Technical Problem

When traditional power systems face the randomness of renewable energy and the uncertainty of output of thermal power units, it is difficult to effectively optimize scheduling, resulting in economic losses and reliability risks.

Method used

A new power generation plan optimization method is proposed to take into account uncertainty and risk measurement of thermal power. By constructing a thermal power unit output uncertainty and risk measurement model, combined with unit combination and backup decision optimization, joint optimization is achieved.

Benefits of technology

This method can more accurately represent the actual output of the thermal power unit, improve the fault tolerance of constraints, and obtain a more economical and safe unit combination and output plan through joint optimization, reducing the economic loss and reliability risks of system operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119787501A_ABST
    Figure CN119787501A_ABST
Patent Text Reader

Abstract

The invention discloses a day-ahead power generation plan optimization method considering thermal power uncertainty and risk measurement. The day-ahead power generation plan optimization method comprises the following steps: constructing a thermal power generating unit output uncertainty constraint; constructing a two-stage day-ahead power generation plan optimization model; the wind-light and thermal power output uncertain constraint is solved, and uncertain scene generation including wind-light uncertain scene and thermal power output uncertain scene generation and reduction is carried out; and solving the two-stage day-ahead power generation plan optimization model to obtain an optimal unit combination start-stop state and an output plan. According to the method, output uncertainty of renewable energy and a thermal power generating unit is fully considered, a thermal power generating unit output uncertainty constraint is constructed, an optimization model based on unit combination and standby decision is constructed, risk loss measurement is further combined, joint optimization is carried out on the optimization model, and the reliability of the optimization model is improved. And finally obtaining a day-ahead power generation plan which better meets the intrinsic safety requirement of the novel power system.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Cited By

  • Electric power and electric quantity balance calculation method and system based on machine learning

    CN120955621A

  • Power system random scheduling method based on wind-solar joint probability distribution and double-layer dynamic optimization

    CN121150205A