New integrated information monitoring method and system for power system

By conducting comprehensive information monitoring of the power links of the new power system, ranking, analyzing and marking hidden dangers, the problem that traditional monitoring systems are difficult to meet the needs of new power systems is solved, and the effects of resource conservation, rapid locking of hidden dangers and in-depth analysis are achieved.

CN119765623APending Publication Date: 2025-04-04YANCHENG POWER SUPPLY CO STATE GRID JIANGSU ELECTRIC POWER CO +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411610313.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-12
Publication Date
2025-04-04

AI Technical Summary

Technical Problem

The new power system faces problems such as high power volatility, increased load prediction difficulty, and increased grid scheduling complexity. Traditional monitoring systems are difficult to meet their monitoring needs and cannot conduct in-depth analysis of each power link.

Method used

Provide a comprehensive information monitoring method and system for a new power system. By sorting each power link according to the monitoring preset value, conducting comprehensive analysis, generating a comprehensive analysis log, determining whether it is marked as a hidden danger power link, and adjusting the inspection order according to the locked priority value.

Benefits of technology

It effectively reduces resource investment in monitoring multiple power links, controls operating costs, quickly locks in potential hidden dangers, improves monitoring efficiency, and ensures that each power link is deeply analyzed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119765623A_ABST
    Figure CN119765623A_ABST
Patent Text Reader

Abstract

The present invention discloses a comprehensive information monitoring method and system for a new type of electric power system, and relates to the technical field of electric power monitoring. The method discloses the following steps: Step 1: Sort each electric power link in order from large to small according to the numerical value of the monitoring preset value, and perform comprehensive analysis on each electric power link in order according to the ranking of the electric power links every t time period; Step 2: After comprehensive analysis of each electric power link, generate a comprehensive analysis log of the electric power link; Step 3: Obtain a comprehensive information value of the comprehensive analysis log, and determine whether to mark the electric power link as a potential danger electric power link based on a comparison result between the comprehensive information value and its threshold value. The method of the present invention can effectively reduce the resource investment required for simultaneously monitoring multiple electric power links through steps 1 to 3, and help control the operating cost of the new type of electric power system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric power monitoring technology, and more specifically, to a comprehensive information monitoring method and system for a novel electric power system. Background Art

[0002] With the increasing demand for electricity, new power systems based on renewable energy are gradually becoming an important development direction for the future power industry. However, with the large-scale access of renewable energy and the development of distributed energy, new power systems are facing unprecedented challenges, including large power supply fluctuations, increased difficulty in load forecasting, and increased complexity in grid dispatching. Traditional monitoring systems can no longer meet the monitoring needs of new power systems. At the same time, traditional monitoring systems need to spend a lot of resources on monitoring the comprehensive information of new power systems, and cannot conduct in-depth analysis of each power link in the new power system. Summary of the invention

[0003] In view of the deficiencies in the prior art, the present invention aims to provide a new comprehensive information monitoring method and system for a power system.

[0004] To achieve the above object, the present invention provides the following technical solutions:

[0005] The novel integrated information monitoring method of the power system comprises the following steps:

[0006] Step 1: Sort each power link in descending order according to the value of the monitoring preset value, and conduct a comprehensive analysis of each power link in turn according to the order of the power link every t time;

[0007] Step 2: After comprehensive analysis of each power link, generate a comprehensive analysis log of the power link;

[0008] Step 3: Obtain the comprehensive information value of the comprehensive analysis log, and determine whether to mark the power link as a potential danger power link based on the comparison result between the comprehensive information value and its threshold value;

[0009] Step 4: When a hidden danger occurs in an electric power link, obtain the locking priority value of the electric power link to be checked, sort all the electric power links to be checked in order from small to large according to the locking priority value, and conduct a comprehensive analysis of the electric power links to be checked in the sorting order.

[0010] Furthermore, the integrated information monitoring system of the novel power system includes an integrated information monitoring module, an electric power link marking module, and a monitoring priority locking module;

[0011] The comprehensive information monitoring module: obtains the monitoring preset value of each power link in the new power system, sorts each power link in descending order according to the value of the monitoring preset value, and performs a comprehensive analysis on each power link in order according to the order of the power link every t time;

[0012] The power link marking module: after comprehensive analysis of each power link, generates a comprehensive analysis log of the power link, obtains a comprehensive information value of the comprehensive analysis log, and determines whether to mark the power link as a potential danger power link based on a comparison result between the comprehensive information value and its threshold value;

[0013] The monitoring priority lock obtains the locking priority value of the power link to be checked when a hidden danger occurs in the power link, sorts all the power links to be checked in order from small to large according to the locking priority value, and conducts a comprehensive analysis of the power links to be checked in the sorting order.

[0014] Furthermore, the monitoring preset value of the power link is obtained in the following way: obtain all comprehensive analysis logs of the new power system before the current time of the system, obtain the power link name of the comprehensive analysis log, mark the comprehensive analysis log with the same power link name as the same-link comprehensive analysis log, obtain the comprehensive information value of the same-link comprehensive analysis log, sum and average the comprehensive information values ​​of all the same-link comprehensive analysis logs, and obtain the comprehensive information mean FCY, obtain the log generation time of the same-link comprehensive analysis log, sort all the same-link comprehensive analysis logs in the order of log generation time, sum and average the two adjacent comprehensive information values ​​after sorting, and obtain the comprehensive neighbor mean, set the comprehensive neighbor mean threshold, when the comprehensive neighbor mean is greater than or equal to the comprehensive neighbor mean threshold, increase the number of comprehensive neighbor shadows by one, when the comprehensive neighbor mean is less than the comprehensive neighbor mean threshold, do not process it, sum the number of comprehensive neighbor shadows, and obtain the total number of comprehensive neighbor shadows HMg, using the formula The monitoring preset value Juc of the power link is obtained, where P1 is the comprehensive information mean coefficient and P2 is the comprehensive neighboring shadow total number coefficient.

[0015] Furthermore, the comprehensive analysis log includes the power link name, comprehensive information value, and log generation time.

[0016] Furthermore, the comprehensive information value of the comprehensive analysis log is obtained in the following manner: obtain the power link name of the comprehensive analysis log, obtain various power information of the power link within a time length of t, obtain the power information impact model of various power information, input each type of power information into the corresponding power information impact model, obtain the power information impact value of various power information, obtain the power information impact limit of various power information, compare the power information impact value of the same power information with the power information impact limit, when the power information impact value is greater than or equal to the power information impact limit, mark the power information as operation hidden danger information, when the power information impact value is less than the power information impact limit, mark the power information as normal operation information, mark the total number of operation hidden danger information of the power link as EY, mark the total number of normal operation information of the power link as XK, calculate the difference between the power information impact value of all operation hidden danger information and the power information impact limit, obtain the hidden danger impact prominent value SRz, set the hidden danger impact prominent value coefficient to AGg, and use the formula The comprehensive information value Zxz of the power link is obtained, where s1 is the coefficient of the number of operation hidden danger information, s2 is the coefficient of the number of normal operation information, z=1, 2,..., Z, and Z is the total number of operation hidden danger information.

[0017] Furthermore, based on the comparison result between the comprehensive information value and its threshold, it is determined whether to mark the power link as a power link with hidden dangers, specifically: the comprehensive information value of the comprehensive analysis log is obtained, and the comprehensive information threshold of the power link is simultaneously obtained; when the comprehensive information value is greater than or equal to the comprehensive information threshold, the power link is marked as a power link with hidden dangers; when the comprehensive information value is less than the comprehensive information threshold, the power link is not marked, and a comprehensive analysis is simultaneously performed on the next power link according to the order of the power links.

[0018] Furthermore, when a hidden danger power link occurs, the remaining power links ranked after the hidden danger power link are marked as power links for investigation, and the link comprehensive monitoring value of the hidden danger power link and the link comprehensive monitoring value of the power link for investigation are obtained, and then the locking priority value of the power link for investigation is obtained.

[0019] Furthermore, the locking priority value of the power link under investigation is obtained by the following method: the difference between the comprehensive monitoring value of the hidden danger power link and the comprehensive monitoring value of the power link under investigation is calculated, and then the locking priority value of the power link under investigation is obtained.

[0020] Furthermore, the integrated monitoring value of the link is obtained in the following manner: obtaining m consecutive integrated analysis logs of the same power link before the current time of the system, obtaining the integrated information value of the integrated analysis log, setting the integrated information high value and the integrated information low value, when the integrated information value of the integrated analysis log is greater than or equal to the integrated information high value, marking the type of the integrated analysis log as a high hidden danger type, when the integrated information value of the integrated analysis log is less than or equal to the integrated information low value, marking the type of the integrated analysis log as a low hidden danger type, when the integrated information value of the integrated analysis log is between the integrated information high value and the integrated information low value, marking the type of the integrated analysis log as a medium hidden danger type, and marking all the integrated analysis logs as high hidden danger types. The logs are sorted in the order of log generation time, and the types of the two adjacent comprehensive analysis logs after sorting are compared. When the types of the two adjacent comprehensive analysis logs are the same, no processing is performed. When the types of the two adjacent comprehensive analysis logs are different, the number of hidden danger changes is increased by one, and the number of hidden danger changes is summed to obtain the total number of hidden danger changes ddg. All comprehensive analysis logs of high hidden danger types are sorted in the order of log generation time, and the log generation time of the two adjacent comprehensive analysis logs after sorting is calculated to obtain the high hidden danger log interval. All high hidden danger log intervals are summed and averaged to obtain the average high hidden danger log interval RSW. The formula is used The comprehensive monitoring value AED of the power link is obtained, where k1 is the total number of hidden danger changes coefficient, and k2 is the average high hidden danger log interval coefficient.

[0021] Compared with the prior art, the present invention has the following beneficial effects:

[0022] 1. The method of the present invention can effectively reduce the resource investment required for simultaneously monitoring multiple power links through steps 1 to 3, which is helpful to control the operating cost of the new power system. Through step 4, the power link with potential hidden dangers can be quickly locked, thereby improving the monitoring efficiency of the new power system;

[0023] 2. By setting up the comprehensive information monitoring module and the power link marking module, the monitoring order and priority of different power links in the new power system can be reasonably arranged, which not only ensures that each power link is monitored independently, but also helps to conduct in-depth and detailed analysis of each power link, making it easier to discover unique problems in each power link. By setting the monitoring priority lock, when hidden dangers are found in a certain power link, the monitoring order of the power link can be flexibly adjusted according to the hidden danger power link. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a flowchart of the integrated information monitoring method for the new power system;

[0025] Figure 2A flowchart for obtaining monitoring preset values;

[0026] Figure 3 A flowchart for obtaining comprehensive monitoring values ​​of links. DETAILED DESCRIPTION

[0027] Example 1

[0028] Reference Figure 1 , a new integrated information monitoring method for a power system includes the following steps:

[0029] Step 1: Sort each power link in descending order according to the value of the monitoring preset value, and conduct a comprehensive analysis of each power link in turn according to the order of the power link every t time;

[0030] Step 2: After comprehensive analysis of each power link, generate a comprehensive analysis log of the power link;

[0031] Step 3: Obtain the comprehensive information value of the comprehensive analysis log, and determine whether to mark the power link as a potential danger power link based on the comparison result between the comprehensive information value and its threshold value;

[0032] Step 4: When a hidden danger occurs in an electric power link, obtain the locking priority value of the electric power link to be checked, sort all the electric power links to be checked in order from small to large according to the locking priority value, and conduct a comprehensive analysis of the electric power links to be checked in the sorting order.

[0033] Through steps one to three, the above method can effectively reduce the resource investment required for simultaneously monitoring multiple power links, which helps to control the operating costs of the new power system. Through step four, the power links with potential hidden dangers can be quickly identified, thereby improving the monitoring efficiency of the new power system.

[0034] Example 2

[0035] Reference Figures 2 to 3 The comprehensive information monitoring system of the new power system includes a comprehensive information monitoring module, a power link marking module, and a monitoring priority locking module.

[0036] Comprehensive information monitoring module: obtain the monitoring preset values ​​of each power link in the new power system (the new power system is a complex and comprehensive system, which covers multiple power links. The power links are interrelated and interact with each other to form a new power system to achieve efficient, clean, safe and sustainable development of energy. The power links include but are not limited to the power generation side, transmission side, distribution side, power consumption side, and energy storage side), and sort the power links in descending order according to the value of the monitoring preset value. Every t time, conduct a comprehensive analysis of each power link in turn according to the sorting of the power links.

[0037] Power link marking module: after comprehensive analysis of each power link, a comprehensive analysis log of the power link is generated. The comprehensive analysis log includes the power link name (i.e. the name of the power link), the comprehensive information value, and the log generation time. The comprehensive information value of the comprehensive analysis log is obtained, and the comprehensive information threshold of the power link is obtained simultaneously (each power link corresponds to an independent comprehensive information threshold, and the comprehensive information thresholds of different power links are not necessarily the same). When the comprehensive information value is greater than or equal to the comprehensive information threshold, the power link is marked as a hidden danger power link. When the comprehensive information value is less than the comprehensive information threshold, the power link is not marked, and the next power link is comprehensively analyzed synchronously according to the order of the power links.

[0038] By setting up a comprehensive information monitoring module and a power link marking module, the monitoring order and priority of different power links in the new power system can be reasonably arranged, which not only ensures that each power link is monitored independently, but also helps to conduct in-depth and detailed analysis of each power link, facilitates the discovery of unique problems in each power link, and can effectively reduce the resource investment required for monitoring multiple power links at the same time, which helps to control the operating costs of the new power system.

[0039] The monitoring preset value of the power link is obtained in the following way: obtain all comprehensive analysis logs of the new power system before the current time of the system, obtain the power link name of the comprehensive analysis log, mark the comprehensive analysis log with the same power link name as the same-link comprehensive analysis log, obtain the comprehensive information value of the same-link comprehensive analysis log, sum and average the comprehensive information values ​​of all the same-link comprehensive analysis logs, and obtain the comprehensive information mean FCY, obtain the log generation time of the same-link comprehensive analysis log, sort all the same-link comprehensive analysis logs in the order of log generation time, sum and average the two adjacent comprehensive information values ​​after sorting, and obtain the comprehensive neighbor mean, set the comprehensive neighbor mean threshold (the system sets the threshold and can be adjusted according to actual needs), when the comprehensive neighbor mean is greater than or equal to the comprehensive neighbor mean threshold, increase the number of comprehensive neighbor shadows by one, when the comprehensive neighbor mean is less than the comprehensive neighbor mean threshold, do not process it, sum the number of comprehensive neighbor shadows, and obtain the total number of comprehensive neighbor shadows HMg, using the formula The monitoring preset value Juc of the power link is obtained, where P1 is the comprehensive information mean coefficient, P2 is the comprehensive neighboring shadow total number coefficient, the value of P1 is 0.82, and the value of P2 is 0.74.

[0040] The comprehensive information value of the comprehensive analysis log is obtained in the following way: obtain the power link name of the comprehensive analysis log, obtain various power information of the power link within the time length t (each power link contains various power information, such as the transmission side contains line operation status information, transmission equipment status information, transmission environment impact information, etc., such as the power consumption side contains power load information, power quality information, power safety information, etc.), obtain the power information impact model of various power information (each power information corresponds to an independent power information impact model), input each power information into the corresponding power information impact model, obtain the power information impact value of various power information, obtain the power information impact limit of various power information (each power information corresponds to an independent power information impact limit, that is, the system sets the threshold and adjusts it according to actual needs), compare the power information impact value of the same power information with the power information impact limit, and when the power information When the impact value is greater than or equal to the power information impact limit, the power information is marked as operation hidden danger information. When the power information impact value is less than the power information impact limit, the power information is marked as normal operation information. The total number of operation hidden danger information of the power link is marked as EY, and the total number of normal operation information of the power link is marked as XK. The power information impact value of all operation hidden danger information and the power information impact limit are calculated by difference to obtain the hidden danger impact prominent value SRz. The hidden danger impact prominent value coefficient is set to AGg, g = 1, 2, 3, ..., g; AG1 < AG2 < AG3 < ... < AGg. Each of the above hidden danger impact prominent value coefficients corresponds to a different range of hidden danger impact prominent values, including [0, SR1], (SR1, SR2], ..., (SRZ-1, SRZ]. When the hidden danger impact prominent value SRz∈[0, SR1], the hidden danger impact prominent value coefficient is AG1. Using the formula The comprehensive information value Zxz of the power link is obtained, where s1 is the coefficient of the number of operation hidden danger information, s2 is the coefficient of the number of normal operation information, z=1, 2,..., Z, Z is the total number of operation hidden danger information, the value of s1 is 1.83, and the value of s2 is 1.59.

[0041] Different power information corresponds to different power information impact models. Different electronic information impact models are constructed in the same way, but the training data of the model needs to be replaced. The following takes the line operation status information as an example to disclose the construction method of the power information impact model: collect n groups of line operation status information, each group of line operation status information contains multiple information related to the line operation status, and the information related to the line operation status includes but is not limited to line temperature, line active power, line reactive power, and line voltage. Build a deep learning model, use n groups of line operation status information as training data for the deep learning model, assign a power information impact value to each training data, divide multiple training data into training sets and validation sets at a ratio of 1:2, and obtain the power information impact model through training the training set and validation set. Among them, the value range of the power information impact value is (1~2), the larger the value of the power information impact value, the higher the line operation status will cause the operation risk of the new power system to increase, and the smaller the value of the power information impact value, the lower the line operation status will cause the operation risk of the new power system to decrease.

[0042] Monitoring priority locking: When a hidden danger power link appears, the remaining power links ranked after the hidden danger power link will be marked as power links for investigation, and the comprehensive monitoring value of the hidden danger power link and the comprehensive monitoring value of the power link for investigation will be obtained, and then the locking priority value of the power link for investigation will be obtained, and all the power links for investigation will be sorted in order from small to large according to the locking priority value, and the power links for investigation will be comprehensively analyzed in the sorting order.

[0043] By setting the monitoring priority lock, when a hidden danger is found in a certain power link, the monitoring order of the power link can be flexibly adjusted according to the power link with the hidden danger, which helps to quickly lock the power link with potential hidden dangers and improve the monitoring efficiency of the new power system.

[0044] The comprehensive monitoring value of the link is obtained in the following way: obtain m consecutive comprehensive analysis logs of the same power link before the current time of the system, obtain the comprehensive information value of the comprehensive analysis log, set the high value of the comprehensive information and the low value of the comprehensive information (the high value of the comprehensive information is greater than the low value of the comprehensive information, and the high value of the comprehensive information and the low value of the comprehensive information are the thresholds set by the system, which can be adjusted according to actual needs); when the comprehensive information value of the comprehensive analysis log is greater than or equal to the high value of the comprehensive information, mark the type of the comprehensive analysis log as a high hidden danger type; when the comprehensive information value of the comprehensive analysis log is less than or equal to the low value of the comprehensive information, mark the type of the comprehensive analysis log as a low hidden danger type; when the comprehensive information value of the comprehensive analysis log is between the high value of the comprehensive information and the low value of the comprehensive information, mark the type of the comprehensive analysis log as a low hidden danger type. The type of the log is marked as the medium hidden danger type. All comprehensive analysis logs are sorted in the order of log generation time. The types of two adjacent comprehensive analysis logs after sorting are compared. When the types of two adjacent comprehensive analysis logs are the same, no processing is performed. When the types of two adjacent comprehensive analysis logs are different, the number of hidden danger changes is increased by one. The number of hidden danger changes is summed to obtain the total number of hidden danger changes ddg. All comprehensive analysis logs of high hidden danger types are sorted in the order of log generation time. The log generation time of the two adjacent comprehensive analysis logs after sorting is calculated by time difference to obtain the high hidden danger log interval. All high hidden danger log intervals are summed and averaged to obtain the average high hidden danger log interval RSW. The formula is used The comprehensive monitoring value AED of the power link is obtained, where k1 is the total number of hidden danger changes coefficient, k2 is the average high hidden danger log interval coefficient, the value of k1 is 0.63, and the value of k2 is 0.57.

[0045] The locking priority value of the power link under investigation is obtained by the following method: the difference between the comprehensive monitoring value of the hidden danger power link and the comprehensive monitoring value of the power link under investigation is calculated, and then the locking priority value of the power link under investigation is obtained.

[0046] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.

[0047] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center by wired or wireless (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.

[0048] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0049] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0050] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0051] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0052] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in the various embodiments of the present application. The aforementioned storage media include: various media that can store program codes, such as USB flash drives, mobile hard disks, read-only memories (ROM), random access memories (RAM), magnetic disks or optical disks.

[0053] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A new integrated information monitoring method for a power system, characterized in that: The steps include: Step 1: Sort each power link in descending order according to the value of the monitoring preset value, and conduct a comprehensive analysis of each power link in turn according to the order of the power link every t time; Step 2: After comprehensive analysis of each power link, generate a comprehensive analysis log of the power link; Step 3: Obtain the comprehensive information value of the comprehensive analysis log, and determine whether to mark the power link as a potential danger power link based on the comparison result between the comprehensive information value and its threshold value; Step 4: When a hidden danger occurs in an electric power link, obtain the locking priority value of the electric power link to be checked, sort all the electric power links to be checked in order from small to large according to the locking priority value, and conduct a comprehensive analysis of the electric power links to be checked in the sorting order.

2. A comprehensive information monitoring system for a new type of power system, applied to the comprehensive information monitoring method for a new type of power system according to claim 1, characterized in that: Including comprehensive information monitoring module, power link marking module, monitoring priority locking module; The comprehensive information monitoring module: obtains the monitoring preset value of each power link in the new power system, sorts each power link in descending order according to the value of the monitoring preset value, and performs a comprehensive analysis on each power link in order according to the order of the power link every t time; The power link marking module: after comprehensive analysis of each power link, generates a comprehensive analysis log of the power link, obtains a comprehensive information value of the comprehensive analysis log, and determines whether to mark the power link as a potential danger power link based on a comparison result between the comprehensive information value and its threshold value; The monitoring priority lock obtains the locking priority value of the power link to be checked when a hidden danger occurs in the power link, sorts all the power links to be checked in order from small to large according to the locking priority value, and conducts a comprehensive analysis of the power links to be checked in the sorting order.

3. The integrated information monitoring system of the new power system according to claim 2 is characterized in that: The monitoring preset value of the power link is obtained in the following way: obtain all comprehensive analysis logs of the new power system before the current time of the system, obtain the power link name of the comprehensive analysis log, mark the comprehensive analysis log with the same power link name as the same-link comprehensive analysis log, obtain the comprehensive information value of the same-link comprehensive analysis log, sum and average the comprehensive information values ​​of all the same-link comprehensive analysis logs, and obtain the comprehensive information mean FCY, obtain the log generation time of the same-link comprehensive analysis log, sort all the same-link comprehensive analysis logs in the order of log generation time, sum and average the two adjacent comprehensive information values ​​after sorting, and obtain the comprehensive neighbor mean, set the comprehensive neighbor mean threshold, when the comprehensive neighbor mean is greater than or equal to the comprehensive neighbor mean threshold, increase the number of comprehensive neighbor shadows by one, when the comprehensive neighbor mean is less than the comprehensive neighbor mean threshold, do not process it, sum the number of comprehensive neighbor shadows, and obtain the total number of comprehensive neighbor shadows HMg, using the formula The monitoring preset value Juc of the power link is obtained, where P1 is the comprehensive information mean coefficient and P2 is the comprehensive neighboring shadow total number coefficient.

4. The integrated information monitoring system of the new power system according to claim 2 is characterized in that: The comprehensive analysis log includes the power link name, comprehensive information value, and log generation time.

5. The integrated information monitoring system of the new power system according to claim 2 is characterized in that: The comprehensive information value of the comprehensive analysis log is obtained in the following way: obtain the power link name of the comprehensive analysis log, obtain various power information of the power link within the time length t, obtain the power information impact model of various power information, input each power information into the corresponding power information impact model, obtain the power information impact value of various power information, obtain the power information impact limit of various power information, compare the power information impact value of the same power information with the power information impact limit, when the power information impact value is greater than or equal to the power information impact limit, mark the power information as operation hidden danger information, when the power information impact value is less than the power information impact limit, mark the power information as normal operation information, mark the total number of operation hidden danger information of the power link as EY, mark the total number of normal operation information of the power link as XK, calculate the difference between the power information impact value of all operation hidden danger information and the power information impact limit, obtain the hidden danger impact prominent value SRz, set the hidden danger impact prominent value coefficient as AGg, and use the formula The comprehensive information value Zxz of the power link is obtained, where s1 is the coefficient of the number of operation hidden danger information, s2 is the coefficient of the number of normal operation information, z=1, 2,..., Z, and Z is the total number of operation hidden danger information.

6. The integrated information monitoring system of the new power system according to claim 2 is characterized in that: Based on the comparison result between the comprehensive information value and its threshold, determine whether to mark the power link as a power link with hidden dangers, specifically: obtain the comprehensive information value of the comprehensive analysis log, and synchronously obtain the comprehensive information threshold of the power link; when the comprehensive information value is greater than or equal to the comprehensive information threshold, mark the power link as a power link with hidden dangers; when the comprehensive information value is less than the comprehensive information threshold, do not mark the power link, and synchronously perform comprehensive analysis on the next power link according to the order of the power links.

7. The integrated information monitoring system for the new power system according to claim 2 is characterized in that: When a hidden danger power link occurs, the remaining power links ranked after the hidden danger power link are marked as power links for investigation, and the comprehensive monitoring value of the hidden danger power link and the comprehensive monitoring value of the power link for investigation are obtained, and then the locking priority value of the power link for investigation is obtained.

8. The integrated information monitoring system for the new power system according to claim 7 is characterized in that: The locking priority value of the power link under investigation is obtained by the following method: the difference between the comprehensive monitoring value of the hidden danger power link and the comprehensive monitoring value of the power link under investigation is calculated, and then the locking priority value of the power link under investigation is obtained.

9. The integrated information monitoring system for the new power system according to claim 8 is characterized in that: The comprehensive monitoring value of the link is obtained by the following method: obtaining m consecutive comprehensive analysis logs of the same power link before the current time of the system, obtaining the comprehensive information value of the comprehensive analysis log, setting the high value and the low value of the comprehensive information, when the comprehensive information value of the comprehensive analysis log is greater than or equal to the high value of the comprehensive information, marking the type of the comprehensive analysis log as a high hidden danger type, when the comprehensive information value of the comprehensive analysis log is less than or equal to the low value of the comprehensive information, marking the type of the comprehensive analysis log as a low hidden danger type, when the comprehensive information value of the comprehensive analysis log is between the high value and the low value of the comprehensive information, marking the type of the comprehensive analysis log as a medium hidden danger type, and all comprehensive analysis logs are marked according to The log generation time is sorted in order, and the types of the two adjacent comprehensive analysis logs after sorting are compared. When the types of the two adjacent comprehensive analysis logs are the same, no processing is performed. When the types of the two adjacent comprehensive analysis logs are different, the number of hidden danger changes is increased by one, and the number of hidden danger changes is summed to obtain the total number of hidden danger changes ddg. All comprehensive analysis logs of high hidden danger types are sorted in the order of log generation time, and the log generation time of the two adjacent comprehensive analysis logs after sorting is calculated to obtain the high hidden danger log interval. All high hidden danger log intervals are summed and averaged to obtain the average high hidden danger log interval RSW. The formula is used The comprehensive monitoring value AED of the power link is obtained, where k1 is the total number of hidden danger changes coefficient, and k2 is the average high hidden danger log interval coefficient.