Post-pulling anchoring type electric construction hanging basket
By using a rear-pull anchored electric construction hanging basket in high-rise buildings and using a cable-stayed steel wire rope to connect the boom and the structural beam, the problem of high construction costs in the existing technology is solved, and cost savings and safety improvements are achieved.
Patent Information
- Application Number
- CN202510211928.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-25
- Publication Date
- 2025-04-18
AI Technical Summary
During the construction process, existing hanging baskets for high-rise buildings require vehicle-mounted cranes to lift the weights, resulting in high construction costs.
The rear-pull anchored electric construction hanging basket is used to connect the boom and the structural beam through a cable-stayed steel wire rope to replace the traditional counterweight blocks and avoid the use of a crane.
Through the connection between the cable-stayed steel wire rope and the structural beam, construction costs are saved and the safety and stability of the hanging basket is improved.
Smart Images

Figure CN119843857A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of high-altitude construction, and in particular to a post-tensioned anchored electric construction hanging basket. Background Art
[0002] A hanging basket is a device used for aerial work, usually consisting of a metal basket suspended from the outside of a building, which can carry workers and tools for high-altitude construction, maintenance or cleaning work.
[0003] The related technology discloses a hanging basket for high-rise buildings, comprising a large arm horizontally arranged on a structural beam, one end of the large arm is provided with a hanging box suspended by a steel wire rope, and the other end is mounted with a counterweight by the steel wire rope, and the hanging box is equipped with a rope winding mechanism for retracting and unwinding the steel wire rope.
[0004] However, the counterweight block is heavy and usually requires a vehicle-mounted crane to lift the counterweight block to a high place. The vehicle-mounted crane will inevitably increase the construction cost expenditure, which has obvious shortcomings. Summary of the invention
[0005] In order to save construction costs, the present application provides a post-tensioned anchored electric construction hanging basket.
[0006] The present application provides a rear-tie anchored electric construction hanging basket adopts the following technical solution: A rear-tie anchored electric construction hanging basket comprises a boom horizontally erected on a structural beam, one end of the boom is mounted with a hanging box via a lifting wire rope, and the other end of the boom is anchored on the structural beam via a downward inclined inclined wire rope.
[0007] By adopting the above technical solution, the inclined steel wire rope realizes the connection between the boom and the structural beam, so that the pulling force of the boom acts on the structural beam through the inclined steel wire rope. By connecting the inclined steel wire rope with the structural beam, the traditional counterweight block is replaced, and the crane is not needed, thereby saving construction costs.
[0008] Optionally, an anchor plate is pre-embedded on the structural beam and fastened by anchor bolts, a U-shaped steel frame is arranged on the anchor plate, and the inclined steel wire rope is passed around the U-shaped steel frame.
[0009] By adopting the above technical solution, the anchor plate cooperates with the U-shaped steel frame to form a stable anchor point on the structural beam for the connection of the inclined steel wire rope.
[0010] Optionally, two anchor plates are arranged on the structural beam, and the two anchor plates correspond to one inclined steel wire rope respectively, and the distance between the two inclined steel wire ropes gradually increases from top to bottom.
[0011] By adopting the above technical solution, the two inclined steel wire ropes cooperate to improve the stability of the inclined steel wire ropes in holding the boom. When any inclined steel wire rope breaks and fails, the other inclined steel wire rope can still maintain the holding state, thereby improving the safety of the entire hanging basket.
[0012] Optionally, both ends of the inclined steel wire rope are fastened by a plurality of steel wire rope clamps.
[0013] By adopting the above technical solution, the inclined steel wire rope can be quickly connected to the U-shaped steel frame.
[0014] Optionally, a basket bolt is provided at the bottom of the inclined steel wire rope.
[0015] By adopting the above technical solution, the basket bolts realize secondary pre-tightening after the connection between the inclined steel wire rope and the U-shaped steel frame, further enhancing the tension of the inclined steel wire rope.
[0016] Optionally, a special-shaped bracket is arranged between the upper arm and the structural beam, and the special-shaped bracket includes a base plate anchored on the structural beam and a support fixed on the base plate, and the upper arm is detachably connected to the support.
[0017] By adopting the above technical solution, multiple special-shaped brackets are equipped, and each special-shaped bracket corresponds to a different angle between the base plate and the support, so that it is suitable for the installation of the upper arm on the structural beam with different inclination angles, providing a stable support for the upper arm.
[0018] Optionally, a vertical upper bracket is arranged on the top of the boom, and a pre-tensioned steel wire rope is tied between the two ends of the boom, and the pre-tensioned steel wire rope is passed around the top of the upper bracket.
[0019] By adopting the above technical solution, prestress can be applied to the boom after the pre-tensioned wire rope is tensioned, thereby further improving the bearing capacity of the hanging basket.
[0020] Optionally, a diagonal support frame is provided between one end of the large arm relative to the diagonal steel wire rope and the structural beam.
[0021] By adopting the above technical solution, the diagonal brace provides strong and powerful support for the upper arm, reducing the possibility of the upper arm being bent and deformed due to excessive force.
[0022] In summary, the present application includes at least one of the following beneficial technical effects: 1. The inclined steel wire rope realizes the connection between the boom and the structural beam, so that the pulling force of the boom acts on the structural beam through the inclined steel wire rope. The connection between the inclined steel wire rope and the structural beam replaces the traditional counterweight block, and there is no need to use a crane, thus saving construction costs; 2. The cooperation of two inclined steel wire ropes improves the stability of the inclined steel wire rope in holding the boom. When one inclined steel wire rope breaks and fails, the other inclined steel wire rope can still maintain the holding state, which improves the safety of the entire hanging basket; 3. Equipped with multiple special-shaped brackets, each of which corresponds to a different angle between the base plate and the support, so it is suitable for the installation of the boom on the structural beam with different inclination angles, providing a stable support for the boom. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the structure of an embodiment of the present application.
[0024] Figure 2 It is a schematic diagram of the positional relationship between the turnbuckle bolt, the inclined wire rope and the wire rope clamp in the embodiment of the present application.
[0025] Figure 3 It is a schematic diagram of the positional relationship between the structural beam, the special-shaped bracket and the upper arm in the embodiment of the present application.
[0026] Figure 4 yes Figure 2 Enlarged view of part A.
[0027] Explanation of the reference numerals in the accompanying drawings: 1. Boom; 2. Lifting wire rope; 3. Hoisting car; 4. Diagonal wire rope; 5. Structural beam; 6. Anchor plate; 7. U-shaped steel frame; 8. Wire rope clamp; 9. Basket bolt; 10. Special-shaped bracket; 101. Bottom plate; 102. Support; 11. Upper bracket; 12. Pre-tensioned wire rope; 13. Diagonal support frame. DETAILED DESCRIPTION
[0028] The following is combined with Figure 1-2 This application is described in further detail.
[0029] The embodiment of the present application discloses a rear-tensioned anchored electric construction hanging basket.
[0030] Reference Figure 1 , Figure 2 and Figure 3 The rear-tensioned anchored electric construction hanging basket includes a special-shaped bracket 10 arranged on the structural beam 5. The special-shaped bracket 10 includes a bottom plate 101 anchored on the structural beam 5 and a support 102 welded on the bottom plate 101. The special-shaped bracket 10 is made of Q235 material, and a horizontal arm 1 is slidably penetrated and bolted on the top of the support 102.
[0031] Reference Figure 1 , Figure 2 and Figure 3In actual construction, the top of the structural beam 5 at different positions may have different inclination angles. Therefore, multiple special-shaped brackets 10 are often equipped. Different special-shaped brackets 10 have different angles between the base plate 101 and the support 102, which is suitable for the installation of the boom 1 on the structural beam 5 with different inclination angles to ensure that the boom 1 remains in a horizontal state.
[0032] Reference Figure 1 One end of the boom 1 is mounted with a hanging box 3 through a lifting wire rope 2. The hanging box 3 is equipped with a rope winding mechanism for winding and unwinding the lifting wire rope 2, so as to realize the lifting and lowering of the hanging box 3. The rope winding mechanism directly adopts the existing technology.
[0033] Reference Figure 1 and Figure 2 The other end of the boom 1 is hinged with a U-shaped frame (not shown in the figure), and the U-shaped frame is equipped with an oblique steel wire rope 4 that is tilted downward and anchored on the structural beam 5.
[0034] Reference Figure 1 , Figure 2 and Figure 4 An anchor plate 6 is pre-buried on the structural beam 5 and fastened by anchor bolts, a U-shaped steel frame 7 is welded on the anchor plate 6, and the inclined steel wire rope 4 passes through the U-shaped steel frame 7 and is fastened by a plurality of steel wire rope clamps 8. The anchor plate 6 cooperates with the U-shaped steel frame 7 to form a stable anchor point on the structural beam 5 for the inclined steel wire rope 4 to be connected.
[0035] Reference Figure 1 , Figure 2 and Figure 4 A basket bolt 9 is arranged at the bottom of the inclined steel wire rope 4, and the basket bolt 9 realizes the secondary pre-tightening after the inclined steel wire rope 4 is connected to the U-shaped steel frame 7, further enhancing the tension of the inclined steel wire rope 4.
[0036] Reference Figure 1 , Figure 2 and Figure 4 There are four anchor plates 6 anchored on the structural beam 5 and divided into two groups, each group corresponds to a boom 1, and the four anchor plates 6 correspond to a diagonal steel wire rope 4 respectively. The distance between the two diagonal steel wire ropes 4 corresponding to the same boom 1 gradually increases from top to bottom.
[0037] The cooperation of the two inclined steel wire ropes 4 in the same group improves the stability of the inclined steel wire ropes 4 in pulling the boom 1. When any inclined steel wire rope 4 breaks and fails, the other inclined steel wire rope 4 can still maintain the pulling state, thereby improving the safety of the entire hanging basket.
[0038] Reference Figure 1A vertical upper bracket 11 is bolted to the top of the boom 1 relative to the special-shaped bracket 10, and a pre-tensioned wire rope 12 is tied between the two ends of the boom 1 through a wire rope clamp 8, and the pre-tensioned wire rope 12 passes around the top of the upper bracket 11.
[0039] Reference Figure 1 One end of the boom 1 relative to the inclined steel wire rope 4 is supported and bolted with an inclined brace 13 between the structural beam 5. The inclined brace 13 is made of 50*50 angle iron. The inclined brace 13 provides strong support for the boom 1, reducing the possibility of the boom 1 being bent downward due to excessive force.
[0040] Reference Figure 1 and Figure 2 In the present application, the anchor plate 6 and the special-shaped bracket 10 are both anchored on the structural beam 5 by anchor bolts. In order to ensure the strength of the anchor bolts, an anchor bolt pull-out test needs to be carried out on site.
[0041] The specific test process is as follows: 1. Preparation Check required materials: ensure that all required materials such as anchor bolts, anchors, handles, connecting rings, etc. are complete.
[0042] Determine the pull-out position: Determine the pull-out position and anchor installation position according to the test requirements to ensure safety and maintain the same anchor distance.
[0043] Check the anchor installation: Carefully check whether the anchor is installed firmly and make necessary reinforcement.
[0044] 2. Installation Select the drill bit: According to the specifications and installation depth of the anchor bolt, select a suitable drill bit to drill the hole, and ensure that the size and depth meet the requirements.
[0045] Clean the holes: The drilled holes should be cleaned to prevent debris from affecting the performance of the anchor bolts.
[0046] Install the anchor bolt: Push the anchor bolt into the hole, being careful not to damage the anchor bolt thread.
[0047] 3. Pulling Secure the anchor bolts: Use the handle to secure the anchor bolts.
[0048] Connect the anchor: Connect the connecting ring to the anchor.
[0049] Apply tension: Start pulling and slowly increase the tension until the anchor bolt separates from the anchor.
[0050] Observation and record: During the pulling process, observe and record the test data, such as pulling force, failure form, failure location and other performance indicators.
[0051] Check the holes: Check whether the holes after drawing are damaged. If damaged, necessary repairs are required.
[0052] Check the anchor bolts: Check whether the anchor bolts show signs of aging, fatigue, etc. after being pulled, and replace them if necessary.
[0053] 4. End of the experiment Data analysis: Analyze and evaluate the test data to determine whether the tensile properties of the anchor bolts meet the standard requirements.
[0054] Equipment maintenance: Maintain and service the test equipment to ensure its long-term stable working condition.
[0055] The implementation principle of the post-tensioned anchored electric construction hanging basket in the embodiment of the present application is: an inclined steel wire rope 4 is used to realize the connection between the boom 1 and the structural beam 5, replacing the traditional counterweight block, and there is no need to use a crane, thereby saving construction costs. The boom 1 applies the pulling force to the structural beam 5 through the inclined steel wire rope 4, and the force is stable.
[0056] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A rear-tie anchored electric construction hanging basket, comprising a boom (1) horizontally erected on a structural beam (5), one end of the boom (1) being mounted with a hanging box (3) via a lifting wire rope (2), characterized in that: The other end of the large arm (1) is anchored on the structural beam (5) via a downwardly inclined inclined steel wire rope (4).
2. The rear-tie anchored electric construction hanging basket according to claim 1 is characterized in that: An anchor plate (6) is pre-buried on the structural beam (5) and fastened by anchor bolts; a U-shaped steel frame (7) is arranged on the anchor plate (6); and the inclined steel wire rope (4) passes around the U-shaped steel frame (7).
3. The rear-tie anchored electric construction hanging basket according to claim 2 is characterized in that: Two anchor plates (6) are arranged on the structural beam (5), and the two anchor plates (6) correspond to one inclined steel wire rope (4) respectively, and the distance between the two inclined steel wire ropes (4) gradually increases from top to bottom.
4. The rear-tie anchored electric construction hanging basket according to claim 3 is characterized in that: Both ends of the inclined steel wire rope (4) are fastened by a plurality of steel wire rope clamps (8).
5. The rear-tie anchored electric construction hanging basket according to claim 4 is characterized in that: A basket bolt (9) is provided at the bottom of the inclined steel wire rope (4).
6. The rear-tie anchored electric construction hanging basket according to claim 1 is characterized in that: A special-shaped bracket (10) is arranged between the upper arm (1) and the structural beam (5), and the special-shaped bracket (10) comprises a base plate (101) anchored on the structural beam (5) and a support (102) fixedly arranged on the base plate (101), and the upper arm (1) is detachably connected to the support (102).
7. The rear-tie anchored electric construction hanging basket according to claim 1 is characterized in that: A vertical upper bracket (11) is arranged at the top of the upper arm (1), and a pre-tensioned steel wire rope (12) is tied between the two ends of the upper arm (1), and the pre-tensioned steel wire rope (12) is passed around the top of the upper bracket (11).
8. The rear-tie anchored electric construction hanging basket according to claim 4 is characterized in that: An oblique support frame (13) is provided between one end of the large arm (1) relative to the oblique steel wire rope (4) and the structural beam (5).