By identifying and processing the "two tickets" information of new energy stations and updating the key status in the equipment area, the problems of low operation and maintenance management efficiency and poor security caused by manual operations are solved, and efficient and accurate operation and maintenance management and automatic key management are achieved.

CN119763135APending Publication Date: 2025-04-04ZHANGJIAKOU POWER SUPPLY COMPANY OF STATE GRID JINBEI ELECTRIC POWER COMPANY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411677574.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-22
Publication Date
2025-04-04

AI Technical Summary

Technical Problem

In the prior art, the operation and maintenance management of new energy stations relies on manual filling and statistics of the "two tickets", which are prone to filling out errors or omissions, resulting in low efficiency and poor safety of operation and maintenance management.

Method used

By obtaining the text information of the bill to be identified, identifying the bill elements and fields, storing the bill information, and updating the key status of the equipment area according to the bill attributes and work progress, the automatic entry and exit function is realized.

Benefits of technology

It significantly improves the efficiency and accuracy of bill processing, reduces the error rate and cost of manual operation, and realizes automatic management of keys in the equipment area, improving the security and efficiency of operation and maintenance management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119763135A_ABST
    Figure CN119763135A_ABST
Patent Text Reader

Abstract

The invention discloses a new energy station operation and maintenance management method, device and equipment and a readable storage medium, relates to the technical field of intelligent management, and aims to automatically identify and process bill information of a new energy station, realize an automatic in-out warehouse function of keys in an equipment area of the new energy station and assist station workers to perform operation and maintenance management more efficiently. The method comprises the following steps: acquiring a to-be-identified bill, and determining character information of the to-be-identified bill; determining a first field associated with the first specified bill element and a second field associated with the second specified bill element in the character information, and storing the to-be-recognized bill according to the first field and the second field; when the bill attribute of the to-be-identified bill is a work bill, judging whether a third specified bill element exists in the character information or not; and if the third specified bill element exists, updating the key state corresponding to each equipment area key according to at least one equipment area key identifier indicated by the third field.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of intelligent management technology, and in particular to a new energy station operation and maintenance management method, device, equipment and readable storage medium. Background Art

[0002] With the rapid development of new energy stations, such as wind power and photovoltaics, the operation and maintenance management within the stations has become more and more complicated. Among them, the "two tickets" (i.e., work tickets and operation tickets) are important tools to ensure the safe operation of the stations. A work ticket refers to a document issued by the relevant person in charge to ensure work safety when performing equipment maintenance, inspection, modification or construction. It records in detail the content, scope, safety measures and work supervisor information of the work. An operation ticket refers to a document issued by the relevant person in charge to ensure the safety and accuracy of the operation when starting, shutting down, switching or other operations of the equipment. It records in detail the operation steps, operators and other information.

[0003] In related technologies, the two-ticket management method mainly relies on manual operations, including filling in, reviewing and statistics. Specifically, staff need to fill in various forms and documents manually, and then the auditors check the accuracy and completeness of these documents one by one. After the review is passed, the statisticians will summarize and analyze the data to ensure the accuracy and consistency of all information. Finally, based on these statistical results, management can determine the rewards and incentives for relevant staff, as well as determine the operation of equipment in new energy stations.

[0004] In the process of implementing this application, the applicant found that the related technology has at least the following problems:

[0005] When manually filling in data, due to human factors, it is easy to make mistakes or omissions in the "two tickets". In addition, when manually counting, due to the large and complex data volume, manual counting is prone to errors, resulting in low efficiency and poor safety in the operation and maintenance management of new energy stations. Summary of the invention

[0006] In view of this, the present application provides a new energy station operation and maintenance management method, device, equipment and readable storage medium, the main purpose of which is to solve the problem that when manually filling in data, due to the influence of human factors, it is easy to make mistakes or omissions in the "two tickets". In addition, when manually counting, due to the large and complex amount of data, manual counting is prone to errors, resulting in low efficiency and poor safety in the operation and maintenance management of new energy stations.

[0007] According to the first aspect of the present application, a new energy station operation and maintenance management method is provided, the method comprising:

[0008] Acquire a bill to be identified, and determine text information of the bill to be identified, wherein the bill to be identified includes a plurality of bill elements, each of the bill elements is associated with a bill field, and the text information includes the plurality of bill elements and the bill field associated with each of the bill elements;

[0009] Determine a first field associated with a first designated bill element and a second field associated with a second designated bill element in the text information, store the bill to be identified according to the first field and the second field, the first field is used to indicate a bill attribute of the bill to be identified, the bill attribute is a work bill or an operation bill, and the second field is used to indicate a work item and work progress associated with the bill to be identified;

[0010] When the ticket attribute of the ticket to be identified is a work ticket, determining whether a third designated ticket element exists in the text information, wherein a third field associated with the third designated ticket element is used to indicate at least one device area key identifier, wherein each device area key identifier is associated with a device area key;

[0011] If the third designated ticket element exists, the key status corresponding to each of the device area keys is updated according to at least one device area key identifier indicated by the third field.

[0012] Optionally, updating the key status corresponding to each of the device area keys includes:

[0013] Determining a fourth field associated with a fourth designated bill element in the text information, wherein the fourth field is used to indicate a person in charge of work associated with the bill to be identified;

[0014] When the work progress indicated by the second field is to start work, query the key status associated with each of the device area key identifiers, the key status being used to determine whether the device area key corresponding to the device area key identifier exists in the key library;

[0015] If the key status is in the warehouse status, a key in the warehouse prompt information is generated and sent to the management terminal associated with the work permit holder corresponding to the to-be-identified ticket for visual display, so that the work permit holder can generate a key removal prompt based on scanning the graphic identification code on the key in the equipment area with a scanner device;

[0016] When the key removal prompt transmitted by the scanner device is detected, the key state corresponding to the device area key identifier is updated to the out-of-warehouse state, and an out-of-warehouse label is set for the device area key identifier, and the label content of the out-of-warehouse label is the fourth field.

[0017] Optionally, after querying the key status associated with each of the device area key identifiers, the method further includes:

[0018] If the key status is the outbound status, query the outbound tag corresponding to the key identifier in the equipment area;

[0019] Generate key outbound reminder information according to the outbound tag, and send the key outbound reminder information to the management terminal associated with the work permit holder for visual display, so that the work permit holder can determine the current holder of the equipment area key based on the outbound reminder information.

[0020] Optionally, updating the key status corresponding to each of the device area keys further includes:

[0021] When the work progress indicated by the second field is the end of the work, at least one equipment area key identification indicated by the third field is sent to the management terminal associated with the work permit holder for visual display, so that the work permit holder generates key storage prompt information based on scanning the graphic identification code on the equipment area key by a scanner device;

[0022] When the key storage prompt information transmitted by the scanner device is detected, the outbound label associated with each device area key identifier is deleted, and the key status corresponding to the device area key identifier is updated to the in-stock status.

[0023] Optionally, storing the to-be-identified bill according to the first field and the second field includes:

[0024] Querying the preset storage space for a storage unit associated with the work item;

[0025] If the storage unit exists, the first field is used to set an attribute tag for the to-be-identified bill, and a work progress tag is set for the to-be-identified bill according to the work progress indicated by the second field, and the to-be-identified bill with the attribute tag and the work progress tag is stored in the storage unit;

[0026] If the storage unit does not exist, a space of a preset size is divided in the preset storage space and associated with the work item to obtain a storage unit associated with the work item, and the first field is used to set an attribute tag for the to-be-identified bill, and a work progress tag is set for the to-be-identified bill according to the work progress indicated by the second field, and the to-be-identified bill with the attribute tag and the work progress tag is stored in the storage unit.

[0027] Optionally, the method further comprises:

[0028] In response to the bill counting instruction, determining text information of at least one bill to be counted in a preset storage space according to a preset counting rule, counting the number of bills corresponding to a designated staff member according to the text information of each bill to be counted, and determining a reward value corresponding to the number of bills according to a preset reward rule, and associating the reward value with the designated staff member; and / or,

[0029] In response to a bill verification instruction, determine the work item to be verified corresponding to the bill verification instruction, determine the storage unit associated with the work item to be verified in the preset storage space, read the text information of all the bills to be verified in the storage unit, and determine the ticket number of each bill to be verified based on the text information of each bill to be verified, and judge whether there is any missing bill of the work item based on the ticket number of each bill to be verified.

[0030] Optionally, the acquiring the bill to be identified and determining the text information of the bill to be identified includes:

[0031] The bill to be identified is obtained, and the bill to be identified is identified by using optical character recognition technology to determine a plurality of bill elements existing in the bill to be identified, and a bill field associated with each of the bill elements.

[0032] According to the second aspect of the present application, a new energy station operation and maintenance management device is provided, the device comprising:

[0033] an acquisition module, configured to acquire a bill to be identified and determine text information of the bill to be identified, wherein the bill to be identified includes a plurality of bill elements, each of which is associated with a bill field, and the text information includes the plurality of bill elements and the bill field associated with each of the bill elements;

[0034] a storage module, configured to determine a first field associated with a first designated bill element and a second field associated with a second designated bill element in the text information, and store the bill to be identified according to the first field and the second field, wherein the first field is used to indicate a bill attribute of the bill to be identified, the bill attribute being a work bill or an operation bill, and the second field is used to indicate a work item and work progress associated with the bill to be identified;

[0035] A judgment module, used for judging whether there is a third designated bill element in the text information when the bill attribute of the bill to be identified is a work bill, wherein a third field associated with the third designated bill element is used to indicate at least one device area key identifier, wherein each device area key identifier is associated with a device area key;

[0036] An updating module is configured to update a key status corresponding to each of the device area keys according to at least one of the device area key identifiers indicated by the third field if the third designated ticket element exists.

[0037] Optionally, the update module is used to determine the fourth field associated with the fourth designated ticket element in the text information, and the fourth field is used to indicate the person in charge of the work associated with the ticket to be identified; when the work progress indicated by the second field is to start work, query the key status associated with each of the equipment area key identifiers, and the key status is used to determine whether the equipment area key corresponding to the equipment area key identifier exists in the key library; if the key status is in the library status, generate key in the library prompt information and send it to the management terminal associated with the work permit holder corresponding to the ticket to be identified for visual display, so that the work permit holder can generate a key retrieval prompt based on scanning the graphic identification code on the equipment area key by a scanner device; when the key retrieval prompt transmitted by the scanner device is detected, the key status corresponding to the equipment area key identifier is updated to the out of library status, and an out of library label is set for the equipment area key identifier, and the label content of the out of library label is the fourth field.

[0038] Optionally, the update module is used to query the out-of-warehouse label corresponding to the equipment area key identifier if the key status is an out-of-warehouse status; generate key out-of-warehouse prompt information based on the out-of-warehouse label, and send the key out-of-warehouse prompt information to the management terminal associated with the work permit holder for visual display, so that the work permit holder can determine the current holder of the equipment area key based on the out-of-warehouse prompt information.

[0039] Optionally, the update module is used to send at least one equipment area key identification indicated by the third field to the management terminal associated with the work permit holder for visual display when the work progress indicated by the second field is the end of the work, so that the work permit holder can generate key entry reminder information based on scanning the graphic identification code on the equipment area key by a scanner device; when the key entry reminder information transmitted by the scanner device is detected, the outbound label associated with each equipment area key identification is deleted, and the key status corresponding to the equipment area key identification is updated to the in-warehouse status.

[0040] Optionally, the storage module is used to query the storage unit associated with the work item in the preset storage space; if the storage unit exists, the first field is used to set an attribute tag for the bill to be identified, and a work progress tag is set for the bill to be identified according to the work progress indicated by the second field, and the bill to be identified with the attribute tag and the work progress tag is stored in the storage unit; if the storage unit does not exist, a space of a preset size is divided in the preset storage space and associated with the work item to obtain a storage unit associated with the work item, and the first field is used to set an attribute tag for the bill to be identified, and a work progress tag is set for the bill to be identified according to the work progress indicated by the second field, and the bill to be identified with the attribute tag and the work progress tag is stored in the storage unit.

[0041] Optionally, the device further comprises:

[0042] a statistics module, configured to respond to a bill statistics instruction, determine text information of at least one bill to be counted in a preset storage space according to a preset statistics rule, count the number of bills corresponding to a designated staff member according to the text information of each bill to be counted, determine a reward value corresponding to the number of bills according to a preset reward rule, and associate the reward value with the designated staff member; and / or,

[0043] A verification module is used to respond to a bill verification instruction, determine the work item to be verified corresponding to the bill verification instruction, determine the storage unit associated with the work item to be verified in the preset storage space, read the text information of all the bills to be verified in the storage unit, and determine the ticket number of each bill to be verified according to the text information of each bill to be verified, and judge whether there is any missing bill of the work item according to the ticket number of each bill to be verified.

[0044] Optionally, the acquisition module is used to acquire the bill to be identified, identify the bill to be identified using optical character recognition technology, and determine multiple bill elements existing in the bill to be identified, as well as bill fields associated with each of the bill elements.

[0045] According to a third aspect of the present application, a computer device is provided, comprising a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of any one of the methods described in the first aspect when executing the computer program.

[0046] According to a fourth aspect of the present application, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps of any one of the methods described in the first aspect are implemented.

[0047] By means of the above technical solution, the present application provides a method, device, equipment and readable storage medium for operation and maintenance management of a new energy station. The present application first obtains the bill to be identified and determines the text information of the bill to be identified, wherein the bill to be identified includes multiple bill elements, each bill element is correspondingly associated with a bill field, and the text information includes multiple bill elements and bill fields associated with each bill element. Further, the first field associated with the first designated bill element and the second field associated with the second designated bill element are determined in the text information, and the bill to be identified is stored according to the first field and the second field, wherein the first field is used to indicate the bill attribute of the bill to be identified, the bill attribute is a work ticket or an operation ticket, and the second field is used to indicate the work item and work progress associated with the bill to be identified. When the bill attribute of the bill to be identified is a work ticket, it is determined whether there is a third designated bill element in the text information, and the third field associated with the third designated bill element is used to indicate at least one equipment area key identifier, wherein each equipment area key identifier is associated with an equipment area key. If there is a third designated bill element, the key state corresponding to each equipment area key is updated according to the at least one equipment area key identifier indicated by the third field. The embodiment of the present application significantly improves the efficiency and accuracy of bill processing by accurately identifying and processing bill information, thereby effectively reducing the error rate and cost of manual operations. In addition, the embodiment can also realize the automatic entry and exit function of keys in the equipment area of ​​new energy stations, assisting station staff to perform operation and maintenance management more efficiently.

[0048] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0050] Figure 1 A schematic diagram of a new energy station operation and maintenance management method provided in an embodiment of the present application is shown;

[0051] Figure 2 A schematic diagram of a new energy station operation and maintenance management method provided in an embodiment of the present application is shown;

[0052] Figure 3 A schematic diagram of the structure of an operation and maintenance management system of a new energy station operation and maintenance management method provided in an embodiment of the present application is shown;

[0053] Figure 4 A schematic diagram of a new energy station operation and maintenance management method provided in an embodiment of the present application is shown;

[0054] Figure 5 A schematic diagram of the structure of a new energy station operation and maintenance management device provided in an embodiment of the present application is shown;

[0055] Figure 6 A schematic diagram of the structure of a new energy station operation and maintenance management device provided in an embodiment of the present application is shown;

[0056] Figure 7 A schematic diagram of the device structure of a computer device provided in an embodiment of the present application is shown. DETAILED DESCRIPTION

[0057] The exemplary embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present application and to fully convey the scope of the present application to those skilled in the art.

[0058] With the rapid development of new energy stations, such as wind power and photovoltaic power, the operation and maintenance management within the stations has become increasingly complex. Among them, the "two tickets" (i.e., work tickets and operation tickets) are important tools to ensure the safe operation of the stations. A work ticket refers to a document issued by the relevant person in charge to ensure the safety of the work when carrying out equipment maintenance, overhaul, renovation or construction, etc., which records in detail the content, scope, safety measures and work supervisor information of the work. An operation ticket refers to a document issued by the relevant person in charge to ensure the safety and accuracy of the operation when starting, shutting down, switching or other operations of the equipment, which records in detail the operation steps, operators and other information. At present, the two-ticket management method mainly relies on manual operation, including filling in, reviewing and statistics. Specifically, staff need to fill in various forms and documents manually, and then the auditors will check the accuracy and completeness of these documents one by one. After the audit is passed, the statisticians will summarize and analyze the data to ensure the accuracy and consistency of all information. Finally, based on these statistical results, the management can determine the rewards and incentives for the relevant staff and determine the operation of the equipment in the new energy stations. However, the applicant recognizes that when manually filling in data, due to the influence of human factors, it is easy to make mistakes or omissions in the "two tickets". In addition, when manually counting, due to the large and complex amount of data, manual counting is prone to errors, resulting in low efficiency and poor security in the operation and maintenance management of new energy stations. Therefore, the present application provides a new energy station operation and maintenance management method, first obtaining a ticket to be identified, determining the text information of the ticket to be identified, wherein the ticket to be identified includes multiple ticket elements, each ticket element is correspondingly associated with a ticket field, and the text information includes multiple ticket elements and the ticket field associated with each ticket element. Further, the first field associated with the first designated ticket element and the second field associated with the second designated ticket element are determined in the text information, and the ticket to be identified is stored according to the first field and the second field, wherein the first field is used to indicate the ticket attribute of the ticket to be identified, the ticket attribute is a work ticket or an operation ticket, and the second field is used to indicate the work item and work progress associated with the ticket to be identified. When the ticket attribute of the ticket to be identified is a work ticket, it is determined whether there is a third designated ticket element in the text information, and the third field associated with the third designated ticket element is used to indicate at least one equipment area key identifier, wherein each equipment area key identifier is associated with an equipment area key. If there is a third designated ticket element, the key status corresponding to each equipment area key is updated according to at least one equipment area key identifier indicated by the third field. The embodiment of the present application significantly improves the efficiency and accuracy of ticket processing by accurately identifying and processing ticket information, thereby effectively reducing the error rate and cost of manual operation. In addition, this embodiment can also realize the automatic entry and exit function of the key of the equipment area of ​​the new energy station, assisting the station staff to perform operation and maintenance management more efficiently.

[0059] The present application embodiment provides a new energy station operation and maintenance management method, such as Figure 1 As shown, the method includes:

[0060] S10, obtaining a bill to be identified, and determining text information of the bill to be identified, wherein the bill to be identified includes multiple bill elements, each bill element is associated with a bill field, and the text information includes multiple bill elements and bill fields associated with each bill element.

[0061] In the embodiment of the present application, the bill to be identified specifically refers to the work ticket and operation ticket used in the new energy station. When the bill to be identified is a work ticket, the person in charge of the work needs to go to the work issuer in person and obtain the paper bill to be identified in accordance with strict procedures and regulations. This bill contains all detailed information related to the work, such as work content, work location, working hours, work leader and work group members. Further, the person in charge of the work will take the paper bill to the work permit holder for work permit, and the work permit holder can scan the paper bill to be identified based on the scanner device. With the start of the scanner, the operation and maintenance management system also starts working. The system first obtains the scanned image of the bill to be identified, and then uses advanced optical character recognition technology to accurately identify the text information in the image. Through this technology, the system can accurately determine the multiple bill elements present in the bill to be identified, such as bill number, work content, work location, etc., as well as the bill fields associated with each bill element. Furthermore, the operation and maintenance management system can also transfer all the identified bill elements and the bill fields associated with the bill elements to the terminal device associated with the work permit holder for visual display. These ticket fields will be set to editable mode, so that during the review process, if the work permit holder finds that there are errors or adjustments in the ticket fields, they can immediately modify the erroneous ticket fields. After the modification is completed, just click the information confirmation button, and the system will upload the text information of the ticket to be identified to the corresponding database or system for storage. In this step, through optical character recognition technology, the system can quickly and accurately identify the text information on the ticket, reducing errors and time consumption in manual entry. Secondly, the visual display and editable function of the ticket elements enable the work permit holder to intuitively check and modify the information during the review process, ensuring the accuracy of the ticket information. In addition, the operation of uploading the information to the database or system after confirmation not only realizes the electronic storage of ticket information, but also facilitates subsequent query, statistics and analysis.

[0062] S20. Determine in the text information the first field associated with the first designated bill element and the second field associated with the second designated bill element, and store the bill to be identified according to the first field and the second field. The first field is used to indicate the bill attribute of the bill to be identified, which is a work bill or an operation bill. The second field is used to indicate the work item and work progress associated with the bill to be identified.

[0063] In an embodiment of the present application, the text information includes multiple bill elements, and the bill elements include but are not limited to a first designated bill element, a second designated bill element, a third designated bill element, and a fourth designated bill element. In the process of processing text information, it is first necessary to identify the first field associated with the first designated bill element and the second field associated with the second designated bill element. These two fields respectively undertake different functions and tasks. Specifically, the main function of the first field is to indicate the bill attribute of the bill to be identified, that is, to indicate whether the bill to be identified is a work ticket or an operation ticket. The main function of the second field is to indicate the work item and work progress associated with the bill to be identified. For example, the second field associated with the second designated bill element in work ticket A is "Photovoltaic panel equipment test, start work", where "Photovoltaic panel equipment test" is a work item and "start work" is a work progress. Further, as Figure 2 As shown, the following steps S21 to S23 are executed to store the bill to be identified according to the first field and the second field.

[0064] S21. Query a storage unit associated with the work item in a preset storage space.

[0065] In this step, in order to facilitate more efficient and convenient management and retrieval of the tickets (work tickets and operation tickets) of the new energy stations in the future, the system will query whether there is a specific storage unit associated with the current work item in the preset storage space. In other words, the operation and maintenance management system will allocate a part of the storage space for each work item to store all the tickets under the work item. In this way, the system can ensure that in the subsequent processing process, all tickets under any work item can be quickly located and processed, thereby improving the data retrieval speed. In addition, automated data retrieval and processing can effectively reduce the possibility of human error and improve overall work efficiency.

[0066] S22. If a storage unit exists, the first field is used to set an attribute tag for the bill to be identified, and a work progress tag is set for the bill to be identified according to the work progress indicated by the second field, and the bill to be identified with the attribute tag and the work progress tag is stored in the storage unit.

[0067] In this step, if the system finds that there is already a storage unit associated with the current work project, it means that the current bill to be identified is not the start bill of the work project, but an intermediate bill in the ongoing work project or an end bill at the end of the work project. At this time, the system will use the first field (usually the bill attribute, such as a work ticket or an operation ticket) to set an attribute tag for the bill to be identified. A work progress tag is set for the bill to be identified according to the work progress indicated by the second field (such as starting work, in progress, ending work, etc.). Finally, the bill to be identified with the attribute tag and work progress tag set is stored in the corresponding storage unit.

[0068] S23. If there is no storage unit, a space of a preset size is divided in the preset storage space and associated with the work project to obtain a storage unit associated with the work project, and an attribute tag is set for the bill to be identified using the first field, and a work progress tag is set for the bill to be identified according to the work progress indicated by the second field, and the bill to be identified with the attribute tag and the work progress tag is stored in the storage unit.

[0069] In this step, if the system finds that there is no storage unit associated with the current work project after querying, then the current to-be-recognized bill to be stored is the start bill of the current work project. At this time, the system will divide a space of a preset size in the preset storage space and associate it with the current work project, thereby creating a new storage unit. Similarly, the system will use the first field to set an attribute tag for the bill to be recognized. Set a work progress tag for the bill to be recognized according to the second field. The bill to be recognized with the attribute tag and work progress tag set is stored in the newly created storage unit. In addition, the system can also generate a ticket number for the text information of the stored bill to be recognized, which is used to subsequently check whether the bills associated with the work project are complete. Through steps S21 to S23, the system can effectively organize and manage the data of bills to be recognized for different work projects. Whether there is an existing storage unit or a new storage unit needs to be created, the system can accurately classify and store the bills to be recognized, thereby improving the efficiency and accuracy of data management.

[0070] S30. When the ticket attribute of the ticket to be identified is a work ticket, determine whether there is a third designated ticket element in the text information, and the third field associated with the third designated ticket element is used to indicate at least one equipment area key identifier, wherein each equipment area key identifier is associated with an equipment area key.

[0071] In this step, if Figure 3As shown, when the attribute of the bill to be identified is identified as a work ticket, the system will check whether the text information contains a third designated bill element. If this element exists, the system will execute step S40 to update the status of each device area key according to at least one device area key identifier indicated by the third field. This process involves real-time monitoring and management of the status of the device area keys to ensure that the key removal and return operations can be accurately recorded and tracked. If the third designated bill element does not exist in the text information, the system will directly store the text information of the bill to be identified for subsequent query and reference. In addition, when the attribute of the bill to be identified is identified as an operation ticket, the system will also directly store the text information of the bill to be identified. This operation ensures that all types of bill information can be fully recorded and saved, which is convenient for subsequent management and auditing. In this way, the system can effectively manage different types of bills and ensure that the status of the relevant device area keys can be accurately reflected in the system.

[0072] S40: If there is a third designated ticket element, update the key status corresponding to each device area key according to at least one device area key identifier indicated by the third field.

[0073] In actual operation, Figure 4 As shown, after receiving the paper bill to be identified from the person in charge of the work, the work permit holder will use a scanner to scan the paper bill to be identified and pass the scan result to the operation and maintenance management system. The operation and maintenance management system will identify the scan result to determine whether there is a third designated bill element. If there is a third designated bill element, at least one equipment area key identifier indicated by the third field is passed back to the management terminal associated with the work permit holder to prompt the work permit holder which keys need to be taken away. Based on this, the work permit holder can go to the key cabinet, open the corresponding key cabinet door, and start looking for the equipment area key that matches the equipment area key identifier indicated by the third field. The key cabinet is usually arranged in a certain order so that the staff can quickly find the required key. After finding the corresponding key, the staff will use a scanner device to scan the graphic identification code on the key. The scanner will read the information in the graphic identification code and convert it into key removal prompt information or key storage prompt information in electronic format. This information will be transmitted through the network and passed to the operation and maintenance management system. Finally, the operation and maintenance management system can update the key status of the equipment area key according to the bill to be identified and the key removal prompt information or key storage prompt information. For example, if the work ticket indicates that work has started, the system will update the key status to "out of storage." If the work ticket indicates that work has ended, the system will update the key status to "in storage." Such updates ensure that the real-time status of the keys in the equipment area can be accurately recorded and tracked, thereby improving the security and management efficiency of the equipment area.

[0074] S41. Determine a fourth field associated with a fourth designated bill element in the text information, where the fourth field is used to indicate a person in charge of work associated with the bill to be identified.

[0075] Specifically, in this step, the fourth field associated with the fourth designated bill element is first determined in the text information, and the fourth field is used to indicate the person in charge of the work associated with the bill to be identified. Once the equipment area key is lost or encounters other situations where it is needed, the current holder of the equipment area key can be directly determined based on this field. Furthermore, when the work progress indicated by the second field is the start of work, it means that the equipment area key needs to be taken out, and then the following steps S42 to S44 are executed to take out the equipment area key. When the work progress indicated by the second field is the end of work, it means that the person in charge of the work needs to return the equipment area key, and then the following step S45 is executed to return the equipment area key. This mechanism ensures that the custodian of the key can be contacted in time in any emergency, thereby effectively ensuring the safety of the equipment area and avoiding the risks and losses that may be caused by improper key management.

[0076] S42: When the work progress indicated by the second field is to start work, query the key status associated with each device area key identifier, and the key status is used to determine whether the device area key corresponding to the device area key identifier exists in the key library.

[0077] In this step, when the second field clearly indicates that the work progress is to start work, it is necessary to query the key status associated with each equipment area key identifier to determine whether the required equipment area key is currently stored in the key library. If the key status is in the library, it means that the currently required equipment area key is in the library, and the following step S43 can be executed to directly take out the equipment area key and update the key status. If the key status is out of the library, it means that the currently required equipment area key has been taken away. At this time, the following step S44 can be executed to generate a prompt message to prompt the work permit holder that the key has been taken away, and who is the person in charge of taking away the key, so that the work permit holder can coordinate the work. In this way, the equipment area keys can be effectively managed to avoid work delays caused by the keys not being in the library.

[0078] S43. If the key status is in the warehouse status, a key in the warehouse prompt information is generated and sent to the management terminal associated with the work permit holder corresponding to the ticket to be identified for visual display, so that the work permit holder can generate a key removal prompt based on the scanning device scanning the graphic identification code on the key in the equipment area.

[0079] In this step, if the key status is in the warehouse status, a key in the warehouse prompt information is generated and sent to the management terminal associated with the work permit holder corresponding to the ticket to be identified for visual display, so that the work permit holder can generate a key removal prompt based on the scanning device scanning the graphic identification code on the equipment area key. Among them, the graphic identification code can be a QR code or a barcode, and this application does not specifically limit the form of the graphic identification code. When the key removal prompt transmitted by the scanner device is detected, the key status corresponding to the equipment area key identification is updated to the out-of-warehouse status, and an out-of-warehouse label is set for the equipment area key identification, and the label content of the out-of-warehouse label is the fourth field. In other words, the out-of-warehouse label will clearly indicate the person who takes the equipment area key. Through this out-of-warehouse label, we can track the whereabouts of the key and understand the use of the key. In addition, the system can also record the time when the scanner scans the graphic identification code on the equipment area key, and use this time as the removal time of the equipment area key, so as to monitor the flow of the key in real time, prevent the key from being lost or misused, and improve the overall operation and maintenance management level of the new energy station.

[0080] S44. If the key status is the outbound status, query the outbound tag corresponding to the key identifier in the equipment area.

[0081] In this step, if the key status is out of the warehouse, the out of the warehouse label corresponding to the key identification of the equipment area is queried, and the key out of the warehouse prompt information is generated according to the out of the warehouse label. The key out of the warehouse prompt information can carry the flow information of the key, such as the out of the warehouse time, the out of the warehouse personnel, the key number and the specific reason for the out of the warehouse (the corresponding work project), etc. The key out of the warehouse prompt information is sent to the management terminal associated with the work permit holder for visual display, so that the work permit holder can determine the current holder of the equipment area key based on the out of the warehouse prompt information. In addition, the management terminal can be a computer, tablet or smart phone and other devices to ensure that the work permit holder can receive the prompt information anytime and anywhere. Such a process not only improves work efficiency, but also enhances safety management and ensures transparency and traceability in the use and management of keys. Through this detailed information transmission and visual display, the work permit holder can make work arrangements and decisions more conveniently, thereby ensuring the safe use and effective management of the equipment area keys.

[0082] S45. When the work progress indicated by the second field is completion of the work, at least one equipment area key identification indicated by the third field is sent to the management terminal associated with the work permit holder for visual display, so that the work permit holder can generate key storage prompt information based on scanning the graphic identification code on the equipment area key with a scanner device.

[0083] In this step, when the second field clearly indicates that the work progress has reached the end of the work stage, the system will automatically send at least one equipment area key identification indicated by the third field to the management terminal associated with the work permit holder for visual display. In this way, the work permit holder can scan the graphic identification code on the equipment area key through the scanner device to generate key storage prompt information. When the system detects the key storage prompt information transmitted by the scanner device, it will automatically delete the outbound label associated with each equipment area key identification, and update the key status corresponding to the equipment area key identification to the in-stock status. In addition, the system can also record the time when the scanner scans the graphic identification code on the equipment area key, and use this time as the return time of the equipment area key, thereby monitoring the flow of keys in real time to prevent the loss or misuse of keys. Through the system's automatic management of keys, even if the keys are lost or stolen during use, the system can easily track the information of the person who received them, which helps to take corresponding measures in time and cooperate with the investigation.

[0084] In addition, in response to the bill statistics instruction, the system will filter out at least one bill that needs to be counted in the preset storage space according to the preset statistical rules. For example, filter by work project, filter by time range, etc. These bills contain rich text information, and the system will analyze and process these text information in detail. Then, according to the text information in each bill to be counted, the system will count the number of bills corresponding to the designated staff. The designated staff of the work ticket includes but is not limited to the work issuer, the work supervisor and the work permit holder. The designated staff of the operation ticket includes but is not limited to the operation ticket operator, the guardian and the person in charge. During the statistical process, the system will calculate the reward value corresponding to the number of bills according to the preset reward rules. Then, the system will associate the calculated reward value with the corresponding designated staff to ensure that each staff member can obtain the corresponding reward according to his or her work performance. In addition, in response to the bill verification instruction, the system will first determine the work item to be verified corresponding to the bill verification instruction. Then, in the preset storage space, the system will locate the storage unit associated with the work item to be verified and read the text information of all bills to be verified from it. By analyzing these text information, the system can further determine the ticket number of each bill to be checked. With these ticket number information, the system will make further judgments to confirm whether there are any missing bills involved in the work project. This process ensures the integrity and accuracy of the bills, thereby providing reliable data support for subsequent work processes. It reduces the workload of staff for two-ticket statistics and two-ticket settlement, and can configure and adjust settlement rules according to business needs, with high flexibility.

[0085] The method provided by the embodiment of the present application first obtains the bill to be identified, determines the text information of the bill to be identified, wherein the bill to be identified includes multiple bill elements, each bill element is correspondingly associated with a bill field, and the text information includes multiple bill elements and bill fields associated with each bill element. Further, the first field associated with the first designated bill element and the second field associated with the second designated bill element are determined in the text information, and the bill to be identified is stored according to the first field and the second field, wherein the first field is used to indicate the bill attribute of the bill to be identified, the bill attribute is a work ticket or an operation ticket, and the second field is used to indicate the work item and work progress associated with the bill to be identified. When the bill attribute of the bill to be identified is a work ticket, it is determined whether there is a third designated bill element in the text information, and the third field associated with the third designated bill element is used to indicate at least one device area key identifier, wherein each device area key identifier is associated with a device area key. If there is a third designated bill element, the key state corresponding to each device area key is updated according to the at least one device area key identifier indicated by the third field. The embodiment of the present application significantly improves the efficiency and accuracy of bill processing by accurately identifying and processing bill information, thereby effectively reducing the error rate and cost of manual operation. In addition, this embodiment can also realize the automatic entry and exit function of keys in the equipment area of ​​the new energy station, assisting the station staff to perform operation and maintenance management more efficiently.

[0086] Further, as Figure 1 The specific implementation of the method, the embodiment of the present application provides a new energy station operation and maintenance management device, such as Figure 5 As shown, the device includes: an acquisition module 501, a storage module 502, a judgment module 503, and an update module 504.

[0087] The acquisition module 501 is used to acquire a bill to be identified and determine text information of the bill to be identified, wherein the bill to be identified includes a plurality of bill elements, each of which is associated with a bill field, and the text information includes the plurality of bill elements and the bill field associated with each of the bill elements;

[0088] The storage module 502 is used to determine a first field associated with a first designated bill element and a second field associated with a second designated bill element in the text information, and store the bill to be identified according to the first field and the second field, wherein the first field is used to indicate a bill attribute of the bill to be identified, and the bill attribute is a work bill or an operation bill, and the second field is used to indicate a work item and work progress associated with the bill to be identified;

[0089] The judgment module 503 is used to judge whether there is a third designated bill element in the text information when the bill attribute of the bill to be identified is a work bill, and the third field associated with the third designated bill element is used to indicate at least one device area key identifier, wherein each device area key identifier is associated with a device area key;

[0090] The updating module 504 is configured to update the key status corresponding to each device area key according to at least one device area key identifier indicated by the third field if the third designated ticket element exists.

[0091] In a specific application scenario, the update module 504 is used to determine the fourth field associated with the fourth designated ticket element in the text information, and the fourth field is used to indicate the person in charge of the work associated with the ticket to be identified; when the work progress indicated by the second field is to start work, query the key status associated with each of the equipment area key identifiers, and the key status is used to determine whether the equipment area key corresponding to the equipment area key identifier exists in the key library; if the key status is in the library status, generate a key in the library prompt information and send it to the management terminal associated with the work permit holder corresponding to the ticket to be identified for visual display, so that the work permit holder can generate a key retrieval prompt based on scanning the graphic identification code on the equipment area key by a scanner device; when the key retrieval prompt transmitted by the scanner device is detected, the key status corresponding to the equipment area key identifier is updated to the out of library status, and an out of library label is set for the equipment area key identifier, and the label content of the out of library label is the fourth field.

[0092] In a specific application scenario, the update module 504 is used to query the out-of-warehouse label corresponding to the key identifier of the equipment area if the key status is an out-of-warehouse status; generate key out-of-warehouse prompt information based on the out-of-warehouse label, and send the key out-of-warehouse prompt information to the management terminal associated with the work permit holder for visual display, so that the work permit holder can determine the current holder of the equipment area key based on the out-of-warehouse prompt information.

[0093] In a specific application scenario, the update module 504 is used to send at least one equipment area key identifier indicated by the third field to the management terminal associated with the work permit holder for visual display when the work progress indicated by the second field is the end of the work, so that the work permit holder can generate key entry prompt information based on scanning the graphic identification code on the equipment area key by a scanner device; when the key entry prompt information transmitted by the scanner device is detected, the outbound label associated with each equipment area key identifier is deleted, and the key status corresponding to the equipment area key identifier is updated to the in-warehouse status.

[0094] In a specific application scenario, the storage module 502 is used to query the storage unit associated with the work project in the preset storage space; if the storage unit exists, the first field is used to set an attribute tag for the bill to be identified, and a work progress tag is set for the bill to be identified according to the work progress indicated by the second field, and the bill to be identified with the attribute tag and the work progress tag is stored in the storage unit; if the storage unit does not exist, a space of a preset size is divided in the preset storage space and associated with the work project to obtain a storage unit associated with the work project, and the first field is used to set an attribute tag for the bill to be identified, and a work progress tag is set for the bill to be identified according to the work progress indicated by the second field, and the bill to be identified with the attribute tag and the work progress tag is stored in the storage unit.

[0095] In specific application scenarios, such as Figure 6 As shown, the device further includes: a statistics module 601 and a checking module 602.

[0096] The statistics module 601 is used to respond to the bill statistics instruction, determine the text information of at least one bill to be counted in the preset storage space according to the preset statistics rule, count the number of bills corresponding to the designated staff member according to the text information of each bill to be counted, and determine the reward value corresponding to the number of bills according to the preset reward rule, and associate the reward value with the designated staff member; and / or,

[0097] The verification module 602 is used to respond to a bill verification instruction, determine the work item to be verified corresponding to the bill verification instruction, determine the storage unit associated with the work item to be verified in the preset storage space, read the text information of all the bills to be verified in the storage unit, and determine the ticket number of each bill to be verified based on the text information of each bill to be verified, and determine whether there is any missing bill of the work item based on the ticket number of each bill to be verified.

[0098] In a specific application scenario, the acquisition module 501 is used to acquire the bill to be identified, identify the bill to be identified using optical character recognition technology, determine multiple bill elements existing in the bill to be identified, and the bill field associated with each bill element.

[0099] It should be noted that for other corresponding descriptions of the functional units involved in the new energy station operation and maintenance management device provided in the embodiment of the present application, reference can be made to Figures 1 to 4 The corresponding description in will not be repeated here.

[0100] In an exemplary embodiment, see Figure 7, and also provides a device, which includes a communication bus, a processor, a memory and a communication interface, and may also include an input and output interface and a display device, wherein each functional unit can communicate with each other through the bus. The memory stores a computer program, and the processor is used to execute the program stored in the memory and execute the new energy station operation and maintenance management method in the above embodiment.

[0101] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the new energy station operation and maintenance management method.

[0102] Through the description of the above implementation methods, those skilled in the art can clearly understand that the present application can be implemented by hardware, or by means of software plus a necessary general hardware platform. Based on such an understanding, the technical solution of the present application can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.), including a number of instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each implementation scenario of the present application.

[0103] Those skilled in the art will appreciate that the accompanying drawings are merely schematic diagrams of a preferred implementation scenario, and the modules or processes in the accompanying drawings are not necessarily required for implementing the present application.

[0104] Those skilled in the art will appreciate that the modules in the device in the implementation scenario can be distributed in the device in the implementation scenario according to the implementation scenario description, or can be changed accordingly and located in one or more devices different from the implementation scenario. The modules in the above implementation scenario can be combined into one module, or can be further split into multiple sub-modules.

[0105] The above application serial numbers are for description only and do not represent the advantages or disadvantages of the implementation scenarios.

[0106] The above disclosure only discloses several specific implementation scenarios of the present application. However, the present application is not limited thereto, and any changes that can be conceived by technicians in this field should fall within the scope of protection of the present application.

Claims

1. A new energy station operation and maintenance management method, characterized in that: include: Acquire a bill to be identified, and determine text information of the bill to be identified, wherein the bill to be identified includes a plurality of bill elements, each of the bill elements is correspondingly associated with a bill field, and the text information includes the plurality of bill elements and the bill field associated with each of the bill elements; Determine a first field associated with a first designated bill element and a second field associated with a second designated bill element in the text information, store the bill to be identified according to the first field and the second field, the first field is used to indicate a bill attribute of the bill to be identified, the bill attribute is a work bill or an operation bill, and the second field is used to indicate a work item and work progress associated with the bill to be identified; When the ticket attribute of the ticket to be identified is a work ticket, determining whether a third designated ticket element exists in the text information, wherein a third field associated with the third designated ticket element is used to indicate at least one device area key identifier, wherein each device area key identifier is associated with a device area key; If the third designated ticket element exists, the key status corresponding to each of the device area keys is updated according to at least one device area key identifier indicated by the third field.

2. The method according to claim 1, characterized in that The updating of the key status corresponding to each of the device area keys includes: Determining a fourth field associated with a fourth designated bill element in the text information, wherein the fourth field is used to indicate a person in charge of work associated with the bill to be identified; When the work progress indicated by the second field is to start work, query the key status associated with each of the device area key identifiers, wherein the key status is used to determine whether the device area key corresponding to the device area key identifier exists in the key library; If the key status is in the warehouse status, a key in the warehouse prompt information is generated and sent to the management terminal associated with the work permit holder corresponding to the ticket to be identified for visual display, so that the work permit holder can generate a key removal prompt based on scanning the graphic identification code on the key in the equipment area with a scanner device; When the key removal prompt transmitted by the scanner device is detected, the key state corresponding to the device area key identifier is updated to the out-of-warehouse state, and an out-of-warehouse label is set for the device area key identifier, and the label content of the out-of-warehouse label is the fourth field.

3. The method according to claim 2, characterized in that After querying the key status associated with each of the device area key identifiers, the method further includes: If the key status is the outbound status, query the outbound tag corresponding to the key identifier in the equipment area; Generate key outbound reminder information according to the outbound tag, and send the key outbound reminder information to the management terminal associated with the work permit holder for visual display, so that the work permit holder can determine the current holder of the equipment area key based on the outbound reminder information.

4. The method according to claim 2, characterized in that: The updating of the key status corresponding to each of the device area keys further includes: When the work progress indicated by the second field is the end of the work, at least one equipment area key identification indicated by the third field is sent to the management terminal associated with the work permit holder for visual display, so that the work permit holder generates key storage prompt information based on scanning the graphic identification code on the equipment area key by a scanner device; When the key storage prompt information transmitted by the scanner device is detected, the outbound label associated with each device area key identifier is deleted, and the key status corresponding to the device area key identifier is updated to the in-stock status.

5. The method according to claim 1, characterized in that The storing the to-be-identified bill according to the first field and the second field comprises: Querying the preset storage space for a storage unit associated with the work item; If the storage unit exists, the first field is used to set an attribute tag for the to-be-identified bill, and a work progress tag is set for the to-be-identified bill according to the work progress indicated by the second field, and the to-be-identified bill with the attribute tag and the work progress tag is stored in the storage unit; If the storage unit does not exist, a space of a preset size is divided in the preset storage space and associated with the work item to obtain a storage unit associated with the work item, and the first field is used to set an attribute tag for the to-be-identified bill, and a work progress tag is set for the to-be-identified bill according to the work progress indicated by the second field, and the to-be-identified bill with the attribute tag and the work progress tag is stored in the storage unit.

6. The method according to claim 1, characterized in that The method further comprises: In response to the bill counting instruction, determining text information of at least one bill to be counted in a preset storage space according to a preset counting rule, counting the number of bills corresponding to a designated staff member according to the text information of each bill to be counted, and determining a reward value corresponding to the number of bills according to a preset reward rule, and associating the reward value with the designated staff member; and / or, In response to a bill verification instruction, determine the work item to be verified corresponding to the bill verification instruction, determine the storage unit associated with the work item to be verified in the preset storage space, read the text information of all the bills to be verified in the storage unit, and determine the ticket number of each bill to be verified based on the text information of each bill to be verified, and judge whether there is any missing bill of the work item based on the ticket number of each bill to be verified.

7. The method according to claim 1, characterized in that The step of obtaining the bill to be identified and determining the text information of the bill to be identified includes: The bill to be identified is obtained, and the bill to be identified is identified by using optical character recognition technology to determine a plurality of bill elements existing in the bill to be identified, and a bill field associated with each of the bill elements.

8. A new energy station operation and maintenance management device, characterized in that: include: an acquisition module, configured to acquire a bill to be identified and determine text information of the bill to be identified, wherein the bill to be identified includes a plurality of bill elements, each of which is associated with a bill field, and the text information includes the plurality of bill elements and the bill field associated with each of the bill elements; a storage module, configured to determine a first field associated with a first designated bill element and a second field associated with a second designated bill element in the text information, and store the bill to be identified according to the first field and the second field, wherein the first field is used to indicate a bill attribute of the bill to be identified, the bill attribute being a work bill or an operation bill, and the second field is used to indicate a work item and work progress associated with the bill to be identified; A judgment module, used for judging whether there is a third designated bill element in the text information when the bill attribute of the bill to be identified is a work bill, wherein a third field associated with the third designated bill element is used to indicate at least one device area key identifier, wherein each device area key identifier is associated with a device area key; An updating module is configured to update a key status corresponding to each of the device area keys according to at least one of the device area key identifiers indicated by the third field if the third designated ticket element exists.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.