, and use the first inclined shim to adjust the height of each shim in the shim group so that the tops of all shims in the shim group are on the same horizontal plane; The second step is to hoist the equipment onto the pad iron group so that the equipment base plate falls on the top surface of the pad iron group; The third step is to select appropriate positions in each direction of the equipment to install the correction device: S31 is made into a pull rod, the front end of the pull rod is provided with a hook head, and the rear end is provided with a vertical bolt hole plate; the front end of the pull rod is extended into the gap between the equipment base plate and the equipment foundation, and the hook head of the pull rod is hooked on the fixed structure to limit the outward displacement of the pull rod; S32, a second inclined washer is arranged at the lower side of the rear end of the pull rod to keep the pull rod horizontal; S33, taking a threaded rod of a certain length to make a mandrel, a through threaded hole is set at the rear end of the mandrel, and a hand rod is installed in the through threaded hole through a threaded connection; S34, install the front end of the push rod into the bolt hole plate, and rotate the hand lever so that the push rod passes through the bolt hole plate and the front end contacts the side wall of the equipment base plate; The fourth step is to continue to rotate the hand lever so that the front end of the top screw moves further forward with the fixed structure at the front end of the pull rod as a lever point, thereby pushing the base plate of the equipment to move slowly, thereby finely adjusting the position and direction of the equipment on the equipment foundation.
[0008] Compared with the prior art, the present invention using the above method has the following beneficial effects: The present invention solves the problem of being restricted by installation conditions, does not need to add any hanging points, is simple to operate, convenient and flexible, and significantly improves construction efficiency; it has a wide range of uses and can be used in installation and correction scenarios in various equipment, can effectively improve installation accuracy, shorten the correction cycle, and create conditions for project performance.
[0009] As a preferred embodiment, a further technical solution of the above structure is: Optionally, if the equipment foundation adopts a direct-buried bolt foundation, the fixing structure is a direct-buried bolt rod pre-buried in the equipment foundation, and the pull rod adopts a hook head with a question mark shape at the front end, and the front end is hooked on the direct-buried bolt.
[0010] Optionally, if the equipment foundation adopts a foundation with reserved bolt holes, the fixing structure is a reserved bolt hole on the equipment foundation, and the pull rod adopts an L-shaped hook head at the front end, and the front end is hooked on the reserved bolt hole.
[0011] The present invention also provides a special correction device for the above-mentioned construction method, including: a pull rod, which is horizontally arranged, a hook head is provided at one end of the pull rod, and the other end is vertically fixed to a bolt hole plate, and the bolt hole plate is provided with bolt holes; a push rod, a surface of which is provided with an external thread, which is installed in the bolt hole plate, the push rod is parallel to the pull rod, and a through threaded hole is provided at the end of the push rod away from the hook head; a hand rod, a threaded head is provided at the lower end, and the threaded head is threadedly fixed to the through threaded hole.
[0012] Compared with the chain-falling mechanism in the prior art, the present invention adopting the above structure has the following beneficial effects: The device is small in size and occupies little space, so there is no requirement for a large space around the device. It has obvious advantages when the device is installed in a narrow environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a schematic diagram of the direct-buried bolt foundation of the present invention; Figure 2 It is a schematic diagram of the elevation adjustment structure of the direct-buried bolt foundation equipment of the present invention; Figure 3 It is a schematic diagram of the installation of the calibration tool for the direct-buried bolt foundation equipment of the present invention; Figure 4 It is a basic schematic diagram of the reserved bolt hole of the present invention; Figure 5 It is a schematic diagram of the installation of the basic equipment correction tool for reserved bolt holes of the present invention; Figure 6 It is a structural schematic diagram of a first embodiment of a correction device of the present invention; Figure 7 It is a structural schematic diagram of Embodiment 2 of the correction device of the present invention.
[0014] In the figure: 1. Equipment foundation; 2. Direct buried bolts; 3. First inclined washer; 4. Base plate; 5. Equipment; 6. Pull rod; 7. Hook head; 8. Bolt hole plate; 9. Top rod; 10. Hand lever; 11. Reserved bolt hole; 12. Second inclined washer. DETAILED DESCRIPTION
[0015] The present invention will be further described below in conjunction with embodiments, the purpose of which is only to provide a better understanding of the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.
[0016] See also Figures 1 to 7 The present invention provides an equipment installation and correction construction method, and the construction process is as follows: In the first step, after the construction of the equipment foundation 1 is completed, the surface of the equipment foundation 1 is pre-laid out, and the shim group is set according to the laid-out. The elevation of the top plane of the shim group is detected by using the level detection equipment, and the height of each shim in the shim group is adjusted by using the first inclined shim 3, so that the tops of all shims in the shim group are on the same horizontal plane, thereby ensuring the installation elevation of the equipment 5; The second step is to hoist the equipment 5 onto the pad iron group so that the equipment base plate 4 falls on the top surface of the pad iron group; The third step is to select a suitable position in each direction of the device 5 to install the correction device: S31, a pull rod 6 is made, the front end of the pull rod 6 is provided with a hook head 7, and the rear end is provided with a vertical bolt hole plate 8; the front end of the pull rod 6 is extended into the gap between the equipment base plate 4 and the equipment foundation 1, and the hook head 7 of the pull rod 6 is hooked on the fixed structure to limit the outward displacement of the pull rod 6; S32, a second inclined washer 12 is provided at the lower side of the rear end of the pull rod 6 to keep the pull rod 6 horizontal; S33, taking a threaded rod of a certain length to make a push rod 9, a through threaded hole is set at the rear end of the push rod 9, and a hand rod 10 is installed in the through threaded hole through a threaded connection; S34, insert the front end of the push rod 9 into the bolt hole plate 8, and rotate the hand lever 10 so that the push rod 9 passes through the bolt hole plate 8 and the front end contacts the side wall of the equipment base plate 4; The fourth step is to continue rotating the hand lever 10 so that the front end of the top screw moves further forward with the front end fixed structure of the pull rod 6 as a lever point, thereby pushing the equipment base plate 4 to move slowly, thereby finely adjusting the position and direction of the equipment 5 on the equipment foundation 1.
[0017] The elevation of the equipment 5 is determined by the conventional shim positioning method. This construction method specifically solves the problem of inaccurate position of the equipment 5 when it is hoisted and placed on the plane of the equipment foundation 1. The inaccurate position includes the overall deviation of the equipment 5 to the left, the deviation of the equipment 5 (some point deviation), etc. Since the equipment 5 has various shapes and different deviation errors, this scheme does not limit the points and number of corrections. Assuming that it is a rectangular equipment base plate 4, one correction device can be installed on the short side and two correction devices can be installed on the long side. The specific situation depends on the deviation of the equipment 5 obtained after re-measurement. This method installs the correction device after the equipment 5 is hoisted to the equipment foundation 1. The correction device uses the fixed structure on the adjacent equipment foundation 1 as a leverage point, and pushes the equipment base plate 4 through the push rod 9, thereby affecting the position of the equipment 5 in the plane. Compared with the chain-falling mechanism, the correction device provided by this scheme is small in size and does not need to reserve space for its installation and operation. This method can adjust the position of the equipment 5 at multiple points at the same time, and can translate the equipment 5 as a whole, or realize the single-point movement of the equipment, with fast adjustment speed and high precision.
[0018] Specifically, if the equipment foundation 1 adopts a direct-buried bolt 2 foundation, the fixing structure is a direct-buried bolt 2 rod pre-buried on the equipment foundation 1, and the pull rod 6 adopts a hook head 7 with a question mark shape at the front end, and the front end is hooked on the direct-buried bolt 2. If the equipment foundation 1 adopts a reserved bolt hole 11 foundation, the fixing structure is a reserved bolt hole 11 on the equipment foundation 1, and the pull rod 6 adopts a hook head 7 with an L-shaped front end, and the front end is hooked on the reserved bolt hole 11.
[0019] The correction device of the present invention comprises: The pull rod 6 is arranged horizontally, a hook head 7 is arranged at one end of the pull rod 6, and a bolt hole plate 8 is vertically fixedly connected to the other end, and the bolt hole plate 8 is provided with bolt holes; A push rod 9 is provided with an external thread on its surface and is installed in the bolt hole plate 8. The push rod 9 is parallel to the pull rod 6, and a through threaded hole is provided at one end of the push rod 9 away from the hook head 7; The hand lever 10 has a threaded head at its lower end, which is threadedly fixed to the through threaded hole.
[0020] In this solution, the pull rod 6 is made of round steel or small square steel.
[0021] If the equipment foundation 1 adopts the direct-buried bolt 2 foundation, the pull rod 6 is made of round steel bars as the main structure, the front end of the round steel bars is bent to form a question mark-shaped hook head 7, the rear end of the round steel bars is vertically welded to the bolt hole plate 8, and a bolt hole is set above the welding point between the round steel bars and the bolt hole plate 8. The question mark-shaped hook head 7 is hooked on the direct-buried bolt 2, and when the hand lever 10 is rotated to make the push rod 9 further extend toward the base plate 4, the push rod 9 pushes the base plate 4 outward with the direct-buried bolt 2 as the base point for leverage.
[0022] If the equipment foundation 1 adopts the foundation with reserved bolt holes 11, the pull rod 6 is made of small square steel as the main structure, the front end of the small square steel is bent downward by 90 degrees to form an L-shaped hook head 7, or a vertical section is welded to form an L-shaped hook head 7; the rear end of the small square steel is bent upward by 90 degrees to form a bolt hole plate 8, or a plate is welded to form a bolt hole plate 8. The vertical part of the L-shaped hook head 7 is hooked on the reserved bolt hole 11 of the equipment foundation 1, and the bolt hole wall is used as the base point for leverage, and the top rod 9 pushes the base plate 4 outward.
[0023] The beneficial effects of the present invention compared with the prior art are as follows: The correction device provided by the present invention is small in size and has no requirements on the size of the equipment space. The method solves the problem of being restricted by installation conditions and does not require any additional hanging points. The operation is simple, convenient and flexible, and the construction efficiency is significantly improved. The method has a wide range of uses and can be used in various equipment installation and correction scenarios. It can effectively improve installation accuracy, shorten the correction cycle, and create conditions for project performance.
[0024] The above description is only a preferred feasible embodiment of the present invention, and does not limit the scope of rights of the present invention. All equivalent changes made using the contents of the present specification and its drawings are included in the scope of rights of the present invention.
Claims
1. A method for equipment installation and correction construction, the construction process is as follows: In the first step, after the construction of the equipment foundation (1) is completed, the surface of the equipment foundation (1) is pre-laid out, and the shim group is set according to the laid-out line. The elevation of the top plane of the shim group is detected by using a level detection device, and the height of each shim in the shim group is adjusted by using a first inclined shim (3) so that the tops of all shims in the shim group are on the same horizontal plane; The second step is to hoist the equipment (5) onto the pad iron assembly so that the equipment base plate (4) falls on the top surface of the pad iron assembly; It is characterized in that The third step is to select appropriate positions in each direction of the equipment to install the correction device: S31, a pull rod (6) is made, the front end of the pull rod (6) is provided with a hook head (7), and the rear end is provided with a vertical bolt hole plate (8); the front end of the pull rod (6) is extended into the gap between the equipment base plate (4) and the equipment foundation (1), and the hook head (7) of the pull rod (6) is hooked on the fixed structure to limit the outward displacement of the pull rod (6); S32, a second inclined washer (12) is provided at the lower side of the rear end of the pull rod (6) to keep the pull rod (6) horizontal; S33, taking a threaded rod of a certain length to make a push rod (9), a through threaded hole is provided at the rear end of the push rod (9), and a hand rod (10) is installed in the through threaded hole through a threaded connection; S34, inserting the front end of the push rod (9) into the bolt hole plate (8), and rotating the hand lever (10) so that the push rod (9) passes through the bolt hole plate (8) and the front end contacts the side wall of the equipment base plate (4); The fourth step is to continue rotating the hand lever (10) so that the front end of the top screw is further moved forward using the front end fixed structure of the pull rod (6) as a lever, thereby pushing the equipment base plate (4) to move slowly, thereby finely adjusting the position and direction of the equipment (5) on the equipment foundation (1).
2. The equipment installation and correction construction method according to claim 1, characterized in that: If the equipment foundation (1) adopts a direct-buried bolt (2) foundation, the fixing structure is a direct-buried bolt (2) rod pre-buried on the equipment foundation (1), and the pull rod (6) adopts a hook head (7) with a question mark shape at the front end, and the front end is hooked on the direct-buried bolt (2).
3. The equipment installation and correction construction method according to claim 1, characterized in that: If the equipment foundation (1) adopts a foundation with a reserved bolt hole (11), the fixing structure is a reserved bolt hole (11) on the equipment foundation (1), and the pull rod (6) adopts a hook head (7) with an L-shaped front end, and the front end is hooked on the reserved bolt hole (11).
4. The special calibration device for the equipment installation calibration construction method according to claim 1 is characterized in that: include: A pull rod (6) is arranged horizontally, a hook head (7) is arranged at one end of the pull rod (6), and a bolt hole plate (8) is vertically fixedly connected to the other end, and a bolt hole is arranged on the bolt hole plate (8); The push rod (9) has an external thread on its surface and is installed in the bolt hole plate (8). The push rod (9) is parallel to the pull rod (6). The end of the push rod (9) away from the hook head (7) is provided with a through threaded hole. The hand lever (10) has a threaded head at the lower end, and the threaded head is threadedly fixed to the through threaded hole.
5. The special calibration device for the equipment installation calibration construction method according to claim 4, characterized in that: The pull rod (6) is mainly composed of round steel bars, the front end of which is bent to form a question mark-shaped hook head (7), the rear end of which is vertically welded to a bolt hole plate (8), and a bolt hole is arranged above the welding point between the round steel bar and the bolt hole plate (8).
6. The special calibration device for the equipment installation calibration construction method according to claim 4, characterized in that: The pull rod (6) is mainly composed of small square steel, the front end of which is bent downward by 90 degrees to form an L-shaped hook head (7), or a vertical section is welded to form an L-shaped hook head (7); the rear end of the small square steel is bent upward by 90 degrees to form a bolt hole plate (8), or a plate is welded to form a bolt hole plate (8).
Citation Information
Patent Citations
High and medium pressure module installing and adjusting method for steam turbine generator unit for overall goods delivery
CN105090686A
Adjustable sizing block for adjusting large equipment and adjusting method of adjustable sizing block
CN115076526A
Accurate positioning device for track embedded bolt
CN115595840A
Calibration device used for centering and leveling in installing process of equipment
CN203404564U
Sliding bed leveling device for supporting block pouring
CN212955988U