Expressway new energy vehicle wireless charging method based on V2X

By adopting V2X technology and wireless charging technology on the highway, building a charging road network map and dynamically adjusting the charging plan, the problem of low charging efficiency of new energy vehicles has been solved, an efficient and safe charging process has been achieved, and the user experience and popularization of new energy vehicles have been improved.

CN119849723APending Publication Date: 2025-04-18CHENGDU TONGGUANG NETLINK TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411975129.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-31
Publication Date
2025-04-18

AI Technical Summary

Technical Problem

Traditional new energy vehicle charging methods have problems such as long charging time and uneven distribution, so how to achieve efficient wireless charging and vehicle management is still a challenge.

Method used

Using V2X-based wireless charging method for highway new energy vehicles, we can evaluate the availability of wireless charging circuit segments and the accessibility of vehicles by building a charging road network map, use Pareto cutting-edge analysis or MOGA to find the optimal path, and use the V2X communication module to monitor road conditions in real time, dynamically adjust the charging power and time, and generate the optimal charging plan.

Benefits of technology

It has achieved the improvement of charging efficiency during driving of new energy vehicles, enhanced safety during driving, improved user experience, reduced operating costs, and promoted the popularization and technological innovation of new energy vehicles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119849723A_ABST
    Figure CN119849723A_ABST
Patent Text Reader

Abstract

The invention relates to a highway new energy vehicle wireless charging method based on V2X, and belongs to the technical field of Internet of Vehicles, and the method comprises the steps: constructing a charging road network diagram; the availability of the wireless charging road section and the reachability of the vehicle are evaluated; selecting one or more optimal paths as candidate schemes according to the destination and the battery state of the vehicle; road conditions on the selected path are checked, and if risk factors exist, path planning is carried out again; road conditions are obtained in real time through the V2X communication module to be monitored, and when risk changes occur, path planning is conducted again; and entering a wireless charging road section for charging, dynamically adjusting the charging power and time according to the charging demand of the vehicle and the current charging load, and generating an optimal charging plan. The charging efficiency in the driving process of the new energy vehicle is improved, and the safety in the driving process is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of vehicle networking technology, and in particular to a V2X-based wireless charging method for new energy vehicles on highways. Background Art

[0002] With the rapid development of new energy vehicles, the problem of charging during long-distance driving has become one of the important factors restricting its popularization. The traditional charging method of charging stations has problems such as long charging time and uneven distribution. In recent years, wireless charging technology has attracted attention due to its feature of charging without stopping. However, how to achieve efficient wireless charging and vehicle management remains a challenge. Summary of the invention

[0003] In order to solve the above-mentioned problems in the prior art, the present invention provides a V2X-based wireless charging method for new energy vehicles on highways.

[0004] A V2X-based wireless charging method for new energy vehicles on highways includes the following steps:

[0005] Step 1: Construct a charging road network diagram;

[0006] Step 2: Evaluate the availability of wireless charging sections and vehicle accessibility and display them on the charging road network map;

[0007] Step 3: Based on the destination and battery status of the vehicle, apply Pareto frontier analysis or MOGA to find non-dominated solutions and select one or more optimal paths as candidate solutions;

[0008] Step 4: Check the road conditions on the selected path according to the candidate solutions. If there are risk factors in the road conditions, return to step 3 to re-plan the path;

[0009] Step 5: After the driver confirms the candidate solution, the V2X communication module is used to monitor the road conditions in real time during the driving process. If there is a risk change in the road conditions, the driver returns to step 3 to re-plan the route.

[0010] Step 6: Enter the wireless charging section to charge, dynamically adjust the charging power and time according to the vehicle's charging needs and current charging load, and generate the optimal charging plan.

[0011] Furthermore, the step 1 specifically includes:

[0012] Step 101: Construct a basic road network based on GIS geographic information system;

[0013] Step 102: Construct a charging road network diagram based on the vehicle charging request information, the wireless charging road section information, and the traffic information.

[0014] Furthermore, the road condition receives traffic infrastructure and other vehicle information in real time through the V2X communication module.

[0015] Furthermore, the vehicle charging request information is sent to the RSU through the V2X communication module, and the RSU forwards it to the wireless charging facility. The wireless charging section information is sent to the RSU through the V2X communication module, and the RSU forwards it to the vehicle.

[0016] Furthermore, the vehicle charging request information includes the vehicle location and battery status.

[0017] Furthermore, the evaluation of the availability of the wireless charging section is specifically as follows:

[0018] Initialize each wireless charging section, and set the number of vehicles that can be charged in each wireless charging section according to the wireless charging section information;

[0019] Monitor the number of vehicles on the wireless charging section, where the number of vehicles is the total number of vehicles being charged and vehicles being pre-charged;

[0020] When the number of vehicles on the wireless charging section reaches the number of vehicles that can be charged, the wireless charging section is judged to be unavailable and the status is marked in the charging road network diagram.

[0021] Furthermore, the evaluation of the vehicle accessibility is specifically as follows: based on the vehicle charging request information and the wireless charging section information, all wireless charging sections that the vehicle can reach when the battery energy is at the lowest point are calculated, and marked in the charging road network map.

[0022] Furthermore, after step 6, the step also includes recording, analyzing and detecting abnormalities of the data of the charging process to ensure the safety and continuity of the charging process.

[0023] The beneficial effects of the present invention are as follows: the present invention realizes the improvement of charging efficiency during driving of new energy vehicles through the combination of V2X communication technology and highway wireless charging technology, thereby enhancing safety during driving, improving user experience, reducing operating costs, and promoting the popularization of new energy vehicles and technological innovation. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 is a flow chart of the method of the present invention;

[0025] Figure 2 It is a system architecture diagram of the present invention. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] In this embodiment, if Figure 1 As shown, a V2X-based wireless charging method for new energy vehicles on highways includes the following steps:

[0028] Step 1: Construct a charging road network diagram; specifically:

[0029] Step 101: Construct a basic road network based on GIS geographic information system;

[0030] Step 102: constructing a charging road network diagram according to the vehicle charging request information, the wireless charging road section information and the traffic information;

[0031] Step 2: Evaluate the availability of wireless charging sections and vehicle accessibility, and display them on the charging road network map; the evaluation of the availability of wireless charging sections is specifically as follows: initialize each wireless charging section, set the number of vehicles that can be charged for each wireless charging section according to the wireless charging section information; monitor the number of vehicles in the wireless charging section, which is the total number of vehicles being charged and pre-charged; when the number of vehicles in the wireless charging section reaches the number of vehicles that can be charged, determine that the wireless charging section is unavailable, and mark the status in the charging road network map. The evaluation of vehicle accessibility is specifically as follows: according to the vehicle charging request information and the wireless charging section information, calculate all the wireless charging sections that the vehicle can reach when the battery energy is at the lowest point, and mark them in the charging road network map.

[0032] Step 3: Based on the destination and battery status of the vehicle, apply Pareto frontier analysis or MOGA to find non-dominated solutions and select one or more optimal paths as candidate solutions;

[0033] Step 4: Check the road conditions on the selected path according to the candidate solutions. If there are risk factors in the road conditions, return to step 3 to re-plan the path;

[0034] Step 5: After the driver confirms the candidate solution, the V2X communication module is used to monitor the road conditions in real time during the driving process. If there is a risk change in the road conditions, the driver returns to step 3 to re-plan the route.

[0035] Step 6: Enter the wireless charging section to charge, dynamically adjust the charging power and time according to the vehicle's charging needs and current charging load, and generate the optimal charging plan.

[0036] In a preferred embodiment, the data of the charging process is recorded, analyzed and abnormality detected to ensure the safety and continuity of the charging process.

[0037] In a preferred embodiment, Figure 2 As shown, this solution mainly involves three parts: the vehicle side, the highway wireless charging facility side and the transportation infrastructure.

[0038] 1. Vehicle side

[0039] 1) V2X communication module: responsible for real-time communication with highway wireless charging facilities and transportation infrastructure, transmitting vehicle location information, battery status, charging requirements and other data.

[0040] 2) Wireless charging receiver: installed at the bottom of the vehicle, transmits energy with the transmitter of the wireless charging facility on the highway.

[0041] 3) Battery management system: monitors the battery status (such as voltage, current, temperature, etc.) to ensure safe charging of the battery.

[0042] 4) High-precision positioning module: ensures precise alignment of the vehicle with the charging facility during driving

[0043] 2. Wireless charging facilities on highways

[0044] 1) V2X communication module: responsible for real-time communication with vehicles and traffic infrastructure, receiving vehicle charging requests, sending charging path information, etc.

[0045] 2) Wireless charging transmitter: installed on specific sections of highways, it transmits electrical energy to vehicles through electromagnetic induction or electromagnetic resonance technology.

[0046] 3) Charging control system: Dynamically adjust the charging power and time according to the vehicle's charging needs and current charging load to generate the optimal charging plan.

[0047] 4) Energy management system: manages the energy supply of charging facilities to ensure the stability and efficiency of the charging process.

[0048] 5) Data recording and analysis module: records various data during the charging process, analyzes and optimizes them, and improves the performance of the charging system.

[0049] 6) Abnormal handling module: When an abnormal situation is detected, timely measures are taken (such as suspending charging, alarming, etc.) to prevent accidents.

[0050] 3. Transportation Infrastructure

[0051] 1) Traffic lights: Provide real-time traffic signal information to help vehicles choose the best driving path.

[0052] 2) Roadside Unit (RSU): As the relay node of V2X communication, it realizes data exchange between vehicles and traffic management center.

[0053] 3) Traffic Management Center: responsible for managing and coordinating the operation of the entire transportation system and providing real-time traffic information and services.

[0054] 4) Real-time traffic information platform: collects and publishes real-time traffic information to help vehicles choose the best charging path and driving route.

[0055] In the description of the embodiments of the present invention, the terms "first", "second", "third", and "fourth" are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", "third", and "fourth" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0056] In the description of the embodiments of the present invention, the term "and / or" herein only describes the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B may represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " herein generally indicates that the associated objects before and after are in an "or" relationship.

[0057] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A V2X-based wireless charging method for new energy vehicles on highways, characterized in that: The following steps are involved: Step 1: Construct a charging road network diagram; Step 2: Evaluate the availability of wireless charging sections and vehicle accessibility and display them on the charging road network map; Step 3: Based on the destination and battery status of the vehicle, apply Pareto frontier analysis or MOGA to find non-dominated solutions and select one or more optimal paths as candidate solutions; Step 4: Check the road conditions on the selected path according to the candidate solutions. If there are risk factors in the road conditions, return to step 3 to re-plan the path; Step 5: After the driver confirms the candidate solution, the V2X communication module is used to monitor the road conditions in real time during the driving process. If there is a risk change in the road conditions, the driver returns to step 3 to re-plan the route. Step 6: Enter the wireless charging section to charge, dynamically adjust the charging power and time according to the vehicle's charging needs and current charging load, and generate the optimal charging plan.

2. A V2X-based wireless charging method for new energy vehicles on highways according to claim 1, characterized in that: The step 1 specifically includes: Step 101: Construct a basic road network based on GIS geographic information system; Step 102: Construct a charging road network diagram based on the vehicle charging request information, the wireless charging road section information, and the traffic information.

3. A V2X-based wireless charging method for new energy vehicles on highways according to claim 1, characterized in that: The road conditions receive traffic infrastructure and other vehicle information in real time through the V2X communication module.

4. A V2X-based wireless charging method for new energy vehicles on highways according to claim 1, characterized in that: The vehicle charging request information is sent to the RSU through the V2X communication module, and the RSU forwards it to the wireless charging facility. The wireless charging section information is sent to the RSU through the V2X communication module, and the RSU forwards it to the vehicle end.

5. A V2X-based wireless charging method for new energy vehicles on highways according to claim 1, characterized in that: The vehicle charging request information includes a vehicle location and a battery status.

6. A V2X-based wireless charging method for new energy vehicles on highways according to claim 1, characterized in that: The evaluation of the availability of the wireless charging section is specifically as follows: Initialize each wireless charging section, and set the number of vehicles that can be charged in each wireless charging section according to the wireless charging section information; Monitor the number of vehicles on the wireless charging section, where the number of vehicles is the total number of vehicles being charged and vehicles being pre-charged; When the number of vehicles on the wireless charging section reaches the number of vehicles that can be charged, the wireless charging section is judged to be unavailable and the status is marked in the charging road network diagram.

7. A V2X-based wireless charging method for new energy vehicles on highways according to claim 1, characterized in that: The vehicle accessibility assessment is specifically as follows: based on the vehicle charging request information and the wireless charging section information, all wireless charging sections that the vehicle can reach when the battery energy is at the lowest point are calculated, and marked in the charging road network diagram.

8. The V2X-based wireless charging method for new energy vehicles on highways according to claim 1 is characterized in that: The step 6 also includes recording, analyzing and detecting abnormalities of the charging process data to ensure the safety and continuity of the charging process.