Test method of storage link, electronic equipment, storage medium and program product

By initializing the controller group and creating a storage cluster in the storage server, dynamically configuring the switch partitions to verify the service reliability after the NPIV function is enabled, the problem of cumbersome and unreliable manual testing paths in the prior art is solved, and automated testing and improved system reliability are achieved.

CN119847846AActive Publication Date: 2025-04-18INSPUR SUZHOU INTELLIGENT TECH CO LTD

Patent Information

Application Number
CN202510331518.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-20
Publication Date
2025-04-18
Estimated Expiration
2045-03-20

AI Technical Summary

Technical Problem

When testing service reliability after NPIV function is enabled, the prior art requires manual verification of the path between the physical port and the virtual port and the mapped host, and due to human factors, the reliability of the test results is difficult to guarantee.

Method used

Create a controller group by initializing multiple controller nodes in the storage server, creating a storage cluster, and configuring switch partitions to dynamically verify the routing path between the physical port and the virtual port and the host.

Benefits of technology

It realizes systematically verifying the service reliability when NPIV function is enabled, improves test coverage and efficiency, and enhances the reliability and flexibility of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119847846A_ABST
    Figure CN119847846A_ABST
Patent Text Reader

Abstract

The invention discloses a test method of a storage link, electronic equipment, a storage medium and a program product, and relates to the technical field of storage networks, and the test method comprises the following steps: initializing a plurality of controller nodes in a storage server to form one or more controller groups, and networking the controller groups to a storage cluster; configuring a switch partition matched with the current state of the port virtualization function of the controller group; verifying a routing path between the host and the storage cluster according to a first mapping relationship between the physical port and the virtual port, the current state and the switch partition; the routing path comprises a second mapping relation between the host and the physical port and a third mapping relation between the host and the virtual port, namely, the storage link between the host and the storage cluster can be tested. The technical problems that virtual port management is complex and manual configuration is prone to errors are solved, and the technical effects that the test coverage rate and efficiency are improved, and the system reliability and flexibility are enhanced are achieved.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Test method of port virtualization of multi-control storage system

    CN107704354A

  • Switch zone configuration method and system and preset management platform

    CN115396301A

  • Data path virtualization

    CN116368458A

  • Network interface partitioning method and device of network card, electronic equipment and readable storage medium

    CN119440636A

  • Computer system and data migration method thereof

    JP2014519061A

Cited By

  • Data transmission method, electronic equipment, storage medium and product

    CN120186509A

  • Fault detection method of storage system and data management platform

    CN121210218A

  • Fault detection method and data management platform for storage systems

    CN121210218B

  • Multi-node cluster lamp controller test platform and adaptive environment construction method thereof

    CN121232778A