Method, device, equipment and storage medium for evaluating construction cost

By using a preset cost evaluation model trained on labeling historical engineering drawings in engineering cost evaluation, the problem of cost accuracy decreases due to changes in actual construction conditions is solved, and a more accurate project cost evaluation is achieved.

CN119761564AInactive Publication Date: 2025-04-04ZHEJIANG JIANYUAN ENG MANAGEMENT CO LTD

Patent Information

Application Number
CN202411811843.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-10
Publication Date
2025-04-04
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the engineering cost evaluation, the cost accuracy decreases due to changes in actual construction conditions.

Method used

An engineering cost evaluation method is proposed. By obtaining the engineering drawings of the project to be evaluated and entering them into the preset cost evaluation model. The model is trained based on the marked historical engineering drawings, and the additional costs under actual working conditions can be considered.

Benefits of technology

It improves the accuracy of project cost evaluation and makes the evaluation results more in line with the actual construction conditions, including additional costs and wasteful costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119761564A_ABST
    Figure CN119761564A_ABST
Patent Text Reader

Abstract

The present application discloses a method, device, equipment and storage medium for evaluating construction cost, and relates to the technical field of construction cost. The method for evaluating construction cost is disclosed, including: after receiving an evaluation instruction for construction cost, obtaining the engineering drawings of the construction project to be evaluated; inputting the engineering drawings into a preset cost evaluation model to obtain the construction cost of the construction project to be evaluated, wherein the preset cost evaluation model is obtained by training the to-be-trained model based on annotated historical engineering drawings, and the annotated historical engineering drawings are historical engineering drawings annotated with additional costs that will be incurred during the construction process according to actual working conditions. That is, when evaluating the construction cost through the preset cost evaluation model, the additional costs that will be required during the construction of the construction project to be evaluated will be combined for evaluation, and the construction cost of the construction project to be evaluated is obtained so that the cost of the construction project to be evaluated is more in line with the actual situation, thereby improving the accuracy of the construction cost evaluation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of engineering cost technology, and in particular to an evaluation method, device, equipment and storage medium for engineering cost. Background Art

[0002] Project cost refers to the evaluation, control and management of all expenses spent on the construction of a project in order to reduce the total cost of the project.

[0003] At present, when evaluating the cost of a certain project construction, in order to ensure the accuracy of the project cost, it is usually combined with the design requirements of the project, based on the design plan, and the project cost is calculated according to different design plans, so as to select a more reasonable construction plan and the best design plan. However, due to external factors, the construction site cannot be strictly constructed according to the construction plan. Therefore, even if a reasonable construction plan is determined according to the design plan, the accuracy of the project cost will decrease due to the actual construction situation.

[0004] The above contents are only used to assist in understanding the technical solution of the present application and do not constitute an admission that the above contents are prior art. Summary of the invention

[0005] The main purpose of this application is to provide a method for evaluating construction cost, aiming to solve the technical problem that the accuracy of construction cost decreases due to actual construction conditions.

[0006] To achieve the above purpose, the present application proposes a method for evaluating construction cost, the method comprising:

[0007] After receiving the engineering cost assessment instruction, obtain the engineering drawings of the project to be assessed;

[0008] The engineering drawings are input into a preset cost assessment model to obtain an engineering cost for the project to be assessed. The preset cost assessment model is obtained by training the model to be trained based on annotated historical engineering drawings. The annotated historical engineering drawings are historical engineering drawings that are annotated with additional costs that will be incurred during the construction process based on actual working conditions.

[0009] In one embodiment, after receiving the engineering cost evaluation instruction, before the step of obtaining the engineering drawings of the project to be evaluated, the step further includes:

[0010] Obtaining historical engineering drawings and cost details, wherein the cost details are details of the cost of the historical engineering corresponding to the historical engineering drawings during the construction process;

[0011] Based on the cost details, marking the engineering areas that will incur additional costs during the construction process in the historical engineering drawings;

[0012] The model to be trained is trained based on historical engineering drawings annotating the engineering area to obtain a preset cost assessment model.

[0013] In one embodiment, the step of marking the engineering area that needs to incur additional costs during the construction process in the historical engineering drawings based on the cost details includes:

[0014] Based on the cost details, simulating the construction process of the historical project corresponding to the historical project drawing;

[0015] Based on the construction process, the cost details are divided into effective cost details and additional cost details, wherein the effective cost details are effective cost details of the necessary process for building the historical project, and the additional cost details are cost details that need to be wasted in building the historical project;

[0016] Determining the association relationship between the effective fee details and the additional fee details;

[0017] Based on the association relationship, the engineering area that needs to incur additional costs is marked in the historical engineering drawings.

[0018] In one embodiment, the step of simulating the construction process of the historical project corresponding to the historical project drawing based on the consumption details includes:

[0019] Identify the purpose of each expense from the expenditure details;

[0020] Simulate the ideal construction steps of the corresponding historical project based on historical engineering drawings;

[0021] Based on the ideal construction steps, screening from the uses additional steps needed to assist the ideal construction steps;

[0022] After integrating the ideal construction steps with the additional steps, the construction process of the historical project is obtained.

[0023] In one embodiment, after the step of inputting the engineering drawings into a preset cost evaluation model to obtain the engineering cost of the project to be evaluated, the step further includes:

[0024] Obtaining information on completed work sections of the project to be evaluated;

[0025] Optimizing the preset cost evaluation model based on the work section information to obtain an optimized cost evaluation model;

[0026] Based on the optimized cost evaluation model, the unfinished sections in the project to be evaluated are re-evaluated to obtain the latest project cost.

[0027] In one embodiment, the step of optimizing the preset cost evaluation model based on the work section information to obtain the optimized cost evaluation model includes:

[0028] Extracting construction information of the construction user who constructs the project to be evaluated from the work section information;

[0029] identifying the construction habits of each of the construction users from the construction information;

[0030] The preset cost assessment model is optimized based on the construction practice to obtain an optimized cost assessment model.

[0031] In addition, to achieve the above purpose, the present application also proposes a device for evaluating construction cost, the device for evaluating construction cost comprising:

[0032] A first acquisition module is used to acquire the engineering drawings of the project to be evaluated after receiving the evaluation instruction of the project cost;

[0033] An evaluation module is used to input the engineering drawings into a preset cost evaluation model to obtain an evaluation of the engineering cost of the project to be evaluated. The preset cost evaluation model is obtained by training the model to be trained based on annotated historical engineering drawings. The annotated historical engineering drawings are historical engineering drawings that are annotated with additional costs that will be incurred during the construction process based on actual working conditions.

[0034] In addition, to achieve the above-mentioned purpose, the present application also proposes a device for evaluating construction cost, which includes: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program is configured to implement the steps of the method for evaluating construction cost as described above.

[0035] In addition, to achieve the above-mentioned purpose, the present application also proposes a storage medium, which is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by a processor, the steps of the project cost evaluation method as described above are implemented.

[0036] In addition, to achieve the above-mentioned purpose, the present application also provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, it implements the steps of the project cost evaluation method as described above.

[0037] One or more technical solutions proposed in this application have at least the following technical effects:

[0038] After receiving the evaluation instruction of the project cost, the engineering drawings of the project to be evaluated are obtained, and the preset cost evaluation model is used to evaluate the project cost of the project to be evaluated corresponding to the engineering drawings according to the engineering drawings. Since the preset cost evaluation model is combined with the waste consumption required by the actual working conditions during training, when the project cost is evaluated by the preset cost evaluation model, the additional costs that will be required during the construction of the project to be evaluated will be evaluated to obtain the project cost of the project to be evaluated. That is, the obtained project cost not only includes the total cost evaluated according to the engineering drawings, but also includes the additional costs required during the construction of the project to be evaluated, so that the cost of the project to be evaluated is more in line with the actual situation, thereby improving the accuracy of the project cost evaluation. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0040] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0041] Figure 1 A flowchart of the first embodiment of the method for evaluating the construction cost of the present application is provided;

[0042] Figure 2 A flow chart of the second embodiment of the method for evaluating the construction cost of the present application;

[0043] Figure 3 A flow chart of the third embodiment of the method for evaluating the construction cost of the present application;

[0044] Figure 4 This is a schematic diagram of the module structure of the engineering cost evaluation device of the embodiment of the present application;

[0045] Figure 5 Schematic diagram of the equipment structure of the hardware operating environment involved in the method for evaluating construction cost in the embodiment of the present application.

[0046] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0047] It should be understood that the specific embodiments described herein are only used to explain the technical solutions of the present application and are not used to limit the present application.

[0048] In order to better understand the technical solution of the present application, a detailed description will be given below in conjunction with the accompanying drawings and specific implementation methods.

[0049] The main solution of the embodiment of the present application is: after receiving the engineering cost evaluation instruction, the equipment capable of realizing the engineering cost obtains the engineering drawings of the project to be evaluated; then the engineering drawings are input into a preset cost evaluation model to obtain the engineering cost of the project to be evaluated, and the preset cost evaluation model is obtained by training the to-be-trained model based on annotated historical engineering drawings, and the annotated historical engineering drawings are historical engineering drawings that are annotated with additional costs that will be incurred during the construction process according to actual working conditions.

[0050] In this embodiment, for the convenience of description, the following description is made with the equipment capable of realizing the engineering cost as the execution subject.

[0051] In order to ensure the accuracy of the project cost, the existing technology usually combines the design requirements of the project and the design scheme as the basis to calculate the project cost according to different design schemes in order to select a more reasonable construction scheme and the best design scheme. However, due to external factors, the construction site cannot be strictly constructed according to the construction scheme. Therefore, even if a reasonable construction scheme is determined according to the design scheme, the accuracy of the project cost will decrease due to the actual construction situation.

[0052] The present application provides a solution, which is to obtain the engineering drawings of the project to be evaluated after receiving the evaluation instruction of the project cost, so as to use the preset cost evaluation model to evaluate the engineering cost of the project to be evaluated corresponding to the engineering drawings according to the engineering drawings. Since the preset cost evaluation model is combined with the waste consumption required by the actual working conditions during training, when the project cost is evaluated by the preset cost evaluation model, the additional costs that will be required during the construction of the project to be evaluated will be evaluated to obtain the project cost of the project to be evaluated. That is, the obtained project cost not only includes the total cost evaluated according to the engineering drawings, but also includes the additional costs required during the construction of the project to be evaluated, so that the cost of the project to be evaluated is more in line with the actual situation, thereby improving the accuracy of the project cost evaluation.

[0053] It should be noted that the execution subject of this embodiment can be a computing service device with data processing, network communication and program running functions, such as a tablet computer, a personal computer, a mobile phone, etc., or an electronic device that can realize the above functions, a device that can realize the engineering cost, etc. The following takes the device that can realize the engineering cost as an example to illustrate this embodiment and the following embodiments.

[0054] Based on this, the present application embodiment provides a method for evaluating the construction cost. Figure 1 , Figure 1 This is a flow chart of the first embodiment of the method for evaluating the construction cost of the present application.

[0055] In this embodiment, the project cost assessment method includes steps S10 to S20:

[0056] Step S10, after receiving the engineering cost evaluation instruction, obtaining the engineering drawings of the project to be evaluated;

[0057] It should be noted that the evaluation instruction can be a start instruction for starting the cost evaluation of the project to be evaluated. After receiving the instruction, the equipment capable of realizing the project cost obtains the engineering drawings of the project to be evaluated, so as to perform the cost evaluation of the project to be evaluated based on the engineering drawings. The project to be evaluated can be a construction project that has not yet started construction, or a construction project under construction. The engineering drawings can be the design drawings of the project to be evaluated. In the project cost evaluation, the engineering drawings provide the necessary basic data and details to ensure the accuracy and comprehensiveness of the evaluation, wherein the design drawings can be the original design drawings of the project to be evaluated, or they can be the design drawings modified from the original design drawings during the construction process of the project to be evaluated. The engineering drawings contain all the detailed information of the project to be evaluated, including but not limited to building materials, structural design, construction technology, etc.

[0058] In a specific implementation, after receiving the instruction, the device capable of realizing project cost estimation displays an interface for obtaining engineering drawings on the display interface of the device. The user searches for engineering drawings corresponding to the project to be evaluated through the engineering drawings or the drawing database of the device, and retrieves the engineering drawings from the drawing database of the device to facilitate the subsequent use of the model to perform cost estimation on the project to be evaluated based on the engineering drawings.

[0059] Step S20, input the engineering drawings into a preset cost assessment model to obtain an engineering cost for evaluating the project to be evaluated, wherein the preset cost assessment model is obtained by training the model to be trained based on annotated historical engineering drawings, and the annotated historical engineering drawings are historical engineering drawings that are annotated with additional costs that will be incurred during the construction process based on actual working conditions.

[0060] It should be noted that the additional costs in the annotated historical engineering drawings provide important reference data for training the cost assessment model, so that the preset cost assessment model can combine the additional costs incurred during the actual construction process when evaluating the cost of the working condition to be evaluated, thereby improving the prediction accuracy. Additional costs refer to the costs that exceed the budget due to various reasons during the construction process, as well as the costs that need to be wasted during the construction process. The preset cost assessment model can be a machine learning model built based on historical data, such as a random forest or neural network model.

[0061] Among them, the various reasons may be design changes, material price fluctuations, changes in construction personnel or changes in construction personnel's wages, etc., which shall be determined based on actual conditions.

[0062] Among them, the costs that need to be wasted may include the bricks at the construction site that are often used as pads for the cart during the construction process to prevent the cart from sliding down the slope. In this case, the cost of the bricks used as pads is an additional expense; or the engineering drawings show that three wires of a certain type are required to bundle two vertical steel bars. However, in the actual construction process, four or five wires of a certain type may be required due to some safety factors. The cost of the extra wires is an additional expense, etc.

[0063] It is understandable that since the preset cost assessment model is trained based on annotated historical engineering drawings, these annotated historical engineering drawings contain additional cost information under actual working conditions, so that the preset cost assessment model can take into account various actual possible situations when conducting cost assessment of the project to be assessed. That is, when encountering similar special construction conditions, the preset cost assessment model can refer to historical data to accurately estimate the additional costs, rather than simply calculating the cost based on standard engineering materials and processes, thereby improving the accuracy of the project cost assessment.

[0064] It is understandable that after receiving the evaluation instruction, the engineering drawings can be quickly obtained and input into the preset model to obtain the project cost, which reduces the tedious steps of manually searching for information, analyzing various special situations, etc., and thus improves the evaluation efficiency.

[0065] It is understandable that the use of deep learning models to analyze engineering drawings can more objectively and accurately identify factors that may lead to additional costs, thereby improving the accuracy of the preset cost assessment model in assessing the cost of the project to be assessed.

[0066] The present embodiment provides a method for evaluating a project cost. After receiving an evaluation instruction for the project cost, the engineering drawings of the project to be evaluated are obtained, and the engineering cost of the project to be evaluated corresponding to the engineering drawings is evaluated based on the engineering drawings using a preset cost evaluation model. Since the preset cost evaluation model is combined with the waste consumption required by actual working conditions during training, when evaluating the project cost using the preset cost evaluation model, the additional costs that will be required during the construction of the project to be evaluated will be evaluated to obtain the project cost of the project to be evaluated. That is, the obtained project cost includes not only the total cost evaluated according to the engineering drawings, but also the additional costs required during the construction of the project to be evaluated, so that the cost of the project to be evaluated is more in line with the actual situation, thereby improving the accuracy of the project cost evaluation.

[0067] Based on the first embodiment of the present application, in the second embodiment of the present application, the same or similar contents as those in the above-mentioned embodiment 1 can refer to the above introduction, and will not be repeated later. Figure 2 Before step S10, the project cost evaluation method further includes steps S01 to S03:

[0068] Step S01, obtaining historical engineering drawings and cost details, wherein the cost details are details of the cost of the historical engineering corresponding to the historical engineering drawings during the construction process;

[0069] Step S02, based on the cost details, marking the engineering areas that need to incur additional costs during the construction process in the historical engineering drawings;

[0070] Step S03: training the model to be trained based on the historical engineering drawings that mark the engineering area to obtain a preset cost assessment model.

[0071] It should be noted that historical engineering drawings are design drawings of completed engineering projects. Historical engineering drawings describe in detail various parts of the engineering project, including but not limited to the building structure, electrical system, water supply and drainage system, etc. They are usually presented in two-dimensional or three-dimensional form and contain various symbols and annotations to indicate specific construction requirements and material specifications. Cost details refer to the detailed records of all engineering-related expenses during the construction of the project. These expenses may include material costs, labor costs, machinery and equipment usage fees, additional construction measures costs (such as foundation reinforcement, earthquake prevention measures, etc.), and other unforeseen expenses (such as work stoppage losses due to weather, etc.). Each expense has a detailed description and amount. The engineering area is the area on the historical engineering drawings that represents the need to incur additional costs during the construction process. This area can be part of the building structure (such as foundation, wall, roof, etc.), or a specific functional area (such as office, conference room, warehouse, etc.), or a part of each construction step.

[0072] It can be understood that through a large number of historical engineering drawings and their corresponding actual engineering cost details, the collected engineering drawings are digitized and the parts that may incur additional costs during the construction process are marked for subsequent model training, so that the preset cost assessment model obtained by training can learn to identify features from engineering drawings that may lead to additional costs, so as to ensure that the final preset cost assessment model has the ability to identify additional costs.

[0073] Furthermore, step S02 further includes:

[0074] Based on the cost details, simulating the construction process of the historical project corresponding to the historical project drawing;

[0075] Based on the construction process, the cost details are divided into effective cost details and additional cost details, wherein the effective cost details are effective cost details of the necessary process for building the historical project, and the additional cost details are cost details that need to be wasted in building the historical project;

[0076] Determining the association relationship between the effective fee details and the additional fee details;

[0077] Based on the association relationship, the engineering area that needs to incur additional costs is marked in the historical engineering drawings.

[0078] It should be noted that effective cost details refer to the reasonable costs required to complete the necessary processes of the construction project, that is, the inevitable and reasonable expenses in the project implementation process, such as material procurement, labor wages, machinery rental, etc. Extra cost details refer to the unexpected costs caused by abnormal factors during the construction process, the costs that need to be wasted in addition to the effective costs, and unnecessary or avoidable costs. The correlation relationship refers to the connection and mutual influence between the effective cost details and the extra cost details. By analyzing the correlation relationship, we can better understand which factors may lead to additional costs, and optimize future project management and cost control strategies accordingly.

[0079] It can be understood that by dividing the consumption details into effective cost details and additional cost details and determining the correlation between them, the model to be trained can be trained more accurately, so that the final preset cost assessment model can more accurately identify the characteristics corresponding to the additional costs, thereby improving the accuracy of the project cost assessment.

[0080] It can be understood that by simulating the construction process of historical projects and marking the project areas that require additional costs, the ability of the preset cost assessment model to identify the characteristics corresponding to the additional costs can be improved.

[0081] Furthermore, the step of simulating the construction process of the historical project corresponding to the historical project drawing based on the consumption details includes:

[0082] Identify the purpose of each expense from the expenditure details;

[0083] Simulate the ideal construction steps of the corresponding historical project based on historical engineering drawings;

[0084] Based on the ideal construction steps, screening from the uses additional steps needed to assist the ideal construction steps;

[0085] After integrating the ideal construction steps with the additional steps, the construction process of the historical project is obtained.

[0086] It should be noted that the purpose of the cost is the specific purpose of each cost in a specific project or the corresponding project link. It is obtained by analyzing and identifying the relevant information of each cost in the cost details, and is used to clarify the relationship between each cost and various aspects of the project construction. For example, in a construction project, the purpose of a steel purchase cost may be to build the frame structure of a building. This purpose is determined based on the understanding of the project construction process and the characteristics of steel and the common use parts in the building. The ideal construction steps are based on the engineering drawings. According to the general logic and best practices of engineering construction, the construction process sequence of the project without unexpected interference is inferred, that is, an idealized construction process model, covering the sequence of major stages and links from the initial preparation to the final completion of the project. Each step corresponds to the structure, layout and other elements in the engineering drawings. The additional steps are steps that are found in the process of analyzing the purpose of costs based on the ideal construction steps to assist the ideal construction steps, which are not part of the ideal construction steps themselves but have a supporting or supplementary role in the project construction. The additional steps may be caused by special project requirements, external environmental factors or temporary problem solutions.

[0087] It is understandable that since the additional costs are temporarily incurred based on the construction site and are not costs incurred based on the ideal construction steps obtained based on the engineering drawings, in order to obtain the details of the additional costs, it is necessary to identify the purpose of each cost based on the consumption details, and to filter out the additional steps required to assist the ideal construction steps from the purposes based on the ideal construction steps, so as to ensure that the model to be trained can accurately identify the additional steps.

[0088] Based on the first and second embodiments of the present application, in the third embodiment of the present application, the same or similar contents as those in the above embodiments can be referred to the above introduction, and will not be described in detail later. Figure 3 After step S20, the project cost evaluation method further includes steps S1 to S3:

[0089] Step S1, obtaining the completed work section information of the project to be evaluated;

[0090] Step S2, optimizing the preset cost evaluation model based on the work section information to obtain an optimized cost evaluation model;

[0091] Step S3, re-evaluating the unfinished sections in the project to be evaluated based on the optimized cost evaluation model to obtain the latest project cost.

[0092] It should be noted that the work section information is the detailed information of each completed construction stage in the project to be evaluated, including but not limited to the completed workload, materials used, labor invested, construction time, and any cost and progress information related to the completed work section. Unfinished work sections refer to the construction stages that have not yet started or are in progress in the project to be evaluated. The cost evaluation of this work section can be carried out based on the optimized cost evaluation model to timely predict the cost required to complete these work sections according to actual conditions. The latest project cost refers to the updated cost estimate of the entire project obtained after re-evaluating the unfinished work sections. This estimate includes the actual cost of the completed work sections and the predicted cost of the unfinished work sections, providing a more accurate forecast of the total cost of the project.

[0093] It is understandable that the completed work section information of the project to be evaluated is first obtained, and then the work section information is input into the preset cost evaluation model as new training data to optimize the model so that it can more accurately reflect the actual situation of the current project.

[0094] It is understandable that the optimized model is called the optimized cost assessment model. The optimized model (optimized cost assessment model) is used to re-evaluate the unfinished sections of the project to obtain the cost assessment that best fits the current project, further improving the accuracy of the project cost assessment.

[0095] It is understandable that the preset cost assessment model is constantly updated and optimized during the project. As the project progresses and new data is introduced, the assessment results can be updated in real time to obtain a more realistic cost assessment in real time, thereby improving the accuracy of the assessment.

[0096] Furthermore, step S2 further includes:

[0097] Extracting construction information of the construction user who constructs the project to be evaluated from the work section information;

[0098] identifying the construction habits of each of the construction users from the construction information;

[0099] The preset cost assessment model is optimized based on the construction practice to obtain an optimized cost assessment model.

[0100] It should be noted that construction users are individuals or teams involved in the construction of the project to be evaluated, including but not limited to contractors, subcontractors, construction teams or any entities directly involved in construction activities. Construction information refers to data and information related to the specific operations and activities of construction users during the construction process, including construction methods, construction sequence, construction efficiency, problems encountered during construction and their solutions, construction personnel's skill level and the use of construction equipment, etc. Construction habits are relatively fixed construction methods, processes and behavior patterns formed by construction users in long-term construction practice. Such habits may include specific construction technology preferences, material usage habits, construction rhythm control, safety and quality management habits, etc.

[0101] It can be understood that by optimizing the preset cost assessment model using the construction user's construction habit information, the preset cost assessment model can be made closer to reality, and personalized assessments can be performed based on the construction habits of different construction users, thereby improving the accuracy of the preset cost assessment model in assessing project costs.

[0102] It should be noted that the above examples are only used to understand the present application and do not constitute a limitation on the method for evaluating the project cost of the present application. More simple transformations based on this technical concept are all within the scope of protection of the present application.

[0103] This application also provides a device for evaluating construction cost, please refer to Figure 4 , the project cost assessment device comprises:

[0104] The first acquisition module 10 is used to acquire the engineering drawings of the project to be evaluated after receiving the evaluation instruction of the project cost;

[0105] The evaluation module 20 is used to input the engineering drawings into a preset cost evaluation model to obtain the engineering cost of the project to be evaluated. The preset cost evaluation model is obtained by training the model to be trained based on annotated historical engineering drawings. The annotated historical engineering drawings are historical engineering drawings that are annotated with additional costs that will be incurred during the construction process based on actual working conditions.

[0106] Optionally, the second acquisition module 30 is used to acquire historical engineering drawings and cost details, wherein the cost details are details of the cost of the historical engineering corresponding to the historical engineering drawings during the construction process;

[0107] A marking module 40, for marking, in the historical engineering drawings, engineering areas that require additional costs during the construction process based on the cost details;

[0108] The training module 50 is used to train the model to be trained based on the historical engineering drawings that mark the engineering area to obtain a preset cost assessment model.

[0109] Optionally, the marking module 40 is also used to simulate the construction process of the historical project corresponding to the historical engineering drawing based on the cost details; based on the construction process, divide the cost details into effective cost details and additional cost details, the effective cost details are the effective cost details of the necessary process for building the historical project, and the additional costs are the cost details that need to be wasted in building the historical project; determine the association between the effective cost details and the additional cost details; based on the association, mark the engineering area that needs to incur additional costs in the historical engineering drawings.

[0110] Optionally, the marking module 40 is also used to identify the purpose of each expense from the consumption details; simulate the ideal construction steps of the corresponding historical project based on the historical engineering drawings; based on the ideal construction steps, screen additional steps required to assist the ideal construction steps from the purposes; after integrating the ideal construction steps with the additional steps, obtain the construction process of the historical project.

[0111] Optionally, the training module 50 is also used to obtain the completed work section information of the project to be evaluated; optimize the preset cost evaluation model based on the work section information to obtain an optimized cost evaluation model; re-evaluate the unfinished work sections in the project to be evaluated based on the optimized cost evaluation model to obtain the latest project cost.

[0112] Optionally, the training module 50 is also used to extract construction information of construction users who construct the project to be evaluated from the work section information; identify the construction habits of each construction user from the construction information; and optimize the preset cost evaluation model based on the construction habits to obtain an optimized cost evaluation model.

[0113] The engineering cost evaluation device provided by the present application adopts the engineering cost evaluation method in the above embodiment, which can solve the technical problem that the accuracy of the engineering cost decreases due to the actual construction situation. Compared with the prior art, the beneficial effects of the engineering cost evaluation device provided by the present application are the same as the beneficial effects of the engineering cost evaluation method provided by the above embodiment, and the other technical features in the engineering cost evaluation device are the same as the features disclosed in the above embodiment method, which will not be repeated here.

[0114] The present application provides an engineering cost assessment device, which includes: at least one processor; and a memory that is communicatively connected to the at least one processor; wherein the memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the engineering cost assessment method in the above-mentioned embodiment one.

[0115] Reference below Figure 5, which shows a schematic diagram of the structure of an engineering cost assessment device suitable for implementing the embodiment of the present application. The engineering cost assessment device in the embodiment of the present application may include but is not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (Personal Digital Assistants), PADs (Portable Application Descriptions), PMPs (Portable Media Players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 5 The engineering cost assessment device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0116] like Figure 5 As shown, the construction cost assessment device may include a processing device 1001 (e.g., a central processing unit, a graphics processing unit, etc.), which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM: Read Only Memory) 1002 or a program loaded from a storage device 1003 to a random access memory (RAM: Random Access Memory) 1004. Various programs and data required for the operation of the construction cost assessment device are also stored in the RAM 1004. The processing device 1001, the ROM 1002, and the RAM 1004 are connected to each other via a bus 1005. An input / output (I / O) interface 1006 is also connected to the bus. Typically, the following systems can be connected to the I / O interface 1006: input devices 1007 including, for example, a touch screen, a touchpad, a keyboard, a mouse, an image sensor, a microphone, an accelerometer, a gyroscope, etc.; output devices 1008 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 1003 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 1009. The communication device 1009 can allow the engineering cost assessment device to communicate wirelessly or wired with other devices to exchange data. Although the figure shows an engineering cost assessment device with various systems, it should be understood that it is not required to implement or have all the systems shown. More or fewer systems may be implemented or have alternatively.

[0117] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device, or installed from a storage device 1003, or installed from a ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment disclosed in the present application are executed.

[0118] The engineering cost assessment device provided by the present application adopts the engineering cost assessment method in the above embodiment, which can solve the technical problem that the accuracy of the engineering cost decreases due to the actual construction situation. Compared with the prior art, the beneficial effects of the engineering cost assessment device provided by the present application are the same as the beneficial effects of the engineering cost assessment method provided by the above embodiment, and the other technical features in the engineering cost assessment device are the same as the features disclosed in the previous embodiment method, which will not be repeated here.

[0119] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.

[0120] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0121] The present application provides a computer-readable storage medium having computer-readable program instructions (ie, computer programs) stored thereon, and the computer-readable program instructions are used to execute the method for evaluating the construction cost in the above-mentioned embodiment.

[0122] The computer-readable storage medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, systems or devices, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, system or device. The program code contained on the computer-readable storage medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency), etc., or any suitable combination of the above.

[0123] The computer-readable storage medium may be included in the engineering cost evaluation device; or may exist independently without being assembled into the engineering cost evaluation device.

[0124] The above-mentioned computer-readable storage medium carries one or more programs. When the above-mentioned one or more programs are executed by the project cost assessment device, the project cost assessment device: after receiving the project cost assessment instruction, obtains the engineering drawings of the project to be assessed; inputs the engineering drawings into a preset cost assessment model to obtain the engineering cost of the project to be assessed, and the preset cost assessment model is obtained by training the to-be-trained model based on annotated historical engineering drawings, and the annotated historical engineering drawings are historical engineering drawings that are annotated with additional costs that will be incurred during the construction process according to actual working conditions.

[0125] Computer program code for performing the operations of the present application may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0126] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0127] The modules involved in the embodiments described in this application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.

[0128] The readable storage medium provided by the present application is a computer-readable storage medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-mentioned method for evaluating construction cost, and can solve the technical problem that the accuracy of construction cost decreases due to actual construction conditions. Compared with the prior art, the beneficial effects of the computer-readable storage medium provided by the present application are the same as the beneficial effects of the method for evaluating construction cost provided by the above-mentioned embodiment, and will not be elaborated here.

[0129] The present application also provides a computer program product, including a computer program, which implements the steps of the above-mentioned project cost evaluation method when executed by a processor.

[0130] The computer program product provided by this application can solve the technical problem that the accuracy of the project cost is reduced due to the actual construction situation. Compared with the prior art, the beneficial effects of the computer program product provided by this application are the same as the beneficial effects of the project cost evaluation method provided by the above embodiment, which will not be repeated here.

[0131] The above descriptions are only some embodiments of the present application, and are not intended to limit the patent scope of the present application. All equivalent structural changes made using the contents of the present application specification and drawings under the technical concept of the present application, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present application.

Claims

1. A method for evaluating construction cost, characterized in that: The method includes: After receiving the engineering cost assessment instruction, obtain the engineering drawings of the project to be assessed; The engineering drawings are input into a preset cost assessment model to obtain an engineering cost for the project to be assessed. The preset cost assessment model is obtained by training the model to be trained based on annotated historical engineering drawings. The annotated historical engineering drawings are historical engineering drawings that are annotated with additional costs that will be incurred during the construction process based on actual working conditions.

2. The method according to claim 1, characterized in that After receiving the engineering cost evaluation instruction, before the step of obtaining the engineering drawings of the project to be evaluated, the step also includes: Obtaining historical engineering drawings and cost details, wherein the cost details are details of the cost of the historical engineering corresponding to the historical engineering drawings during the construction process; Based on the cost details, marking the engineering areas that will incur additional costs during the construction process in the historical engineering drawings; The model to be trained is trained based on historical engineering drawings annotating the engineering area to obtain a preset cost assessment model.

3. The method according to claim 2, characterized in that The step of marking the engineering area that needs to incur additional costs during the construction process in the historical engineering drawings based on the cost details includes: Based on the cost details, simulating the construction process of the historical project corresponding to the historical project drawing; Based on the construction process, the cost details are divided into effective cost details and additional cost details, wherein the effective cost details are effective cost details of the necessary process for building the historical project, and the additional cost details are cost details that need to be wasted in building the historical project; Determining the association relationship between the effective fee details and the additional fee details; Based on the association relationship, the engineering area that needs to incur additional costs is marked in the historical engineering drawings.

4. The method according to claim 3, characterized in that The step of simulating the construction process of the historical project corresponding to the historical project drawing based on the cost details includes: Identify the purpose of each expense from the expenditure details; Simulate the ideal construction steps of the corresponding historical project based on historical engineering drawings; Based on the ideal construction steps, screening from the uses additional steps needed to assist the ideal construction steps; After integrating the ideal construction steps with the additional steps, the construction process of the historical project is obtained.

5. The method according to any one of claims 1 to 4, characterized in that After the step of inputting the engineering drawings into a preset cost evaluation model to obtain the engineering cost of the project to be evaluated, the method further includes: Obtaining information on completed work sections of the project to be evaluated; Optimizing the preset cost evaluation model based on the work section information to obtain an optimized cost evaluation model; Based on the optimized cost evaluation model, the unfinished sections in the project to be evaluated are re-evaluated to obtain the latest project cost.

6. The method according to claim 5, characterized in that The step of optimizing the preset cost evaluation model based on the work section information to obtain the optimized cost evaluation model comprises: Extracting construction information of construction users who construct the project to be evaluated from the work section information; identifying the construction habits of each of the construction users from the construction information; The preset cost assessment model is optimized based on the construction practice to obtain an optimized cost assessment model.

7. A device for evaluating construction cost, characterized in that: The device comprises: A first acquisition module is used to acquire the engineering drawings of the project to be evaluated after receiving the evaluation instruction of the project cost; An evaluation module is used to input the engineering drawings into a preset cost evaluation model to obtain an evaluation of the engineering cost of the project to be evaluated. The preset cost evaluation model is obtained by training the model to be trained based on annotated historical engineering drawings. The annotated historical engineering drawings are historical engineering drawings that are annotated with additional costs that will be incurred during the construction process based on actual working conditions.

8. An engineering cost assessment device, characterized in that: The device comprises: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program is configured to implement the steps of the method for evaluating the construction cost according to any one of claims 1 to 6.

9. A storage medium, characterized in that: The storage medium is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by a processor, the steps of the method for evaluating the construction cost according to any one of claims 1 to 6 are implemented.

10. A computer program product, characterized in that The computer program product comprises a computer program, and when the computer program is executed by a processor, the steps of the method for estimating construction cost according to any one of claims 1 to 6 are implemented.

Citation Information

Patent Citations

  • Engineering cost assessment management system based on big data analysis

    CN113919028A

  • BIM-based project cost evaluation method, system, device and equipment, and medium

    CN115358456A

  • Engineering cost evaluation method and system, electronic equipment and readable storage medium

    CN117371850A

  • Project cost prediction method and device

    CN118798947A

  • Image assessment method and apparatus, and device, storage medium and program product

    WO2023217117A1

Cited By

  • Building material cost estimation method and system, terminal and storage medium

    CN121639261A