Automatic pier column concrete vibrating device for bridge construction

By designing the automatic vibration device of pier column concrete for bridge construction, the problems of high labor intensity and safety hazards of manual vibration during construction are solved, automatic vibration and pier column maintenance are realized, and construction efficiency and safety are improved.

CN119843567APending Publication Date: 2025-04-18CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410708058.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-03
Publication Date
2025-04-18

AI Technical Summary

Technical Problem

During the bridge construction, during the layered pouring of pier column concrete, workers need to frequently use manual vibration to up and down the hanging boxes, resulting in high labor intensity, long vibration cycle and great safety hazards.

Method used

An automatic vibration device for pier column concrete for bridge construction is designed, including a hanging box, a movable vibration mechanism and a spray assembly. The movable vibration mechanism can be automatically lowered to concrete surfaces of different heights, perform asynchronous arc movement for vibration, and pierce the concrete surface during the vibration process to speed up the discharge of gas and accumulated water. The spray assembly is used for maintenance of pier columns, and spraying is achieved through water conduit of the lower hopper.

Benefits of technology

Automatic vibration of pier column concrete is realized, manual operation is reduced, vibration efficiency and safety is improved, and effective maintenance of pier columns is achieved through spray components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119843567A_ABST
    Figure CN119843567A_ABST
Patent Text Reader

Abstract

The pier column concrete automatic vibrating device for bridge construction comprises a hanging box, the hanging box is installed at the top of a supporting formwork in a matched mode, a top hanging assembly is installed at the top of the interior of the hanging box and comprises a top plate, the top plate is fixedly arranged at the top of the interior of the hanging box, and a discharging hopper is fixedly arranged in the middle of the top plate; the blanking hopper is used as a diversion structure of concrete and curing water; the outer wall of the upper guide ring is symmetrically sleeved with spraying assemblies. Outer supporting assemblies are arranged at the bottom of the upper guide ring at intervals, each outer supporting assembly comprises supporting frames and an outer ring plate, the supporting frames are symmetrically arranged on the two sides of each outer ring plate, and the supporting frames are fixedly arranged in the hanging box; two traction wheels are symmetrically arranged on the surface of the top plate, a second traction rope is wound around the outer wall of each traction wheel, and the bottom ends of the two second traction ropes are connected with the inner supporting assembly. By arranging the automatic vibrating mechanism capable of automatically ascending and descending, layered vibrating can be quickly completed, and the safety is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pier column concrete on-site vibrating equipment, in particular to an automatic vibrating device for pier column concrete used in bridge construction. Background Art

[0002] The pouring of bridge piers usually includes the following steps, especially when vibrators are used: Formwork preparation: Design and make concrete pier formwork to ensure accurate dimensions and stable support to maintain the verticality and flatness of the structure. The surface of the formwork may need to be coated with a release agent to reduce the adhesion between the concrete and the formwork. Concrete pouring: Pour the prepared concrete mixture into the formwork according to the design requirements. Concrete pouring should be carried out from bottom to top to ensure continuity and avoid cold bridges. Use a flat vibrator to vibrate point by point along the perimeter and center of the formwork to ensure that the concrete is evenly distributed. Vibration operation: Use a vibrator to vibrate from the bottom up according to the project requirements and construction process. The key is to ensure that each point vibrates for a long enough time, but avoid excessive vibration to avoid damaging the concrete structure. For large-volume piers, it may be necessary to use a vibrator in sections, such as partition vibration or use a vibrating table. Interval and curing: After completing the initial vibration, ensure that the concrete surface moves horizontally and that not too much concrete flows out when the vibrator is inserted. During the vibration process, the outer diameter of the pier should be continuously checked to ensure that its size is controlled within the allowable range. After vibration, the concrete should be allowed to settle properly and stand still, and then cured according to the standard curing time of concrete. Curing: Use special curing equipment for moisture curing.

[0003] Due to the high height of the pier, it is necessary to pour in layers. Currently, during the layered pouring, the crane installs the hanging box on the top of the support formwork. When the specified amount is poured into the support formwork, the workers lower the hanging box and carry vibrating rods to the concrete surface. Then the workers step on the steel cage to perform manual vibration operations. The entire vibration process requires a lot of labor from the workers, the vibration cycle is long, and there are major safety hazards. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides an automatic vibrating device for pier column concrete used in bridge construction, which solves the problems mentioned in the background technology.

[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0006] Automatic vibrating device for pier concrete used in bridge construction, including hanging box,

[0007] The hanging box is installed on the top of the supporting formwork, and a top hanging assembly is installed on the inner top of the hanging box. The top hanging assembly includes a top plate, which is fixed on the inner top of the hanging box. A lower hopper is fixed in the middle of the top plate, and the lower hopper is used as a diversion structure for concrete and curing water; a lower material pipe is connected to the bottom of the lower hopper, and a vertical plate is vertically symmetrically arranged on the bottom surface of the top plate. The bottom end of the vertical plate is fixedly connected to an upper guide ring, and the upper guide ring is located on the outer side of the lower material pipe. The outer wall of the upper guide ring is symmetrically covered with a spray assembly;

[0008] An outer support assembly is provided at intervals at the bottom of the upper guide ring, and the outer support assembly includes a support frame and an outer ring plate. Support frames are symmetrically provided on both sides of the outer ring plate, and the support frames are fixed in the hanging box;

[0009] Two groups of traction wheels are symmetrically arranged on the surface of the top plate, and the outer wall of each group of traction wheels is wound with a second traction rope, and the bottom ends of the two groups of second traction ropes are connected to the inner support assembly, and the inner support assembly includes an inner ring plate, the outer diameter of the inner ring plate is smaller than the inner diameter of the outer ring plate, the outer diameter of the upper guide ring is smaller than the outer diameter of the inner ring plate, and the inner ring plate, the outer ring plate and the outer support assembly are all located on the same center line; the outer diameter of the inner ring plate is smaller than the inner diameter of the steel cage; the outer wall of the inner ring plate is symmetrically equipped with a movable vibrating mechanism;

[0010] The automatic vibrating device includes pier casting mode and pier maintenance mode:

[0011] The pier casting mode includes the following states;

[0012] In the first state, the hanging box is installed on the support formwork, the inner ring plate is lifted to be concentric with the outer ring plate, and the concrete material is introduced into the support formwork through the lower hopper;

[0013] In the second state, the inner ring plate is lowered into the steel cage until the two sets of active vibrating mechanisms are inserted into the concrete. The two sets of active vibrating mechanisms synchronously perform asynchronous circular motions to automatically vibrate the concrete. At the same time, the active vibrating mechanisms pierce the top surface of the concrete and absorb the surface water of the concrete.

[0014] The pier column maintenance mode includes the following states:

[0015] In the third state, the inner ring plate is lifted to be concentric with the outer ring plate, the hanging box is placed above the pier column with a water spraying gap between the hanging box and the pier column, and the spray assembly is placed on the outside of the pier column;

[0016] The water supply pipe guides water to the lower hopper, and the lower hopper guides water to the spray assembly. The spray assembly performs a circular spraying motion, so that the spray water falls evenly along the pier from the spraying gap.

[0017] Furthermore, a lifting guide assembly is symmetrically provided on the surface of the inner ring plate, and the lifting guide assembly includes an inner seat body and an outer cover body. The inner seat body is symmetrically provided on the surface of the inner ring plate, and the top surface of the inner seat body is connected to the second traction rope. A spring rod is provided in the middle of the outer wall of the inner seat body, and guide rods are slidably installed on both sides of the outer wall. The outer ends of the spring rod and the guide rod are fixedly connected to the arc-shaped outer cover body, and the outer cover body is fitted with the inner wall of the steel cage. The outer cover body is used to flexibly support and guide the inner ring plate, so that the inner ring plate can be stably lifted and stably placed above the concrete.

[0018] Furthermore, the movable vibrating mechanism includes an active walking plate, a driving wheel, a vibrating assembly, and a floating driving mechanism; the inner ring of the surface of the inner ring plate is provided with an inner convex ring, and the outer wall of the inner convex ring is symmetrically provided with two groups of driving wheels, and the driving wheels are installed on the bottom surface of the active walking plate. A group of floating driving mechanisms is provided at the inner end of each group of active walking plates, and the floating driving mechanism is connected to the vibrating assembly. The floating driving mechanism is used to drive the vibrating assembly to rise and fall in the concrete, and the driving wheel is used to drive the vibrating assembly to reciprocate in a semi-circular manner.

[0019] Furthermore, the vibration assembly includes a vibration main unit, a vibration tube, and a vibration rod. The top end of the vibration rod is assembled and connected to the vibration tube. The vibration rod is electrically connected to a wire. The wire passes through the vibration tube and the end is connected to the vibration main unit. The vibration main unit is arranged on the surface of the active walking plate. A constraint seat is provided at the outer end of the active walking plate, and an arc-shaped matching plate is provided on the inner wall of the constraint seat. A constraint sleeve is provided on the outer wall of the bottom end of the matching plate. The vibration tube passes through the constraint sleeve.

[0020] Furthermore, the floating drive mechanism includes a screw rod, which passes through the constraint seat. The top end of the screw rod is rotatably mounted on the top surface of the constraint seat, and the bottom end of the screw rod is rotatably mounted on the inner bottom of the constraint sleeve. A floating plate is vertically slidably embedded in the inner part of the constraint sleeve. The screw thread passes through the floating plate, and the vibrating tube is fixedly passed through the floating plate. The screw rod rotates to drive the floating plate to move up and down, so that the vibrating rod can be lifted and lowered and vibrated in the concrete.

[0021] Furthermore, the bottom surface of the floating plate is provided with multiple groups of puncture rods, the bottom surface of the floating plate is provided with multiple pumping heads, the top surface of the floating plate is connected to the second pumping pipe, the second pumping pipe passes through the restraining seat and the end is connected to the return water tank, and the return water tank is provided on the top of the vibration host;

[0022] In the second state, when the floating plate moves up and down, the piercing rod moves up and down to pierce the concrete surface, so that the concrete surface forms a rough surface and accelerates the seepage of accumulated water; when the pumping head contacts the concrete surface, the accumulated water on the concrete surface is sucked out.

[0023] Furthermore, the spray assembly includes an outrigger arm and a movable seat. The outrigger arm is in a 7-shape. The outer end of the outrigger plate is fixedly provided with a movable seat. The movable seat is slidably mounted on the outer wall of the outer ring plate. A spray rack is installed on the bottom surface of the movable seat. A driven wheel is installed on the bottom surface of the inner end of the outrigger arm. The driven wheel is rollingly clamped on the outer wall of the upper guide ring. A liquid pump is installed on the top surface of the inner end of the outrigger arm. The inlet end of the liquid pump is connected to the side wall of the feed pipe through the first liquid pumping pipe, and the outlet end of the liquid pump is connected to the spray rack through the output pipe. A sealing valve plate is installed at the bottom end of the feed pipe. In the pier casting mode, the sealing valve plate is opened; in the pier maintenance mode, the sealing valve plate is closed.

[0024] In the third state, the spray rack is located outside the top end of the pier, and the outlet of the spray rack is inclined toward the pier.

[0025] Furthermore, a matching clamping plate is vertically provided on the bottom surface of the inner end of the outrigger arm, and the matching clamping plate is located on the outer side of the upper guide ring;

[0026] In the third state, when the inner ring plate is lifted, the active walking plate moves upward to between the matching clamping plates; when the active wheel moves, the driven wheel can be driven to follow the movement.

[0027] Furthermore, traction assemblies are symmetrically provided on both sides of the hoisting box, and the traction assembly includes a constraint frame, which is arranged on the side wall of the hoisting box, and a winding wheel is installed inside the constraint frame. A first traction rope is wrapped around the outer wall of the winding wheel, and the end of the first traction rope is connected to an anchor nail, and a lifting ring is provided on the top surface of the constraint frame.

[0028] Furthermore, a support ring is provided on the top of the outer wall of the support formwork;

[0029] When the hanging box is installed, the hanging box stopper is installed on the supporting ring, and the anchor nail is inserted into the soil, so that the first traction rope is pulled from the side to position the hanging box and the supporting formwork;

[0030] When the hanging box is in the hoisting state, the hanging box is lifted up and separated from the supporting formwork, and the anchor nails remain inserted into the soil, so that the first traction rope pulls and positions the hanging box in the suspended state from the side.

[0031] The present invention provides an automatic vibrating device for pier concrete used in bridge construction. Compared with the prior art, it has the following beneficial effects:

[0032] 1. The setting of the movable vibrating mechanism has the following effects: when unloading, the movable vibrating mechanism is lifted up to the outer ring plate, so that the concrete can be directly discharged into the supporting formwork and will not fall on the movable vibrating mechanism; when vibration is required, the traction wheel can lower the second traction rope, and then lower the movable vibrating mechanism, so that the movable vibrating mechanism can be lowered to the concrete surface at different heights; the movable vibrating mechanism can automatically make an arc mechanism to evenly vibrate each position of the concrete to achieve automatic vibration without manual operation; the movable vibrating mechanism can puncture the concrete during the vibration operation, so that the top surface of the concrete forms a rough surface, which is convenient for the combination of concrete at different levels. At the same time, during the puncture, the gas and accumulated water in the concrete can be discharged faster; the movable vibrating mechanism can quickly absorb the seeping accumulated water during the vibration operation to ensure the connection strength between multiple layers of concrete.

[0033] 2. The hanging box can be installed on the supporting formwork during the pier casting stage. After the pier is formed and the supporting formwork is removed, the hanging box can also be installed on the formed pier. In this way, the built-in spray assembly of the hanging box can spray water to the top of the pier, and the spray water can flow down along the top of the pier to achieve pier maintenance.

[0034] 3. The design of the lower hopper can guide the concrete during pouring, so that the concrete can be accurately discharged to the center of the support formwork. In the maintenance mode, the lower hopper can guide the maintenance water to the spray assembly without the need to connect the water pipe to the spray assembly. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0036] Figure 1 A schematic diagram of the assembly structure of the automatic concrete vibrating device and the supporting formwork of the present invention is shown;

[0037] Figure 2 A schematic diagram of the structure of the traction assembly of the present invention is shown;

[0038] Figure 3 The figure shows the internal cross-sectional structure diagram of the automatic concrete vibrating device of the present invention;

[0039] Figure 4 A schematic diagram of the lowering structure of the inner support assembly of the present invention is shown;

[0040] Figure 5 A schematic diagram of the structure of the movable vibrating mechanism of the present invention is shown;

[0041] Figure 6 A schematic diagram of the side cross-section structure of the movable vibrating mechanism of the present invention is shown;

[0042] Figure 7 A schematic diagram of the side cross-sectional structure of a floating plate of the present invention is shown;

[0043] Figure 8 A schematic diagram of the structure of the lifting guide assembly of the present invention is shown;

[0044] Fig. 9 A schematic diagram of the structure of the spray group of the present invention when viewed from above is shown;

[0045] Fig.10 A schematic diagram showing the concentric structure of the inner ring plate and the outer ring plate of the present invention is shown;

[0046] Fig.11 A schematic diagram of the spray state structure of the spray assembly of the present invention is shown;

[0047] As shown in the figure: 1. hanging box, 2. traction assembly, 21. first traction rope, 22. anchor nail, 23. constraint frame, 24. lifting ring, 25. winding wheel, 26. first motor, 3. support formwork, 31. supporting ring, 4. top hanging assembly, 41. top plate, 42. traction wheel, 421. second traction rope, 43. lower hopper, 431. lower feed pipe, 4311. sealing valve plate, 44. vertical plate, 45. upper guide ring, 5. outer support assembly, 51. support frame, 52. outer ring plate, 6. inner support assembly, 61. inner ring plate, 611. inner convex ring, 62. inner seat body, 621. spring rod, 622. guide rod, 63. outer cover body, 7. spray group Parts, 71, outrigger arm, 72, movable seat, 73, spray rack, 74, matching splint, 75, driven wheel, 76, liquid pump, 761, first liquid pumping pipe, 762, output pipe, 8, movable vibrating mechanism, 811, active walking plate, 812, active wheel, 82, vibrating assembly, 821, vibrating host, 822, wire, 823, vibrating pipe, 824, vibrating rod, 83, floating drive mechanism, 831, screw, 832, second liquid pumping pipe, 833, return water tank, 834, floating plate, 8341, pumping head, 835, piercing rod, 84, restraint seat, 85, matching plate, 86, restraint sleeve, 9, steel cage, 9a, pier column. DETAILED DESCRIPTION

[0048] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] Embodiment 1

[0050] In order to solve the technical problems in the background technology, the following automatic vibrating device for pier concrete used in bridge construction is provided:

[0051] Combination Figure 1-Figure 11 As shown, the automatic vibrating device for pier concrete used in bridge construction provided by the present invention includes a hanging box 1, which is installed on the top of the supporting formwork 3. A top hanging assembly 4 is installed on the internal top of the hanging box 1. The top hanging assembly 4 includes a top plate 41, which is fixed to the internal top of the hanging box 1. A lower hopper 43 is fixed in the middle of the top plate 41, and the lower hopper 43 is used as a diversion structure for concrete and curing water; a lower feed pipe 431 is connected to the bottom of the lower hopper 43, and a vertical plate 44 is vertically symmetrically provided on the bottom surface of the top plate 41. The bottom end of the vertical plate 44 is fixedly connected to an upper guide ring 45, which is located on the outside of the lower feed pipe 431, and the outer wall of the upper guide ring 45 is symmetrically covered with a spray assembly 7; an outer support assembly 5 is provided at intervals at the bottom of the upper guide ring 45, and the outer support assembly 5 includes a support A support frame 51 and an outer ring plate 52, support frames 51 are symmetrically arranged on both sides of the outer ring plate 52, and the support frames 51 are fixed in the hanging box 1; two groups of traction wheels 42 are symmetrically arranged on the surface of the top plate 41, and the outer wall of each group of traction wheels 42 is wrapped with a second traction rope 421, and the bottom ends of the two groups of second traction ropes 421 are connected to the inner support component 6, and the inner support component 6 includes an inner ring plate 61, and the outer diameter of the inner ring plate 61 is smaller than the inner diameter of the outer ring plate 52, and the outer diameter of the upper guide ring 45 is smaller than the outer diameter of the inner ring plate 61, and the inner ring plate 61, the outer ring plate 52 and the outer support component 5 are all located on the same center line; the outer diameter of the inner ring plate 61 is smaller than the inner diameter of the steel cage 9; the outer wall of the inner ring plate 61 is symmetrically covered with a movable vibrating mechanism 8; a through hole is opened on the bottom surface of the hanging box, and the inner diameter of the through hole is not less than the outer diameter of the support formwork.

[0052] The automatic vibrating device includes the pier 9a casting mode and the pier 9a maintenance mode:

[0053] The casting mode of the pier column 9a includes the following states: in the first state, the hanging box 1 is installed on the support formwork 3, the inner ring plate 61 is lifted up to be concentric with the outer ring plate 52, and the concrete material is introduced into the support formwork 3 through the lower hopper 43; in the second state, the inner ring plate 61 is lowered into the steel cage 9 until the two sets of active vibrating mechanisms 8 are inserted into the concrete, and the two sets of active vibrating mechanisms 8 synchronously perform asynchronous circular arc motion to automatically vibrate the concrete. At the same time, the active vibrating mechanisms 8 pierce the top surface of the concrete, and the active vibrating mechanisms 8 absorb the surface water of the concrete;

[0054] The maintenance mode of pier 9a includes the following states. In the third state, the inner ring plate 61 is lifted to be concentric with the outer ring plate 52, the hanging box 1 is placed above the pier 9a and a water spraying gap is left between the hanging box 1 and the pier 9a, and the spray assembly 7 is placed on the outside of the pier 9a; the water supply pipe guides water to the lower hopper 43, the lower hopper 43 guides water to the spray assembly 7, and the spray assembly 7 performs a circular spraying motion, so that the spray water falls evenly along the pier 9a from the water spraying gap.

[0055] In the above scheme,

[0056] 1. The setting of the movable vibrating mechanism has the following effects:

[0057] 1.1. When unloading, the movable vibrating mechanism is lifted up to the outer ring plate, so that the concrete can be directly discharged into the supporting formwork and will not fall on the movable vibrating mechanism;

[0058] 1.2. When vibration is required, the traction wheel can lower the second traction rope, and then lower the movable vibrating mechanism, so that the movable vibrating mechanism can be lowered to the concrete surface at different heights;

[0059] 1.3. The movable vibrating mechanism can automatically make an arc mechanism to evenly vibrate each position of the concrete, realizing automatic vibration without manual operation;

[0060] 1.4. The movable vibrating mechanism can puncture the concrete during the vibration operation, so that the top surface of the concrete forms a rough surface, which is convenient for the combination of concrete at different levels. At the same time, during the puncture, the gas and accumulated water in the concrete can be discharged faster;

[0061] 1.5. The movable vibrating mechanism can quickly absorb the seeping water during the vibration operation to ensure the connection strength between multiple layers of concrete.

[0062] 2. The hanging box can be installed on the supporting formwork during the pier casting stage. After the pier is formed and the supporting formwork is removed, the hanging box can also be installed on the formed pier. In this way, the built-in spray assembly of the hanging box can spray water to the top of the pier, and the spray water can flow down along the top of the pier to achieve pier maintenance.

[0063] 3. The design of the lower hopper can guide the concrete during pouring, so that the concrete can be accurately discharged to the center of the support formwork. In the maintenance mode, the lower hopper can guide the maintenance water to the spray assembly without the need to connect the water pipe to the spray assembly.

[0064] Embodiment 2

[0065] Based on the above embodiments, this embodiment further provides the following contents:

[0066] When the inner ring plate is lifted vertically, it lacks a supporting and stable structure, resulting in insufficient stability of the inner ring plate, and the design of the inner ring plate needs to be adapted to the steel cage;

[0067] In this embodiment, the surface of the inner ring plate 61 is symmetrically provided with a lifting guide assembly, which includes an inner seat body 62 and an outer cover body 63. The inner seat body 62 is symmetrically arranged on the surface of the inner ring plate 61, and the top surface of the inner seat body 62 is connected to the second traction rope 421. A spring rod 621 is provided in the middle of the outer wall of the inner seat body 62, and guide rods 622 are slidably installed on both sides of the outer wall. The outer ends of the spring rod 621 and the guide rod 622 are fixedly connected to the arc-shaped outer cover body 63, and the outer cover body 63 is fitted with the inner wall of the steel cage 9. The outer cover body 63 is used to flexibly support and guide the inner ring plate 61, so that the inner ring plate 61 can be stably lifted and stably placed on the concrete.

[0068] In the above scheme, the arc-shaped outer cover is designed to fit with the steel cage, and the spring rod supports the outer cover to elastically fit with the steel cage, which can adapt to the concave and convex surface requirements of the steel cage, thereby ensuring the stability of the inner ring plate during lifting and vibration.

[0069] In this embodiment, the movable vibrating mechanism 8 includes an active walking plate 811, a driving wheel 812, a vibrating assembly 82, and a floating driving mechanism 83; the inner ring of the surface of the inner ring plate 61 is provided with an inner convex ring 611, and the outer wall of the inner convex ring 611 is symmetrically provided with two groups of driving wheels 812, and the driving wheels 812 are installed on the bottom surface of the active walking plate 811. The inner end of each group of active walking plates 811 is provided with a group of floating driving mechanisms 83, and the floating driving mechanism 83 is connected to the vibrating assembly 82. The floating driving mechanism 83 is used to drive the vibrating assembly 82 to rise and fall in the concrete, and the driving wheel 812 is used to drive the vibrating assembly 82 to reciprocate in a semi-circular manner.

[0070] In the above scheme, the two sets of driving wheels act asynchronously, the driving wheels rotate to move along the inner convex ring, the driving wheels drive the active walking plate to move, and the active walking plate drives the vibrating assembly and the floating drive mechanism to move back and forth in an arc synchronously, so as to vibrate various positions of the concrete and achieve uniform vibration. At the same time, during the vibration process, the floating drive assembly can drive the vibrating assembly to move up and down, which can further increase the vibration dimension of the vibrating assembly. At the same time, when the vibrating assembly moves vertically, it can also accelerate the escape of gas.

[0071] In this embodiment, the vibration assembly 82 includes a vibration host 821, a vibration tube 823, and a vibration rod 824. The top end of the vibration rod 824 is assembled and connected to the vibration tube 823. The vibration rod 824 is electrically connected to the wire 822. The wire 822 passes through the vibration tube 823 and the end is connected to the vibration host 821. The vibration host 821 is arranged on the surface of the active walking plate 811; the outer end of the active walking plate 811 is provided with a constraint seat 84, the inner wall of the constraint seat 84 is provided with an arc-shaped matching plate 85, and the outer wall of the bottom end of the matching plate 85 is provided with a constraint sleeve 86; the vibration tube 823 passes through the constraint sleeve 86.

[0072] In the above scheme, the vibrating main machine transmits electric current to the vibrating rod, and the vibrating rod can perform vibration operation in the concrete.

[0073] In this embodiment, the floating drive mechanism 83 includes a screw 831, which passes through the constraint seat 84. The top end of the screw 831 is rotatably mounted on the top surface of the constraint seat 84, and the bottom end of the screw 831 is rotatably mounted on the inner bottom of the constraint sleeve 86. A floating plate 834 is vertically slidably embedded in the inner part of the constraint sleeve 86. The screw 831 threadably passes through the floating plate 834, and the vibrating tube 823 is fixedly passed through the floating plate 834. The screw 831 rotates to drive the floating plate 834 to move up and down, so that the vibrating rod 824 can be lifted and lowered and vibrated in the concrete.

[0074] In the above scheme, during the lifting action, the screw can rotate to drive the floating plate to move up and down along the restraining sleeve, and the restraining sleeve is on the top surface of the concrete.

[0075] In this embodiment, the bottom surface of the floating plate 834 is provided with a plurality of piercing rods 835, the bottom surface of the floating plate 834 is provided with a plurality of pumping heads 8341, the top surface of the floating plate 834 is connected to the second pumping pipe 832, the second pumping pipe 832 passes through the restraining seat 84 and the end thereof is connected to the return water tank 833, and the return water tank 833 is provided on the top of the vibration host 821;

[0076] In the second state, when the floating plate 834 moves up and down, the piercing rod 835 moves up and down to pierce the concrete surface, so that the concrete surface forms a rough surface and accelerates the seepage of accumulated water; when the pumping head 8341 contacts the concrete surface, the accumulated water on the concrete surface is sucked out.

[0077] In the above scheme, puncture rods and pumping heads are staggered on the bottom surface of the floating plate, the interior of the floating plate is a cavity structure, and the top surface of the floating plate is connected to the recovery box through the second pumping pipe. When pumping water, the accumulated water passes through the pumping head and the second pumping pipe to the recovery box.

[0078] Embodiment 3

[0079] Based on the above embodiments, this embodiment further provides the following contents:

[0080] In this embodiment, the spray assembly 7 includes an outrigger arm 71 and a movable seat 72. The outrigger arm 71 is in the shape of a letter "7". The outer end of the outrigger plate is fixedly provided with a movable seat 72. The movable seat 72 is slidably mounted on the outer wall of the outer ring plate 52. A spray rack 73 is installed on the bottom surface of the movable seat 72. A driven wheel 75 is installed on the bottom surface of the inner end of the outrigger arm 71. The driven wheel 75 is rollingly clamped on the outer wall of the upper guide ring 45. A liquid pump 76 is installed on the top surface of the inner end of the outrigger arm 71. The inlet of the liquid pump 76 The mouth end is connected to the side wall of the discharge pipe 431 through the first liquid extraction pipe 761, and the outlet end of the liquid extraction pump is connected to the spray rack 73 through the output pipe 762; a sealing valve plate 4311 is installed at the bottom end of the discharge pipe 431, and in the casting mode of the pier 9a, the sealing valve plate 4311 is opened; in the maintenance mode of the pier 9a, the sealing valve plate 4311 is closed; in the third state, the spray rack 73 is located on the outside of the top end of the pier 9a, and the outlet of the spray rack 73 is inclined toward the pier 9a.

[0081] In the above scheme,

[0082] When spraying is required, the sealing valve plate closes and blocks the feed pipe;

[0083] The external water pipe guides water to the discharge hopper and the discharge pipe, and then guides water to the spray rack through the first liquid extraction pipe and the output pipe, so that spray maintenance can be achieved. In this way, there is no need to assemble the external water pipe and the spray rack, so that the spray rack can move in a normal arc shape;

[0084] The driven wheel moves along the upper guide ring to drive the outrigger to move, and the moving seat can move along the outer ring plate.

[0085] In this embodiment, a mating clamp 74 is vertically provided on the bottom surface of the inner end of the outward extension arm 71, and the mating clamp 74 is located on the outer side of the upper guide ring 45; in the third state, when the inner ring plate 61 is lifted, the active walking plate 811 moves upward to between the mating clamps 74; when the active wheel 812 moves, it can drive the driven wheel 75 to follow the movement.

[0086] In the above scheme, when in maintenance mode, the inner ring plate is lifted up to the inner side of the outer ring plate, and with the setting of the clamping plate, the active walking plate can drive the outrigger arm to follow the opening and closing action. In this way, the outrigger arm does not need to be equipped with a separate drive motor, but only a motor matching the active wheel is required.

[0087] Embodiment 4

[0088] Based on the above embodiments, this embodiment further provides the following contents:

[0089] In this embodiment, the traction assembly 2 is symmetrically provided on both sides of the hanging box 1, and the traction assembly 2 includes a constraint frame 23, which is provided on the side wall of the hanging box 1, and a winding wheel 25 is installed inside the constraint frame 23, and a first traction rope 21 is wound around the outer wall of the winding wheel 25, and the end of the first traction rope 21 is connected to the anchor nail 22, and a lifting ring 24 is provided on the top surface of the constraint frame 23. A first motor 26 for driving the winding wheel 25 to rotate is provided at the end of the constraint frame 23;

[0090] In this embodiment, a support ring 31 is provided on the top of the outer wall of the support formwork 3;

[0091] When the hanging box 1 is installed, the stopper of the hanging box 1 is installed on the supporting ring 31, and the anchor nail 22 is inserted into the soil, so that the first traction rope 21 pulls and positions the hanging box 1 and the supporting formwork 3 from the side;

[0092] When the hanging box 1 is in the hoisted state, the hanging box 1 is lifted up and separated from the supporting formwork 3, and the anchor nails 22 remain inserted into the soil, so that the first traction rope 21 pulls and positions the hanging box 1 in the suspended state from the side.

[0093] In the above scheme:

[0094] The setting of the traction component can achieve the following effects:

[0095] 1. The traction assembly can be used to pull and position the hanging box from both sides during the installation of the hanging box to maintain the stability of the hanging box and the supporting formwork;

[0096] 2. When the supporting formwork needs to be disassembled, the hanging box can be lifted up, and the reel can release the first traction rope to adapt to the height of the hanging box. At the same time, the first traction rope can also ensure the stability of the hanging box from both sides to prevent the hanging box from shaking too much at high altitude.

[0097] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0098] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. An automatic vibrating device for pier concrete used in bridge construction, characterized in that: It includes a hanging box, which is installed on the top of the supporting formwork. A top hanging assembly is installed on the top of the interior of the hanging box. The top hanging assembly includes a top plate, which is fixed on the top of the interior of the hanging box. A lower hopper is fixed in the middle of the top plate. The lower hopper is used as a diversion structure for concrete and curing water. A lower feed pipe is connected to the bottom of the lower hopper. Vertical plates are vertically symmetrically arranged on the bottom surface of the top plate. The bottom ends of the vertical plates are fixedly connected to an upper guide ring. The upper guide ring is located on the outside of the lower feed pipe. The outer wall of the upper guide ring is symmetrically covered with a spray assembly. An outer support assembly is provided at intervals at the bottom of the upper guide ring, and the outer support assembly includes a support frame and an outer ring plate. Support frames are symmetrically provided on both sides of the outer ring plate, and the support frames are fixed in the hanging box; Two groups of traction wheels are symmetrically arranged on the surface of the top plate, and the outer wall of each group of traction wheels is wound with a second traction rope, and the bottom ends of the two groups of second traction ropes are connected to the inner support assembly, and the inner support assembly includes an inner ring plate, the outer diameter of the inner ring plate is smaller than the inner diameter of the outer ring plate, the outer diameter of the upper guide ring is smaller than the outer diameter of the inner ring plate, and the inner ring plate, the outer ring plate and the outer support assembly are all located on the same center line; the outer diameter of the inner ring plate is smaller than the inner diameter of the steel cage; the outer wall of the inner ring plate is symmetrically equipped with a movable vibrating mechanism; The automatic vibrating device includes pier casting mode and pier maintenance mode: The pier casting mode includes the following states; In the first state, the hanging box is installed on the support formwork, the inner ring plate is lifted to be concentric with the outer ring plate, and the concrete material is introduced into the support formwork through the lower hopper; In the second state, the inner ring plate is lowered into the steel cage until the two sets of active vibrating mechanisms are inserted into the concrete. The two sets of active vibrating mechanisms synchronously perform asynchronous circular motions to automatically vibrate the concrete. At the same time, the active vibrating mechanisms pierce the top surface of the concrete and absorb the surface water of the concrete. The pier column maintenance mode includes the following states: In the third state, the inner ring plate is lifted to be concentric with the outer ring plate, the hanging box is placed above the pier column with a water spraying gap between the hanging box and the pier column, and the spray assembly is placed on the outside of the pier column; The water supply pipe guides water to the lower hopper, and the lower hopper guides water to the spray assembly. The spray assembly performs a circular spraying motion, so that the spray water falls evenly along the pier from the spraying gap.

2. The automatic vibrating device for pier concrete used in bridge construction according to claim 1 is characterized in that: The surface of the inner ring plate is symmetrically provided with a lifting guide assembly, which includes an inner seat body and an outer cover body. The inner seat body is symmetrically arranged on the surface of the inner ring plate, and the top surface of the inner seat body is connected to the second traction rope. A spring rod is provided in the middle of the outer wall of the inner seat body, and guide rods are slidably installed on both sides of the outer wall. The outer ends of the spring rod and the guide rod are fixedly connected to the arc-shaped outer cover body, and the outer cover body is fitted with the inner wall of the steel cage. The outer cover body is used for flexibly supporting and guiding the inner ring plate, so that the inner ring plate can be stably lifted and stably placed above the concrete.

3. The automatic vibrating device for pier concrete used in bridge construction according to claim 2 is characterized in that: The movable vibrating mechanism includes an active walking plate, a driving wheel, a vibrating assembly, and a floating driving mechanism; an inner convex ring is provided on the inner ring of the surface of the inner ring plate, and two sets of driving wheels are symmetrically mounted on the outer wall of the inner convex ring. The driving wheels are installed on the bottom surface of the active walking plate, and a set of floating driving mechanisms is provided at the inner end of each set of active walking plates. The floating driving mechanism is connected to the vibrating assembly, and the floating driving mechanism is used to drive the vibrating assembly to rise and fall in the concrete, and the driving wheel is used to drive the vibrating assembly to reciprocate in a semi-circular manner.

4. The automatic vibrating device for pier concrete used in bridge construction according to claim 3 is characterized in that: The vibrating assembly includes a vibrating main unit, a vibrating tube, and a vibrating rod. The top end of the vibrating rod is assembled and connected to the vibrating tube. The vibrating rod is electrically connected to a wire, which passes through the vibrating tube and has an end connected to the vibrating main unit. The vibrating main unit is arranged on the surface of an active walking plate. A restraining seat is arranged at the outer end of the active walking plate, an arc-shaped matching plate is arranged on the inner wall of the restraining seat, and a restraining sleeve is arranged on the outer wall of the bottom end of the matching plate. The vibrating tube passes through the restraining sleeve.

5. The automatic vibrating device for pier concrete used in bridge construction according to claim 4 is characterized in that: The floating drive mechanism includes a screw rod, which passes through a constraint seat. The top end of the screw rod is rotatably mounted on the top surface of the constraint seat, and the bottom end of the screw rod is rotatably mounted on the inner bottom of the constraint sleeve. A floating plate is vertically slidably embedded in the inner part of the constraint sleeve. The screw thread passes through the floating plate, and the vibrating tube is fixedly passed through the floating plate. The screw rod rotates to drive the floating plate to move up and down, so that the vibrating rod can be lifted and lowered and vibrated in the concrete.

6. The automatic vibrating device for pier concrete used in bridge construction according to claim 5 is characterized in that: The bottom surface of the floating plate is provided with multiple groups of puncture rods, the bottom surface of the floating plate is provided with multiple pumping heads, the top surface of the floating plate is connected to the second pumping pipe, the second pumping pipe passes through the restraining seat and the end is connected to the return water tank, and the return water tank is arranged on the top of the vibration host; In the second state, when the floating plate moves up and down, the piercing rod moves up and down to pierce the concrete surface, so that the concrete surface forms a rough surface and accelerates the seepage of accumulated water; when the pumping head contacts the concrete surface, the accumulated water on the concrete surface is sucked out.

7. The automatic vibrating device for pier concrete used in bridge construction according to claim 6 is characterized in that: The spray assembly includes an outrigger arm and a movable seat. The outrigger arm is in a 7-shape. A movable seat is fixedly arranged at the outer end of the outrigger plate. The movable seat is slidably mounted on the outer wall of the outer ring plate. A spray rack is installed on the bottom surface of the movable seat. A driven wheel is installed on the bottom surface of the inner end of the outrigger arm. The driven wheel is rollingly clamped on the outer wall of the upper guide ring. A liquid pump is installed on the top surface of the inner end of the outrigger arm. The inlet end of the liquid pump is connected to the side wall of the feed pipe through the first liquid pumping pipe, and the outlet end of the liquid pump is connected to the spray rack through the output pipe. A sealing valve plate is installed at the bottom end of the feed pipe. In the pier casting mode, the sealing valve plate is opened; in the pier maintenance mode, the sealing valve plate is closed. In the third state, the spray rack is located outside the top end of the pier, and the outlet of the spray rack is inclined toward the pier.

8. The automatic vibrating device for pier concrete used in bridge construction according to claim 7 is characterized in that: A matching clamping plate is vertically provided on the bottom surface of the inner end of the outrigger arm, and the matching clamping plate is located on the outer side of the upper guide ring; In the third state, when the inner ring plate is lifted, the active walking plate moves upward to between the matching clamping plates; when the active wheel moves, the driven wheel can be driven to follow the movement.

9. The automatic vibrating device for pier concrete used in bridge construction according to claim 8, characterized in that: The two sides of the hanging box are symmetrically provided with traction components, which include a constraint frame, which is arranged on the side wall of the hanging box, a winding wheel is installed inside the constraint frame, and a first traction rope is wound around the outer wall of the winding wheel. The end of the first traction rope is connected to the anchor nail, and a lifting ring is arranged on the top surface of the constraint frame.

10. The automatic vibrating device for pier concrete used in bridge construction according to claim 9, characterized in that: A supporting ring is provided on the top of the outer wall of the supporting formwork; When the hanging box is installed, the hanging box stopper is installed on the supporting ring, and the anchor nail is inserted into the soil, so that the first traction rope is pulled from the side to position the hanging box and the supporting formwork; When the hanging box is in the hoisting state, the hanging box is lifted up and separated from the supporting formwork, and the anchor nails remain inserted into the soil, so that the first traction rope pulls and positions the hanging box in the suspended state from the side.

Citation Information

Cited By

  • Positioning device and positioning method for equipment welding

    CN120055708A

  • Concrete pier column pouring and vibrating device

    CN120666917A