Cyclone group inlet pressure control method, device and equipment and storage medium
By setting the target inlet pressure range and obtaining the control model quality code to determine the closed-loop control conditions, real-time inlet pressure control of the cyclone group is realized, and the problem of poor pressure control stability in the prior art is solved, and the sorting effect and working efficiency are improved.
Patent Information
- Application Number
- CN202510003006.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-02
- Publication Date
- 2025-04-11
AI Technical Summary
The prior art has poor stability, low accuracy and complex control process in the pressure control of cyclone sets, making it difficult to achieve real-time and stable inlet pressure control.
By setting the target inlet pressure range of the cyclone group, obtaining the control model quality code, and determining whether the closed-loop control conditions are met. If so, obtaining the real-time inlet pressure and controlling the opening or closing of the valve according to the target range and real-time pressure.
Effectively controlling the real-time inlet pressure of the cyclone group within the target range improves the stability and accuracy of pressure control, and improves the sorting effect and working efficiency of the ore dressing process.
Smart Images

Figure CN119793727A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of automation technology, and in particular to a method, device, equipment and storage medium for controlling the inlet pressure of a cyclone group. Background Art
[0002] In the process of mineral processing in metallurgical mines, the slurry in the slurry pump pool is pumped out by the slurry pump and transported to the hydrocyclone group for slurry particle size classification. Due to the size difference between coarse particles and fine particles, they are subject to different centrifugal forces, centripetal buoyancy, fluid drag, etc., and under the effect of centrifugal sedimentation, the slurry with coarse particles is discharged from the sand settling port at the bottom of the hydrocyclone cone, while the slurry with fine particles is discharged from the overflow port at the center of the hydrocyclone cylinder, thereby achieving the purpose of sorting. In the daily production process, the hydrocyclone, as a mechanical equipment, will inevitably have mechanical failures, and the blockage of the hydrocyclone will cause the pressure change of the hydrocyclone, causing the hydrocyclone group to overflow and the sand settling pressure to fluctuate, thus affecting the classification effect of the hydrocyclone group.
[0003] Therefore, in the mineral processing process, stable control of the cyclone group pressure is a key factor in stable production. At present, the cyclone pressure control is usually carried out by manually observing the inlet pressure of the cyclone and manually changing the cyclone valve switch. However, in the actual operation process, there are a large number of valves in each cyclone group, and the valves of each cyclone group are installed at different positions on the inlet main pipe. The influence of each cyclone in each cyclone group on the inlet main pipe pressure is also different, resulting in poor stability of the cyclone group pressure control, low accuracy and complex control process. Therefore, there is an urgent need for a method that can control the inlet pressure of the cyclone in real time and stably. Summary of the invention
[0004] In view of this, an object of the present invention is to overcome the deficiencies in the prior art and to provide a method, device, equipment and storage medium for controlling the inlet pressure of a cyclone group.
[0005] The present invention provides the following technical solutions:
[0006] In a first aspect, an embodiment of the present disclosure provides a method for controlling a cyclone group inlet pressure, the method comprising:
[0007] Setting the target inlet pressure range of the cyclone group;
[0008] Acquire a control model quality code of the cyclone group, and determine whether the cyclone group meets a closed-loop control condition according to the control model quality code;
[0009] If the control model quality code is the first preset condition, determining that the cyclone group meets the closed-loop control condition and obtaining the real-time inlet pressure of the cyclone group according to a preset period;
[0010] The valve of the cyclone group is controlled to be opened or closed according to the target inlet pressure interval and the real-time inlet pressure.
[0011] According to a specific implementation method disclosed in the present application, the step of obtaining the control model quality code of the cyclone group includes:
[0012] Collect production data within a continuous time period, verify the completeness, accuracy and timeliness of the production data, and generate a control model quality code.
[0013] According to a specific implementation method disclosed in the present application, the step of judging whether the cyclone group meets the closed-loop control condition according to the control model quality code includes:
[0014] If the control model quality code is the second preset condition, it is determined that the cyclone group does not meet the closed-loop control condition and the step of judging whether the cyclone group can participate in the control according to the control model quality code is repeated.
[0015] According to a specific embodiment disclosed in the present application, the step of controlling the valve of the cyclone group to open or close according to the target inlet pressure interval and the real-time inlet pressure includes:
[0016] Initialize the cumulative calculation times to 0;
[0017] determining whether the real-time inlet pressure is within the target inlet pressure range;
[0018] If the real-time inlet pressure is within the target inlet pressure range, the accumulated calculation times are reset to 0;
[0019] If the real-time inlet pressure is less than the left extreme value of the target inlet pressure, the cumulative calculation times are increased based on a preset period to determine whether the real-time cumulative calculation times are greater than a preset threshold value; if the real-time cumulative calculation times are greater than the preset threshold value, the cyclone group valve is closed according to a preset valve control strategy, wherein the preset valve control strategy includes any one of a first valve control strategy, a second valve control strategy, a third valve control strategy and a fourth valve control strategy;
[0020] If the real-time inlet pressure is greater than the right extreme value of the target inlet pressure, the cumulative calculation times are increased based on a preset period to determine whether the real-time cumulative calculation times are greater than a preset threshold; if the real-time cumulative calculation times are greater than the preset threshold, the cyclone group valve is opened according to a preset valve control strategy, wherein the preset valve control strategy includes any one of a first valve control strategy, a second valve control strategy, a third valve control strategy and a fourth valve control strategy.
[0021] According to a specific implementation method disclosed in the present application, the first valve control strategy includes:
[0022] Sorting and numbering the cyclones according to their positions in the cyclone group;
[0023] Each cyclone is traversed in the order of numbering to control the opening or closing of the valve of the cyclone group.
[0024] According to a specific implementation method disclosed in the present application, the second valve control strategy includes:
[0025] Obtaining an inlet pressure influence factor of each cyclone in the cyclone group;
[0026] Sort and number the cyclones from large to small according to the inlet pressure influencing factors;
[0027] Each cyclone is traversed in the order of numbering to control the opening or closing of the valve of the cyclone group.
[0028] According to a specific implementation method disclosed in this application, the third valve control strategy includes:
[0029] Obtaining the cumulative number of times each cyclone in the cyclone group is turned on and off;
[0030] The cyclones are sorted and numbered according to the cumulative number of opening and closing times. The cumulative number of opening times is numbered from small to large, and the cumulative number of closing times is numbered from small to large, forming two number lists;
[0031] Each cyclone is traversed according to the number list to control the opening or closing of the valve of the cyclone group.
[0032] According to a specific implementation method disclosed in this application, the fourth valve control strategy includes:
[0033] Obtaining the accumulated working time of each cyclone in the cyclone group;
[0034] Sort and number each cyclone according to the accumulated working time;
[0035] Each cyclone is traversed in the order of numbering, and the opening or closing of the valve of the cyclone group is controlled according to the accumulated working time.
[0036] In a second aspect, an embodiment of the present disclosure provides a cyclone group inlet pressure control device, the device comprising:
[0037] A setting module, used for setting a target inlet pressure range of the cyclone group;
[0038] an acquisition module, used for acquiring a control model quality code of the cyclone group, and judging whether the cyclone group meets a closed-loop control condition according to the control model quality code;
[0039] a determination module, configured to determine that the cyclone group satisfies a closed-loop control condition and obtain a real-time inlet pressure of the cyclone group according to a preset period if the control model quality code is a first preset condition;
[0040] A control module is used to control the valve of the cyclone group to open or close according to the target inlet pressure range and the real-time inlet pressure.
[0041] In a third aspect, an electronic device is provided in an embodiment of the present disclosure, the electronic device comprising a memory and a processor, the memory storing a computer program, and the processor implementing the steps of the cyclone group inlet pressure control method described in any one of the first aspects when executing the computer program.
[0042] In a fourth aspect, a computer-readable storage medium is provided in an embodiment of the present disclosure, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the cyclone group inlet pressure control method described in any one of the first aspects are implemented.
[0043] The above-mentioned cyclone group inlet pressure control method provided by the present application sets the target inlet pressure range of the cyclone group, obtains the control model quality code of the cyclone group, and judges whether the cyclone group meets the closed-loop control condition according to the control model quality code. If the control model quality code is the first preset condition, it is determined that the cyclone group meets the closed-loop control condition and the real-time inlet pressure of the cyclone group is obtained according to the preset period. The valve of the cyclone group is controlled to be opened or closed according to the target inlet pressure range and the real-time inlet pressure. The valve opening or closing of each cyclone in the cyclone group is adjusted in real time through the control model. The real-time inlet pressure of the cyclone group can be effectively controlled within the target inlet pressure range, thereby improving the stability and accuracy of the cyclone group pressure control, and can improve the sorting effect and work efficiency of the mineral processing process.
[0044] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and understandable, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work. In each of the drawings, similar components are numbered similarly.
[0046] Figure 1 A schematic flow chart of a cyclone group inlet pressure control method provided in an embodiment of the present application is shown;
[0047] Figure 2 A schematic diagram of a valve control process provided in an embodiment of the present application;
[0048] Figure 3 A schematic structural diagram of a cyclone group inlet pressure control device provided in an embodiment of the present application is shown;
[0049] Figure 4 A schematic structural diagram of an electronic device provided in an embodiment of the present application is shown. DETAILED DESCRIPTION
[0050] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0051] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. In contrast, when an element is referred to as being "directly on" another element, there is no intermediate element. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.
[0052] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0053] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0054] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein in the specification of the template are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more of the related listed items.
[0055] Example 1
[0056] like Figure 1 FIG. 1 is a flow chart of a method for controlling the inlet pressure of a cyclone group provided in an embodiment of the present application. The method for controlling the inlet pressure of a cyclone group provided in an embodiment of the present application comprises the following steps:
[0057] Step S101, setting a target inlet pressure range of the cyclone group.
[0058] Specifically, the target inlet pressure range of the cyclone group is set according to the material properties of the minerals in actual working conditions and the process parameters of the cyclone group combined with the classification effect of each material. The target inlet pressure range is the inlet pressure range that can achieve the preset classification effect when the cyclone group classifies minerals.
[0059] Step S102, obtaining a control model quality code of the cyclone group, and judging whether the cyclone group meets a closed-loop control condition according to the control model quality code.
[0060] Specifically, the control model quality code is a code to ensure the quality of the control model output, and the control model quality code includes a first preset condition and a second preset condition, wherein the first preset condition is True and the second preset condition is False. By judging whether the cyclone group meets the closed-loop control condition according to the control model quality code, it can be ensured that the input data and the operating state of the control model meet the quality standards before the control model participates in the control, thereby improving the stability of the production process.
[0061] The step of obtaining the control model quality code of the cyclone group includes:
[0062] Collect production data within a continuous time period, verify the completeness, accuracy and timeliness of the production data, and generate a control model quality code.
[0063] Determine the model quality code. If the control model quality code is the first preset condition, the model will participate in the control process. If the control model quality code is the second preset condition, the model will not participate in the control, which can avoid control errors caused by data quality problems.
[0064] The step of judging whether the cyclone group meets the closed-loop control condition according to the control model quality code comprises:
[0065] If the control model quality code is the second preset condition, it is determined that the cyclone group does not meet the closed-loop control condition and the step of judging whether the cyclone group can participate in the control according to the control model quality code is repeated.
[0066] It can be understood that by judging the closed-loop control conditions of the cyclone group, it can be ensured that the model is in the best state before participating in the control, reducing fluctuations and instability in the production process. By double checking the data and model quality, it can be ensured that the sorted ore liquid meets the composite sorting standards. When the model control effect is not good, it can be switched back to manual control in time, which improves the flexibility and safety of production.
[0067] Step S103: if the control model quality code is the first preset condition, it is determined that the cyclone group meets the closed-loop control condition and the real-time inlet pressure of the cyclone group is obtained according to a preset period.
[0068] Specifically, the preset period is 1 second, that is, the real-time inlet pressure of the cyclone group is obtained every second, so as to ensure the timeliness of the control model.
[0069] Step S104, controlling the valve of the cyclone group to open or close according to the target inlet pressure range and the real-time inlet pressure.
[0070] Specifically, see Figure 2 , Figure 2 A valve control flow diagram is provided for an embodiment of the present application. The step of controlling the valve of the cyclone group to open or close according to the target inlet pressure interval and the real-time inlet pressure comprises:
[0071] Step S1041, initialize the cumulative number of calculations to 0.
[0072] Step S1042, determining whether the real-time inlet pressure is within the target inlet pressure range.
[0073] Step S1043: if the real-time inlet pressure is within the target inlet pressure range, the accumulated calculation times are reset to 0.
[0074] Step S1044, if the real-time inlet pressure is less than the left extreme value of the target inlet pressure, the cumulative calculation times are increased based on the preset period to determine whether the real-time cumulative calculation times are greater than the preset threshold; if the real-time cumulative calculation times are greater than the preset threshold, the cyclone group valve is closed according to the preset valve control strategy, wherein the preset valve control strategy includes any one of the first valve control strategy, the second valve control strategy, the third valve control strategy and the fourth valve control strategy.
[0075] Step S1045, if the real-time inlet pressure is greater than the right extreme value of the target inlet pressure, the cumulative calculation times are increased based on the preset period to determine whether the real-time cumulative calculation times are greater than the preset threshold; if the real-time cumulative calculation times are greater than the preset threshold, the cyclone group valve is opened according to the preset valve control strategy, wherein the preset valve control strategy includes any one of the first valve control strategy, the second valve control strategy, the third valve control strategy and the fourth valve control strategy.
[0076] In specific implementation, the cumulative calculation times are the times of obtaining the real-time cyclone group inlet pressure, the real-time cumulative calculation times are the times of the cyclone group inlet pressure currently obtained in real time, each time the real-time inlet pressure is within the target inlet pressure range, the cumulative calculation times are initialized, when the real-time inlet pressure is not within the target inlet pressure range, the cumulative calculation times are increased once according to a preset period, when the real-time cumulative calculation times are greater than the preset threshold, it is considered that the cyclone group valve needs to be adjusted, correspondingly, when the real-time cumulative calculation times are less than the preset threshold, it is considered that the cyclone group valve does not need to be adjusted, and the process returns to the step of determining whether the real-time inlet pressure is within the target inlet pressure range, preferably, the preset threshold is 30s, when the real-time inlet pressure is within the target inlet pressure range, the process returns to the previous step. The current working state of the cyclone group can be determined by judging the real-time cumulative calculation times. When the real-time inlet pressure is not within the target inlet pressure range and the real-time cumulative calculation times are greater than the preset threshold, the cyclone group is determined to be in an abnormal state. If the real-time inlet pressure is less than the left extreme value of the target inlet pressure, the valve in the unopened cyclone group is closed to close an opened cyclone. If the real-time inlet pressure is greater than the right extreme value of the target inlet pressure, the valve in the opened cyclone group is opened to open an unopened cyclone. The real-time inlet pressure of the cyclone group is controlled by the control model to ensure that when the inlet pressure exceeds the target inlet pressure range, the inlet pressure is controlled by adjusting the valve of the cyclone group to keep it within the target inlet pressure range, thereby improving the slurry sorting effect. At the same time, by checking the quality code of the control model, the stability and reliability of the control process are ensured, manual intervention is reduced, and production efficiency and safety are improved.
[0077] Preferably, the first valve control strategy includes:
[0078] Sorting and numbering the cyclones according to their positions in the cyclone group;
[0079] Each cyclone is traversed in the order of numbering to control the opening or closing of the valve of the cyclone group.
[0080] It can be understood that the numbers are sorted in the order of physical positions, and the corresponding cyclone valves are opened or closed in combination with the current switch state of the cyclone and the sorting sequence number. When a cyclone needs to be opened, the first cyclone found in the traversal process and in the closed state is opened; when a cyclone needs to be closed, the first cyclone found in the traversal process and in the open state is closed.
[0081] Preferably, the second valve control strategy includes:
[0082] Obtaining an inlet pressure influence factor of each cyclone in the cyclone group;
[0083] Sort and number the cyclones from large to small according to the inlet pressure influencing factors;
[0084] Each cyclone is traversed in the order of numbering to control the opening or closing of the valve of the cyclone group.
[0085] It can be understood that the inlet pressure influence factor is the influence of the relative position of each cyclone in the cyclone group on the inlet pressure. By sorting the cyclones according to the inlet pressure influence factor, the corresponding cyclone valve can be opened or closed according to the sorting sequence number. When a cyclone needs to be opened, the difference between the current pressure and the target pressure is first determined. If the difference is large, the cyclone with a large influence factor is opened first, and if the difference is small, the cyclone with a small influence factor is opened first; when a cyclone needs to be closed, the difference between the current pressure and the target pressure is first determined. If the difference is large, the cyclone with a large influence factor is closed first, and if the difference is small, the cyclone with a small influence factor is closed first.
[0086] Preferably, the third valve control strategy includes:
[0087] Obtaining the cumulative number of times each cyclone in the cyclone group is turned on and off;
[0088] The cyclones are sorted and numbered according to the cumulative number of opening and closing times. The cumulative number of opening times is numbered from small to large, and the cumulative number of closing times is numbered from small to large, forming two number lists;
[0089] Each cyclone is traversed according to the number list to control the opening or closing of the valve of the cyclone group.
[0090] It can be understood that when a cyclone needs to be opened, the first cyclone found in the traversal process that is in the closed state and has the least cumulative opening times is opened; when a cyclone needs to be closed, the first cyclone found in the traversal process that is in the open state and has the least cumulative closing times is closed. The cumulative number of switches is the cumulative number of opening and closing of each cyclone valve. The cyclone valves in the cyclone group are sorted according to the cumulative number of openings and the cumulative number of closings. When the real-time inlet pressure of the cyclone group is greater than the right extreme value of the target inlet pressure, the cyclone valve with the least cumulative opening times is selected according to the sorting sequence number based on the cumulative number of openings. When the real-time inlet pressure of the cyclone group is less than the left extreme value of the target inlet pressure, the cyclone valve with the least cumulative closing times is selected according to the sorting sequence number based on the cumulative number of closings. By controlling the opening or closing of the cyclone valve according to the cumulative number of switches, the full use of the instrument equipment can be guaranteed, and the service life of the instrument equipment is increased.
[0091] Preferably, the fourth valve control strategy includes:
[0092] Obtaining the accumulated working time of each cyclone in the cyclone group;
[0093] Sort and number each cyclone according to the accumulated working time;
[0094] Each cyclone is traversed in the order of numbering, and the opening or closing of the valve of the cyclone group is controlled according to the accumulated working time.
[0095] It can be understood that the cumulative working time of each cyclone is recorded as T [n] =T [n] +t, where t is the time interval from the current opening to the current closing of the current cyclone. The cyclones in the cyclone group are sorted according to the cumulative working time. When the real-time inlet pressure of the cyclone group is greater than the right extreme value of the target inlet pressure, the cyclone valve with a low cumulative working time is preferentially opened according to the sorting sequence number. When the real-time inlet pressure of the cyclone group is less than the left extreme value of the target inlet pressure, the cyclone valve with a high cumulative working time is preferentially closed according to the sorting sequence number. When a cyclone needs to be opened, the first cyclone with the shortest cumulative opening time found in the traversal process in the closed state is opened; when a cyclone needs to be closed, the first cyclone with the longest cumulative opening time found in the traversal process in the open state is closed.
[0096] The embodiment of the present application provides a method for controlling the inlet pressure of a cyclone group, by setting a target inlet pressure range of the cyclone group, obtaining a control model quality code of the cyclone group, judging whether the cyclone group meets a closed-loop control condition according to the control model quality code, and if the control model quality code is a first preset condition, determining that the cyclone group meets the closed-loop control condition and obtaining the real-time inlet pressure of the cyclone group according to a preset period, controlling the valve of the cyclone group to open or close according to the target inlet pressure range and the real-time inlet pressure, and adjusting the valve opening or closing of each cyclone in the cyclone group in real time through the control model, so as to effectively control the real-time inlet pressure of the cyclone group within the target inlet pressure range, thereby improving the stability and accuracy of the pressure control of the cyclone group, and improving the sorting effect and working efficiency of the mineral separation process.
[0097] Example 2
[0098] like Figure 3 FIG. 1 is a schematic diagram of a cyclone group inlet pressure control device 300 provided in an embodiment of the present application, wherein the device comprises:
[0099] A setting module 301 is used to set a target inlet pressure range of the cyclone group;
[0100] An acquisition module 302 is used to acquire a control model quality code of the cyclone group, and determine whether the cyclone group meets the closed-loop control condition according to the control model quality code;
[0101] A determination module 303 is used to determine whether the cyclone group meets the closed-loop control condition and obtain the real-time inlet pressure of the cyclone group according to a preset period if the control model quality code is the first preset condition;
[0102] The control module 304 is used to control the valve of the cyclone group to open or close according to the target inlet pressure range and the real-time inlet pressure.
[0103] The cyclone group inlet pressure control device 300 provided in this embodiment can implement the cyclone group inlet pressure control method shown in Example 1, and will not be described again here to avoid repetition.
[0104] The cyclone group inlet pressure control device 300 provided in the embodiment of the present application sets a target inlet pressure range of the cyclone group, obtains a control model quality code of the cyclone group, and determines whether the cyclone group meets the closed-loop control condition according to the control model quality code. If the control model quality code is a first preset condition, it is determined that the cyclone group meets the closed-loop control condition and the real-time inlet pressure of the cyclone group is obtained according to a preset period. The valve of the cyclone group is controlled to be opened or closed according to the target inlet pressure range and the real-time inlet pressure. The valve opening or closing of each cyclone in the cyclone group is adjusted in real time through the control model, so that the real-time inlet pressure of the cyclone group can be effectively controlled within the target inlet pressure range, thereby improving the stability and accuracy of the pressure control of the cyclone group and improving the sorting effect and work efficiency of the mineral processing process.
[0105] Example 3
[0106] In addition, an embodiment of the present disclosure provides an electronic device 400, including a memory and a processor, wherein the memory stores a computer program.
[0107] For details, see Figure 4 The electronic device 400 includes: a receiver 401, a bus interface and a processor 402.
[0108] In the embodiment of the present invention, the electronic device 400 further includes a memory 403. Figure 4 In the embodiment, the bus architecture may include any number of interconnected buses and bridges, specifically linking various circuits of one or more processors represented by processor 402 and memory represented by memory 403. The bus architecture may also link various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. The bus interface provides an interface. The receiver 401 may be a plurality of components, namely, a transmitter and a receiver, providing a unit for communicating with various other devices on a transmission medium. The processor 402 is responsible for managing the bus architecture and general processing, and the memory 403 may store data used by the processor 402 when performing operations.
[0109] The electronic device 400 provided in the embodiment of the present invention can implement the cyclone group inlet pressure control method shown in Example 1, which will not be described again to avoid repetition.
[0110] The electronic device 400 provided in this embodiment sets a target inlet pressure range of the cyclone group, obtains the control model quality code of the cyclone group, and determines whether the cyclone group meets the closed-loop control condition according to the control model quality code. If the control model quality code is the first preset condition, it is determined that the cyclone group meets the closed-loop control condition and the real-time inlet pressure of the cyclone group is obtained according to a preset period. The valve of the cyclone group is controlled to be opened or closed according to the target inlet pressure range and the real-time inlet pressure. The valve opening or closing of each cyclone in the cyclone group is adjusted in real time through the control model, so that the real-time inlet pressure of the cyclone group can be effectively controlled within the target inlet pressure range, thereby improving the stability and accuracy of the pressure control of the cyclone group and improving the sorting effect and work efficiency of the ore dressing process.
[0111] In several embodiments provided in the present application, it should be understood that the disclosed devices and methods can also be implemented in other ways. The device embodiments described above are merely schematic. For example, the flowcharts and structure diagrams in the accompanying drawings show the possible architecture, functions and operations of the devices, methods and computer program products according to multiple embodiments of the present invention. In this regard, each box in the flowchart or block diagram can represent a module, a program segment or a part of a code, and the module, a program segment or a part of a code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in an alternative implementation, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the structure diagram and / or the flow chart, and the combination of boxes in the structure diagram and / or the flow chart, can be implemented with a dedicated hardware-based system that performs a specified function or action, or can be implemented with a combination of dedicated hardware and computer instructions.
[0112] In addition, the functional modules or units in the various embodiments of the present invention may be integrated together to form an independent part, or each module may exist independently, or two or more modules may be integrated to form an independent part.
[0113] If the functions are implemented in the form of software function modules and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a smart phone, a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0114] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A method for controlling the inlet pressure of a cyclone group, characterized in that: The method comprises: Setting the target inlet pressure range of the cyclone group; Acquire a control model quality code of the cyclone group, and determine whether the cyclone group meets a closed-loop control condition according to the control model quality code; If the control model quality code is the first preset condition, determining that the cyclone group meets the closed-loop control condition and obtaining the real-time inlet pressure of the cyclone group according to a preset period; The valve of the cyclone group is controlled to be opened or closed according to the target inlet pressure interval and the real-time inlet pressure.
2. The method for controlling the inlet pressure of a cyclone group according to claim 1, characterized in that: The step of obtaining the control model quality code of the cyclone group includes: Collect production data within a continuous time period, verify the completeness, accuracy and timeliness of the production data, and generate a control model quality code.
3. The method for controlling the inlet pressure of a cyclone group according to claim 1, characterized in that: The step of judging whether the cyclone group meets the closed-loop control condition according to the control model quality code comprises: If the control model quality code is the second preset condition, it is determined that the cyclone group does not meet the closed-loop control condition and the step of judging whether the cyclone group can participate in the control according to the control model quality code is repeated.
4. The method for controlling the inlet pressure of a cyclone group according to claim 1, characterized in that: The step of controlling the valve of the cyclone group to open or close according to the target inlet pressure interval and the real-time inlet pressure comprises: Initialize the cumulative calculation times to 0; determining whether the real-time inlet pressure is within the target inlet pressure range; If the real-time inlet pressure is within the target inlet pressure range, the accumulated calculation times are reset to 0; If the real-time inlet pressure is less than the left extreme value of the target inlet pressure, the cumulative calculation times are increased based on a preset period to determine whether the real-time cumulative calculation times are greater than a preset threshold value. If the real-time cumulative calculation times are greater than the preset threshold value, the cyclone group valve is closed according to a preset valve control strategy, wherein the preset valve control strategy includes any one of a first valve control strategy, a second valve control strategy, a third valve control strategy and a fourth valve control strategy; If the real-time inlet pressure is greater than the right extreme value of the target inlet pressure, the cumulative calculation times are increased based on a preset period to determine whether the real-time cumulative calculation times are greater than a preset threshold; if the real-time cumulative calculation times are greater than the preset threshold, the cyclone group valve is opened according to a preset valve control strategy, wherein the preset valve control strategy includes any one of a first valve control strategy, a second valve control strategy, a third valve control strategy and a fourth valve control strategy.
5. The method for controlling the inlet pressure of a cyclone group according to claim 4, characterized in that: The first valve control strategy includes: Sorting and numbering the cyclones according to their positions in the cyclone group; Each cyclone is traversed in the order of numbering to control the opening or closing of the valve of the cyclone group.
6. The method for controlling the inlet pressure of a cyclone group according to claim 4, characterized in that: The second valve control strategy includes: Obtaining an inlet pressure influence factor of each cyclone in the cyclone group; Sort and number the cyclones from large to small according to the inlet pressure influencing factors; Each cyclone is traversed in the order of numbering to control the opening or closing of the valve of the cyclone group.
7. The method for controlling the inlet pressure of a cyclone group according to claim 4, characterized in that: The third valve control strategy includes: Obtaining the cumulative number of times each cyclone in the cyclone group is turned on and off; The cyclones are sorted and numbered according to the cumulative number of opening and closing times. The cumulative number of opening times is numbered from small to large, and the cumulative number of closing times is numbered from small to large, forming two number lists; Each cyclone is traversed according to the number list to control the opening or closing of the valve of the cyclone group.
8. The method for controlling the inlet pressure of a cyclone group according to claim 4, characterized in that: The fourth valve control strategy includes: Obtaining the accumulated working time of each cyclone in the cyclone group; Sort and number each cyclone according to the accumulated working time; Each cyclone is traversed in the order of numbering, and the opening or closing of the valve of the cyclone group is controlled according to the accumulated working time.
9. A cyclone group inlet pressure control device, characterized in that: The device comprises: A setting module, used for setting a target inlet pressure range of the cyclone group; an acquisition module, used for acquiring a control model quality code of the cyclone group, and judging whether the cyclone group meets a closed-loop control condition according to the control model quality code; a determination module, configured to determine that the cyclone group satisfies a closed-loop control condition and obtain a real-time inlet pressure of the cyclone group according to a preset period if the control model quality code is a first preset condition; A control module is used to control the valve of the cyclone group to open or close according to the target inlet pressure range and the real-time inlet pressure.
10. An electronic device, characterized in that: The method comprises a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the cyclone group inlet pressure control method according to any one of claims 1 to 8 when executing the computer program.
11. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method for controlling the inlet pressure of a cyclone group according to any one of claims 1 to 8 are implemented.