Drilling and blasting trolley applied to large-section deep vertical shaft and construction method of drilling and blasting trolley

By designing a drilling and explosion trolley for deep vertical shafts in large sections, using track chassis, hydraulic drive and electronic label identification technology, the problems of inefficiency and safety hazards of existing drilling equipment are solved, and efficient and safe drilling operations are achieved.

CN119801393AActive Publication Date: 2025-04-11GUANGDONG KUNDA CONSTRUCTION CO LTD
View PDF 12 Cites 0 Cited by

Patent Information

Application Number
CN202411934026.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-26
Publication Date
2025-04-11
Estimated Expiration
2044-12-26

AI Technical Summary

Technical Problem

Existing drilling equipment is inefficient in large-section deep shaft operations, requires a large number of personnel to operate, has high power consumption, low energy utilization, and will discharge oil mist and harmful gases.

Method used

A drilling and explosion trolley was designed, adopting a tracked chassis and hydraulic drive structure, equipped with hydraulic drilling rods and rock drilling components, combining electronic tag identification technology and drilling measurement system to achieve automatic positioning and precise control.

Benefits of technology

Improve drilling efficiency and safety, reduce personnel operation needs, reduce power consumption and noise, and avoid emissions of oil mist and harmful gases.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119801393A_ABST
    Figure CN119801393A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of vertical shaft punching trolleys, and provides a drilling and blasting trolley applied to a large-section deep vertical shaft and a construction method thereof.The drilling and blasting trolley comprises a crawler chassis, the upper end of the crawler chassis is rotationally connected with a drilling arm base, the upper end of the drilling arm base is connected with a driving structure, and one end of the driving structure is connected with a drilling assembly; the terminal end of the drill arm base is connected with a micro host end through a wireless signal, a concave groove is formed in the surface of the drill arm base, and a movable supporting leg is movably connected into the concave groove; the driving structure comprises a rotating disc rotationally connected to the outer surface of the drill arm base, a fixing support is fixedly connected to the surface of the rotating disc, and an extension rod is fixedly connected to the outer surface of the rotating disc. According to the technical scheme, the problems that existing drilling equipment needs to be operated by a large number of workers, efficiency is low, oil mist and harmful gas can be discharged at the same time, power consumption is large, the energy utilization rate is low, rock drilling efficiency is not high, and exhaust noise is large are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of shaft drilling trolleys, and in particular to a drilling and blasting trolley applied to a large-section deep shaft and a construction method thereof. Background Art

[0002] At present, the mechanical equipment, hydraulic control and electronic technology used in the engineering industry have been vigorously developed and applied, and the rock drilling cycle of horizontal holes (tunnels / roads) has been mechanized; however, in vertical shaft operations, it is generally still at the old stage of low efficiency of pneumatic machinery and high labor input;

[0003] After searching, the drilling equipment used in "Explosive Excavation of Large-section Vertical Shafts under Complex Geological Conditions" by Tian Aijun, Ma Yanhui, and Gong Bing is usually carried out through the drilling operation of the bracket-type down-the-hole drill and the pneumatic rock drill;

[0004] However, the above-mentioned existing drilling equipment not only requires a large number of people to operate, but also has low efficiency, and will emit oil mist and harmful gases, and has the disadvantages of high power consumption, low energy utilization, low rock drilling efficiency, and high exhaust noise. For this reason, we propose a drilling and blasting trolley and a construction method for large-section deep vertical shafts. Summary of the invention

[0005] The present invention proposes a drilling and blasting trolley for large-section deep vertical shafts and a construction method thereof, which solves the problems mentioned in the background technology that the existing drilling equipment not only requires a large number of personnel to operate, but also has low efficiency, discharges oil mist and harmful gases, and has the disadvantages of high power consumption, low energy utilization, low rock drilling efficiency, and high exhaust noise.

[0006] The technical solution of the present invention is as follows:

[0007] A drilling and blasting trolley for use in a large-section deep shaft comprises a crawler chassis, the upper end of the crawler chassis is rotatably connected to a drill arm base, the upper end of the drill arm base is connected to a drive structure, one end of the drive structure is connected to a drilling assembly, a terminal of the drill arm base is connected to a micro host terminal via a wireless signal, a concave groove is provided on the surface of the drill arm base, and a movable leg is movably connected inside the concave groove;

[0008] The driving structure includes a turntable rotatably connected to the outer surface of the drill arm base, a fixed bracket is fixedly connected to the surface of the turntable, an extension rod is fixedly connected to the outer surface of the turntable, a No. 4 hydraulic rod is hinged between the drill arm base and the extension rod, a main bracket is hinged to the surface of the fixed bracket, an adjustment bracket is hinged to the surface of the main bracket, a No. 1 hydraulic rod is connected between the fixed bracket and the main bracket, two ends of the No. 1 hydraulic rod are respectively hinged to the fixed bracket and the main bracket, a No. 2 hydraulic rod is connected between the main bracket and the adjustment bracket, and two ends of the No. 2 hydraulic rod are respectively hinged to the adjustment bracket and the main bracket.

[0009] As a further technical solution of the present invention, the driving structure is provided in two groups and is arranged diagonally in the longitudinal direction of the drill arm base. The rotation angle of the main bracket on the surface of the fixed bracket is adjusted by extending and contracting the No. 1 hydraulic rod. The rotation angle of the adjusting bracket on the surface of the main bracket is adjusted by extending and contracting the No. 2 hydraulic rod. The number of the No. 1 hydraulic rod and the No. 2 hydraulic rod are both two groups and are symmetrically distributed. A reinforcing structure is provided between the adjusting bracket and the main bracket.

[0010] As a further technical solution of the present invention, the drilling assembly includes a rock rod support fixedly connected to one end of the adjusting support, and the surface of the rock rod support is respectively connected with a hydraulic rock drilling rod and a hydraulic rock drilling assembly, and the hydraulic rock drilling rod is used to drill holes on the inner wall of the deep well. The hydraulic rock drilling rod and the hydraulic rock drilling assembly are used to maintain the stability of the holes drilled by the hydraulic rock drilling rod. The surfaces of the hydraulic rock drilling rod and the rock rod support are sleeved with positioning structures, and the drill arm base is equipped with a load sensing system and a pilot proportional control system for accurately controlling the feed speed and rotation speed.

[0011] As a further technical solution of the present invention, one end of the movable leg extending into the drill arm base can rotate horizontally, and the movable leg can be pushed and retracted into the interior of the recessed groove when it rotates to be aligned with the opening direction of the recessed groove. The lower end of the movable leg can extend to support the drill arm base to maintain its stability. The bottom of the drill arm base is also symmetrically provided with two groups of columns, which can be used to cooperate with the movable legs to strengthen the support and anchoring of the drill arm base when in use. A driving gear B is provided for rotation inside the crawler chassis, and a driven gear A is meshedly connected to the surface of the driving gear B. A rotating motor C that drives the driving gear B to rotate is fixedly connected to the inner side of the crawler chassis.

[0012] As a further technical solution of the present invention, the reinforcement structure includes a support plate that is arranged between the adjustment bracket and the main bracket, a through hole is opened on the surface of the support plate, a positioning ring is arranged on the inner side of the adjustment bracket near both sides of the support plate, a fixing column is fixedly connected between the positioning ring and the inner side of the adjustment bracket, a telescopic cylinder is fixedly connected to the surface of the adjustment bracket corresponding to the center of the positioning ring, and an insertion rod is fixedly connected to the output end of the telescopic cylinder.

[0013] As a further technical solution of the present invention, the positioning structure includes a main box and a sub-box which are respectively slidably connected to the surface of the hydraulic rock drilling rod and the rock rod support, and the same section of the inner side of the main box and the sub-box is hingedly connected with a No. 3 hydraulic rod, and a frame is hingedly connected between the ends of the two groups of No. 3 hydraulic rods on the same section, and a universal ball is fixedly connected to the outer surface of the frame, and a noise reduction plate is fixedly connected between the inner sides of the main box and the sub-box.

[0014] As a further technical solution of the present invention, the support plate and the main bracket are welded and fixed, the support plate and the adjusting bracket are slidably connected, the number of the through holes is several groups and distributed in a ring array, the positioning ring is a hollow circular ring structure, there are several groups of fixing columns between the positioning ring and the adjusting bracket, the diameter of the insertion rod is equal to the inner diameter of the positioning ring and the aperture size of the through hole, and the telescopic cylinder extends and pushes the insertion rod to be stuck into the two groups of positioning rings and the inside of the through hole to enhance the supporting performance between the adjusting bracket and the main bracket.

[0015] As a further technical solution of the present invention, the main box and the auxiliary box are slidably connected to each other, and the main box and the auxiliary box are slidably connected to the rock rod support and the hydraulic rock drilling rod, and the end of the No. 3 hydraulic rod away from the output is fixedly connected to the rock rod support through the support, the number of the No. 3 hydraulic rods is two groups and they are symmetrically distributed, and the main box and the auxiliary box are driven to move away from or closer to each other by the two groups of No. 3 hydraulic rods, and the support and positioning of the hydraulic rock drilling rod by the universal ball is achieved by the mutual approach of the main box and the auxiliary box, and the surface of the rock rod support is respectively provided with an electronic tag identifier, the electronic tag identifier has a depth and angle sensor, and the electronic tag identifier is used to correct the drilling trajectory.

[0016] As a further technical solution of the present invention, one end of the auxiliary box is matched with the main box, a metal plate is arranged in the middle of the noise reduction plate, and elastic sponges are adhered to both sides of the metal plate, when the No. 3 hydraulic rod is extended to the maximum, the main box and the auxiliary box are away from each other to the maximum distance, and the noise reduction plate is an unfolded straight structure at this time, and when the No. 3 hydraulic rod is contracted to the minimum position, the auxiliary box is embedded with the main box, and the noise reduction plate is a raised arc structure at this time.

[0017] The present invention also includes a construction method of a drilling and blasting trolley for a large-section deep shaft, and the construction method includes the following contents:

[0018] Step 1: Positioning and drilling; the main support is rotated to a suitable angle by pushing the No. 1 hydraulic rod, and the adjustment support is rotated to a suitable angle by pushing the No. 2 hydraulic rod, so that the outer end of the hydraulic drilling rod is tilted to correspond to the hole position marked on the inner side of the shaft, and the drilling assembly is started to make the outer end of the hydraulic drilling rod drill until the drilling reaches the designed depth;

[0019] Step 2: Slag removal, cleaning and hole formation; water injection for cleaning is performed while drilling, and water is continuously injected after drilling is completed to remove slag, and holes are formed after the discharged water flow becomes clean water.

[0020] The working principle and beneficial effects of the present invention are:

[0021] 1. The equipment is based on crawler chassis. The main machine is 3 meters long and has a compact structure. After the drill arm is retracted to a set angle, it can smoothly pass through the hoisting platform facilities in the well. It can be used without obstacles whether it is for forward or reverse well construction.

[0022] 2. The anchoring position adopts the method of hydraulic four movable legs and double column top and bottom support, which has simple anchoring process, high efficiency and stable anchoring;

[0023] 3. The forming equipment has all-round drilling function, with a horizontal hole opening angle of 0-180° and a pitch angle of ±90°, a wide hole opening range and strong adaptability;

[0024] 4. The equipment's unique electronic tag recognition technology enables the acquisition and recording of drilling angles and depths. The host can automatically analyze the transmission signal and correct the drilling trajectory in real time, making the construction more efficient.

[0025] 5. The measurement while drilling system adopts wireless data transmission, which has the characteristics of high transmission efficiency, fast data analysis and high accuracy, and can reduce the cost of consumables such as drilling tools;

[0026] 6. It adopts advanced load-sensitive system and pilot proportional control system, which can accurately control the feed speed and rotation speed, and has the characteristics of energy saving, high flow control accuracy and overload protection;

[0027] 7. The equipment is equipped with a micro host terminal, which can control the equipment operation from a distance. The real-time drilling information can be wirelessly transmitted to the micro host, which can read parameters, record data and correct drilling deviation during the construction process; a touch-screen large-screen remote control can also be set up as needed, separated from the host, and connected to the parent and child machines;

[0028] 8. The equipment is equipped with a hydraulic pump station and hydraulic rods to achieve all-round adjustment of the drilling angle, and cooperate with the drilling measurement system to achieve directional and controllable drilling of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0030] Figure 1 It is a schematic diagram of the structure of the device of the present invention;

[0031] Figure 2 It is a schematic diagram of the local structure of the driving structure and the drilling assembly of the present invention;

[0032] Figure 3 It is a schematic diagram of the local structure of the driving structure of the present invention;

[0033] Figure 4 It is a schematic diagram of the local structure of the connection between the fixed support and the drill arm base of the present invention;

[0034] Figure 5 It is a schematic diagram of a local structure in which the reinforcing structure and the positioning structure of the present invention are respectively mounted on the driving structure and the drilling assembly;

[0035] Figure 6 It is a partial structural schematic diagram of another perspective of the strengthening structure of the present invention;

[0036] Figure 7 For the present invention Figure 6 A schematic diagram of a local structure cut away from another perspective;

[0037] Figure 8 For the present invention Figure 7 A schematic diagram of a local structure cut away from another perspective;

[0038] Fig. 9 It is a schematic diagram of the local structure of the positioning structure of the present invention;

[0039] Fig.10 It is a schematic diagram of a partial structure of the positioning structure of the present invention;

[0040] Fig.11 It is a schematic diagram of the local structure of the universal ball of the present invention;

[0041] Fig.12 This is a partial cross-sectional view of the rotation principle of the drill arm base according to the present invention when viewed from above.

[0042] In the figure: 1. crawler chassis; 2. drill arm base;

[0043] 3. Driving structure; 31. Fixed bracket; 32. Main bracket; 33. Adjusting bracket; 34. No. 1 hydraulic rod; 35. No. 2 hydraulic rod; 36. Turntable; 37. Extension rod; 38. No. 4 hydraulic rod;

[0044] 4. Drilling assembly; 41. Rock rod support; 42. Hydraulic rock drilling rod; 43. Hydraulic rock drilling assembly;

[0045] 5. Micro host end; 6. Concave groove; 7. Movable legs;

[0046] 8. Strengthening structure; 81. Support plate; 82. Through hole; 83. Positioning ring; 84. Fixing column; 85. Telescopic cylinder; 86. Insertion rod;

[0047] 9. Positioning structure; 91. Main box; 92. Auxiliary box; 93. No. 3 hydraulic rod; 94. Frame; 95. Universal ball; 96. Noise reduction plate.

[0048] A. Driven gear; B. Driving gear; C. Rotating motor. DETAILED DESCRIPTION

[0049] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0050] Example 1

[0051] like Figure 1 to Figure 5 and Fig.12 As shown, this embodiment proposes a drilling and blasting trolley for use in a large-section deep shaft, comprising a crawler chassis 1, the upper end of the crawler chassis 1 is rotatably connected to a drill arm base 2, the upper end of the drill arm base 2 is connected to a drive structure 3, one end of the drive structure 3 is connected to a drilling assembly 4, a terminal of the drill arm base 2 is connected to a micro host terminal 5 via a wireless signal, a concave groove 6 is provided on the surface of the drill arm base 2, and a movable leg 7 is movably connected inside the concave groove 6;

[0052] The driving structure 3 includes a turntable 36 rotatably connected to the outer surface of the drill arm base 2, a fixed bracket 31 is fixedly connected to the surface of the turntable 36, an extension rod 37 is fixedly connected to the outer surface of the turntable 36, a No. 4 hydraulic rod 38 is hinged between the drill arm base 2 and the extension rod 37, a main bracket 32 ​​is hinged to the surface of the fixed bracket 31, an adjusting bracket 33 is hinged to the surface of the main bracket 32, a No. 1 hydraulic rod 34 is connected between the fixed bracket 31 and the main bracket 32, and the two ends of the No. 1 hydraulic rod 34 are respectively hinged to the fixed bracket 31 and the main bracket 32, a No. 2 hydraulic rod 35 is connected between the main bracket 32 ​​and the adjusting bracket 33, and the two ends of the No. 2 hydraulic rod 35 are respectively hinged to the adjusting bracket 33 and the main bracket 32.

[0053] There are two groups of driving structures 3, which are arranged diagonally in the longitudinal direction of the drill arm base 2. The rotation angle of the main bracket 32 ​​on the surface of the fixed bracket 31 is adjusted by extending and contracting the No. 1 hydraulic rod 34, and the rotation angle of the adjusting bracket 33 on the surface of the main bracket 32 ​​is adjusted by extending and contracting the No. 2 hydraulic rod 35. There are two groups of No. 1 hydraulic rod 34 and No. 2 hydraulic rod 35, which are symmetrically distributed. A reinforcing structure 8 is arranged between the adjusting bracket 33 and the main bracket 32.

[0054] The drilling assembly 4 includes a rock rod support 41 fixedly connected to one end of the adjusting bracket 33, and the surface of the rock rod support 41 is respectively connected with a hydraulic rock drilling rod 42 and a hydraulic rock drilling assembly 43. The hydraulic rock drilling rod 42 drills holes on the inner wall of the deep well. The hydraulic rock drilling rod 42 and the hydraulic rock drilling assembly 43 are used to maintain the stability of the holes drilled by the hydraulic rock drilling rod 42. The surfaces of the hydraulic rock drilling rod 42 and the rock rod support 41 are sleeved with a positioning structure 9. The drill arm base 2 is built with a load sensing system and a pilot proportional control system for accurately controlling the feed speed and rotation speed.

[0055] One end of the movable leg 7 extending into the drill arm base 2 can rotate horizontally, and the movable leg 7 can be pushed and retracted into the inside of the recessed groove 6 when it rotates to be aligned with the opening direction of the recessed groove 6. The lower end of the movable leg 7 can extend to support the drill arm base 2 to maintain its stability. The bottom of the drill arm base 2 is also symmetrically provided with two groups of columns, which can be used to cooperate with the movable leg 7 to strengthen the support and anchoring of the drill arm base 2 when in use. A driving gear B is rotatably arranged inside the crawler chassis 1, and a driven gear A is meshedly connected to the surface of the driving gear B. A rotating motor C that drives the driving gear B to rotate is fixedly connected to the inner side of the crawler chassis 1.

[0056] In this embodiment, the equipment uses a crawler chassis for walking. The main machine is 3 meters long and has a compact structure. After the drill arm is retracted to a set angle, it can smoothly pass through the hoisting tray facilities in the well. Whether it is a forward well or a reverse well construction, it can be used without obstacles.

[0057] The station anchoring adopts the method of hydraulic four movable legs and double column top and bottom support, which has simple anchoring process, high efficiency and stable anchoring;

[0058] By extending and retracting the No. 4 hydraulic rod 38, the extension rod 37 can be pushed to allow the turntable 36 to freely rotate at an angle of 30° to the left and right of its own axis, greatly improving the free adjustment range of the drilling assembly 4; it can also reduce mutual interference caused by drilling direction or position when two rods 4 are working at the same time.

[0059] The forming equipment has all-round drilling function, with a horizontal hole opening angle of 0 to 180° and a pitch angle of ±90°, a wide hole opening range and strong adaptability;

[0060] The equipment's unique electronic tag recognition technology enables the acquisition and recording of drilling angles and depths. The host can automatically analyze the transmission signals and correct the drilling trajectory in real time, making construction more efficient.

[0061] The measurement while drilling system adopts wireless data transmission, which has the characteristics of high transmission efficiency, fast data analysis and high accuracy, and can reduce the cost of consumables such as drilling tools;

[0062] It adopts advanced load-sensing system and pilot proportional control system, which can accurately control the feed speed and rotation speed, and has the characteristics of energy saving, high flow control accuracy and overload protection;

[0063] The equipment is equipped with a micro host, which can control the equipment operation from a distance. The real-time drilling information can be wirelessly transmitted to the micro host, which can read parameters, record data and correct drilling deviation during the construction process; a touch-screen large-screen remote control can also be set up as needed, separated from the host, and connected to the parent and child machines;

[0064] The equipment is equipped with a hydraulic pump station and hydraulic rods to achieve all-round angular adjustment of the drilling hole, and cooperates with the drilling measurement system to achieve directional and controllable drilling of the equipment.

[0065] Example 2

[0066] like Figure 6 to Figure 8 As shown, on the basis of Example 1, it is further proposed that the reinforcement structure 8 includes a support plate 81 that is arranged between the adjustment bracket 33 and the main bracket 32, a through hole 82 is opened on the surface of the support plate 81, and a positioning ring 83 is arranged on the inner side of the adjustment bracket 33 near both sides of the support plate 81, a fixing column 84 is fixedly connected between the positioning ring 83 and the inner side of the adjustment bracket 33, a telescopic cylinder 85 is fixedly connected to the surface of the adjustment bracket 33 corresponding to the center of the positioning ring 83, and an insertion rod 86 is fixedly connected to the output end of the telescopic cylinder 85.

[0067] The support plate 81 and the main bracket 32 ​​are welded and fixed, and the support plate 81 and the adjusting bracket 33 are slidably connected. The number of through holes 82 is several groups and distributed in a ring array. The positioning ring 83 is a hollow circular ring structure. There are several groups of fixing columns 84 between the positioning ring 83 and the adjusting bracket 33. The diameter of the insertion rod 86 is equal to the inner diameter of the positioning ring 83 and the aperture size of the through hole 82. The telescopic cylinder 85 extends and pushes the insertion rod 86 to be stuck into the two groups of positioning rings 83 and the inside of the through hole 82 to enhance the supporting performance between the adjusting bracket 33 and the main bracket 32.

[0068] In this embodiment, during use, the adjustment bracket 33 can be stretched out on the surface of the main bracket 32, while maintaining the stability of the rotation and expansion between the adjustment bracket 33 and the main bracket 32, which has a reinforcing effect and can effectively reduce the jacking pressure of the second hydraulic rod 35, thereby effectively improving the service life of the equipment.

[0069] Example 3

[0070] like Figures 9 to 11 As shown, on the basis of Example 1, a positioning structure 9 is proposed, which includes a main box 91 and a sub-box 92 which are respectively slidably sleeved on the surface of the hydraulic rock drilling rod 42 and the rock rod support 41, and a No. 3 hydraulic rod 93 is hingedly connected to the same cross-section on the inner side of the main box 91 and the sub-box 92, and a frame 94 is hingedly connected between the ends of the two groups of No. 3 hydraulic rods 93 on the same cross-section, and a universal ball 95 is fixedly connected to the outer surface of the frame 94, and a noise reduction plate 96 is fixedly connected between the inner sides of the main box 91 and the sub-box 92.

[0071] The main box 91 and the auxiliary box 92 are slidably connected to each other, and the main box 91 and the auxiliary box 92 are slidably connected to the rock rod support 41 and the hydraulic rock drilling rod 42, and the end of the No. 3 hydraulic rod 93 away from the output is fixedly connected to the rock rod support 41 through the support. The number of No. 3 hydraulic rods 93 is two groups and they are symmetrically distributed. The two groups of No. 3 hydraulic rods 93 respectively drive the main box 91 and the auxiliary box 92 to move away from or close to each other, and the universal ball 95 supports and positions the hydraulic rock drilling rod 42 through the mutual approach of the main box 91 and the auxiliary box 92. Electronic tag identifiers are respectively provided on the surface of the rock rod support 41. The electronic tag identifiers have depth and angle sensors, and the electronic tag identifiers are used to correct the drilling trajectory.

[0072] One end of the auxiliary box 92 is matched with the main box 91, a metal plate is provided in the middle of the noise reduction plate 96, and elastic sponges are adhered to both sides of the metal plate. When the No. 3 hydraulic rod 93 is extended to the maximum, the main box 91 and the auxiliary box 92 are away from each other to the maximum distance, and the noise reduction plate 96 is an unfolded straight structure. When the No. 3 hydraulic rod 93 is retracted to the minimum position, the auxiliary box 92 is embedded in the main box 91, and the noise reduction plate 96 is a raised arc structure.

[0073] In this embodiment, during use, the position of the hydraulic rock drilling rod 42 can be positioned, fixed, and guided by the universal ball 95, which can reduce the slight offset of the hydraulic rock drilling rod 42 after long-term use. At the same time, the force of the universal ball 95 squeezing the hydraulic rock drilling rod 42 can be adjusted by contracting the No. 3 hydraulic rod 93. At the same time, the curvature of the noise reduction plate 96 can be increased, thereby reducing the operating noise of the hydraulic rock drilling rod 42.

[0074] The present invention also includes a construction method of a drilling and blasting trolley for a large-section deep shaft, and the construction method includes the following contents:

[0075] Step 1: Positioning and drilling; the main support 32 is rotated to a suitable angle by pushing the No. 1 hydraulic rod 34, and the adjustment support 33 is rotated to a suitable angle by pushing the No. 2 hydraulic rod 35, so that the outer end of the hydraulic drilling rod 42 is tilted to correspond to the hole position marked on the inner side of the shaft, and the drilling assembly 4 is started to make the outer end of the hydraulic drilling rod 42 drill a hole until the drilling reaches the designed depth;

[0076] Step 2: Slag removal, cleaning and hole formation; water injection for cleaning is performed while drilling, and water is continuously injected after drilling is completed to remove slag, and holes are formed after the discharged water flow becomes clean water.

[0077] In summary, the working principle of the present invention is as follows:

[0078] During use, first positioning and drilling are performed; the main support 32 is rotated to a suitable angle by pushing the No. 1 hydraulic rod 34, and the adjustment support 33 is rotated to a suitable angle by pushing the No. 2 hydraulic rod 35, so that the outer end of the hydraulic rock drilling rod 42 is tilted to correspond to the hole position marked on the inner side of the shaft, and the drilling assembly 4 is started, so that the outer end of the hydraulic rock drilling rod 42 is used to drill a hole until the drilling reaches the designed depth;

[0079] After that, the slag is removed, cleaned and holes are formed; water is injected for cleaning while drilling, and water is continuously injected after the drilling is completed to remove the slag, and holes are formed after the discharged water flow becomes clean water.

[0080] During the above-mentioned use, when the adjusting bracket 33 is unfolded to a suitable angle at one end of the main bracket 32 ​​and it is necessary to maintain the current posture for drilling, the output end of the telescopic cylinder 85 can be extended so that one end of the insertion rod 86 passes through the inside of a group of positioning rings 83, and then passes through the through hole 82 on the surface of the support plate 81, and then passes through the inside of another group of positioning rings 83. The two groups of positioning rings 83 are connected to the support plate 81 through the insertion rod 86, so that a better and more stable supporting force is obtained between the adjusting bracket 33 and the main bracket 32, effectively maintaining the performance of the equipment for long-term use, and at the same time, the reaction force of the No. 2 hydraulic rod 35 when the drilling assembly 4 is drilling can be reduced, thereby extending the service life of the equipment.

[0081] During the drilling process, the No. 3 hydraulic rod 93 can be retracted, and the main box 91 and the auxiliary box 92 will approach each other until the main box 91 and the auxiliary box 92 are interlocked with each other. During this process, the inclination angle of the No. 3 hydraulic rod 93 on the same cross section will increase until the surface of the universal ball 95 directly forms a point contact state with the surface of the hydraulic rock drilling rod 42. At the same time, the noise reduction plate 96 will change from a straight state to a curved state. During the drilling process of the hydraulic rock drilling rod 42, the universal ball 95 supports and guides the drilling position of the hydraulic rock drilling rod 42, so that on the basis of the original rock rod support 41, the hydraulic rock drilling rod 42 can be further maintained without generating any vibration when running. The axial offset is generated to achieve the effect of precise positioning, which greatly reduces the error in the drilling process. According to the arc angle of the noise reduction plate 96, the noise transmitted to the outside during the operation of the hydraulic rock drill rod 42 can be effectively suppressed. According to the adjustment of the distance between the main box 91 and the auxiliary box 92, when the main box 91 and the auxiliary box 92 are far away from each other, the noise reduction plate 96 is in a straight state. At this time, the noise reduction effect is minimal, and when the main box 91 and the auxiliary box 92 are in the engaged state, the noise reduction plate 96 will be in an arc structure. At this time, the sponge structure on both sides of the noise reduction plate 96 can be fully exposed, and effectively suppress the noise of the hydraulic rock drill rod 42 during rotation drilling, thereby suppressing the noise.

[0082] It should be noted that compared with the original pneumatic rock drilling machinery and equipment used in shaft excavation, this new equipment has significant advantages such as energy saving, high efficiency, low cost and good working conditions due to its full hydraulic drive. According to the requirements of the drilling arrangement of shaft excavation, the slot holes, auxiliary holes and peripheral holes of the excavation section can be fully adapted to the drilling; in addition, the drilling of anchor holes that take up a long time when supporting the shaft wall is used to maximize the superior performance of the machinery. Its drilling speed is generally 50-100% higher than that of pneumatic equipment (comparison: the drilling speed of a manually operated hand pneumatic drill is 0.25m / min (aperture 32-42mm); the drilling speed of this type of equipment is 1.5m / min (aperture 50mm), and there is no obvious attenuation of the hole-forming efficiency when the aperture reaches 60mm), and the energy consumption is one-third of that of wind (gas) drive; it can also adjust the oil volume, pressure and piston stroke according to the hardness of the surrounding rock, greatly improving the rock drilling efficiency.

[0083] Compared with wind (gas) driven drilling equipment, it does not emit oil mist and harmful gases during construction, and also has the advantages of low power consumption, high energy utilization, high rock drilling efficiency, and no exhaust noise.

[0084] The development and use of this equipment can truly realize the functions of automatic hole opening, automatic shutdown, automatic drill withdrawal, drill jam prevention, automatic shifting and positioning of the trolley and drill arm, and remote control operation system. It is used to drill rock holes with a diameter of 20 to 100 mm and a depth of less than 20 meters in medium-hard rocks.

[0085] In addition, in order to meet the needs of various special wellbore construction, this type of equipment is also developing in the direction of large-scale and miniaturization; and implanting three-dimensional digital applications, progress visualization control technology and procedures, greatly improving the level of safety control, dynamic quality tracking and other refinements of on-site construction.

[0086] The noise sound pressure level generated by the equipment may be close to 100dB (A), and the sound energy is concentrated in the 1kHz-5kHz frequency range, which is still within the sensitive frequency range of the human ear. If noise protection measures are not taken, it will still be harmful to the health of construction workers. The sound sources mainly include the noise generated by the impact mechanism, the noise generated by the rotary mechanism, and the noise generated by the drill bit breaking the rock. The noise is mainly caused by structural noise. The structural gap of the hydraulic rock drill, the accumulator parameters, the characteristics of the impact material, and the tightness of the connecting parts are all factors that affect the noise of the hydraulic rock drill. To reduce the noise generated, a variety of measures should be taken to obtain greater improvement. Through the joint action of the various structures of the positioning structure 9 of the present invention, the noise can be effectively suppressed.

[0087] It should be noted that, in the present invention:

[0088] The upper part of the crawler chassis 1 is connected to a gear turntable structure consisting of a driven gear A, a driving gear B, and a rotating motor C, and the drill arm base 2 of the driving structure 3 is connected to the driving end of the gear disk, and the drill arm base 2 can realize 360-degree arbitrary rotation;

[0089] By extending and retracting the No. 4 hydraulic rod 38, the extension rod 37 can be pushed to allow the turntable 36 to freely rotate at an angle of 30° to the left and right of its own axis, greatly improving the free adjustment range of the drilling assembly 4; it can also reduce the mutual interference caused by the drilling direction or position when the two drilling assemblies 4 are working at the same time;

[0090] All hinges are hydraulically driven, making them highly adaptable in any space.

[0091] All actions of this type of machine are mechanized and can be completed by personnel operating the micro host terminal;

[0092] This type of machine should have both diesel engine and external power supply;

[0093] The present invention is committed to developing and putting into use a drilling and blasting trolley applicable to various industries and various types of vertical shaft operations, and is committed to realizing the vertical shaft drilling and blasting operations entering a higher intelligent mechanization era.

[0094] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A drilling and blasting trolley for use in large-section deep shafts, characterized in that: The crawler chassis (1) comprises a crawler chassis (1), the upper end of which is rotatably connected to a drill arm base (2), the upper end of which is connected to a drive structure (3), one end of which is connected to a drilling assembly (4), a terminal of the drill arm base (2) is connected to a micro host terminal (5) via a wireless signal, a recessed groove (6) is provided on the surface of the drill arm base (2), and a movable leg (7) is movably connected inside the recessed groove (6); The driving structure (3) comprises a turntable (36) rotatably connected to the outer surface of the drill arm base (2); a fixed bracket (31) is fixedly connected to the surface of the turntable (36); an extension rod (37) is fixedly connected to the outer surface of the turntable (36); a fourth hydraulic rod (38) is hinged between the drill arm base (2) and the extension rod (37); a main bracket (32) is hinged to the surface of the fixed bracket (31); an adjustment bracket (33) is hinged to the surface of the main bracket (32); a first hydraulic rod (34) is connected between the fixed bracket (31) and the main bracket (32); two ends of the first hydraulic rod (34) are hinged to the fixed bracket (31) and the main bracket (32), respectively; a second hydraulic rod (35) is connected between the main bracket (32) and the adjustment bracket (33), and two ends of the second hydraulic rod (35) are hinged to the adjustment bracket (33) and the main bracket (32), respectively.

2. The drilling and blasting trolley for large-section deep shafts according to claim 1, characterized in that: The driving structures (3) are provided in two groups and are arranged diagonally in the longitudinal direction of the drill arm base (2). The rotation angle of the main support (32) on the surface of the fixed support (31) is adjusted by extending and contracting the No. 1 hydraulic rod (34). The rotation angle of the adjustment support (33) on the surface of the main support (32) is adjusted by extending and contracting the No. 2 hydraulic rod (35). The No. 1 hydraulic rod (34) and the No. 2 hydraulic rod (35) are provided in two groups and are symmetrically distributed. A reinforcing structure (8) is provided between the adjustment support (33) and the main support (32).

3. The drilling and blasting trolley for large-section deep shaft according to claim 1, characterized in that: The drilling assembly (4) comprises a rock rod support (41) fixedly connected to one end of an adjusting support (33); a hydraulic rock drilling rod (42) and a hydraulic rock drilling assembly (43) are respectively connected to the surface of the rock rod support (41); the hydraulic rock drilling rod (42) drills a hole on the inner wall of a deep well; the hydraulic rock drilling rod (42) and the hydraulic rock drilling assembly (43) are used to maintain the stability of the hole drilled by the hydraulic rock drilling rod (42); a positioning structure (9) is sleeved on the surface of the hydraulic rock drilling rod (42) and the rock rod support (41); and a load sensing system and a pilot proportional control system are built into the drill arm base (2) for accurately controlling the feed speed and the rotation speed.

4. The drilling and blasting trolley for large-section deep shaft according to claim 1, characterized in that: The end of the movable leg (7) extending into the inside of the drill arm base (2) can rotate horizontally, and when the movable leg (7) rotates to be aligned with the opening direction of the recessed groove (6), it can be pushed and retracted into the inside of the recessed groove (6). The lower end of the movable leg (7) can extend to support the drill arm base (2) to maintain its stability. The bottom of the drill arm base (2) is also symmetrically provided with two groups of columns, which can be used to cooperate with the movable leg (7) to strengthen the support and anchoring of the drill arm base (2) when in use. The inside of the crawler chassis (1) is rotatably provided with a driving gear B, and the surface of the driving gear B is meshedly connected with a driven gear A. The inner side of the crawler chassis (1) is fixedly connected with a rotating motor C that drives the driving gear B to rotate.

5. The drilling and blasting trolley for large-section deep shaft according to claim 2, characterized in that: The reinforcing structure (8) comprises a support plate (81) penetrating between the adjustment bracket (33) and the main bracket (32); a through hole (82) is provided on the surface of the support plate (81); a positioning ring (83) is provided on the inner side of the adjustment bracket (33) near both sides of the support plate (81); a fixing column (84) is fixedly connected between the positioning ring (83) and the inner side of the adjustment bracket (33); a telescopic cylinder (85) is fixedly connected on the surface of the adjustment bracket (33) corresponding to the center of the positioning ring (83); and an insertion rod (86) is fixedly connected to the output end of the telescopic cylinder (85).

6. The drilling and blasting trolley for large-section deep shaft according to claim 3, characterized in that: The positioning structure (9) comprises a main box (91) and a sub-box (92) which are respectively slidably sleeved on the surfaces of the hydraulic rock drilling rod (42) and the rock rod support (41); a No. 3 hydraulic rod (93) is hingedly connected to the same cross section of the inner side of the main box (91) and the sub-box (92); a frame (94) is hingedly connected between the ends of two groups of No. 3 hydraulic rods (93) on the same cross section; a universal ball (95) is fixedly connected to the outer surface of the frame (94); and a noise reduction plate (96) is fixedly connected between the inner sides of the main box (91) and the sub-box (92).

7. The drilling and blasting trolley for large-section deep shaft according to claim 5, characterized in that: The support plate (81) and the main support (32) are fixed by welding, and the support plate (81) and the adjustment support (33) are slidably connected. The number of the through holes (82) is a plurality of groups and is distributed in a ring array. The positioning ring (83) is a hollow annular structure. The fixing columns (84) between the positioning ring (83) and the adjustment support (33) are a plurality of groups. The diameter of the insertion rod (86) is equal to the inner diameter of the positioning ring (83) and the aperture of the through hole (82). The telescopic cylinder (85) extends and pushes the insertion rod (86) to be inserted into the two groups of positioning rings (83) and the inside of the through hole (82), so as to enhance the support performance between the adjustment support (33) and the main support (32).

8. The drilling and blasting trolley for large-section deep shaft according to claim 6, characterized in that: The main box (91) and the auxiliary box (92) are slidably connected to each other. The main box (91) and the auxiliary box (92) are slidably connected to the rock rod support (41) and the hydraulic rock drilling rod (42). The end of the third hydraulic rod (93) away from the output is fixedly connected to the rock rod support (41) through the support. The number of the third hydraulic rods (93) is two groups and they are symmetrically distributed. The two groups of the third hydraulic rods (93) respectively drive the main box (91) and the auxiliary box (92) to move away from or approach each other. The universal ball (95) supports and positions the hydraulic rock drilling rod (42) by the mutual approach of the main box (91) and the auxiliary box (92). The surface of the rock rod support (41) is respectively provided with an electronic tag identifier, and the electronic tag identifier has a depth and angle sensor. The electronic tag identifier is used to correct the drilling trajectory.

9. The drilling and blasting trolley for large-section deep shaft according to claim 8, characterized in that: One end of the auxiliary box (92) matches the main box (91), a metal plate is arranged in the middle of the noise reduction plate (96), and elastic sponges are adhered to both sides of the metal plate. When the No. 3 hydraulic rod (93) is extended to the maximum, the main box (91) and the auxiliary box (92) are separated from each other to the maximum distance, and the noise reduction plate (96) is an unfolded straight structure. When the No. 3 hydraulic rod (93) is retracted to the minimum position, the auxiliary box (92) is embedded with the main box (91), and the noise reduction plate (96) is a raised arc structure.

10. A construction method of a drilling and blasting trolley for a large-section deep vertical shaft, using the drilling and blasting trolley for a large-section deep vertical shaft as claimed in any one of claims 1 to 9, characterized in that: The construction methods include the following: Step 1: positioning and drilling; the main support (32) is rotated to a suitable angle by pushing the No. 1 hydraulic rod (34), and the adjustment support (33) is rotated to a suitable angle by pushing the No. 2 hydraulic rod (35), so that the outer end of the hydraulic drilling rod (42) is tilted to correspond to the hole position marked on the inner side of the shaft, and the drilling assembly (4) is started to make the outer end of the hydraulic drilling rod (42) drill a hole until the drilling reaches the designed depth; Step 2: Slag removal, cleaning and hole formation; water injection for cleaning is performed while drilling, and water is continuously injected after drilling is completed to remove slag, and holes are formed after the discharged water flow becomes clean water.

Citation Information

Patent Citations

  • Integrated drilling and loading machine for mining and use method thereof

    CN109538205A

  • Crawler-type thin seam anchor rod drill rig

    CN110374498A

  • Drilling and blasting trolley

    CN116084835A

  • Load sensitive control and constant pressure control combined hydraulic system and arch anchor operation trolley

    CN117514958A

  • Intelligent multi-cantilever drill jumbo

    CN118997721A