Position determination method, device and equipment of energy power station and medium
By forming a collection of distribution station areas centered on incremental distribution station areas, the target location of the energy power station is determined, and the problem of lack of overall consideration in the establishment method of power stations in the existing technology is solved, and efficient utilization of resources and matching location with needs is achieved.
Patent Information
- Application Number
- CN202411968258.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-30
- Publication Date
- 2025-04-04
AI Technical Summary
The existing power station establishment method lacks overall considerations, cannot achieve efficient utilization of resources, and the planning location is quite different from the actual demand.
By obtaining the incremental distribution station area and its target power generation, a collection of distribution station areas centered on the incremental distribution station area is formed, and the target location of the energy power station is determined based on the set and the target power generation amount.
It improves the comprehensiveness of the location determination of energy power stations, realizes efficient utilization of resources, and ensures the matching of planned locations with actual needs.
Smart Images

Figure CN119765472A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power systems, and in particular to a method, device, equipment and medium for determining the location of an energy power station. Background Art
[0002] With the rapid development of the economy, traditional distribution networks are gradually unable to meet electricity demand. In particular, for areas with planned development, incremental distribution is needed to optimize power supply.
[0003] The existing method of establishing power stations is often to simply build corresponding energy power stations in the area of the target incremental substation to perform incremental power distribution operations. This operation method lacks overall considerations and has certain limitations. It cannot achieve efficient use of resources and is prone to large differences between the planned location and actual needs. Summary of the invention
[0004] The present invention provides a method, device, equipment and medium for determining the location of an energy power station. A distribution station area set is determined by incremental distribution station areas, thereby determining the location of the energy power station within the consideration range of the entire distribution station area set, thereby improving the comprehensiveness of consideration to achieve efficient utilization of energy power station resources.
[0005] According to one aspect of the present invention, a method for determining a location of an energy power station is provided, comprising:
[0006] Obtaining an incremental distribution substation and a target power generation of the incremental distribution substation;
[0007] A distribution station area set is formed according to the incremental distribution station area and the distribution station area within a set distance range; wherein the set distance range is a distance range centered on the location of the incremental distribution station area;
[0008] A target location of an energy power station is determined based on the set of distribution station areas and the target power generation.
[0009] According to another aspect of the present invention, there is provided a device for determining a position of an energy power station, comprising:
[0010] An acquisition module, used for acquiring an incremental distribution substation and a target power generation of the incremental distribution substation;
[0011] A distribution station area set determination module, used to form a distribution station area set according to the incremental distribution station area and the distribution station area within a set distance range; wherein the set distance range is a distance range centered on the location of the incremental distribution station area;
[0012] The target location determination module is used to determine the target location of the energy power station based on the distribution station area set and the target power generation.
[0013] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:
[0014] at least one processor; and
[0015] a memory communicatively connected to the at least one processor; wherein,
[0016] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the method for determining the location of an energy power station described in any embodiment of the present invention.
[0017] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the method for determining the location of an energy power station described in any embodiment of the present invention when executed.
[0018] The technical solution of the embodiment of the present invention is to obtain the incremental distribution station area and the target power generation of the incremental distribution station area; form a distribution station area set according to the incremental distribution station area and the distribution station areas within a set distance range; wherein the set distance range is a distance range centered on the location of the incremental distribution station area; and determine the target location of the energy power station based on the distribution station area set and the target power generation. This technical solution forms a distribution station area set within a distance range centered on the incremental distribution station area, thereby determining the location of the energy power station within the consideration range of the entire distribution station area set, thereby improving the comprehensiveness of consideration to achieve efficient utilization of energy power station resources.
[0019] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0021] Figure 1 is a flow chart of a method for determining the location of an energy power station provided according to Embodiment 1 of the present invention;
[0022] Figure 2is a flow chart of a method for determining the location of an energy power station provided according to Embodiment 2 of the present invention;
[0023] Figure 3 is a schematic diagram of the structure of a device for determining the position of an energy power station provided according to Embodiment 3 of the present invention;
[0024] Figure 4 It is a schematic diagram of the structure of an electronic device provided according to Embodiment 4 of the present invention. DETAILED DESCRIPTION
[0025] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0026] It should be noted that the terms "initial", "target", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0027] Embodiment 1
[0028] Figure 1 This is a flow chart of a method for determining the location of an energy power station provided according to the first embodiment of the present invention. This embodiment is applicable to the case of performing incremental control of power distribution within the incremental area. The method can be executed by a location determination device for an energy power station. The location determination device for an energy power station can be implemented in the form of hardware and / or software. The location determination device for an energy power station can be configured in an electronic device with data processing capabilities. Figure 1 As shown, the method includes:
[0029] The technical solution of this embodiment can be executed by the incremental distribution processing system. After locating the incremental substations with planned development plans, they are combined with their surrounding substations to form a distribution substation set. The selection of points for establishing green energy power stations is carried out within the distribution substation set. The consideration scope is wider and there is more room for planning options. At the same time, the power supply planning can be carried out in coordination with the distribution network for power dispatching of different substations. This can achieve incremental distribution while also having an energy-saving effect.
[0030] S110, obtaining the incremental distribution substation area and the target power generation of the incremental distribution substation area.
[0031] Among them, the incremental distribution station area can be considered as a newly added distribution network area, or a new distribution business added on the basis of an existing distribution network. In this embodiment, the operation of new distribution services and related businesses can be carried out outside the existing power distribution system in the planning area. The target power generation can be considered as the total power generation required to finally determine the incremental distribution network. In this embodiment, the target power generation can be faulted according to the attribute information of the incremental distribution station area, so as to obtain the corresponding target power generation.
[0032] Specifically, in this embodiment, the substation area with planned development area can be recorded as the incremental distribution substation area; then the power consumption required for the incremental distribution substation area is predicted according to the planning data, and the prediction result is used as the target power generation. The planning data can refer to the number, size, and population of the cells within the scope of the incremental substation area, so as to obtain the incremental distribution substation area and the total power generation required by the incremental distribution substation area.
[0033] S120. Form a distribution station area set according to the incremental distribution station areas and the distribution station areas within the set distance range.
[0034] Among them, the set distance range is the distance range centered on the location of the incremental distribution station. The set distance range in this embodiment can be set according to actual needs. For example, the set distance range can be within the power supply radius distance range centered on the location of the incremental distribution station, and can also be set according to actual needs. In this embodiment, the distribution station combination set may include multiple distribution stations, and the specific number can be determined by the location of the incremental distribution station. In this embodiment, multiple distribution stations within the distance range centered on the location of the incremental distribution station can be used to form a distribution station set together with the incremental distribution station. In this embodiment, by obtaining the information of several adjacent distribution stations to the incremental distribution station, a distribution station set is formed together with the incremental distribution station. While expanding the reference range, it has a wider range of green energy selection points, and because the distribution station is determined based on the power supply distance range, it also provides convenient support for the power dispatching of the distribution network.
[0035] S130. Determine a target location of the energy power station based on the distribution station area set and the target power generation.
[0036] Among them, the energy power station is a power station that converts various forms of energy into electrical energy. The energy power station in this embodiment may include but is not limited to a hydroelectric power station, a wind power station, and a photovoltaic power station. The target location can be understood as the location where the energy power station is finally established. In this embodiment, multiple points to be established that are suitable for energy power stations can be selected within the distribution station area set, and then based on the power generation capacity of each point to be established obtained through prediction, the point to be established where the power generation capacity reaches the target power generation capacity can be determined as the target location.
[0037] In this embodiment, optionally, the target location of the energy power station is determined based on the distribution station area set and the target power generation, including: determining the energy type and multiple initial locations of the energy power station according to the geographical attributes of the area where the distribution station area set is located; determining the corresponding multiple predicted power generation based on the energy type and the multiple initial locations; and determining the target location of the energy power station based on the multiple predicted power generation and the target power generation.
[0038] Among them, the geographical attributes may include geographical location information and resource condition information. In this embodiment, the geographical location can be considered as the geographical location of the overall area in the distribution station area set; the resource conditions can be understood as the different energy conditions possessed by the overall area in the distribution station area set. In this embodiment, the resource conditions can be considered as the specific conditions of the hydropower resources, wind power resources or photovoltaic resources possessed by the area. Energy types may include hydropower energy types, wind energy types, photovoltaic energy types, etc. In this embodiment, the type of suitable energy power station can be determined based on the energy type. Multiple initial positions can be considered as suitable establishment points where it is preliminarily believed that energy power stations corresponding to energy types can be established. Multiple predicted power generation can be power generation obtained by estimating the amount of power that can be generated based on the multiple initial positions preliminarily determined and the corresponding energy types.
[0039] In this embodiment, suitable green energy power generation types can be selected based on the geographical location and resource conditions of the areas where each distribution station area in the distribution station area set is located, so as to determine the energy type of the energy power station and multiple initial suitable establishment points. After the distribution station area set determines multiple suitable establishment points for green energy power stations of corresponding energy types, the power generation after the green energy power station is built at the establishment point is predicted to obtain each standby establishment point and the corresponding power generation, that is, multiple predicted power generation, which can also be displayed in a table, and the multiple predicted power generation is screened to provide enough target power generation to the corresponding point to be established, which is determined as the final establishment point, that is, the target location.
[0040] Through such a setting in this embodiment, multiple locations suitable for establishing energy power stations can be selected within the overall area of the distribution station area collection, and then the predicted power generation can be screened based on these multiple locations. On the basis of expanding the selection of energy power station establishment points, a wider range of energy types can be provided, thereby improving the selectivity of different energy types.
[0041] In this embodiment, optionally, corresponding multiple predicted power generation amounts are determined based on energy type and multiple initial positions, including: respectively determining corresponding multiple energy generation amounts according to the energy type and multiple initial positions; and determining corresponding multiple predicted power generation amounts according to multiple energy generation amounts and set power generation conversion efficiency.
[0042] Among them, the energy generation amount can be the total amount of energy that can be generated by multiple locations and their corresponding energy types. The energy generation amount in this embodiment can divide each energy type with a same time standard and other information, and respectively determine multiple energy generation amounts corresponding to the same standard at multiple initial positions. The set power generation conversion efficiency can be used to convert the energy generation amount into power generation. The set power generation conversion efficiency in this embodiment can be a pre-set conversion efficiency, an existing conventional power generation conversion efficiency, or a conversion efficiency set according to actual needs, and this embodiment does not limit this.
[0043] In this embodiment, the amount of energy generated can be determined based on factors such as the geographical location, environmental conditions, energy type, and energy generation equipment of multiple initial suitable establishment points, and then the corresponding power generation can be converted based on these multiple energy generation amounts and the set power generation conversion efficiency to obtain multiple predicted power generation amounts.
[0044] Through such an arrangement in this embodiment, multiple corresponding predicted power generation amounts can be obtained according to the pre-set power generation conversion efficiency and multiple energy total amounts, thereby facilitating screening and determining the power generation amount that can meet the demand based on these predicted power generation amounts.
[0045] In this embodiment, optionally, the target position of the energy power station is determined based on multiple predicted power generation and target power generation, including: screening multiple predicted power generation based on the target power generation, and determining the initial position that reaches the target power generation as the target position of the energy power station.
[0046] In this embodiment, the target power generation can be used as a screening reference standard to screen multiple predicted power generation to obtain one or more initial positions that reach the target power generation as the target position of the energy power station.
[0047] In this embodiment, if the predicted power generation of one initial position can reach the target power generation, then only one energy power station can be established. If the predicted power generation of one initial position cannot reach the target power generation, the sum of the predicted power generation of multiple initial positions can reach the target power generation, and then multiple energy power stations need to be established. The number of energy power stations eventually established needs to not exceed the set number threshold. If it exceeds the set number threshold, the establishment of the energy power station is terminated.
[0048] Specifically, in this embodiment, multiple predicted power generation can be screened, and any one of the predicted power generation can reach the standby establishment point of the target power generation supply can be screened first; if it exists, the screened standby establishment point is used as the final establishment point, that is, the target position; otherwise, if it does not exist, the standby establishment point whose sum of power generation can reach the target power generation supply of any two standby establishment points is screened, if it exists, the screened standby establishment point is used as the final establishment point, that is, the target position; otherwise, if it does not exist, the standby establishment point whose sum of power generation can reach the target power generation supply of any three standby establishment points is screened, if it exists, the screened standby establishment point is used as the final establishment point, that is, the target position; otherwise, if it does not exist, the standby establishment point whose sum of power generation can reach the target power generation supply of any N standby establishment points is screened, if it exists, the screened standby establishment point is used as the final establishment point, that is, the target position; otherwise, if it does not exist, the establishment plan of the green energy power station is terminated. Among them, N has a corresponding set quantity threshold, and N can be 5 for example, and can also be set according to actual needs.
[0049] Through such a setting in this embodiment, the initial position that meets the reference standard can be screened based on the target power generation as the reference standard as the location for finally establishing the energy power station. While considering a wider range, green energy is introduced as an increment, so that the control of incremental power distribution has the advantage of efficient resource utilization.
[0050] The technical solution of the embodiment of the present invention obtains the incremental distribution station area and the target power generation of the incremental distribution station area; forms a distribution station area set according to the incremental distribution station area and the distribution station area within a set distance range; wherein the set distance range is a distance range centered on the location of the incremental distribution station area; and determines the target location of the energy power station based on the distribution station area set and the target power generation. This technical solution determines the location of the energy power station within the consideration range of the entire distribution station area set by forming a distribution station area set within a distance range centered on the incremental distribution station area, thereby improving the comprehensiveness of consideration to achieve efficient utilization of energy power station resources.
[0051] Embodiment 2
[0052] Figure 2This is a flow chart of a method for determining the location of an energy power station according to the second embodiment of the present invention. This embodiment is optimized based on the above embodiment. The specific optimization is: after determining the target location of the energy power station, it also includes: determining the distribution increment control method of the distribution station area set according to the target location of the energy power station. Figure 2 As shown, the method includes:
[0053] S210, obtaining the incremental distribution substation area and the target power generation of the incremental distribution substation area.
[0054] S220. Form a distribution station area set according to the incremental distribution station area and the distribution station areas within the set distance range.
[0055] The set distance range is a distance range centered on the location of the incremental distribution station area.
[0056] S230: Determine the target location of the energy power station based on the distribution station area set and the target power generation.
[0057] S240. Determine a distribution increment control method for a set of distribution substations according to a target location of the energy power station.
[0058] The incremental distribution control method can be understood as an overall dispatching method for each normal power supply and incremental distribution through the distribution network. In this embodiment, different incremental distribution control methods can be determined according to whether the energy power station is built in the incremental distribution station area.
[0059] In this embodiment, energy storage equipment can also be established at the target location where the energy power station is finally established to pre-store the electricity generated by the green energy power station, which can provide more stable and reliable operation guarantees for the incremental power distribution in the incremental distribution station area.
[0060] In this embodiment, optionally, a distribution incremental control method for a set of distribution substations is determined according to the target position of the energy power station, including: if the target position is not in the incremental distribution substation, the distribution substation where the target position is located is used as the target distribution substation, and the predicted power generation corresponding to the target position is determined as the target power generation; the scheduled power supply of the target distribution substation is determined according to the target power generation and the historical power supply of the target distribution substation; the target distribution substation is supplied with power based on the scheduled power supply, and the remaining power in the distribution substation set is centrally transmitted to the incremental distribution substation for incremental distribution.
[0061] Among them, the target power generation can be considered as the dispatched power of the target distribution substation, and can be a supplementary power supply to the distribution substation. Exemplarily, the distribution substation set includes five distribution substations, namely distribution substation A, distribution substation B, distribution substation C, distribution substation D and incremental substation E, among which the target distribution substation is A. If the current target distribution substation A is used to transmit power to the incremental distribution substation E, the target distribution substation itself may not meet the normal usage standard. The power consumption of the distribution substation or the incremental distribution substation will be supplemented by dispatching power to reach a normal standard. The historical power supply can be the total amount of electric energy actually provided to users by the target distribution substation during the historical time period. The dispatched power supply can be the power difference obtained by subtracting the historical power supply of the target distribution substation from the predicted target power generation.
[0062] In this embodiment, when the green energy power station established at the final establishment point is used to perform incremental distribution control on the distribution station area set, when the target position is not in the incremental distribution station area, the station area where the target position is located is marked as the target distribution station area, and the predicted power generation corresponding to the target position is used as the target power generation of the target distribution station area, which can also be called the dispatched power. In this embodiment, after determining the dispatched power, the power supply value of the subsequent target distribution station area can be adjusted to the difference between the historical power supply and the dispatched power, as the dispatched power supply of the distribution station area. Furthermore, in this embodiment, energy storage equipment can also be established at the target location of the energy power station to pre-store the power generated by the green energy power station; then the pre-stored power is combined with the dispatched power supply of the distribution station area to supply power to the target distribution station area; and the remaining power in the distribution station area set is centrally transmitted to the incremental distribution station area for incremental distribution.
[0063] It should be noted that, in this embodiment, the dispatched power quantity is the power supplied by the energy power station to the distribution substation; the dispatched power supply quantity is the power supply dispatched between distribution substations.
[0064] Through such a setting in this embodiment, the existing power grid can be used for power dispatching, and there is no need to convert the electricity according to the location of the energy power station, which reduces the power supply length of the energy power station and facilitates the control of incremental power distribution.
[0065] In this embodiment, optionally, the dispatched power supply of the target distribution substation is determined based on the target power generation and the historical power supply of the target distribution substation, including: determining the power difference based on the target power generation and the historical power supply of the target distribution substation; and determining the power difference as the dispatched power supply of the target distribution substation.
[0066] The power difference may be the absolute value of the difference between the target power generation and the historical power supply. In this embodiment, the target power generation corresponding to the target location and the historical power supply of the target distribution station area may be subtracted to obtain the corresponding power difference, and the power difference is determined as the dispatched power supply of the target distribution station area.
[0067] In this embodiment, through such a setting, the power distribution control is performed by determining the dispatched power supply, comprehensively considering multiple factors and taking corresponding incremental distribution control to ensure the safe, stable and efficient operation of the power system.
[0068] In this embodiment, when the green energy power station established at the final establishment point is used to perform incremental distribution control on the distribution station area set, when the final establishment point is in the incremental distribution station area, an energy storage device can be first established at the final establishment point to pre-store the amount of electricity generated by the green energy power station, and the pre-stored amount of electricity combined with the historical normal power supply of the incremental distribution station area can be used to perform incremental distribution to the distribution station area. In this embodiment, the energy storage device can also be used to store the output power of the distribution network during the period of low electricity consumption. In this embodiment, in order to reduce the impact of low electricity consumption in the distribution station area, the output power of the distribution network during the period of low electricity consumption can be stored by the energy storage device. This can also compensate for the unstable power generation of the green energy power station, reduce the loss of the normal distribution network, and provide a more stable and reliable operation guarantee for the incremental distribution of the distribution station area.
[0069] The technical solution of the embodiment of the present invention is to obtain the incremental distribution station area and the target power generation of the incremental distribution station area; form a distribution station area set according to the incremental distribution station area and the distribution station area within a set distance range; wherein the set distance range is a distance range centered on the location of the incremental distribution station area; determine the target location of the energy power station based on the distribution station area set and the target power generation; and determine the distribution increment control method of the distribution station area set according to the target location of the energy power station. This technical solution forms a distribution station area set within a distance range centered on the incremental distribution station area, thereby determining the location of the energy power station within the consideration range of the entire distribution station area set, thereby improving the comprehensiveness of consideration to achieve efficient utilization of energy power station resources.
[0070] In addition, the technical solution in this embodiment can be executed by an incremental distribution project planning system, which specifically includes a target prediction module, a distribution station area set analysis module, an incremental site selection analysis module and a distribution incremental control module. The target prediction module is connected to the distribution station area set analysis module, the distribution station area set analysis module is connected to the incremental site selection analysis module, and the incremental site selection analysis module is connected to the distribution incremental control module. The target prediction module is used to record the substations with planned development areas as incremental distribution substations, and predict the power consumption of the incremental distribution substations based on the planning data as the target power generation; the distribution substation set analysis module is used to obtain the information of several adjacent substations of the incremental distribution substation, which together with the incremental distribution substation constitute a distribution substation set; the incremental site selection analysis module is used to select suitable green energy power generation types according to the geographical location and resource conditions of the area where the distribution substation set is located, and after determining several suitable establishment points of corresponding types of green energy power stations in the distribution substation set, the power generation after the green energy power station is built at the establishment point is calculated, the table of standby establishment points and corresponding power generation is obtained, and the final establishment point that is sufficient to supply the target power generation is determined; the distribution increment control module is used to use the green energy power station established at the final establishment point to perform distribution increment control on the distribution substation set.
[0071] In this embodiment, after locating the incremental substations with planned development plans, they are combined with their surrounding distribution substations to form a distribution substation set, and the selection of points for establishing green energy power stations is carried out within the distribution substation set. The consideration scope is wider and there is more room for planning options. At the same time, the power supply planning can be carried out in conjunction with the distribution network for power dispatching in different substations. This not only achieves incremental power distribution, but also has the effect of energy saving. After the green energy power station is established, the stability of the overall power supply of the distribution substation set is guaranteed by pre-storing electricity in energy storage equipment. It can also effectively reduce the waste of electricity during low electricity consumption and achieve efficient utilization of electric energy resources.
[0072] Embodiment 3
[0073] Figure 3 Schematic diagram of a device for determining the location of an energy power station according to Embodiment 3 of the present invention. Figure 3 As shown, the device comprises:
[0074] An acquisition module 310 is used to acquire the incremental distribution substation area and the target power generation of the incremental distribution substation area;
[0075] The distribution station area set determination module 320 is used to form a distribution station area set according to the incremental distribution station area and the distribution station area within a set distance range; wherein the set distance range is a distance range centered on the location of the incremental distribution station area;
[0076] The target location determination module 330 is used to determine the target location of the energy power station based on the distribution station area set and the target power generation.
[0077] Optionally, the target location determination module 330 includes:
[0078] An initial position determination unit, used to determine the energy type and multiple initial positions of the energy power station according to the geographical attributes of the area where the distribution station area set is located;
[0079] A predicted power generation determination unit, configured to determine a plurality of corresponding predicted power generation amounts based on the energy type and the plurality of initial positions;
[0080] The target position determination unit is used to determine the target position of the energy power station according to multiple predicted power generation and target power generation.
[0081] Optionally, the predicted power generation determination unit is specifically used to:
[0082] Determine a plurality of corresponding energy generation amounts according to energy types and a plurality of initial positions;
[0083] A plurality of corresponding predicted power generation amounts are determined according to a plurality of energy generation amounts and a set power generation conversion efficiency.
[0084] Optionally, the target position determination unit is specifically used to:
[0085] Based on the target power generation, multiple predicted power generation amounts are screened, and an initial position where the target power generation amount is reached is determined as a target position of the energy power station.
[0086] Optionally, the device further comprises:
[0087] The incremental control module is used to determine the distribution incremental control method of the distribution station set according to the target position of the energy power station after determining the target position of the energy power station.
[0088] Optional, incremental control module, including:
[0089] A target power generation determination unit, for determining the power generation area where the target position is located as the target power generation area if the target position is not located in the incremental power generation area, and determining the predicted power generation corresponding to the target position as the target power generation;
[0090] A dispatching power supply determination unit, used to determine the dispatching power supply of the target distribution substation area according to the target power generation and the historical power supply of the target distribution substation area;
[0091] The incremental distribution unit is used to supply power to the target distribution area based on the scheduled power supply, and to centrally transmit the remaining power in the distribution area set to the incremental distribution area for incremental power distribution.
[0092] Optionally, the dispatching power supply determination unit is specifically used to:
[0093] Determine the power difference based on the target power generation and the historical power supply of the target distribution station area;
[0094] The power difference is determined as the dispatching power supply of the target distribution station area.
[0095] An energy power station location determination device provided by an embodiment of the present invention can execute an energy power station location determination method provided by any embodiment of the present invention, and has corresponding functional modules and beneficial effects of the execution method.
[0096] Embodiment 4
[0097] Figure 4 1 is a schematic diagram of the structure of an electronic device provided according to Embodiment 4 of the present invention. The electronic device 10 is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device may also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0098] like Figure 4 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0099] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0100] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as a method for determining the location of an energy power station.
[0101] In some embodiments, the location determination method of the energy power station can be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program can be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the location determination method of the energy power station described above can be performed. Alternatively, in other embodiments, the processor 11 can be configured to execute the location determination method of the energy power station in any other appropriate manner (for example, by means of firmware).
[0102] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0103] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0104] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0105] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0106] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0107] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0108] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0109] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for determining the location of an energy power station, characterized in that: include: Obtaining an incremental distribution substation and a target power generation of the incremental distribution substation; A distribution station area set is formed according to the incremental distribution station area and the distribution station area within a set distance range; wherein the set distance range is a distance range centered on the location of the incremental distribution station area; A target location of an energy power station is determined based on the set of distribution station areas and the target power generation.
2. The method according to claim 1, characterized in that Determining a target location of an energy power station based on the set of distribution station areas and the target power generation includes: Determine the energy type and multiple initial locations of the energy power station according to the geographical attributes of the area where the set of distribution station areas are located; Determining a plurality of corresponding predicted power generation amounts based on the energy type and a plurality of initial locations; A target location of the energy power station is determined based on the multiple predicted power generation amounts and the target power generation amount.
3. The method according to claim 2, characterized in that Determining a plurality of corresponding predicted power generation amounts based on the energy type and the plurality of initial positions includes: Determining a plurality of corresponding energy generation amounts according to the energy type and the plurality of initial positions; A corresponding plurality of predicted power generation amounts are determined according to the plurality of energy generation amounts and the set power generation conversion efficiency.
4. The method according to claim 2, characterized in that: Determining a target location of an energy power station according to the plurality of predicted power generation amounts and the target power generation amount comprises: The plurality of predicted power generation amounts are screened based on the target power generation amount, and an initial position at which the target power generation amount is reached is determined as a target position of the energy power station.
5. The method according to claim 1, characterized in that After determining the target location of the energy generating station, it also includes: The power distribution increment control method of the power distribution station set is determined according to the target location of the energy power station.
6. The method according to claim 5, characterized in that Determining the power distribution increment control method of the power distribution station set according to the target location of the energy power station includes: If the target location is not in the incremental power distribution substation area, the power distribution substation area where the target location is located is used as the target power distribution substation area, and the predicted power generation corresponding to the target location is determined as the target power generation; Determine the dispatched power supply of the target distribution substation area according to the target power generation and the historical power supply of the target distribution substation area; The target distribution substation is supplied with power based on the scheduled power supply, and the remaining power in the distribution substation set is centrally transmitted to the incremental distribution substation to perform incremental power distribution.
7. The method according to claim 6, characterized in that Determining the dispatched power supply of the target distribution substation area according to the target power generation and the historical power supply of the target distribution substation area includes: Determine the power difference according to the target power generation and the historical power supply of the target distribution station area; The power difference is determined as the dispatched power supply of the target distribution station area.
8. A device for determining the position of an energy power station, characterized in that: include: An acquisition module, used for acquiring an incremental distribution substation and a target power generation of the incremental distribution substation; A distribution station area set determination module, used to form a distribution station area set according to the incremental distribution station area and the distribution station area within a set distance range; wherein the set distance range is a distance range centered on the location of the incremental distribution station area; The target location determination module is used to determine the target location of the energy power station based on the distribution station area set and the target power generation.
9. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the method for determining the position of the energy power station according to any one of claims 1-7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the method for determining the location of an energy power station according to any one of claims 1 to 7 when executed.