Performance form application method based on supervision field project management
Through the application method of performance form based on the supervision site project management, the project performance form is constructed and the supervision evaluation results are generated, and the problem of inadequate supervision in engineering project management is solved, and efficient and accurate supervision of engineering projects and completion on time and on quality are achieved.
Patent Information
- Application Number
- CN202510345890.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-24
- Publication Date
- 2025-04-22
- Estimated Expiration
- 2045-03-24
AI Technical Summary
In engineering project management, it is difficult for the company to conduct on-site supervision efficiently and accurately, resulting in inadequate supervision, difficult to discover and solve problems in a timely manner, affecting the completion of the engineering project on time and in quality.
Provide a method for the application of the performance form based on the supervision site project management. By obtaining the project information of the target project, building the project performance form, obtaining the on-site supervision information of the projects to be managed, generating the supervision evaluation results and project management plan, and automatically conducting supervision.
It has achieved efficient and accurate supervision of the project site, timely discover and solve problems, and ensured that the project is completed on time and in quality.
Smart Images

Figure CN119863219A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of engineering project supervision, and in particular to a performance form application method based on on-site project management of supervision. Background Art
[0002] An engineering project is a project that uses engineering construction as a carrier and is a one-time engineering construction task that is managed.
[0003] It takes buildings or structures as the target output, requires payment of a certain fee, follows a certain procedure, is completed within a certain time, and should meet quality requirements.
[0004] In order to complete the project on time and with quality, it is necessary to carry out on-site supervision when the project starts to be implemented, and to record and manage the implementation status.
[0005] However, for a company, it is often responsible for several engineering projects at the same time. It is easy to have inadequate supervision during management. Due to the complexity of the supervised engineering projects and the large number of supervision records, it is difficult to discover and solve problems in a timely manner, which has a negative impact on the engineering projects. Summary of the invention
[0006] In order to efficiently and accurately supervise the construction project site, this application provides a performance form application method based on supervision site project management.
[0007] In the first aspect, the present application provides a performance form application method based on on-site project management, which adopts the following technical solutions: A performance form application method based on on-site supervision project management, comprising: Acquire project information of a target engineering project, wherein the target engineering project includes a plurality of completed standard engineering projects; Constructing a project performance form based on the project information; Obtain the on-site supervision information and on-site supervision person-in-charge information of the project to be managed; Generate a supervision evaluation result of the target supervision project based on the project performance form and the on-site supervision information; Generate a project management plan based on the supervision evaluation results and the information of the on-site supervision person in charge; Supervise the project to be managed based on the project performance form and the project management plan.
[0008] By adopting the above technical solution, the engineering projects that have been completed and meet the standards are taken as the target engineering projects, and the project information of the target engineering projects is used to construct a project performance form for project management. The on-site supervision information and the information of the on-site supervision person in charge are collected for the projects to be managed that do not use the project performance form. The on-site supervision information is evaluated using the constructed project performance form to obtain the supervision evaluation results. The project management plan for managing the projects to be managed is constructed based on the supervision evaluation results and the on-site supervision person in charge information. After that, the project performance form and the project plan are used to automatically and comprehensively supervise the projects to be managed, so that the engineering project site can be supervised efficiently and accurately.
[0009] Optionally, constructing a project performance form based on the project information includes: Extracting effective information from the project information to obtain project execution content; Extracting fixed content from the project execution content to determine the project fixed content and the project difference content; Extracting content keywords and type keywords of the project difference content; Calculating the application relevance between the project difference contents based on the content keywords and the type keywords; Dividing the project difference contents into application ranges based on the application relevance, and generating application content division results; Generate a project operation flow based on the project fixed content and the application content division result; Obtain project supervision requirements, and generate a project performance form based on the project supervision requirements and the project operation process.
[0010] Optionally, the calculating the application relevance between the project difference contents based on the content keyword and the type keyword includes: Acquire the keyword attributes of the content keyword and the type classification rules of the type keyword; Determining content similarity between the content keywords based on the keyword attributes; Determine the type similarity between the type keywords based on the type classification rule; Get the correlation calculation rule; The application association between each of the item difference contents is determined based on the association calculation rule, the content similarity and the type similarity.
[0011] Optionally, generating a project operation process based on the project fixed content and the application content division result includes: Obtain project standard execution procedures; Determine fixed work steps based on the project standard execution procedures and the project fixed content; Based on the application content division result, the project difference content is subdivided and arranged in steps to generate a content processing result; Adjust the content processing results based on the project standard execution procedure to generate difference operation steps; The fixed operation steps and the differential operation steps are arranged according to the project standard execution procedure to generate a project operation flow.
[0012] Optionally, generating the supervision evaluation result of the project to be managed based on the project performance form and the on-site supervision information includes: Obtaining project planning information of the project to be managed; Select the project performance form based on the project planning information to obtain a target performance form; Generate a project implementation plan based on the target performance form and the project planning information; Generate a supervision performance record based on the on-site supervision information and the target performance form; Obtain supervision and evaluation rules; The project to be managed is evaluated based on the supervision evaluation rules, the project implementation plan and the supervision performance record to generate a supervision evaluation result.
[0013] Optionally, generating a project management plan based on the supervision evaluation result and the on-site supervision person in charge information includes: Obtaining the evaluation grade of the supervision evaluation result; Determining the supervision level of the project to be managed based on the evaluation level and the supervision evaluation rules; Determine whether the project implementation plan needs to be adjusted based on the supervision level; If the project implementation plan needs to be adjusted, the project implementation plan is adjusted based on the target performance form and the supervision level to generate an adjusted implementation plan; Generate a project management plan based on the adjustment implementation plan, the target performance form, the supervision level and the on-site supervision person in charge information; If the project implementation plan does not need to be adjusted, a project management plan is generated based on the project implementation plan, the target performance form, the supervision level and the on-site supervision person in charge information.
[0014] Optionally, the supervising the project to be managed based on the project performance form and the project management plan includes: Obtaining the project performance form filling information of the project to be managed in real time; Determine whether the project to be managed complies with the preset execution plan based on the form filling information and the project management plan; If the project to be managed complies with the preset execution plan, repeating the step of obtaining the project performance form filled-in information of the project to be managed in real time; If the project to be managed does not comply with the preset execution plan, then determine the project abnormality information based on the information filled in the project performance form and the project management plan; A supervision responsibility letter is generated based on the project abnormality information and the on-site supervision person in charge information.
[0015] In the second aspect, the present application provides a performance form application device based on on-site project management, which adopts the following technical solution: A performance form application device based on supervision site project management, comprising: A project information acquisition module, used to acquire project information of a target engineering project, wherein the target engineering project includes a plurality of completed standard engineering projects; A performance form construction module, used to construct a project performance form based on the project information; Supervision information acquisition module, used to obtain on-site supervision information and on-site supervision person-in-charge information of the project to be managed; A supervision result generation module, used for generating the supervision evaluation result of the project to be managed based on the project performance form and the on-site supervision information; A management plan generation module is used to generate a project management plan based on the supervision evaluation results and the information of the on-site supervision person in charge; The engineering project supervision module is used to supervise the project to be managed based on the project performance form and the project management plan.
[0016] By adopting the above technical solution, the engineering projects that have been completed and meet the standards are taken as the target engineering projects, and the project information of the target engineering projects is used to construct a project performance form for project management. The on-site supervision information and the information of the on-site supervision person in charge are collected for the projects to be managed that do not use the project performance form. The on-site supervision information is evaluated using the constructed project performance form to obtain the supervision evaluation results. The project management plan for managing the projects to be managed is constructed based on the supervision evaluation results and the on-site supervision person in charge information. After that, the project performance form and the project plan are used to automatically and comprehensively supervise the projects to be managed, so that the engineering project site can be supervised efficiently and accurately.
[0017] In a third aspect, the present application provides an electronic device, which adopts the following technical solution: An electronic device comprises a processor, wherein the processor is coupled to a memory; The processor is used to execute the computer program stored in the memory, so that the electronic device executes the computer program of the performance form application method based on supervision site project management as described in any one of the first aspects.
[0018] In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution: A computer-readable storage medium stores a computer program that can be loaded by a processor and execute the method for applying a performance form based on on-site project management according to any one of the first aspects.
[0019] In summary, the present application includes at least one of the following beneficial technical effects: Take the engineering projects that have been completed and meet the standards as the target engineering projects, use the project information of the target engineering projects to construct a project performance form for project management, collect the on-site supervision information and the information of the on-site supervision person in charge for the projects to be managed that do not use the project performance form, use the constructed project performance form to judge the on-site supervision information, and obtain the supervision judgment results. Use the supervision judgment results and the on-site supervision person in charge information to build a project management plan for the projects to be managed, and then use the project performance form and project plan to automatically and comprehensively supervise the projects to be managed, so that the engineering project site can be supervised efficiently and accurately. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a flow chart of a method for applying a performance form based on on-site project management provided in an embodiment of the present application.
[0021] Figure 2 It is a structural block diagram of a performance form application device based on supervision site project management provided in an embodiment of the present application.
[0022] Figure 3 It is a structural block diagram of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0023] The present application is further described in detail below in conjunction with the accompanying drawings.
[0024] An embodiment of the present application provides a method for applying a performance form based on on-site project management for supervision. The method for applying a performance form based on on-site project management for supervision can be executed by an electronic device, which can be a server or a terminal device, wherein the server can be an independent physical server, a server cluster or a distributed system composed of multiple physical servers, or a cloud server that provides cloud computing services.
[0025] The terminal device may be a smart phone, a tablet computer, a desktop computer, etc., but is not limited thereto.
[0026] Figure 1 A flowchart of a method for applying a performance form based on on-site project management provided in an embodiment of the present application.
[0027] like Figure 1 As shown, the main process of the method is described as follows (steps S101 to S106): Step S101 : acquiring project information of a target engineering project, wherein the target engineering project includes a plurality of completed standard engineering projects.
[0028] In this embodiment, in order to make the performance forms created subsequently more standardized, it is necessary to collect a large number of completed standard engineering projects, take all the collected completed standard engineering projects as target engineering projects, extract the project information in the target engineering projects, and obtain the project information to be used subsequently. The project information includes a series of content directly related to project implementation, such as project name, project creation time, project end time, project type, project implementation location, project execution records, etc.
[0029] It should be noted that the target engineering projects need to include all types of projects, such as electrical projects, non-production patent projects, distribution network projects, equipment supervision projects, civil engineering projects, line projects, new energy projects, comprehensive management projects, etc. Standard engineering projects refer to engineering projects that are completed within the specified time with guaranteed quality and quantity without any unexpected events.
[0030] Step S102, constructing a project performance form based on project information.
[0031] For step S102, effective information is extracted from the project information to obtain the project execution content; fixed content is extracted from the project execution content to determine the project fixed content and the project difference content; content keywords and type keywords of the project difference content are extracted; the application correlation between the project difference contents is calculated based on the content keywords and type keywords; the application scope of the project difference content is divided based on the application correlation to generate the application content division result; the project operation process is generated based on the project fixed content and the application content division result; the project supervision requirements are obtained, and the project performance form is generated based on the project supervision requirements and the project operation process.
[0032] In this embodiment, in addition to the valid information that can be used to construct the project performance form, the project information also includes modal particles, content descriptions unrelated to the project, and descriptions of useless situations such as region, environment and weather. These contents are not only irrelevant to the construction of the project performance form, but also increase the processing pressure of the computer. Therefore, it is necessary to remove these useless contents or extract the contents other than these useless contents to obtain valid information, and use the obtained valid information as the project execution content.
[0033] After obtaining the project execution content, it is necessary to further extract the project execution content, that is, to extract the content that all projects in the project execution content must execute uniformly, and use this part of the content as the fixed content of the project, and the remaining part as the project difference content. Among them, the fixed content of the project includes the start node record of the project, the mid-term inventory of the project, the final verification of the project, etc., and the project difference content includes different nodes corresponding to different projects, such as the material purchase node, foundation construction node and framework construction node in the civil engineering project, and the network cable procurement node, regional distribution network node and network cable laying node in the distribution network project. Keywords are extracted from the project difference content to obtain two types of keywords, content keywords and type keywords. Among them, the content keywords mainly reflect the main work content of the project, such as laying the foundation, laying the network cable and power configuration, etc., while the type keywords mainly reflect the main type of the project, such as distribution network steel pipe rack construction, bridge construction, distribution device installation, etc., and two types of keywords are obtained.
[0034] It should be noted that the setting of content keywords and type keywords needs to be set according to the actual project content. The above keyword content is only for illustration and not for specific limitation.
[0035] After obtaining the content keywords and type keywords, the application correlation between the project difference contents is calculated according to the content keywords and type keywords, and the corresponding correlation threshold is set. The project difference contents with application correlation greater than or equal to the correlation threshold are divided into one application range, and the project difference contents with application correlation less than the correlation threshold are divided into separate application ranges, thereby obtaining the final content division result. The project operation process is created according to the project fixed content and the application division result. According to the created project operation process and project supervision requirements, a project performance form for project supervision is constructed.
[0036] The project performance form constructed has a header that is set according to the project supervision requirements, including serial number, job name, supervision control points, behavior type, output, and supervision basis; the risk-related continuation table set according to the operation risks in the process includes serial number, operation task (first-level task, second-level task and third-level task), risk name, risk type, risk level, risk control measures, and supervision control measures; then, the number of rows in the project performance form and the operation nodes that need to use the risk-related continuation table are determined according to the project operation process.
[0037] Furthermore, using content keywords and type keywords to calculate the application correlation between project difference contents mainly involves obtaining keyword attributes of content keywords and type classification rules of type keywords; determining content similarity between content keywords based on keyword attributes; determining type similarity between type keywords based on type classification rules; obtaining correlation calculation rules; and determining the application correlation between each project difference content based on the correlation calculation rules, content similarity and type similarity.
[0038] In this embodiment, the keyword attribute of the content keyword is the category to which the content keyword belongs, such as the keyword attribute of foundation construction is land excavation and construction, the keyword attribute of distribution device installation is power equipment configuration, etc. The purpose of setting the keyword attribute is to further distinguish the keywords through keyword attributes when the keyword names are similar, so as to avoid classifying keywords with similar names but different meanings as the same keyword.
[0039] By comparing the keyword attributes of the content keywords, the similarity of the content keywords with the same keyword attribute meaning is set to the highest value, otherwise it is divided into the lowest value. The average value is calculated according to the number of content keywords and the similarity value between the different contents of the two projects to obtain the final. At the same time, the type keywords are compared to obtain the content similarity, and then the type similarity between the type keywords is determined by the type division rule. The type division rule is to set the same type of form. The same type of form is set with all types of type keywords and type similarity relationships. Different type similarity relationships correspond to different scores. If two type keywords are synonyms or near synonyms, the corresponding score is set to the highest value. If two type keywords belong to the same major category but different minor categories, the corresponding score is set to a value one level lower than the highest value. Among them, the division of major categories, minor categories, highest values and score levels needs to be set separately according to the actual project implementation needs and different types of projects. It only needs to meet the above division ideas. The actual content of the same type form setting is not specifically limited here.
[0040] Finally, the final application association is calculated through the association calculation rule. The association calculation rule is to set the ratio of content similarity and type similarity, calculate the first similarity according to the content similarity and the ratio of content similarity, calculate the second similarity according to the type similarity and the ratio of type similarity, add the first similarity and the second similarity and convert them into percentage values. The percentage value finally calculated is the application association, among which the ratio of content similarity and type similarity needs to be set according to actual application requirements, and the percentage value is rounded to two decimal places.
[0041] Furthermore, the use of the project fixed content and application content division results to create a project work flow mainly includes: obtaining the project standard execution procedure; determining the fixed work steps based on the project standard execution procedure and the project fixed content; subdividing and arranging the project difference content steps based on the application content division results to generate content processing results; adjusting the content processing results based on the project standard execution procedure to generate difference work steps; arranging the fixed work steps and the difference work steps according to the project standard execution procedure to generate a project work flow.
[0042] In this embodiment, the project standard execution program is a program that allows the project to proceed smoothly without adjusting the sequence of project nodes during project implementation. The project standard program includes the project execution sequence, node content that can be executed in parallel or execution restrictions, etc., and for different types of projects, the project standard execution program also processes the project difference content differently. Therefore, when constructing a project operation process, it is necessary to first determine the fixed operation steps, that is, the operation sequence of the project fixed content, according to the project standard execution program and the project fixed content. After that, the specific steps and execution sequence of the application content during project implementation are determined by the application content division result. The project difference content corresponding to the application content division result is subdivided into steps using the specific steps and execution sequence to obtain multiple execution steps, and the execution steps are arranged in the order of execution to obtain the content processing result. In the obtained content processing result, there may be a conflict in the order of execution or content that can be executed simultaneously, so the project standard value performance program is used to adjust the content processing result to obtain the difference operation steps, and the difference operation steps are inserted into the fixed operation steps that have been determined according to the project execution standard to obtain the final project operation process.
[0043] Step S103, obtaining the on-site supervision information and on-site supervision person-in-charge information of the project to be managed.
[0044] In this embodiment, the project to be managed is an engineering project that is about to be implemented or is beginning to be implemented. The on-site supervision information includes information such as the project implementation status, project implementation results, project implementation progress, and problems and accidents generated during the project implementation. The on-site supervision information mainly records the implementation-related content of the project to be managed, and the information of the on-site supervision person in charge includes the name of the person in charge, the gender of the person in charge, the main supervision content that the person in charge is responsible for, the position of the person in charge, and the contact information of the person in charge.
[0045] It should be noted that the on-site supervision information and the on-site supervision person in charge information include but are not limited to the above-mentioned contents, and may also be increased or adjusted according to the actual supervision needs and the situation of the projects to be managed, and no specific limitation is made here.
[0046] Step S104: Generate the supervision evaluation result of the target supervision project based on the project performance form and on-site supervision information.
[0047] For step S104, obtain the project planning information of the project to be managed; select the project performance form based on the project planning information to obtain the target performance form; generate the project implementation plan based on the target performance form and the project planning information; generate the supervision performance record based on the on-site supervision information and the target performance form; obtain the supervision evaluation rules; evaluate the project to be managed based on the supervision evaluation rules, the project implementation plan and the supervision performance record, and generate the supervision evaluation results.
[0048] In this embodiment, the project planning information of the project to be managed includes the project plan, project start time and project implementation location, etc., and the project type of the project to be managed can be determined based on the project plan, and after the project performance form is created, the project application type of the project performance form is determined based on the application content division result of the project performance form, the project type of the project to be managed is determined based on the project plan, the project type is matched with the project application type, and the project performance form corresponding to the project application type that matches the project type is used as the target performance form, the project operation process of the target performance form is obtained, the project planning information is filled in the project operation process, and the project implementation plan is obtained.
[0049] Fill the collected on-site supervision information into the target performance form to obtain the supervision performance record, obtain the abnormal part in the supervision performance record, compare the abnormal part with the supervision evaluation rules, and obtain the supervision evaluation result, wherein the supervision evaluation rule is to set up a scoring table for multiple project performance forms, first determine the supervision evaluation rules used this time according to the project implementation plan constructed according to the project operation process corresponding to the target performance form, compare the abnormal part in the supervision performance record with the supervision evaluation rules, determine the score of each abnormal part, and set the grade corresponding to the score in the supervision evaluation rules, add up all the scores to get the final total score, determine the evaluation grade according to the total score, and bind the total score to the evaluation grade to get the final supervision evaluation result.
[0050] Step S105, generating a project management plan based on the supervision evaluation results and the information of the person in charge of on-site supervision.
[0051] For step S105, obtain the evaluation grade of the supervision evaluation result; determine the supervision grade of the project to be managed based on the evaluation grade and the supervision evaluation rules; determine whether the project implementation plan needs to be adjusted based on the supervision grade; if the project implementation plan needs to be adjusted, adjust the project implementation plan based on the target performance form and the supervision grade to generate an adjusted implementation plan; generate a project management plan based on the adjusted implementation plan, the target performance form, the supervision grade and the information of the on-site supervisor; if the project implementation plan does not need to be adjusted, generate a project management plan based on the project implementation plan, the target performance form, the supervision grade and the information of the on-site supervisor.
[0052] In this embodiment, a judgment grade numerical range is also set in the supervision judgment rule, and each judgment grade numerical range corresponds to a supervision level. When determining the supervision level of the project to be managed, the judgment grade is used to determine the judgment grade numerical range in which it is located, so that the supervision level corresponding to the judgment grade numerical range in which it is located is used as the supervision level of the project to be managed. A grade threshold is set to determine whether the supervision level is not greater than the grade threshold. If the supervision level is not greater than the grade threshold, it is determined that the project implementation plan does not need to be adjusted, and the project implementation plan, target performance form, supervision level and on-site supervision person in charge information are directly bound to generate a project management plan. If the supervision level is greater than the grade threshold, it is determined that the project implementation plan needs to be adjusted, and the target performance form and supervision level are used to adjust the project implementation plan to obtain an adjusted implementation plan, and the adjusted implementation plan, target performance form, supervision level and on-site supervision person in charge information are bound to generate a project management plan.
[0053] When adjusting the project execution plan to generate an adjusted execution plan, determine the node position that needs to be adjusted in the project execution plan based on the project performance form, determine the execution information in the node position, and make adjustments based on the supervision level according to the specific execution information to obtain the final adjusted execution plan, in which the project execution information includes the execution progress and execution error content. When the content that needs to be adjusted is the execution progress, determine the progress that needs to be made up based on the actual execution progress, and determine the execution time of the progress that needs to be made up based on the supervision level. The higher the supervision level, the shorter the execution time that needs to be made up. The specific time needs to be set according to the actual project situation. The corresponding table can be used to search and determine according to the supervision level, node position and project execution information. Other project execution information is queried in the same way as the adjustment table to make adjustments.
[0054] Step S106: Supervise the project to be managed based on the project performance form and the project management plan.
[0055] For step S106, the project performance form filling information of the project to be managed is obtained in real time; based on the form filling information and the project management plan, it is determined whether the project to be managed complies with the preset execution plan; if the project to be managed complies with the preset execution plan, the step of obtaining the project performance form filling information of the project to be managed in real time is repeated; if the project to be managed does not comply with the preset execution plan, the project abnormality information is determined based on the project performance form filling information and the project management plan; and a supervision responsibility letter is generated based on the project abnormality information and the information of the on-site supervision person in charge.
[0056] In this embodiment, when the project performance form and the project management plan are used to supervise the project to be managed, it is necessary to collect the filled-in information of the project rate index sheet of the project to be managed in real time to obtain the filled-in information of the project performance form of the project to be managed. The form filling information includes the form filling time, the form filling node and the form filling content. The above three contents are compared with the project management plan to check whether they are consistent with the project management plan or whether they are within the allowable range of differences. If they are consistent or within the allowable range of differences, the steps of obtaining and comparing are repeated until a problem occurs or the project ends; if they are inconsistent or within the allowable range of differences, the filled-in information of the project performance form is compared with the project management plan to determine the abnormal information of the project, bind the abnormal information of the project with the information of the on-site supervision person in charge, generate a supervision responsibility letter, and hold the person responsible for the abnormal problems accountable through the supervision responsibility letter, so that the key to the problem can be determined in time when a problem occurs in the project, and timely remediation can be carried out through accountability to reduce the negative impact on the overall project.
[0057] Figure 2 A structural block diagram of a performance form application device 200 based on on-site project management for supervision is provided for an application embodiment.
[0058] like Figure 2 As shown, the performance form application device 200 based on on-site project management of supervision mainly includes: A project information acquisition module 201 is used to acquire project information of a target engineering project, wherein the target engineering project includes a plurality of completed standard engineering projects; A job performance form construction module 202 is used to construct a project job performance form based on project information; The supervision information acquisition module 203 is used to obtain the on-site supervision information and on-site supervision person-in-charge information of the project to be managed; The supervision result generation module 204 is used to generate the supervision evaluation results of the project to be managed based on the project performance form and the on-site supervision information; A management plan generation module 205 is used to generate a project management plan based on the supervision evaluation results and the information of the on-site supervision person in charge; The engineering project supervision module 206 is used to supervise the project to be managed based on the project performance form and the project management plan.
[0059] As an optional implementation of this embodiment, the job performance form construction module 202 includes: An execution content extraction module is used to extract effective information from project information and obtain project execution content; The project content determination module is used to extract fixed content from the project execution content and determine the project fixed content and project difference content; Keyword extraction module, used to extract content keywords and type keywords of project difference content; A correlation degree calculation module, used for calculating the application correlation between project difference contents based on content keywords and type keywords; A division result generation module is used to divide the application scope of the project difference content based on the application relevance and generate the application content division result; The operation flow generation module is used to generate the project operation flow based on the results of the division of project fixed content and application content; The performance form generation module is used to obtain project supervision requirements and generate project performance forms based on project supervision requirements and project operation processes.
[0060] In this optional embodiment, the association degree calculation module is specifically used to obtain keyword attributes of content keywords and type classification rules of type keywords; determine the content similarity between content keywords based on keyword attributes; determine the type similarity between type keywords based on type classification rules; obtain association degree calculation rules; determine the application association degree between the difference contents of each project based on the association degree calculation rules, content similarity and type similarity.
[0061] In this optional embodiment, the job flow generation module is specifically used to obtain the project standard execution procedure; determine the fixed job steps based on the project standard execution procedure and the project fixed content; subdivide and arrange the project difference content steps based on the application content division results to generate content processing results; adjust the content processing results based on the project standard execution procedure to generate difference job steps; arrange the fixed job steps and the difference job steps according to the project standard execution procedure to generate the project job flow.
[0062] As an optional implementation mode of this embodiment, the supervision result generation module 204 is specifically used to obtain project planning information of the project to be managed; select the project performance form based on the project planning information to obtain the target performance form; generate a project implementation plan based on the target performance form and the project planning information; generate a supervision performance record based on the on-site supervision information and the target performance form; obtain supervision evaluation rules; evaluate the project to be managed based on the supervision evaluation rules, the project implementation plan and the supervision performance record, and generate a supervision evaluation result.
[0063] As an optional implementation mode of this embodiment, the management plan generation module 205 is specifically used to obtain the evaluation level of the supervision evaluation results; determine the supervision level of the project to be managed based on the evaluation level and the supervision evaluation rules; judge whether the project implementation plan needs to be adjusted based on the supervision level; if the project implementation plan needs to be adjusted, adjust the project implementation plan based on the target performance form and the supervision level to generate an adjusted implementation plan; generate a project management plan based on the adjusted implementation plan, the target performance form, the supervision level and the on-site supervision person in charge information; if the project implementation plan does not need to be adjusted, generate a project management plan based on the project implementation plan, the target performance form, the supervision level and the on-site supervision person in charge information.
[0064] As an optional implementation mode of this embodiment, the engineering project supervision module 206 is specifically used to obtain the project performance form filling information of the project to be managed in real time; judge whether the project to be managed complies with the preset execution plan based on the form filling information and the project management plan; if the project to be managed complies with the preset execution plan, repeat the step of obtaining the project performance form filling information of the project to be managed in real time; if the project to be managed does not comply with the preset execution plan, determine the project abnormality information based on the project performance form filling information and the project management plan; generate a supervision responsibility letter based on the project abnormality information and the information of the on-site supervision person in charge.
[0065] In one example, the module in any of the above devices can be one or more integrated circuits configured to implement the above methods, such as: one or more application specific integrated circuits (ASICs), or, one or more digital signal processors (DSPs), or, one or more field programmable gate arrays (FPGAs), or a combination of at least two of these integrated circuit forms.
[0066] For another example, when the modules in the device can be implemented in the form of a processing element scheduling program, the processing element can be a general-purpose processor, such as a central processing unit (CPU) or other processors that can call programs.
[0067] For another example, these modules can be integrated together and implemented in the form of a system-on-a-chip (SOC).
[0068] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the above-described devices and modules can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0069] Figure 3 This is a structural block diagram of an electronic device 300 provided in an embodiment of the present application.
[0070] like Figure 3 As shown, the electronic device 300 includes a processor 301 and a memory 302 , and may further include an information input / information output (I / O) interface 303 , one or more of a communication component 304 , and a communication bus 305 .
[0071] Among them, the processor 301 is used to control the overall operation of the electronic device 300 to complete all or part of the steps of the above-mentioned performance form application method based on supervision on-site project management; the memory 302 is used to store various types of data to support operations on the electronic device 300, and these data may, for example, include instructions for any application or method operating on the electronic device 300, as well as application-related data.
[0072] The memory 302 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as one or more of a static random access memory (SRAM), an electrically erasable programmable read-only memory (EEPROM), an erasable programmable read-only memory (EPROM), a programmable read-only memory (PROM), a read-only memory (ROM), a magnetic memory, a flash memory, a magnetic disk, or an optical disk.
[0073] The I / O interface 303 provides an interface between the processor 301 and other interface modules, which may be a keyboard, a mouse, buttons, etc. These buttons may be virtual buttons or physical buttons.
[0074] The communication component 304 is used for wired or wireless communication between the electronic device 300 and other devices.
[0075] Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G or 4G, or a combination of one or more of them, so the corresponding communication component 304 may include: Wi-Fi component, Bluetooth component, NFC component.
[0076] The electronic device 300 can be implemented by one or more application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the performance form application method based on supervision site project management given in the above embodiment.
[0077] The communication bus 305 may include a pathway for transmitting information between the above-mentioned components.
[0078] The communication bus 305 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus, etc.
[0079] The communication bus 305 can be divided into an address bus, a data bus, a control bus, and the like.
[0080] The electronic device 300 may include, but is not limited to, mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc., and may also be servers, etc.
[0081] The present application also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned performance form application method based on supervision on-site project management are implemented.
[0082] The computer-readable storage medium may include: a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.
[0083] The terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not expressly listed, or also includes elements inherent to such process, method, article, or apparatus.
[0084] The above description is only a preferred embodiment of the present application and an illustration of the technical principles used.
[0085] Those skilled in the art should understand that the scope of application involved in this application is not limited to the technical solutions formed by a specific combination of the above-mentioned technical features, but should also cover other technical solutions formed by any combination of the above-mentioned technical features or their equivalent features without departing from the aforementioned application concept.
[0086] For example, the above-mentioned features are replaced with (but not limited to) technical features with similar functions in this application to form a technical solution.
Claims
1. A performance form application method based on on-site supervision project management, characterized in that: include: Acquire project information of a target engineering project, wherein the target engineering project includes a plurality of completed standard engineering projects; Constructing a project performance form based on the project information; Obtain the on-site supervision information and on-site supervision person-in-charge information of the project to be managed; Generate a supervision evaluation result of the target supervision project based on the project performance form and the on-site supervision information; Generate a project management plan based on the supervision evaluation results and the information of the on-site supervision person in charge; Supervise the project to be managed based on the project performance form and the project management plan.
2. The method according to claim 1, characterized in that The constructing of a project performance form based on the project information includes: Extracting effective information from the project information to obtain project execution content; Extracting fixed content from the project execution content to determine the project fixed content and the project difference content; Extracting content keywords and type keywords of the project difference content; Calculating the application relevance between the project difference contents based on the content keywords and the type keywords; Dividing the project difference contents into application ranges based on the application relevance, and generating application content division results; Generate a project operation flow based on the project fixed content and the application content division result; Obtain project supervision requirements, and generate a project performance form based on the project supervision requirements and the project operation process.
3. The method according to claim 2, characterized in that The calculating the application relevance between the project difference contents based on the content keywords and the type keywords comprises: Acquire the keyword attributes of the content keyword and the type classification rules of the type keyword; Determining content similarity between the content keywords based on the keyword attributes; Determine the type similarity between the type keywords based on the type classification rule; Get the correlation calculation rule; The application association between each of the item difference contents is determined based on the association calculation rule, the content similarity and the type similarity.
4. The method according to claim 2, characterized in that: The generating of the project operation process based on the project fixed content and the application content division result comprises: Obtain project standard execution procedures; Determine fixed work steps based on the project standard execution procedures and the project fixed content; Based on the application content division result, the project difference content is subdivided and arranged in steps to generate a content processing result; Adjust the content processing results based on the project standard execution procedure to generate difference operation steps; The fixed operation steps and the differential operation steps are arranged according to the project standard execution procedure to generate a project operation flow.
5. The method according to claim 1, characterized in that The generating of the supervision evaluation result of the project to be managed based on the project performance form and the on-site supervision information includes: Obtaining project planning information of the project to be managed; Select the project performance form based on the project planning information to obtain a target performance form; Generate a project implementation plan based on the target performance form and the project planning information; Generate a supervision performance record based on the on-site supervision information and the target performance form; Obtain supervision and evaluation rules; The project to be managed is evaluated based on the supervision evaluation rules, the project implementation plan and the supervision performance record to generate a supervision evaluation result.
6. The method according to claim 5, characterized in that The project management plan generated based on the supervision evaluation results and the on-site supervision person in charge information includes: Obtaining the evaluation grade of the supervision evaluation result; Determining the supervision level of the project to be managed based on the evaluation level and the supervision evaluation rules; Determine whether the project implementation plan needs to be adjusted based on the supervision level; If the project implementation plan needs to be adjusted, the project implementation plan is adjusted based on the target performance form and the supervision level to generate an adjusted implementation plan; Generate a project management plan based on the adjustment implementation plan, the target performance form, the supervision level and the on-site supervision person in charge information; If the project implementation plan does not need to be adjusted, a project management plan is generated based on the project implementation plan, the target performance form, the supervision level and the on-site supervision person in charge information.
7. The method according to claim 1, characterized in that The supervision of the project to be managed based on the project performance form and the project management plan includes: Obtaining the project performance form filling information of the project to be managed in real time; Determine whether the project to be managed complies with the preset execution plan based on the form filling information and the project management plan; If the project to be managed complies with the preset execution plan, repeating the step of obtaining the project performance form filled-in information of the project to be managed in real time; If the project to be managed does not comply with the preset execution plan, then determine the project abnormality information based on the information filled in the project performance form and the project management plan; A supervision responsibility letter is generated based on the project abnormality information and the on-site supervision person in charge information.
8. A performance form application device based on on-site project management, characterized in that: include: A project information acquisition module, used to acquire project information of a target engineering project, wherein the target engineering project includes a plurality of completed standard engineering projects; A performance form construction module, used to construct a project performance form based on the project information; Supervision information acquisition module, used to obtain on-site supervision information and on-site supervision person-in-charge information of the project to be managed; A supervision result generation module, used for generating the supervision evaluation result of the project to be managed based on the project performance form and the on-site supervision information; A management plan generation module is used to generate a project management plan based on the supervision evaluation results and the information of the on-site supervision person in charge; The engineering project supervision module is used to supervise the project to be managed based on the project performance form and the project management plan.
9. An electronic device, characterized in that: comprising a processor coupled to a memory; The processor is configured to execute a computer program stored in the memory, so that the electronic device executes the method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The method comprises a computer program or an instruction, which, when executed on a computer, causes the computer to execute the method according to any one of claims 1 to 7.
Citation Information
Patent Citations
Construction project supervision information management method and system
CN110322147A
Management system and method for intelligent building supervision engineering project
CN114677044A
Scientific research project management method and system
CN116862440A
Construction method of quantitative evaluation model based on engineering construction safety management performance
CN116993236A
Engineering construction whole process digital management method, device, equipment and medium
CN117575518A
Cited By
Performance form application method and system based on supervision field project management
CN121504391A
A performance table form application method and system based on supervision on-site project management
CN121504391B