Testing system for testing breakaway valve
By designing a tension valve test system including detection, intake, boost, refrigeration, exhaust and control components, the problem of lack of mature test systems in the prior art is solved, and effective verification and testing of the performance of the tension valve is achieved.
Patent Information
- Application Number
- CN202311337861.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-16
- Publication Date
- 2025-04-18
AI Technical Summary
The existing technology lacks a mature hydrogen valve tension valve test system for hydrogen refueling stations, and it is impossible to effectively verify the safety, sealing and high pressure resistance of the tension valve.
A test system for tension valve testing is designed, including detection components, intake components, boost components, refrigeration components, exhaust components and control components. Through the combination of these components, pressure testing, leakage testing, circulation testing and pre-cooled hydrogen exposure can be carried out.
The test system can effectively verify the performance of the pull-off valve, ensure its safety and reliability in hydrogen refueling stations, filling the gaps lacking in the prior art.
Smart Images

Figure CN119845570A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of testing, in particular to a test system for testing a breakaway valve. Background Art
[0002] In hydrogen refueling stations, hydrogen valve breakaway valves are an important component, and their technical requirements and test methods are becoming increasingly important. In order to verify the safety, sealing, and high pressure resistance of hydrogen valve breakaway valves, it is necessary to conduct tests such as pressure testing, leakage testing, cycle testing, and pre-cooled hydrogen exposure. However, there is currently no mature hydrogen valve breakaway valve test system for hydrogen refueling stations. Summary of the invention
[0003] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention provides a test system for testing a breakaway valve, which can perform a verification test on the performance of the breakaway valve.
[0004] The test system for the breakaway valve test according to the embodiment of the present invention is used to test the performance of the breakaway valve, and includes: a test assembly, an air intake assembly, a pressurization assembly, a refrigeration assembly, an exhaust assembly and a control assembly. The test assembly includes a test cabin, the test cabin includes a cabin body and a cabin door, the cabin body has a test cavity, the breakaway valve is placed in the test cavity, the cabin door is rotatably connected to the cabin body to open or close the opening of the cabin body; the air intake assembly includes an air intake pipe; the pressurization assembly includes a supercharger, the supercharger is arranged on the air intake pipe to pressurize the test gas in the air intake pipe; the refrigeration assembly includes a refrigerator, the refrigerator is arranged on the air intake pipe and is located between the supercharger and the test cabin, the supercharger and the control assembly are connected to the test cabin body, and the supercharger and the control assembly are connected to the test cabin body. An air intake pipe between the cooler is provided with a first flow channel and a second flow channel, one end of the first flow channel and the second flow channel are both connected to the supercharger, and the other end of the first flow channel is connected to the refrigerator, an air inlet is provided on the cabin body, the air inlet is connected to the break valve and the other end of the second flow channel or connects the break valve and the refrigerator, a first control valve is provided on the first flow channel, and a second control valve is provided on the second flow channel; the exhaust assembly includes a first exhaust pipe, the first exhaust pipe is connected to the break valve to discharge the test gas in the break valve, and a third control valve and a one-way valve are provided on the first exhaust pipe; the supercharger, the refrigerator, the first control valve, the second control valve and the third control valve are all electrically connected to the control assembly.
[0005] According to the test system for the breakaway valve test of the embodiment of the present invention, by providing a pressurizing component and a refrigeration component, the test system can perform pressure testing, leakage testing, cycle testing, pre-cooling hydrogen exposure and other tests on the breakaway valve.
[0006] In addition, the test system for breaking valve testing according to the present invention may also have the following additional technical features:
[0007] In some embodiments, the boosting assembly further includes a low-pressure gas storage tank and a high-pressure gas storage tank, both of which are arranged on the intake pipe, the low-pressure gas storage tank is located on one side of the intake end of the supercharger, and the high-pressure gas storage tank is located on one side of the outlet end of the supercharger.
[0008] In some embodiments, a first pressure sensor is provided at the low-pressure gas storage tank, a fourth control valve and a one-way valve are provided at the air inlet end of the low-pressure gas storage tank, a second pressure sensor is provided at the high-pressure gas storage tank, a flow meter is provided at the air outlet end of the high-pressure gas storage tank, a fifth control valve is provided on the air inlet pipe between the supercharger and the high-pressure gas storage tank, and the first pressure sensor, the second pressure sensor, the flow meter, the fourth control valve and the fifth control valve are all electrically connected to the control component.
[0009] In some embodiments, the exhaust assembly further includes a second exhaust pipe, which is connected to the air inlet pipe and is disposed close to the air inlet.
[0010] In some embodiments, the second exhaust pipe is provided with a third flow channel and a fourth flow channel, one end of the third flow channel and the fourth flow channel are both connected to the outlet end of the second exhaust pipe, the third flow channel is provided with a sixth control valve and a one-way valve, and the fourth flow channel is provided with a safety valve. When the pressure value in the fourth flow channel exceeds the set threshold value of the safety valve, the safety valve opens, and the sixth control valve is electrically connected to the control component.
[0011] In some embodiments, a third pressure sensor and a temperature sensor are disposed on the intake pipe, the third pressure sensor and the temperature sensor are both disposed at the intake port, and the third pressure sensor and the temperature sensor are both electrically connected to the control unit.
[0012] In some embodiments, a circulation device, a heat exchange device and a refrigeration device are provided in the detection chamber. The heat exchange device is used to increase the temperature of the gas in the detection chamber, the refrigeration device is used to lower the temperature of the gas in the detection chamber, and the circulation device is used to circulate the gas in the detection chamber.
[0013] In some embodiments, the air intake assembly also includes a test gas pipeline and a first purge gas pipeline, the test gas pipeline and the first purge gas pipeline are both connected to the air intake end of the air intake pipe, a seventh control valve and a one-way valve are provided on the test gas pipeline, an eighth control valve and a one-way valve are provided on the first purge gas pipeline, and the seventh control valve and the eighth control valve are electrically connected to the control assembly.
[0014] In some embodiments, the air intake assembly further includes a second purge gas pipeline, which is connected to the detection chamber and is provided with a one-way valve. The exhaust assembly further includes a third exhaust pipe, which is connected to the detection chamber.
[0015] In some embodiments, an exhaust fan is provided on the third exhaust pipe, and a hydrogen and oxygen concentration sensor is provided in the detection chamber. The hydrogen and oxygen concentration sensor monitors the concentrations of hydrogen and oxygen in the detection chamber in real time and transmits an electrical signal to the control component so that the control component controls the opening or closing of the exhaust fan.
[0016] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 is a flow chart of a test system for breaking valve testing according to an embodiment of the present invention;
[0018] Figure 2 Schematic diagram of a detection cabin of a test system for breaking valve testing according to an embodiment of the present invention.
[0019] Reference numerals:
[0020] 100. Test system for breaking valve test;
[0021] 1. Detection component; 11. Detection cabin; 111. Circulation device; 112. Heat exchange device; 113. Refrigeration device; 114. Hydrogen and oxygen concentration sensor;
[0022] 2. Intake assembly; 21. Intake pipe; 22. Test gas pipeline; 23. First purge gas pipeline; 24. Second purge gas pipeline; 211. First flow channel; 212. Second flow channel; 213. Fifth control valve; 214. Third pressure sensor; 215. Temperature sensor; 221. Seventh control valve; 231. Eighth control valve; 2111. First control valve; 2121. Second control valve;
[0023] 3. Pressurizing assembly; 31. Supercharger; 32. Low-pressure gas storage tank; 33. High-pressure gas storage tank; 321. First pressure sensor; 322. Fourth control valve; 331. Second pressure sensor; 332. Flow meter;
[0024] 4. Refrigeration components; 41. Refrigerator;
[0025] 5. Exhaust assembly; 51. First exhaust pipe; 52. Second exhaust pipe; 53. Third exhaust pipe; 511. Third control valve; 521. Third flow channel; 522. Fourth flow channel; 531. Exhaust fan; 5211. Sixth control valve; 5221. Safety valve;
[0026] 6. Control components;
[0027] 7. Check valve. DETAILED DESCRIPTION
[0028] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0029] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0030] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0031] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or a communication; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0032] Reference below Figure 1-Figure 2 A test system 100 for a breakaway valve test according to an embodiment of the present invention is described.
[0033] like Figure 1 and Figure 2 As shown, a test system 100 for testing a breakaway valve according to an embodiment of the present invention is used to detect the performance of the breakaway valve, and includes: a detection component 1, an air intake component 2, a boost component 3, a refrigeration component 4, an exhaust component 5 and a control component 6; wherein the detection component 1 includes a detection cabin 11, the detection cabin 11 includes a cabin body and a cabin door, the cabin body is provided with a detection cavity, the breakaway valve is placed in the detection cavity, and the cabin door is rotatably connected to the cabin body to open or close the opening of the cabin body.
[0034] The air intake assembly 2 includes an air intake pipe 21; the air intake pipe 21 can deliver test gas to the breakaway valve.
[0035] The booster assembly 3 includes a booster 31, which is arranged on the intake pipe 21 to boost the test gas in the intake pipe 21 so as to provide high-pressure test gas for the breakaway valve for pressure testing, leakage testing, cycle testing, etc. of the breakaway valve.
[0036] The refrigeration assembly 4 includes a refrigerator 41, which is arranged on the air inlet pipe 21 and located between the supercharger 31 and the detection chamber 11. The refrigerator 41 can cool the test gas so as to perform a low-temperature test on the breakaway valve.
[0037] The air intake pipe 21 between the supercharger 31 and the refrigerator 41 is provided with a first flow channel 211 and a second flow channel 212. One end of the first flow channel 211 and the second flow channel 212 are both connected to the supercharger 31, and the other end of the first flow channel 211 is connected to the refrigerator 41. An air inlet is provided on the cabin body, and the air inlet is connected to the break valve and the other end of the second flow channel 212 or to the break valve and the refrigerator 41. A first control valve 2111 is provided on the first flow channel 211, and a second control valve 2121 is provided on the second flow channel 212.
[0038] In this embodiment, the first flow channel 211 and the second flow channel 212 can divert the test gas flowing out of the supercharger 31. When a low-temperature test is required, the first control valve 2111 is opened and the second control valve 2121 is closed to connect the first flow channel 211 and allow the test gas to flow through the refrigerator 41 for cooling. When a low-temperature test is not required, the first control valve 2111 is closed and the second control valve 2121 is opened to connect the second flow channel 212 and allow the test gas to flow directly into the breakaway valve.
[0039] The exhaust assembly 5 includes a first exhaust pipe 51, which is connected to the break valve to discharge the test gas in the break valve. The first exhaust pipe 51 is provided with a third control valve 511 and a one-way valve 7. When the break valve test is completed, the third control valve 511 is opened, the first exhaust pipe 51 is connected, and the test gas in the break valve can be discharged from the first exhaust pipe 51. The one-way valve 7 can prevent gas backflow, thereby ensuring the safety of the test system.
[0040] The supercharger 31, the refrigerator 41, the first control valve 2111, the second control valve 2121 and the third control valve 511 are all electrically connected to the control component 6, and the control component 6 can control the opening or closing of the supercharger 31, the refrigerator 41, the first control valve 2111, the second control valve 2121 and the third control valve 511 to enable the test system to operate normally.
[0041] In some embodiments, the test gas is hydrogen.
[0042] In some embodiments, both the gas outlet end of the second flow channel 212 and the gas outlet end of the refrigerator 41 are provided with a one-way valve 7 .
[0043] According to the test system 100 for testing a breakaway valve according to an embodiment of the present invention, by providing a pressurizing component 3 and a refrigeration component 4, the test system can perform pressure testing, leakage testing, cycle testing, pre-cooling hydrogen exposure and other tests on the breakaway valve.
[0044] In one embodiment of the present invention, Figure 1 and Figure 2 As shown, the boost assembly 3 also includes a low-pressure gas storage tank 32 and a high-pressure gas storage tank 33. The low-pressure gas storage tank 32 and the high-pressure gas storage tank 33 are both arranged on the intake pipe 21. The low-pressure gas storage tank 32 is located on one side of the intake end of the supercharger 31, and the high-pressure gas storage tank 33 is located on one side of the outlet end of the supercharger 31.
[0045] In this embodiment, both the low-pressure gas tank 32 and the high-pressure gas tank 33 can store test gas so that the test gas can be delivered to the break valve at any time; after the test gas enters the air intake pipe 21, it will flow into the low-pressure gas tank 32 and be stored in the tank. After the test gas flows out of the low-pressure gas tank 32 and is pressurized by the supercharger 31, it will flow into the high-pressure gas tank 33 and be stored in the tank. When the test requires high-pressure test gas, the high-pressure gas tank 33 can immediately release the high-pressure test gas to allow it to flow to the break valve.
[0046] In a specific embodiment of the present invention, Figure 1 and Figure 2As shown, a first pressure sensor 321 is provided at the low-pressure gas storage tank 32, a fourth control valve 322 and a one-way valve 7 are provided at the air inlet end of the low-pressure gas storage tank 32, a second pressure sensor 331 is provided at the high-pressure gas storage tank 33, a flow meter 332 is provided at the air outlet end of the high-pressure gas storage tank 33, a fifth control valve 213 is provided on the air inlet pipe 21 between the supercharger 31 and the high-pressure gas storage tank 33, and the first pressure sensor 321, the second pressure sensor 331, the flow meter 332, the fourth control valve 322 and the fifth control valve 213 are all electrically connected to the control component 6.
[0047] In this specific embodiment, the first pressure sensor 321 can monitor the gas pressure in the low-pressure gas tank 32, and the second pressure sensor 331 can monitor the gas pressure in the high-pressure gas tank 33. Both the first pressure sensor 321 and the second pressure sensor 331 can transmit the gas pressure signal to the control component 6. If the gas pressure signal is greater than the preset pressure threshold in the control component 6, the control component 6 can control the fourth control valve 322 and / or the fifth control valve 213 to close to prevent the gas from continuing to flow into the low-pressure gas tank 32 and / or the high-pressure gas tank 33, so as to avoid the gas pressure in the gas tank from being too high and causing an explosion. In this way, the overall safety performance of the test system is improved.
[0048] In addition, the one-way valve 7 can prevent gas backflow, thereby improving the gas storage efficiency; the flow meter 332 can monitor the test gas flowing out of the high-pressure gas storage tank 33, and transmit the monitored gas flow signal to the control component 6. If the gas flow is too small and does not meet the test requirements, the control component 6 can issue a prompt in time to remind the test personnel that the flow is too small, so as to promptly detect the test system and eliminate the fault.
[0049] In one embodiment of the present invention, Figure 1 and Figure 2 As shown, the exhaust assembly 5 also includes a second exhaust pipe 52, which is connected to the intake pipe 21 and is arranged close to the air inlet. In this embodiment, the test gas in the intake pipe 21 can be discharged through the second exhaust pipe 52, so that when the intake pipe 21 is tested next time, it can ensure that there is no residual test gas in the pipe body, thereby avoiding the residual test gas affecting the accuracy of the next test.
[0050] In a specific embodiment of the present invention, Figure 1 and Figure 2As shown, the second exhaust pipe 52 is provided with a third flow channel 521 and a fourth flow channel 522. One end of the third flow channel 521 and the fourth flow channel 522 are both connected to the outlet end of the second exhaust pipe 52. The third flow channel 521 is provided with a sixth control valve 5211 and a one-way valve 7. The fourth flow channel 522 is provided with a safety valve 5221. When the pressure value in the fourth flow channel 522 exceeds the set threshold of the safety valve 5221, the safety valve 5221 opens, and the sixth control valve 5211 is electrically connected to the control component 6.
[0051] In this specific embodiment, when it is necessary to discharge the residual test gas in the intake pipe 21, the control component 6 controls the sixth control valve 5211 to open so that the test gas can be discharged through the third flow channel 521. At this time, part of the test gas enters the fourth flow channel 522 at the same time. Since the safety valve 5221 is in a normally closed state, the test gas cannot be discharged through the fourth flow channel 522. If the pressure value of the test gas in the fourth flow channel 522 is greater than the set threshold value of the safety valve 5221, the safety valve 5221 will open to allow the test gas to be discharged through the fourth flow channel 522. In this way, the gas pressure in the second exhaust pipe 52 can be quickly reduced to avoid the occurrence of pipeline rupture due to excessive pressure, thereby effectively improving the safety of the test system.
[0052] In one embodiment of the present invention, Figure 1 and Figure 2 As shown, a third pressure sensor 214 and a temperature sensor 215 are provided on the air inlet 21, and the third pressure sensor 214 and the temperature sensor 215 are both provided at the air inlet, and the third pressure sensor 214 and the temperature sensor 215 are both electrically connected to the control unit. In this embodiment, the third pressure sensor 214 can monitor the gas pressure value at the air inlet in real time, and the temperature sensor 215 can monitor the gas temperature at the air inlet in real time; the control component 6 can judge whether the pressure and temperature of the test gas meet the test requirements according to the received gas pressure signal and gas temperature signal, and if not, the control component 6 can issue a prompt in time to remind the test personnel, so as to detect the test system in time and eliminate the fault.
[0053] In one embodiment of the present invention, Figure 1 and Figure 2As shown, a circulation device 111, a heat exchange device 112 and a refrigeration device 113 are provided in the detection chamber. The heat exchange device 112 is used to increase the gas temperature in the detection chamber, the refrigeration device 113 is used to reduce the gas temperature in the detection chamber, and the circulation device 111 is used to circulate the gas in the detection chamber. In this embodiment, the heat exchange device 112 and the refrigeration device 113 can adjust the ambient temperature and humidity in the detection chamber to create a test environment that meets the test requirements; the circulation device 111 can promote the air circulation in the detection chamber 11, so that the ambient temperature of each part in the detection chamber 11 is relatively balanced, so as to create a test environment with a relatively stable ambient temperature.
[0054] In one embodiment of the present invention, Figure 1 and Figure 2 As shown, the air intake component 2 also includes a test gas pipeline 22 and a first purge gas pipeline 23. The test gas pipeline 22 and the first purge gas pipeline 23 are both connected to the air intake end of the air intake pipe 21. The test gas pipeline 22 is provided with a seventh control valve 221 and a one-way valve 7. The first purge gas pipeline 23 is provided with an eighth control valve 231 and a one-way valve 7. The seventh control valve 221 and the eighth control valve 231 are electrically connected to the control component 6.
[0055] In this embodiment, the test gas pipeline 22 is used to deliver the test gas to the intake pipe 21 to maintain the normal progress of the test, and the first purge gas pipeline 23 is used to deliver the purge gas to the intake pipe 21. The purge gas is used to blow the residual test gas in the intake pipe 21 out of the intake pipe 21 to clear the intake pipe 21, which not only prevents the residual test gas from corroding the intake pipe 21, but also prevents the residual test gas from affecting the next test. The control component 6 can control the opening and closing of the seventh control valve 221 and / or the eighth control valve 231 so that the test gas or the purge gas can enter the intake pipe 21 in time.
[0056] In a specific embodiment of the present invention, Figure 1 and Figure 2 As shown, the air intake assembly 2 further includes a second purge gas pipeline 24, which is connected to the detection chamber, and a one-way valve 7 is provided on the second purge gas pipeline 24. The exhaust assembly 5 further includes a third exhaust pipe 53, which is connected to the detection chamber. In this specific embodiment, the second purge gas pipeline 24 can deliver purge gas to the detection chamber, and the purge gas can replace the air in the detection chamber to prevent impurities in the air from affecting the detection of the detection device, thereby ensuring the normal operation of the detection device, and at the same time, reducing the hydrogen and oxygen concentration in the detection chamber to avoid explosion and ensure the safety of the test.
[0057] In some embodiments, the purge gas is nitrogen.
[0058] In a specific embodiment of the present invention, Figure 1 and Figure 2 As shown, an exhaust fan 531 is provided on the third exhaust pipe 53, and a hydrogen and oxygen concentration sensor 114 is provided in the detection chamber. The hydrogen and oxygen concentration sensor 114 monitors the concentration of hydrogen and oxygen in the detection chamber in real time, and transmits an electrical signal to the control component 6, so that the control component 6 controls the opening or closing of the exhaust fan 531. In this specific embodiment, when the hydrogen and oxygen concentration signal received by the control component 6 is higher than the preset hydrogen and oxygen concentration value, the control component 6 controls the exhaust fan 531 to open, and controls the second purge gas pipeline 24 to continuously deliver purge gas to the detection chamber, so as to quickly discharge the hydrogen and oxygen in the detection chamber, reduce the hydrogen and oxygen concentration value in the detection chamber, and ensure the safety of the detection chamber.
[0059] Other structures and operations of the test system 100 for breaking valve testing according to the embodiment of the present invention are known to those skilled in the art and will not be described in detail here.
[0060] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0061] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A test system for breaking valve testing, used to detect the performance of breaking valves, characterized in that: include: A detection assembly (1), the detection assembly (1) comprising a detection cabin (11), the detection cabin (11) comprising a cabin body and a cabin door, the cabin body having a detection cavity, the breakaway valve being placed in the detection cavity, the cabin door being rotatably connected to the cabin body to open or close an opening of the cabin body; An air intake assembly (2), the air intake assembly (2) comprising an air intake pipe (21); A pressurizing assembly (3), the pressurizing assembly (3) comprising a supercharger (31), the supercharger (31) being arranged on the air intake pipe (21) to pressurize the test gas in the air intake pipe (21); A refrigeration assembly (4), the refrigeration assembly (4) comprising a refrigerator (41), the refrigerator (41) being arranged on the air intake pipe (21) and located between the supercharger (31) and the detection chamber (11), The air intake pipe (21) between the supercharger (31) and the refrigerator (41) is provided with a first flow channel (211) and a second flow channel (212); one end of each of the first flow channel (211) and the second flow channel (212) is in communication with the supercharger (31); the other end of the first flow channel (211) is in communication with the refrigerator (41); an air intake port is provided on the cabin body; the air intake port is in communication with the break valve and the other end of the second flow channel (212) or with the break valve and the refrigerator (41); a first control valve (2111) is provided on the first flow channel (211); and a second control valve (2121) is provided on the second flow channel (212); An exhaust assembly (5), the exhaust assembly (5) comprising a first exhaust pipe (51), the first exhaust pipe (51) being connected to the breakaway valve to exhaust the test gas in the breakaway valve, and the first exhaust pipe (51) being provided with a third control valve (511) and a one-way valve (7); The control component (6), the supercharger (31), the refrigerator (41), the first control valve (2111), the second control valve (2121) and the third control valve (511) are all electrically connected to the control component (6).
2. The test system for breaking valve testing according to claim 1, characterized in that: The boosting assembly (3) further comprises a low-pressure gas storage tank (32) and a high-pressure gas storage tank (33), wherein the low-pressure gas storage tank (32) and the high-pressure gas storage tank (33) are both arranged on the intake pipe (21), the low-pressure gas storage tank (32) is located on one side of the intake end of the supercharger (31), and the high-pressure gas storage tank (33) is located on one side of the outlet end of the supercharger (31).
3. The test system for breaking valve testing according to claim 2, characterized in that: The low-pressure gas storage tank (32) is provided with a first pressure sensor (321), the air inlet end of the low-pressure gas storage tank (32) is provided with a fourth control valve (322) and a one-way valve (7), the high-pressure gas storage tank (33) is provided with a second pressure sensor (331), the air outlet end of the high-pressure gas storage tank (33) is provided with a flow meter (332), the air inlet pipe (21) between the supercharger (31) and the high-pressure gas storage tank (33) is provided with a fifth control valve (213), and the first pressure sensor (321), the second pressure sensor (331), the flow meter (332), the fourth control valve (322) and the fifth control valve (213) are all electrically connected to the control component (6).
4. The test system for breaking valve testing according to claim 1, characterized in that: The exhaust assembly (5) further comprises a second exhaust pipe (52), wherein the second exhaust pipe (52) is in communication with the air intake pipe (21) and is arranged close to the air intake port.
5. The test system for breaking valve testing according to claim 4, characterized in that: The second exhaust pipe (52) is provided with a third flow channel (521) and a fourth flow channel (522); one end of the third flow channel (521) and one end of the fourth flow channel (522) are both connected to the gas outlet end of the second exhaust pipe (52); the third flow channel (521) is provided with a sixth control valve (5211) and a one-way valve (7); the fourth flow channel (522) is provided with a safety valve (5221); when the pressure value in the fourth flow channel (522) exceeds a set threshold value of the safety valve (5221), the safety valve (5221) opens, and the sixth control valve (5211) is electrically connected to the control component (6).
6. The test system for breaking valve testing according to claim 1, characterized in that: The air intake pipe (21) is provided with a third pressure sensor (214) and a temperature sensor (215); the third pressure sensor (214) and the temperature sensor (215) are both provided at the air intake port; and the third pressure sensor (214) and the temperature sensor (215) are both electrically connected to the control unit.
7. The test system for breaking valve testing according to claim 1, characterized in that: The detection chamber is provided with a circulation device (111), a heat exchange device (112) and a refrigeration device (113); the heat exchange device (112) is used to increase the temperature of the gas in the detection chamber; the refrigeration device (113) is used to reduce the temperature of the gas in the detection chamber; and the circulation device (111) is used to circulate the gas in the detection chamber.
8. The test system for breaking valve testing according to claim 1, characterized in that: The air intake assembly (2) further comprises a test gas pipeline (22) and a first purge gas pipeline (23); the test gas pipeline (22) and the first purge gas pipeline (23) are both connected to the air intake end of the air intake pipe (21); a seventh control valve (221) and a one-way valve (7) are provided on the test gas pipeline (22); an eighth control valve (231) and a one-way valve (7) are provided on the first purge gas pipeline (23); the seventh control valve (221) and the eighth control valve (231) are electrically connected to the control assembly (6).
9. The test system for breaking valve testing according to claim 8, characterized in that: The air intake assembly (2) further comprises a second purge gas pipeline (24), the second purge gas pipeline (24) being connected to the detection chamber, a one-way valve (7) being provided on the second purge gas pipeline (24), and the exhaust assembly (5) further comprises a third exhaust pipe (53), the third exhaust pipe (53) being connected to the detection chamber.
10. The test system for breaking valve testing according to claim 9, characterized in that: An exhaust fan (531) is arranged on the third exhaust pipe (53), and a hydrogen and oxygen concentration sensor (114) is arranged in the detection chamber. The hydrogen and oxygen concentration sensor (114) monitors the concentrations of hydrogen and oxygen in the detection chamber in real time, and transmits an electrical signal to the control component (6), so that the control component (6) controls the opening or closing of the exhaust fan (531).