By designing and installing openings and transfer devices on the climbing frame of the tower belt machine, the problem of conveying belt interference when the tower belt machine is installed is solved, and efficient operation of installing the standard section without removing the conveying equipment is achieved.
Patent Information
- Application Number
- CN202510204199.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-24
- Publication Date
- 2025-04-25
AI Technical Summary
When the existing tower belt machine is equipped with standard sections, the conveyor belt will interfere with the hoisting system. The conveyor belt needs to be removed before the standard sections are installed, resulting in complex operation and low efficiency.
A tower belt machine is designed, and its climbing sleeve has a relatively arranged opening and installation side. The opening side is equipped with an installation opening. The transfer device is arranged on the installation side, which can drive the conveying equipment to a suitable height. When installing the standard section, the standard section is placed in the climbing sleeve from the installation opening and directly installed on the top of the tower body.
It realizes the installation of standard sections without removing the conveying equipment, improves the installation efficiency and conveying efficiency, and simplifies the operation process.
Smart Images

Figure CN119877547A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of concrete pouring, and in particular relates to a tower belt machine. Background Art
[0002] At present, when building large concrete gravity dams, roller compacted concrete is usually used for pouring. Roller compacted concrete does not need to be vibrated during pouring, but the concrete conveying volume is large. Tower belt conveyors are widely used in concrete pouring projects because they can continuously convey large amounts of concrete. However, when installing standard sections on existing tower belt conveyors, the conveyor belt used to convey concrete will interfere with the jacking system used to install standard sections. The conveyor belt needs to be removed before the standard section can be installed. The conveyor belt removal steps are cumbersome, and the installation of standard sections is complicated, resulting in low installation efficiency. Summary of the invention
[0003] In view of the above-mentioned defects or shortcomings, the present invention provides a tower belt machine, aiming to solve the technical problems of complex operation and low installation efficiency of the existing tower belt machine for adding standard sections.
[0004] In order to achieve the above object, the present invention provides a tower belt machine, which includes:
[0005] Tower body;
[0006] The conveying device comprises a feeding device, a transfer device and a feeding device, wherein the feeding device is connected to one end of the transfer device and is used to supply materials to the transfer device, and the other end of the transfer device is connected to the feeding device and is used to convey the materials to the feeding device;
[0007] The climbing frame is liftably mounted on the tower body, and has an opening side and an installation side that are relatively arranged. The opening side of the climbing frame is provided with an installation opening for installing a standard section, and the transfer device is arranged on the installation side of the climbing frame.
[0008] In an embodiment of the present invention, the transfer device includes a mounting frame and a transfer conveyor belt mechanism, the mounting frame is arranged on the mounting side of the climbing sleeve frame, the transfer conveyor belt mechanism is arranged on the mounting frame, the feeding device is connected to the feeding end of the transfer conveyor belt mechanism, and the feeding device includes a first feeding belt mechanism, which is rotatably arranged at one end of the mounting frame away from the feeding device, and the feeding end of the first feeding belt mechanism is located below the discharge end of the transfer conveyor belt mechanism.
[0009] In an embodiment of the present invention, the feeding device also includes a second feeding belt mechanism, which is rotatably arranged at the discharge end of the first feeding belt mechanism, and the feed end of the second feeding belt mechanism is located below the discharge end of the first feeding belt mechanism.
[0010] In an embodiment of the present invention, the tower belt machine also includes a lifting device, which includes a lifting arm, a lifting hook and a mobile luffing car. The lifting arm is arranged at the top of the tower body, and the mobile luffing car is movably arranged on the lifting arm. The lifting hook is connected to the mobile luffing car through a lifting rope, and the lifting hook is connected to the second feeding belt mechanism.
[0011] In an embodiment of the present invention, the feeding device also includes a feeding luffing mechanism, which includes a pulley group, an luffing rope and an luffing drive component. The pulley group is arranged on the climbing sleeve frame, and the luffing drive component is arranged on the mounting frame and is drivingly connected to one end of the luffing rope. The luffing rope is arranged to bypass the pulley group, and the other end of the luffing rope is connected to the first feeding belt mechanism.
[0012] In an embodiment of the present invention, the feeding device includes a feeding conveyor belt mechanism, which is rotatably arranged at one end of the mounting frame away from the first feeding belt mechanism, and the discharge end of the feeding conveyor belt mechanism is located above the feed end of the transfer conveyor belt mechanism.
[0013] In an embodiment of the present invention, the feeding device further comprises a climbing follower vehicle, and the feeding end of the feeding conveyor belt mechanism is connected to the climbing follower vehicle.
[0014] In an embodiment of the present invention, the mounting frame includes a frame body and a first rotating assembly. The frame body is arranged on the mounting side of the climbing sleeve frame. The first rotating assembly includes a first rotating support frame and a first rotating seat. The first rotating support frame is arranged on the lower side of the frame body and is located at one end of the frame body away from the feeding conveyor belt mechanism. The first rotating seat is rotatably arranged on the first rotating support frame, and the feeding end of the first feeding belt mechanism is connected to the first rotating seat.
[0015] In an embodiment of the present invention, the mounting frame also includes a second rotating assembly, which includes a second rotating support frame and a second rotating seat. The second rotating support frame is arranged on the upper side of the frame body and is located at an end of the frame body away from the first feeding belt mechanism. The second rotating seat is rotatably arranged on the second rotating support frame, and the discharge end of the feeding conveyor belt mechanism is connected to the second rotating seat.
[0016] In the embodiment of the present invention, an additional support platform is provided on the opening side of the climbing sleeve, and the additional support platform is arranged corresponding to the additional opening and is used for placing the standard section.
[0017] Through the above technical solution, the tower belt conveyor provided by the embodiment of the present invention has the following beneficial effects:
[0018] In the technical solution of the present invention, one side of the climbing sleeve is set as the installation side, and the transfer device is connected to the installation side of the climbing sleeve. The climbing sleeve can drive the transfer device, the feeding device and the delivery device to rise and fall to a suitable working height, so that the feeding device transports the material from the ground to the transfer device, and then the transfer device transports the material from the feeding device to the delivery device, and the delivery device transports the material to the casting working surface, thereby realizing the transfer and transportation of the material; and, the side of the climbing sleeve opposite to the installation side is set as the opening side, and the opening side of the climbing sleeve is provided with an installation opening. When it is necessary to install a standard section, the climbing sleeve drives the transfer device to rise to the top of the tower body relative to the tower body, and the standard section can be installed on the top of the tower body by placing the standard section from the installation opening into the climbing sleeve. In the tower belt machine of the present invention, the installation opening for the standard section to be installed and the conveying equipment for conveying materials are arranged on both sides of the climbing sleeve. The climbing sleeve can allow the standard section to be installed on the top of the tower body from the installation opening when the standard section is installed, and can also drive the conveying equipment to rise and fall to a suitable working height for material conveying when the pouring operation is carried out. The utilization rate of the climbing sleeve is high, and the standard section can be installed without dismantling the conveying equipment. The installation of the standard section and the material conveying are convenient and fast, thereby improving the installation efficiency and the conveying efficiency.
[0019] Other features and advantages of the embodiments of the present invention will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The accompanying drawings are used to provide a further understanding of the embodiments of the present invention and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the embodiments of the present invention, but do not constitute a limitation on the embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on the structures shown in these drawings without creative work. In the accompanying drawings:
[0021] Figure 1 is a schematic diagram of the main structure of a tower belt conveyor according to an embodiment of the present invention;
[0022] Figure 2 is a schematic diagram of a top view of a tower belt conveyor according to an embodiment of the present invention;
[0023] Figure 3 is a schematic structural diagram of a tower belt conveyor according to an embodiment of the present invention at a viewing angle;
[0024] Figure 4 yes Figure 3 A magnified schematic diagram of the middle A area;
[0025] Figure 5 is a schematic structural diagram of a tower belt conveyor according to an embodiment of the present invention from another perspective;
[0026] Figure 6 yes Figure 5 A magnified schematic diagram of the middle B area;
[0027] Figure 7 It is a schematic structural diagram of a climbing frame in a tower belt conveyor according to an embodiment of the present invention.
[0028] Description of Reference Numerals
[0029] 10 Tower 511 Add opening
[0030] 20 Feeding device 52 Installation side
[0031] 21 Feeding conveyor belt mechanism 53 Install support platform
[0032] 22 Climbing follower vehicle 54 Upper climbing part
[0033] 30 Transfer device 55 Lower climbing part
[0034] 31 Mounting frame 56 Platform intercommunication device
[0035] 311 rack body 561 ladder
[0036] 312 First slewing support frame 562 Roller adjustment platform
[0037] 313 First rotary seat 563 First lifting operation platform
[0038] 314 Second slewing support frame 564 Second lifting operation platform
[0039] 315 Second swivel seat 57 Arm support platform
[0040] 32 Transfer conveyor belt mechanism 571 Walking platform
[0041] 40 Feeding device 572 Arm support frame
[0042] 41 First feeding belt mechanism 573 Support surface
[0043] 42 Second feeding belt mechanism 58 Amplitude adjustment installation platform
[0044] 43 Feeding luffing mechanism 581 Triangular platform
[0045] 431 pulley block 582 diagonal support rod
[0046] 432 luffing rope 60 lifting device
[0047] 433 luffing drive 61 crane arm
[0048] 44 Feeding rotary seat 62 Lifting hook
[0049] 50 Climbing frame 63 Mobile luffing vehicle
[0050] 51 Opening side 64 Lifting rope DETAILED DESCRIPTION
[0051] The specific implementation of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present invention, and is not used to limit the present invention.
[0052] The tower belt conveyor of the present invention will be described below with reference to the accompanying drawings.
[0053] like Figures 1 to 6 As shown, the present invention provides a tower belt machine, which includes a tower body 10, a conveying device and a climbing frame 50, wherein the conveying device includes a feeding device 20, a transfer device 30 and a feeding device 40, wherein the feeding device 20 is connected to one end of the transfer device 30 and is used to supply materials to the transfer device 30, and the other end of the transfer device 30 is connected to the feeding device 40 and is used to convey materials to the feeding device 40; the climbing frame 50 is escalably mounted on the tower body 10, and the climbing frame 50 has an opening side 51 and an installation side 52 arranged oppositely, and the opening side 51 of the climbing frame 50 is provided with an installation opening 511 for installing a standard section, and the transfer device 30 is arranged on the installation side 52 of the climbing frame 50. It should be noted that the conveying device of the tower belt machine can be used to transport materials from the ground to the casting operation surface, wherein the materials can be building materials such as concrete, cement, and concrete, and the conveying device transfers the materials and transports them to the casting operation surface for casting operations.
[0054] Specifically, the climbing frame 50 is sleeved on the tower body 10 and can rise or fall relative to the tower body 10. One side of the climbing frame 50 is set as the installation side 52. The transfer device 30 is connected to the installation side 52 of the climbing frame 50. The two ends of the transfer device 30 are respectively connected to the feeding device 20 and the feeding device 40 in a one-to-one correspondence. The climbing frame 50 can drive the transfer device 30, the feeding device 20 and the feeding device 40 to rise and fall to a suitable working height, so that the feeding device 20 transports the material from the ground to the transfer device 30, and then the transfer device 30 transports the material from the feeding device 20 to the feeding device 40. The feeding device 40 transports the materials to the pouring working surface, and the transfer device 30 transfers the materials from the feeding device 20 to the feeding device 40, thereby realizing the transfer and transportation of the materials; and, the side of the climbing sleeve 50 opposite to the installation side 52 is set as the opening side 51, and the opening side 51 of the climbing sleeve 50 is provided with an installation opening 511. When it is necessary to install a standard section, the climbing sleeve 50 drives the transfer device 30 to rise to the top of the tower body 10 relative to the tower body 10, and the standard section can be installed on the top of the tower body 10 by placing the standard section from the installation opening 511 in the climbing sleeve 50.
[0055] In the tower belt machine in the embodiment of the present invention, the installation opening 511 for installing the standard section and the conveying equipment for conveying materials are respectively arranged on both sides of the climbing sleeve 50. The climbing sleeve 50 can allow the standard section to be installed on the top of the tower body 10 from the installation opening 511 when installing the standard section, and can also drive the conveying equipment to rise and fall to a suitable working height for material conveying during the pouring operation. The utilization rate of the climbing sleeve 50 is high, and the standard section can be installed without dismantling the conveying equipment. The installation of the standard section and the material transportation are convenient and fast, which improves the installation efficiency and the transportation efficiency.
[0056] In an embodiment of the present invention, the transfer device 30 includes a mounting frame 31 and a transfer conveyor belt mechanism 32. The mounting frame 31 is arranged on the mounting side 52 of the climbing sleeve frame 50. The transfer conveyor belt mechanism 32 is arranged on the mounting frame 31. The feeding device 20 is connected to the feeding end of the transfer conveyor belt mechanism 32. The feeding device 40 includes a first feeding belt mechanism 41. The first feeding belt mechanism 41 is rotatably arranged at one end of the mounting frame 31 away from the feeding device 20, and the feeding end of the first feeding belt mechanism 41 is located below the discharging end of the transfer conveyor belt mechanism 32.
[0057] like Figures 1 to 4As shown, the transfer conveyor belt mechanism 32 is arranged on the mounting frame 31, and the mounting frame 31 is connected to the mounting side 52 of the climbing sleeve frame 50 to fix the transfer conveyor belt mechanism 32 on the mounting side 52, and the feeding device 20 transports the material from the ground to the feeding end of the transfer conveyor belt mechanism 32, so that the transfer conveyor belt mechanism 32 transports the material toward the discharging end of the transfer conveyor belt mechanism 32, and the height of the feeding end of the first feeding belt mechanism 41 is lower than the height of the discharging end of the transfer conveyor belt mechanism 32, so that the material on the transfer conveyor belt mechanism 32 can be transported from the discharging end of the transfer conveyor belt mechanism 32 to the feeding end of the first feeding belt mechanism 41, thereby realizing the transfer of the material from the feeding device 20 to the first feeding belt mechanism 41, and the first feeding belt mechanism 41 is connected to the mounting side 52 of the climbing sleeve frame 50, and the feeding device 20 transports the material from the ground to the feeding end of the transfer conveyor belt mechanism 32 ..., and the feeding device 20 is connected to the mounting side 52, and the feeding device 20 is connected to the mounting side 52, and the feeding device 20 is connected to the mounting side 52, and the feeding device 20 is connected to the mounting side 52, and the feeding device 20 is connected to the mounting side 52, and the feeding A feeding belt mechanism 41 can swing relative to the mounting frame 31, so as to adjust the first feeding belt mechanism 41 to the angle corresponding to the casting working surface, thereby facilitating the feeding device 40 to transport the material to the casting working surface, thereby improving the material transportation efficiency. In addition, when installing a standard section, the climbing sleeve 50 can drive the mounting frame 31 to rise, so that the mounting frame 31 drives the transfer conveyor belt mechanism 32, the feeding device 20 and the first feeding belt mechanism 41 to rise. The standard section is placed into the climbing sleeve 50 from the installation opening 511 facing away from the mounting frame 31, and the standard section can be installed on the top of the tower body 10. During installation, the mounting frame 31 will not interfere with the standard section, thereby omitting the step of dismantling the conveying equipment, and the installation operation is simple.
[0058] Furthermore, the feeding device 40 further includes a second feeding belt mechanism 42, which is rotatably disposed at the discharge end of the first feeding belt mechanism 41, and the feed end of the second feeding belt mechanism 42 is located below the discharge end of the first feeding belt mechanism 41. Figures 1 to 4 As shown, the transfer conveyor belt mechanism 32, the first feeding belt mechanism 41 and the second feeding belt mechanism 42 are connected in sequence, and the height of the feeding end of the second feeding belt mechanism 42 is lower than the height of the discharging end of the first feeding belt mechanism 41, and the height of the feeding end of the first feeding belt mechanism 41 is lower than the height of the discharging end of the transfer conveyor belt mechanism 32, so that the material on the transfer conveyor belt mechanism 32 can be transported to the first feeding belt mechanism 41, and the material on the first feeding belt mechanism 41 can be transported to the second feeding belt mechanism 42, and the second feeding belt mechanism 42 transports the material to the casting operation surface for casting. During the pouring operation, the second feeding belt mechanism 42 extends the material conveying path, realizes the conveying and pouring of materials, and the second feeding belt mechanism 42 can swing relative to the first feeding belt mechanism 41. Specifically, the lower side of the first feeding belt mechanism 41 is provided with a feeding turntable 44 which can rotate relative to the first feeding belt mechanism 41, and the feeding end of the second feeding belt mechanism 42 is connected to the feeding turntable 44, so as to adjust the second feeding belt mechanism 42 to the angle corresponding to the pouring working surface, thereby facilitating the second feeding belt mechanism 42 to convey the material to the pouring working surface, and the material transportation is flexible and convenient.
[0059] In an embodiment of the present invention, the tower belt machine also includes a lifting device 60, which includes a lifting arm 61, a lifting hook 62 and a mobile luffing vehicle 63. The lifting arm 61 is arranged at the top of the tower body 10, and the mobile luffing vehicle 63 is movably arranged on the lifting arm 61. The lifting hook 62 is connected to the mobile luffing vehicle 63 through a lifting rope 64, and the lifting hook 62 is connected to the second feeding belt mechanism 42.
[0060] like Figure 1 and Figure 2 As shown, a boom 61 is provided at the top of the tower body 10, and a mobile luffing vehicle 63 for moving along the boom 61 is provided on the boom 61, and a lifting rope 64 connected to a lifting hook 62 is provided on the mobile luffing vehicle 63. The mobile luffing vehicle 63 moves along the boom 61 to drive the lifting hook 62 to rise or fall. When conveying materials, the lifting hook 62 is connected to the second feeding belt mechanism 42, and the mobile luffing vehicle 63 moves and drives the lifting hook 62 to rise and fall, so that the lifting hook 62 drives the second feeding belt mechanism 42 relative to the tower body 10. The boom length adjustment realizes the adjustment of the pitch angle of the second feeding belt mechanism 42, so that the second feeding belt mechanism 42 can be adjusted to the angle corresponding to the casting working surface, thereby improving the flexibility of material transportation; and, when installing the standard section, the climbing frame 50 can climb to the top of the tower body 10 and lift the lifting arm 61, and the mobile boom vehicle 63 drives the lifting hook 62 to lift the standard section, and then the standard section can be lifted to the position corresponding to the installation opening 511, and the standard section can be installed from the installation opening 511 to the top of the tower body 10, thereby realizing the rapid installation of the standard section.
[0061] In addition, in the prior art, when installing a standard section, it is usually necessary to fill the standard section from the top of the tower body 10 from top to bottom. When installing, the height of the standard section is higher than the height of the lifting arm 61. It is necessary to configure an additional lifting rod device to lift the standard section to the top of the tower body 10 before installation. The installation efficiency is low and the operation is complicated. In the tower belt machine of the embodiment of the present invention, the opening side 51 of the climbing sleeve 50 is provided with an installation opening 511. When installing the standard section, the standard section is placed on the top of the tower body 10 from the installation opening 511. The climbing sleeve 50 lifts the lifting arm 61 so that the lifting arm 61 is located above the climbing sleeve 50, thereby making the height of the installation opening 511 lower than the height of the lifting arm 61. The standard section can be installed by lifting the standard section through the lifting hook 62. There is no need to add additional lifting rod equipment to increase the height of the standard section, which improves the utilization rate of the lifting device 60 and improves the convenience of installation.
[0062] In an embodiment of the present invention, the feeding device 40 also includes a feeding amplitude variation mechanism 43, which includes a pulley group 431, an amplitude variation pull rope 432 and an amplitude variation driving component 433. The pulley group 431 is arranged on the climbing sleeve 50, and the amplitude variation driving component 433 is arranged on the mounting frame 31 and is drivingly connected to one end of the amplitude variation pull rope 432. The amplitude variation pull rope 432 is arranged to bypass the pulley group 431, and the other end of the amplitude variation pull rope 432 is connected to the first feeding belt mechanism 41.
[0063] like Figure 1 As shown, a variable amplitude driving component 433 is provided on the mounting frame 31, a pulley block 431 is provided on the climbing sleeve frame 50, a variable amplitude pull rope 432 is connected to the variable amplitude driving component 433, and the variable amplitude pull rope 432 passes around the pulley block 431 and is connected to the first feeding belt mechanism 41. When material is conveyed, the variable amplitude driving component 433 drives the variable amplitude pull rope 432 to release or retract the rope, so that the variable amplitude pull rope 432 drives the first feeding belt mechanism 41 to change the amplitude relative to the tower body 10, thereby realizing the adjustment of the pitch angle of the first feeding belt mechanism 41, and further improving the flexibility of material conveying and the structural stability.
[0064] In the embodiment of the present invention, the feeding device 20 includes a feeding conveyor belt mechanism 21, which is rotatably arranged at one end of the mounting frame 31 away from the first feeding belt mechanism 41, and the discharge end of the feeding conveyor belt mechanism 21 is located above the feed end of the transfer conveyor belt mechanism 32. Figure 1 As shown, the feed end of the feeding conveyor belt mechanism 21 is used for inputting materials from the ground, and the height of the discharge end of the feeding conveyor belt mechanism 21 is higher than the height of the feed end of the transfer conveyor belt mechanism 32, so that the feeding conveyor belt mechanism 21 can transport the materials on the ground to the transfer conveyor belt mechanism 32, thereby realizing the transportation of materials from a low place to a high place, and facilitating the transportation of materials to the casting working surface located at a high place; and the feeding conveyor belt mechanism 21 can swing relative to the mounting frame 31, so as to facilitate the adjustment of the feeding conveyor belt mechanism 21 to the corresponding material storage area of the mixing station, mixer, etc., thereby facilitating the feeding conveyor belt mechanism 21 to transport the materials to the transfer conveyor belt mechanism 32, thereby improving the material transportation efficiency.
[0065] Furthermore, the feeding device 20 also includes a climbing follower vehicle 22, and the feeding end of the feeding conveyor belt mechanism 21 is connected to the climbing follower vehicle 22. Figure 1As shown, one end of the feeding conveyor belt mechanism 21 away from the transfer conveyor belt mechanism 32 is connected to the climbing follower car 22, and the climbing follower car 22 can move relative to the ground. When the climbing sleeve 50 drives the mounting frame 31 to rise and fall relative to the tower body 10, the mounting frame 31 can drive the discharging end of the feeding conveyor belt mechanism 21 to move up and down, and the climbing follower car 22 drives the feeding end of the feeding conveyor belt mechanism 21 to move toward or away from the tower body 10 to timely adjust the angle of the feeding conveyor belt mechanism 21, so that when adjusting the height of the transfer conveyor belt mechanism 32 and installing the standard section, there is no need to remove the feeding conveyor belt mechanism 21, and the height adjustment of the climbing sleeve 50 is convenient and quick, thereby improving the working efficiency.
[0066] In an embodiment of the present invention, the mounting frame 31 includes a frame body 311 and a first rotating assembly. The frame body 311 is arranged on the mounting side 52 of the climbing sleeve 50. The first rotating assembly includes a first rotating support frame 312 and a first rotating seat 313. The first rotating support frame 312 is arranged on the lower side of the frame body 311 and is located at one end of the frame body 311 away from the feeding conveyor belt mechanism 21. The first rotating seat 313 is rotatably arranged on the first rotating support frame 312, and the feeding end of the first feeding belt mechanism 41 is connected to the first rotating seat 313.
[0067] like Figure 4 As shown, the first rotating support frame 312 is arranged on the lower side of the frame body 311, the first rotating seat 313 is arranged on the first rotating support frame 312 and can rotate relative to the first rotating support frame 312, and the first feeding belt mechanism 41 is connected to the first rotating seat 313 so that the first feeding belt mechanism 41 can swing relative to the frame body 311 to adjust the angle of the first feeding belt mechanism 41, thereby improving the convenience of material transportation, and the first rotating support frame 312 and the first rotating seat 313 are located on the lower side of the frame body 311 so that the feeding end of the first feeding belt mechanism 41 is lower than the discharging end of the transfer conveyor belt mechanism 32, thereby enabling the material on the transfer conveyor belt mechanism 32 to be transported from high to low to the first feeding belt mechanism 41, thereby realizing the transfer and transportation of materials and improving the transportation efficiency and transportation reliability.
[0068] In addition, if Figure 3 As shown, the second feeding belt mechanism 42 can swing relative to the first feeding belt mechanism 41, and the lower side of the first feeding belt mechanism 41 is provided with a feeding turntable 44 which can rotate relative to the first feeding belt mechanism 41, and the feeding end of the second feeding belt mechanism 42 is connected to the feeding turntable 44, so as to facilitate the second feeding belt mechanism 42 to adjust to the angle corresponding to the casting working surface, thereby facilitating the second feeding belt mechanism 42 to transport the material to the casting working surface, and the material transportation is flexible and convenient.
[0069] Furthermore, the mounting frame 31 also includes a second rotating assembly, which includes a second rotating support frame 314 and a second rotating seat 315. The second rotating support frame 314 is arranged on the upper side of the frame body 311 and is located at an end of the frame body 311 away from the first feeding belt mechanism 41. The second rotating seat 315 is rotatably arranged on the second rotating support frame 314, and the discharge end of the feeding conveyor belt mechanism 21 is connected to the second rotating seat 315.
[0070] like Figure 4 As shown, the second swivel support frame 314 is arranged on the upper side of the frame body 311, the second swivel seat 315 is arranged on the second swivel support frame 314 and can rotate relative to the second swivel support frame 314, the feeding conveyor belt mechanism 21 is connected to the second swivel seat 315 so that the feeding conveyor belt mechanism 21 can swing relative to the frame body 311 to adjust the angle of the feeding conveyor belt mechanism 21, thereby improving the convenience of material transportation, and the second swivel support frame 314 and the second swivel seat 315 are located on the upper side of the frame body 311 so that the discharge end of the feeding conveyor belt mechanism 21 is higher than the feed end of the transfer conveyor belt mechanism 32, thereby enabling the material on the feeding conveyor belt mechanism 21 to be transported from high to low to the transfer conveyor belt mechanism 32, thereby realizing the transfer and transportation of materials and improving the transportation efficiency and transportation reliability.
[0071] In the embodiment of the present invention, the opening side 51 of the climbing frame 50 is provided with an additional support platform 53, and the additional support platform 53 is arranged corresponding to the additional opening 511 and is used for placing the standard section. Figure 6 As shown, the installation support platform 53 is connected to the opening side 51 of the climbing sleeve 50 and is located at the lower end of the installation opening 511. When installing a standard section, the standard section can be hoisted onto the installation support platform 53 so that the installation support platform 53 supports the standard section, and then it is convenient to install the standard section from the installation opening 511 to the top of the tower body 10. The installation is convenient and quick, and the conveying equipment is arranged on the installation side 52 of the climbing sleeve 50 facing away from the installation support platform 53, so that when the climbing sleeve 50 is raised and lowered along the tower body 10 and the standard section is installed, there is no need to remove the conveying equipment from the climbing sleeve 50. The operation is simple and convenient, which reduces the hidden dangers of work safety caused by missed operations and wrong operations of operators, and improves work safety and work efficiency.
[0072] In an embodiment of the present invention, the climbing frame 50 also includes an upper climbing part 54, a lower climbing part 55 and a platform intercommunication device 56. The upper climbing part 54 can perform climbing operations along the tower body 10. The additional support platform 53 is arranged on the upper climbing part 54 and can be used for installation of the introduction device and for placement of the standard section. The upper end of the lower climbing part 55 is connected to the lower end of the upper climbing part 54. The mounting frame 31 is arranged on the lower climbing part 55 and can be used for installation of the transfer conveyor belt mechanism 32. The platform intercommunication device 56 is arranged between the additional support platform 53 and the mounting frame 31.
[0073] like Figure 7 As shown, when the climbing frame 50 is used, since it includes an upper climbing portion 54, a lower climbing portion 55 and a platform intercommunication device 56, the upper climbing portion 54 can perform a climbing operation along the tower body 10, that is, the upper climbing portion 54 can be used as a tower belt machine climbing frame, and the lower climbing portion 55 is provided with a mounting frame 31 for mounting a transfer conveyor belt mechanism 32, and the transfer conveyor belt mechanism 32 is respectively connected to the feeding device 20 and the feeding device 40, so that the transfer conveyor belt mechanism 32 can receive the material from the feeding device 20. 0 and transported to the pouring working surface through the feeding device 40, that is, the lower climbing part 55 can be used as a sleeve frame for installing the transfer device 30, and at the same time, the upper end of the lower climbing part 55 is connected to the lower end of the upper climbing part 54, and a platform intercommunication device 56 is added between the additional support platform 53 on the upper climbing part 54 and the mounting frame 31 on the lower climbing part 55, so that the upper climbing part 54 can be interconnected with the platform on the lower climbing part 55, which significantly improves the convenience of personnel operation.
[0074] In the embodiment of the present invention, Figure 7 As shown, the climbing frame 50 also includes an arm support platform 57. The arm support platform 57 and the mounting frame 31 are arranged on opposite sides of the lower climbing part 55. The arm support platform 57 can be used to place the feeding device 40 that has stopped working and removed from the lifting hook 62. By adding the arm support platform 57, the feeding device 40 that has stopped working and removed from the lifting hook 62 can be stably placed on the arm support platform 57, so that in the process of switching from the tower belt machine function to the traditional tower crane function, the feeding device 40 does not need to be removed, which plays a role in improving production efficiency. It should be particularly noted that in addition to the placement support of the arm support platform 57, the feeding device 40 also has a connection between the end and the mounting frame 31, and the hoisting of the feeding amplitude change mechanism 43 on the climbing part 54 can further improve the placement stability of the feeding device 40. More specifically, the feeding device 40 includes a first feeding belt mechanism 41 and a second feeding belt mechanism 42. The first feeding belt mechanism 41 and the second feeding belt mechanism 42 can be folded in a V-shape so that the first feeding belt mechanism 41 and the second feeding belt mechanism 42 are arranged on opposite sides of the lower climbing portion 55.
[0075] Furthermore, if Figure 7As shown, the arm support platform 57 includes a walking platform 571 and an arm support frame 572 arranged in sequence from top to bottom. The walking platform 571 is arranged flush with the mounting frame 31 and communicates with each other through the connecting platform. The arm support frame 572 forms a support surface 573 below the walking platform 571 for placing the feeding device 40. That is, the mounting frame 31, the connecting platform and the walking platform 571 in the arm support platform 57 can be used for personnel to communicate and walk at the current height, so as to further improve the convenience of personnel operation. Specifically, a ladder 561 is provided on the arm support frame 572 for personnel to climb up and down between the walking platform 571 and the support surface 573.
[0076] In the embodiment of the present invention, Figure 7 As shown, the platform intercommunication device 56 includes an intermediate operating platform and a ladder 561. The intermediate operating platform is arranged between the additional support platform 53 and the mounting frame 31, and the ladder 561 is placed between two adjacent platforms. Therefore, on the basis of establishing the intercommunication between the additional support platform 53 and the mounting frame 31, other operations can also be performed while standing on the intermediate operating platform.
[0077] Specifically, there can be three intermediate operating platforms, which are arranged from bottom to top as a roller adjustment platform 562, a first jacking operating platform 563, and a second jacking operating platform 564. The roller device at the lower end of the upper climbing part 54 can be adjusted on the roller adjustment platform 562, the jacking beam can be operated on the first jacking operating platform 563, and the jacking cylinder and the step-changing device can be operated on the second jacking operating platform 564. More specifically, a total of six platform layers can be provided on the climbing frame 50, and the six platform layers can be, from bottom to top, respectively: a mounting frame 31, a roller adjustment platform 562, a first jacking operation platform 563, a second jacking operation platform 564, an additional support platform 53 and a variable amplitude mounting platform 58. The additional support platform 53 can form a first-layer platform together with the connecting platform and the arm support platform 57, and its function is to allow operators to stand and operate the conveying of materials to be conveyed, to operate the folding and opening of the feeding device 40, and to adjust the clamp device on the lower climbing part 55. The function of the variable amplitude mounting platform 58 is not only to allow operators to stand and install the feeding variable amplitude mechanism 43, but also to disassemble and assemble the upper climbing part 54 and the transition section and adjust the clamp device on the upper climbing part 54.
[0078] In an embodiment of the present invention, the climbing frame 50 also includes a variable-length mounting platform 58, which is arranged on the upper climbing part 54 and can be used to install a pulley group 431 that provides a suspension point for the first feeding belt mechanism 41, so that on the basis of the lifting hook 62 providing a suspension point for the feeding device 40, a new suspension point can be provided for the feeding device 40 by adding a pulley group 431 on the variable-length mounting platform 58.
[0079] like Figure 7 As shown, the variable-length mounting platform 58 includes a triangular platform 581 and an oblique support rod 582. The triangular platform 581 is arranged at the upper end of the upper climbing part 54. The triangular platform 581 is arranged in a triangular shape. One side of the upper climbing part 54 serves as a side length of the triangular platform 581, and the pulley block 431 can be arranged at a corner position of the triangular platform 581 away from the upper climbing part 54. The oblique support rod 582 is located on the lower side of the triangular platform 581. One end of the oblique support rod 582 is connected to the upper climbing part 54, and the other end is connected to the lower side of the triangular platform 581 where the pulley block 431 is arranged. The structure is stable and reliable.
[0080] In addition, the present invention further provides a method for using a climbing frame 50, wherein the method for using the climbing frame 50 adopts the climbing frame 50 described above and can be switched between a tower belt machine mode and a tower crane mode. In the tower belt machine mode, the method for using the climbing frame 50 includes:
[0081] The upper end of the upper climbing part 54 and the transition section are disassembled, and the height is adjusted on the tower body 10 by relying on the climbing mechanism on the upper climbing part 54, and after the height is adjusted in place, the climbing frame 50 is supported by the step-changing device in the climbing mechanism;
[0082] One end of the feeding device 40 away from the mounting frame 31 is suspended on the lifting hook 62 .
[0083] It can be understood that when the equipment is used as a tower belt machine, by disassembling the upper end of the upper climbing part 54 and the transition section, and after adjusting the height of the upper climbing part 54 to the right position using the climbing mechanism, the climbing sleeve 50 is supported by the step-changing device, so that the feeding device 40 can adapt to the needs of pouring operations at different heights. Specifically, the method for using the tower belt machine also includes: connecting the upper end of the upper climbing part 54 to the transition section so that the transition section can support the climbing sleeve 50. There are two methods for using the tower belt machine, one is that the upper climbing part 54 is always connected to the transition section, and the feeding device 40 can only adapt to the needs of a single height pouring operation, and the other is to disassemble after the connection, the upper climbing part 54 can be adjusted in height, and the feeding device 40 can adapt to the needs of pouring operations at different heights.
[0084] Meanwhile, in the tower crane mode, the use method of the climbing sleeve 50 includes:
[0085] Remove the feeding device 40 from the lifting hook 62 and adjust it to be placed on the arm support platform 57 arranged opposite to the mounting frame 31, or remove the feeding device 20, the transfer device 30 and the feeding device 40;
[0086] The lifting hook 62 is used to lift and hoist the construction materials.
[0087] It can be understood that when the equipment is used as a traditional tower crane, there are two methods of use: one is not to remove the feeding device 20, the transfer device 30 and the feeding device 40, and the other is to remove the feeding device 20, the transfer device 30 and the feeding device 40. The specific method can be selected according to actual needs.
[0088] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0089] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0090] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0091] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A tower belt conveyor, characterized in that: The tower belt machine comprises: Tower body (10); A conveying device, comprising a feeding device (20), a transfer device (30) and a feeding device (40), wherein the feeding device (20) is connected to one end of the transfer device (30) and is used to supply materials to the transfer device (30), and the other end of the transfer device (30) is connected to the feeding device (40) and is used to transport materials to the feeding device (40); A climbing frame (50) is mounted on the tower body (10) in a liftable manner, the climbing frame (50) having an opening side (51) and an installation side (52) arranged opposite to each other, the opening side (51) of the climbing frame (50) is provided with an installation opening (511) for installing a standard section, and the transfer device (30) is arranged on the installation side (52) of the climbing frame (50).
2. The tower belt conveyor according to claim 1, characterized in that: The transfer device (30) includes a mounting frame (31) and a transfer conveyor belt mechanism (32), wherein the mounting frame (31) is arranged on the mounting side (52) of the climbing sleeve frame (50), and the transfer conveyor belt mechanism (32) is arranged on the mounting frame (31), and the feeding device (20) is connected to the feeding end of the transfer conveyor belt mechanism (32), and the feeding device (40) includes a first feeding belt mechanism (41), and the first feeding belt mechanism (41) is rotatably arranged at one end of the mounting frame (31) away from the feeding device (20), and the feeding end of the first feeding belt mechanism (41) is located below the discharging end of the transfer conveyor belt mechanism (32).
3. The tower belt conveyor according to claim 2, characterized in that: The feeding device (40) further comprises a second feeding belt mechanism (42), wherein the second feeding belt mechanism (42) is rotatably arranged at the discharge end of the first feeding belt mechanism (41), and the feed end of the second feeding belt mechanism (42) is located below the discharge end of the first feeding belt mechanism (41).
4. The tower belt conveyor according to claim 3, characterized in that: The tower belt machine also includes a lifting device (60), the lifting device (60) includes a lifting arm (61), a lifting hook (62) and a movable luffing vehicle (63), the lifting arm (61) is arranged on the top of the tower body (10), the movable luffing vehicle (63) is movably arranged on the lifting arm (61), the lifting hook (62) is connected to the movable luffing vehicle (63) through a lifting rope (64), and the lifting hook (62) is connected to the second feeding belt mechanism (42).
5. The tower belt conveyor according to claim 2, characterized in that: The feeding device (40) also includes a feeding luffing mechanism (43), which includes a pulley block (431), an luffing rope (432) and an luffing drive (433). The pulley block (431) is arranged on the climbing sleeve (50), and the luffing drive (433) is arranged on the mounting frame (31) and is drivingly connected to one end of the luffing rope (432). The luffing rope (432) is arranged to bypass the pulley block (431), and the other end of the luffing rope (432) is connected to the first feeding belt mechanism (41).
6. The tower belt conveyor according to claim 2, characterized in that: The feeding device (20) comprises a feeding conveyor belt mechanism (21), wherein the feeding conveyor belt mechanism (21) is rotatably arranged at one end of the mounting frame (31) away from the first feeding belt mechanism (41), and the discharge end of the feeding conveyor belt mechanism (21) is located above the feed end of the transfer conveyor belt mechanism (32).
7. The tower belt conveyor according to claim 6, characterized in that: The feeding device (20) further comprises a climbing follower vehicle (22), and the feeding end of the feeding conveyor belt mechanism (21) is connected to the climbing follower vehicle (22).
8. The tower belt conveyor according to claim 6, characterized in that: The mounting frame (31) includes a frame body (311) and a first rotating assembly. The frame body (311) is arranged on the mounting side (52) of the climbing sleeve frame (50). The first rotating assembly includes a first rotating support frame (312) and a first rotating seat (313). The first rotating support frame (312) is arranged on the lower side of the frame body (311) and is located at an end of the frame body (311) away from the feeding conveyor belt mechanism (21). The first rotating seat (313) is rotatably arranged on the first rotating support frame (312). The feeding end of the first feeding belt mechanism (41) is connected to the first rotating seat (313).
9. The tower belt conveyor according to claim 8, characterized in that: The mounting frame (31) also includes a second rotating assembly, which includes a second rotating support frame (314) and a second rotating seat (315). The second rotating support frame (314) is arranged on the upper side of the frame body (311) and is located at an end of the frame body (311) away from the first feeding belt mechanism (41). The second rotating seat (315) is rotatably arranged on the second rotating support frame (314), and the discharge end of the feeding conveyor belt mechanism (21) is connected to the second rotating seat (315).
10. The tower belt conveyor according to any one of claims 1 to 9, characterized in that: An additional support platform (53) is provided on the opening side (51) of the climbing sleeve (50); the additional support platform (53) is arranged corresponding to the additional opening (511) and is used for placing a standard section.