Foundation pile with damping function

By fixing the connecting column at the bottom of the foundation pile and setting up support components and driven components on the connecting column, the automatic positioning and fixing of the foundation pile is solved, and the problem of tilting and damage of the foundation pile during the pile sinking process is improved, and the working efficiency is avoided.

CN119877524AInactive Publication Date: 2025-04-25ZHONGLI (FUJIAN) NEW ENERGY TECHNOLOGY GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510343820.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-22
Publication Date
2025-04-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the pile sinking process, existing foundation piles are prone to incline due to uneven bottom of the foundation pit, resulting in reduced working efficiency, and the foundation piles are easily damaged when placed in the foundation pit.

Method used

A foundation pile with shock absorption function is designed, by fixing the connecting column at the bottom of the foundation pile, and a supporting assembly and a driven assembly are provided on the connecting column. The support assembly includes a sleeve, a slider, an auxiliary spring and an anchor rod. The anchor rod is squeezed through the sleeve to insert the anchor rod into the soil to fix the foundation pile, and improve the pull-resistance with auxiliary parts. The driven assembly includes a press plate, a sleeve rod and a rotary rod. Through the cooperation of the sleeve rod and the rotary rod, the positioning and fixing of the foundation pile is achieved.

Benefits of technology

The foundation pile can be automatically positioned and fixed in the foundation pit through the cooperation of the support assembly and the driven assembly, avoiding manual adjustment, improving work efficiency, and providing buffering when placed through the elastic telescopic rod to avoid damage to the foundation pile.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119877524A_ABST
    Figure CN119877524A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of foundation piles, and discloses a foundation pile with a damping function, which comprises a foundation pile, a connecting column is fixed at the bottom of the foundation pile, the foundation pile is provided with a supporting assembly for auxiliary fixing and positioning of the foundation pile, and the connecting column is provided with a driven assembly for controlling the supporting assembly. A groove is formed in the surface of the foundation pile, the supporting assembly comprises a sleeve, the foundation pile penetrates through the sleeve and is rotationally connected with the foundation pile, and a sliding block is slidably installed on the inner side of the groove in the surface of the foundation pile. The sleeve extrudes the anchor rod to enable the anchor rod to swing, so that the anchor rod is inserted into soil to fix and support the foundation pile, meanwhile, the positioning effect can be achieved, it is guaranteed that the foundation pile is centered in a foundation pit, then workers do not need to manually adjust the foundation pile, and the working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pile foundations, and in particular to a pile foundation with a shock-absorbing function. Background Art

[0002] The pile foundation is also called the pile foundation, which is composed of the pile and the cap connected to the top of the pile. If the pile body is completely buried in the soil and the bottom of the cap is in contact with the soil, it is called a low cap pile foundation; if the upper part of the pile body is exposed to the ground and the bottom of the cap is above the ground, it is called a high cap pile foundation. Building pile foundations are usually low cap pile foundations.

[0003] At present, when the foundation piles are sunk, the foundation piles are hoisted into the foundation pit by a crane. After the foundation piles are hoisted in, the staff are required to straighten the foundation piles to prevent the foundation piles from tilting due to the uneven bottom of the foundation pit, which affects their use. This not only reduces the overall work efficiency, but also the foundation piles have a certain weight, which makes it troublesome for the staff to adjust the foundation piles. Moreover, when the foundation piles are placed in the foundation pit, they are easily hit in the foundation pit due to their own weight, causing damage to the foundation piles. For this reason, we propose a foundation pile with a shock-absorbing function. Summary of the invention

[0004] The object of the present invention is to provide a foundation pile with a shock-absorbing function to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solution: a foundation pile with a shock-absorbing function, comprising a foundation pile, a connecting column fixed at the bottom of the foundation pile, a supporting assembly for auxiliary fixing and positioning of the foundation pile is arranged on the foundation pile, and a driven assembly for controlling the supporting assembly is arranged on the connecting column.

[0006] Preferably, a groove is provided on the surface of the foundation pile.

[0007] Preferably, the support assembly includes a sleeve, which is penetrated by the foundation pile and rotatably connected to the foundation pile, a slider is slidably installed on the inner side of the groove on the surface of the pile, an auxiliary spring is fixed on the inner side of the groove on the surface of the pile, the end of the auxiliary spring away from the foundation pile is fixed to the slider, and an anchor rod is hinged on the side of the slider away from the auxiliary spring, the anchor rod penetrates the sleeve, and an auxiliary part for improving the pull-out resistance of the foundation pile is provided on the anchor rod. When the sleeve rotates, the sleeve squeezes the anchor rod, causing the anchor rod to swing, thereby inserting into the soil to fix and support the foundation pile, and at the same time it can play a positioning role to ensure that the foundation pile is centered in the foundation pit.

[0008] Preferably, a through hole is provided on the surface of the sleeve for the anchor rod to pass through, and when the sleeve rotates, the sleeve can contact the anchor rod through the inner side of the through hole on the surface, so that the anchor rod is in a vertical state compared to the foundation pile.

[0009] Preferably, the auxiliary part includes a resistance rod, which passes through the anchor rod and is slidably connected to the anchor rod, a pull rod is fixed to the side of the resistance rod away from the slider, a spring 1 is fixed to the end of the pull rod away from the resistance rod, and the end of the spring 1 away from the pull rod is fixed to the inner wall of the anchor rod, a support rod is hinged on the surface of the pull rod, and the end of the support rod away from the pull rod is hinged to the insertion rod, the insertion rod passes through the anchor rod and is slidably connected to the anchor rod, an auxiliary plate is fixed to the inner wall of the anchor rod, and the auxiliary plate is slidably connected to the insertion rod. When the sleeve rotates, the sleeve resists the anchor rod, so that the anchor rod extends out compared with the sleeve, the resistance rod resists the inner wall of the sleeve, the resistance rod moves compared with the anchor rod, and the resistance rod drives the pull rod to move together, and the pull rod can push the insertion rod to extend out of the anchor rod through the support rod, thereby playing a role of auxiliary fixation.

[0010] Preferably, the driven assembly includes a pressure plate, a sleeve rod is fixed on the top of the pressure plate, the sleeve rod passes through the bottom of the connecting column and is slidably connected to the connecting column, a second spring is fixed on the inner wall of the connecting column, one end of the second spring away from the connecting column is fixed to the sleeve rod, a rotating rod is rotatably installed on the inner wall of the connecting column, and the rotating rod passes through the fixed disk and the rotating disk.

[0011] Preferably, the rotating rod is fixed to the rotating disk, and the fixed disk is fixed to the inner wall of the connecting column. A transverse sliding groove is provided on the fixed disk, and an arc-shaped sliding groove is provided on the rotating disk. An L-shaped rod is slidably installed in the transverse sliding groove on the fixed disk, and the L-shaped rod passes through the arc-shaped sliding groove on the rotating disk. The L-shaped rod passes through the connecting column and is slidably connected to the connecting column, and a connecting rod is fixed on the top of the L-shaped rod. When the rotating disk rotates, the arc-shaped sliding groove on the rotating disk can be against the L-shaped rod, so that the L-shaped rod moves along the transverse sliding groove on the fixed disk to the side away from the center of the rotating disk.

[0012] Preferably, a groove is provided on the top of the sleeve rod, a spiral groove is provided on the surface of the rotating rod, a sliding rod is fixed on the inner side of the groove on the top of the sleeve rod, and the sliding rod is slidably installed on the inner side of the spiral groove on the surface of the rotating rod at one end away from the sleeve rod. When the foundation piles and the connecting columns are placed in the foundation pit, the foundation piles and the connecting columns are pressed downward as a whole under the action of the gravity of the foundation piles, and the sleeve rod moves upward compared to the rotating rod. The sleeve rod moves upward with the sliding rod, and the sliding rod slides upward in the spiral groove on the surface of the rotating rod, so that the rotating rod can rotate.

[0013] Preferably, a sliding groove is provided at the bottom of the sleeve, and the connecting rod is inserted into the sliding groove at the bottom of the sleeve. When the L-shaped rod moves to the side away from the center of the turntable, the L-shaped rod can slide in the sliding groove at the bottom of the sleeve with the connecting rod, so that the sleeve can rotate at a certain angle.

[0014] Preferably, an elastic telescopic rod is fixed to the bottom of the connecting column, which can play a certain buffering role when placing the foundation piles, and can effectively prevent the foundation piles from being directly hit into the foundation pit, causing damage to the foundation piles.

[0015] Compared with the prior art, the present invention provides a foundation pile with a shock-absorbing function, which has the following beneficial effects: 1. The foundation pile with shock-absorbing function is provided with a supporting assembly and a driven assembly. When the foundation pile is placed into the foundation pit, the sleeve squeezes the anchor rod, causing the anchor rod to swing, thereby inserting into the soil to fix and support the foundation pile. At the same time, it can play a positioning role to ensure that the foundation pile is centered in the foundation pit, thereby eliminating the need for workers to manually adjust the foundation pile, thereby improving work efficiency.

[0016] 2. The foundation pile with shock-absorbing function has auxiliary parts set up. When the sleeve rotates, the sleeve pushes the anchor rod, so that the anchor rod extends out compared to the sleeve, and the resistance rod resists the inner wall of the sleeve. The resistance rod moves compared to the anchor rod, and the resistance rod drives the pull rod to move together. The pull rod can push the insertion rod to extend out of the anchor rod through the support rod, thereby playing a role of auxiliary fixation.

[0017] 3. The foundation pile with shock-absorbing function can play a certain buffering role when placing the foundation pile through the elastic telescopic rod arranged at the bottom of the connecting column, which can effectively prevent the foundation pile from being directly hit into the foundation pit and causing damage to the foundation pile. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a front view structural schematic diagram of the present invention; Figure 2 This is a schematic diagram of the front view of the cross-section of the connecting column of the present invention; Figure 3 It is a schematic diagram of the connection structure of the sleeve rod, the rotating rod and the sliding rod of the present invention; Figure 4 This is a schematic diagram of the structure of the arc-shaped slide groove on the turntable of the present invention; Figure 5 This is a schematic diagram of the cross-sectional structure of the connection between the foundation pile and the sleeve of the present invention; Figure 6 This is a schematic diagram of the connection structure between the groove on the surface of the pile and the auxiliary spring of the present invention; Figure 7 It is a schematic diagram of the cross-sectional structure of the anchor rod of the present invention.

[0019] In the figure: 1. foundation pile; 2. connecting column; 3. supporting assembly; 31. sleeve; 32. sliding block; 33. auxiliary spring; 34. anchor rod; 35. auxiliary part; 351. resistance rod; 352. pull rod; 353. spring one; 354. support rod; 355. insertion rod; 356. auxiliary plate; 4. driven assembly; 41. pressure plate; 42. sleeve rod; 43. spring two; 44. rotating rod; 45. fixed plate; 46. rotating plate; 47. L-shaped rod; 48. connecting rod; 5. sliding rod; 6. elastic telescopic rod. DETAILED DESCRIPTION

[0020] like Figure 1-7 As shown, the present invention provides a technical solution: a foundation pile with a shock-absorbing function, comprising a foundation pile 1, a connecting column 2 is fixed at the bottom of the foundation pile 1, a supporting component 3 for auxiliary fixing and positioning of the foundation pile 1 is arranged on the foundation pile 1, a driven component 4 for controlling the supporting component 3 is arranged on the connecting column 2, and a groove is opened on the surface of the foundation pile 1.

[0021] The support assembly 3 includes a sleeve 31, which is penetrated by the pile 1 and rotatably connected to the pile 1. A slider 32 is slidably installed on the inner side of the groove on the surface of the pile 1, and an auxiliary spring 33 is fixed on the inner side of the groove on the surface of the pile 1. The end of the auxiliary spring 33 away from the pile 1 is fixed to the slider 32, and the side of the slider 32 away from the auxiliary spring 33 is hinged with an anchor rod 34, which penetrates the sleeve 31, and an auxiliary part 35 for improving the pull-out resistance of the pile 1 is provided on the anchor rod 34. When the sleeve 31 rotates, the sleeve 31 squeezes the anchor rod 34, causing the anchor rod 34 to swing, thereby inserting into the soil to fix and support the pile 1, and at the same time it can play a positioning role to ensure that the pile 1 is centered in the foundation pit.

[0022] A through hole is formed on the surface of the sleeve 31 for the anchor rod 34 to pass through. When the sleeve 31 rotates, the sleeve 31 can contact the anchor rod 34 through the inner side of the through hole on the surface, so that the anchor rod 34 is vertical compared to the foundation pile 1.

[0023] The auxiliary member 35 includes a resisting rod 351, which penetrates the anchor rod 34 and is slidably connected to the anchor rod 34. A pull rod 352 is fixed to the side of the resisting rod 351 away from the slider 32. A spring 353 is fixed to the end of the pull rod 352 away from the resisting rod 351. The end of the spring 353 away from the pull rod 352 is fixed to the inner wall of the anchor rod 34. A support rod 354 is hinged on the surface of the pull rod 352. The end of the support rod 354 away from the pull rod 352 is hinged to the insertion rod 355. The insertion rod 355 penetrates the anchor rod 34 and is slidably connected to the anchor rod 34 is slidably connected, an auxiliary plate 356 is fixed on the inner wall of the anchor rod 34, and the auxiliary plate 356 is slidably connected to the insertion rod 355. When the sleeve 31 rotates, the sleeve 31 pushes the anchor rod 34, so that the anchor rod 34 extends out compared with the sleeve 31, and the resistance rod 351 is abutted on the inner wall of the sleeve 31. The resistance rod 351 moves compared with the anchor rod 34, and the resistance rod 351 drives the pull rod 352 to move together. The pull rod 352 can push the insertion rod 355 to extend out of the anchor rod 34 through the support rod 354, thereby playing a role of auxiliary fixation.

[0024] The driven assembly 4 includes a pressure plate 41, a sleeve rod 42 is fixed on the top of the pressure plate 41, the sleeve rod 42 passes through the bottom of the connecting column 2 and is slidably connected to the connecting column 2, a spring 43 is fixed on the inner wall of the connecting column 2, and the end of the spring 43 away from the connecting column 2 is fixed to the sleeve rod 42, and a rotating rod 44 is rotatably installed on the inner wall of the connecting column 2, the rotating rod 44 passes through a fixed disk 45 and a rotating disk 46, the rotating rod 44 is fixed to the rotating disk 46, the fixed disk 45 is fixed on the inner wall of the connecting column 2, and a A transverse slide groove, an arc-shaped slide groove is opened on the turntable 46, and an L-shaped rod 47 is slidably installed in the transverse slide groove on the fixed plate 45, and the L-shaped rod 47 passes through the arc-shaped slide groove on the turntable 46, and the L-shaped rod 47 passes through the connecting column 2 and is slidably connected with the connecting column 2, and a connecting rod 48 is fixed on the top of the L-shaped rod 47. When the turntable 46 rotates, the arc-shaped slide groove on the turntable 46 can be against the L-shaped rod 47, so that the L-shaped rod 47 moves along the transverse slide groove on the fixed plate 45 to the side away from the center of the turntable 46.

[0025] A groove is provided on the top of the sleeve rod 42, and a spiral groove is provided on the surface of the rotating rod 44. A slide rod 5 is fixed on the inner side of the groove on the top of the sleeve rod 42. The end of the slide rod 5 away from the sleeve rod 42 is slidably installed on the inner side of the spiral groove on the surface of the rotating rod 44. When the foundation pile 1 and the connecting column 2 are placed in the foundation pit, under the action of the gravity of the foundation pile 1, the foundation pile 1 and the connecting column 2 are pressed downward as a whole, and the sleeve rod 42 moves upward compared to the rotating rod 44. The sleeve rod 42 moves upward with the slide rod 5, and the slide rod 5 slides upward in the spiral groove on the surface of the rotating rod 44, so that the rotating rod 44 can rotate.

[0026] A sliding groove is provided at the bottom of the sleeve 31, and the connecting rod 48 is inserted into the sliding groove at the bottom of the sleeve 31. When the L-shaped rod 47 moves to the side away from the center of the turntable 46, the L-shaped rod 47 can slide with the connecting rod 48 in the sliding groove at the bottom of the sleeve 31, so that the sleeve 31 can rotate at a certain angle.

[0027] An elastic telescopic rod 6 is fixed to the bottom of the connecting column 2, which can play a certain buffering role when placing the foundation pile 1, and can effectively prevent the foundation pile 1 from directly hitting the foundation pit and causing damage to the foundation pile 1.

[0028] When in use, the pile 1 is hoisted into the foundation pit by a crane. Under the action of the gravity of the pile 1, the pile 1 and the connecting column 2 are pressed downward as a whole, and the sleeve rod 42 moves upward compared to the rotating rod 44. The sleeve rod 42 moves upward with the sliding rod 5, and the sliding rod 5 slides upward in the spiral groove on the surface of the rotating rod 44, so that the rotating rod 44 can rotate, and the rotating rod 44 drives the turntable 46 to rotate together. The arc-shaped groove on the turntable 46 can be against the L-shaped rod 47, so that the L-shaped rod 47 moves along the transverse groove on the fixed plate 45 to the side away from the center of the turntable 46.

[0029] The L-shaped rod 47 drives the connecting rod 48 to slide in the slide groove at the bottom of the sleeve 31, so that the sleeve 31 rotates at a certain angle. When the sleeve 31 rotates, the sleeve 31 squeezes the anchor rod 34, so that the anchor rod 34 swings, thereby inserting into the soil to fix and support the foundation pile 1. At the same time, it can play a positioning role to ensure that the foundation pile 1 is centered in the foundation pit. The sleeve 31 pushes the anchor rod 34, so that the anchor rod 34 extends out compared to the sleeve 31, and the resistance rod 351 resists on the inner wall of the sleeve 31. The resistance rod 351 moves compared to the anchor rod 34, and the resistance rod 351 drives the pull rod 352 to move together. The pull rod 352 can push the insertion rod 355 through the support rod 354 to extend out of the anchor rod 34, thereby playing a role of auxiliary fixation.

[0030] The above generally describes the present invention in detail, but it is obvious to a person skilled in the art that some modifications or improvements can be made to the present invention. Therefore, modifications or improvements that do not depart from the spirit of the present invention are within the scope of protection of the present invention.

Claims

1. A foundation pile with a shock-absorbing function, comprising a foundation pile (1), characterized in that: A connecting column (2) is fixed to the bottom of the foundation pile (1), a supporting assembly (3) for assisting in fixing and positioning the foundation pile (1) is provided on the foundation pile (1), and a driven assembly (4) for controlling the supporting assembly (3) is provided on the connecting column (2).

2. The pile foundation with shock absorption function according to claim 1, characterized in that: The surface of the foundation pile (1) is provided with a groove.

3. The pile foundation with shock absorption function according to claim 2, characterized in that: The support assembly (3) comprises a sleeve (31), the sleeve (31) being penetrated by the foundation pile (1) and being rotatably connected to the foundation pile (1), a slider (32) being slidably mounted on the inner side of a groove on the surface of the foundation pile (1), an auxiliary spring (33) being fixed on the inner side of the groove on the surface of the foundation pile (1), an end of the auxiliary spring (33) away from the foundation pile (1) being fixed to the slider (32), an anchor rod (34) being hingedly connected to a side of the slider (32) away from the auxiliary spring (33), the anchor rod (34) being penetrated by the sleeve (31), and an auxiliary part (35) for improving the pull-out resistance of the foundation pile (1) being arranged on the anchor rod (34).

4. The pile foundation with shock absorption function according to claim 3, characterized in that: A through hole is provided on the surface of the sleeve (31).

5. The pile foundation with shock absorption function according to claim 3, characterized in that: The auxiliary component (35) comprises a resisting rod (351), the resisting rod (351) passes through the anchor rod (34) and is slidably connected to the anchor rod (34), a pull rod (352) is fixed to the side of the resisting rod (351) away from the slider (32), a spring (353) is fixed to the end of the pull rod (352) away from the resisting rod (351), the end of the spring (353) away from the pull rod (352) is fixed to the inner wall of the anchor rod (34), a support rod (354) is hinged on the surface of the pull rod (352), the end of the support rod (354) away from the pull rod (352) is hinged to an insertion rod (355), the insertion rod (355) passes through the anchor rod (34) and is slidably connected to the anchor rod (34), an auxiliary plate (356) is fixed to the inner wall of the anchor rod (34), and the auxiliary plate (356) is slidably connected to the insertion rod (355).

6. The pile foundation with shock absorption function according to claim 3, characterized in that: The driven assembly (4) comprises a pressure plate (41), a sleeve rod (42) is fixed on the top of the pressure plate (41), the sleeve rod (42) passes through the bottom of the connecting column (2) and is slidably connected to the connecting column (2), a second spring (43) is fixed on the inner wall of the connecting column (2), one end of the second spring (43) away from the connecting column (2) is fixed to the sleeve rod (42), and a rotating rod (44) is rotatably mounted on the inner wall of the connecting column (2).

7. The pile foundation with shock absorption function according to claim 6, characterized in that: The rotating rod (44) passes through the fixed plate (45) and the rotating plate (46); the rotating rod (44) is fixed to the rotating plate (46); the fixed plate (45) is fixed to the inner wall of the connecting column (2); a transverse sliding groove is provided on the fixed plate (45); an arc-shaped sliding groove is provided on the rotating plate (46); an L-shaped rod (47) is slidably installed in the transverse sliding groove on the fixed plate (45); the L-shaped rod (47) passes through the arc-shaped sliding groove on the rotating plate (46); the L-shaped rod (47) passes through the connecting column (2) and is slidably connected to the connecting column (2); a connecting rod (48) is fixed to the top of the L-shaped rod (47).

8. The pile foundation with shock absorption function according to claim 7, characterized in that: A groove is formed on the top of the sleeve rod (42), a spiral groove is formed on the surface of the rotating rod (44), a slide rod (5) is fixed inside the groove at the top of the sleeve rod (42), and one end of the slide rod (5) away from the sleeve rod (42) is slidably mounted inside the spiral groove on the surface of the rotating rod (44).

9. The pile foundation with shock absorption function according to claim 7, characterized in that: The bottom of the sleeve (31) is provided with a sliding groove, and the connecting rod (48) is inserted into the sliding groove at the bottom of the sleeve (31).

10. The pile foundation with shock absorption function according to claim 1, characterized in that: An elastic telescopic rod (6) is fixed to the bottom of the connecting column (2).