Portable electricity meter dismounting rapid processing device and processing method thereof
By designing a portable meter disassembly and rapid processing device, using multi-angle acquisition and consistency verification technology, the cumbersome disassembly and energy meter disassembly process is solved, and an efficient and standardized meter disassembly and assembly process is achieved, which improves service quality and work efficiency.
Patent Information
- Application Number
- CN202510204454.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-24
- Publication Date
- 2025-04-25
AI Technical Summary
The disassembly process of existing power meters is complicated and lacks specifications, resulting in the extended working time of disassembly, the data records are not detailed, and the situation of the power meter cannot be truly reflected. The traditional tools have complex or single functions, which are not portable.
A portable electric meter removal and rapid processing device is designed, including a front rotary metering module, a main control module and a built-in positioning and detection module. By collecting electric meter data from multiple angles, rapid data collection and consistency verification are achieved, and electronic work orders are generated to standardize processes and improve efficiency.
Effectively and reasonably standardize the disassembly and assembly process of electricity meter, improve service quality and work efficiency, ensure the accuracy and reliability of meter data, and reduce operational errors and safety risks.
Smart Images

Figure CN119881412A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of disassembly and assembly of electric energy meters, and in particular to a portable electric energy meter disassembly and assembly rapid processing device and a processing method thereof. Background Art
[0002] Electricity is an indispensable part of our daily life. The energy meter is one of the basic equipment for power grid data collection. It undertakes the tasks of collecting, measuring and transmitting original energy data, and is the basis for realizing information integration, analysis optimization and information display. In recent years, with the continuous promotion of low-carbon economy and green energy-saving ideas and the release of relevant policies, the requirements for the future development of my country's power grid have become higher and higher. With the emergence of smart grids, the energy meter plays a vital role as a basic equipment in the smart grid. In order to adapt to the needs of modern digital power grid management, it is very necessary to strengthen the management of the energy meter verification and removal process, ensure the quality of work, ensure the accurate and reliable operation of the metering device, provide high-quality services to electricity users, standardize the operating specifications of business personnel, and improve the service quality of power companies.
[0003] When field operators dismantle and rotate electric energy meters, there are too many intermediate links in the existing dismantling process, which requires approval at various levels, has cumbersome procedures, and requires multiple types of work to be implemented on site. There is no standardized process, and visual supervision is difficult, which seriously prolongs the overall time of dismantling work; the records of dismantled electric energy meters are not detailed and cannot truly reflect the situation of the electric energy meters. When users or inspectors have objections to the readings of dismantled electric energy meters, it is often because the electric energy meters have been dismantled for too long and have been improperly stored, and most of the electric energy meter cases and lead seals have been damaged and cannot be verified; and traditional tools have complex or single functions and are inconvenient to carry. In view of these inconveniences and in combination with actual work requirements, it is urgent to study and formulate a set of management models for dismantling electric energy meters, and use advanced computer technology to develop a software for rapid processing of on-site electric energy meter dismantling, reasonably standardize the process, and enable operators to be handy in the process of dismantling electric energy meters, while also improving service quality and work efficiency. Summary of the invention
[0004] The present invention aims to provide a portable meter disassembly and quick processing device and a processing method thereof, so as to solve the above-mentioned technical problems, effectively and reasonably standardize the process of meter installation and disassembly, and improve service quality and work efficiency.
[0005] In order to solve the above technical problems, the present invention provides a portable meter disassembly and quick processing device, comprising a housing, a front rotating metering module, a main control module and a built-in positioning detection module, wherein:
[0006] The front rotary metering module is composed of several acquisition modules with the same acquisition direction fixedly connected side by side, the bottom of the front rotary metering module is rotatably fixedly connected to the outside of the shell, several acquisition module control ends together constitute the front rotary metering module control end, several acquisition module output ends together constitute the front rotary metering module output end, the front rotary metering module control end is electrically connected to the main control module control end, the front rotary metering module control end is electrically connected to the main control module control end, and the front rotary metering module is used for concurrently collecting meter data sets at one time and feeding them back to the main control module;
[0007] The built-in positioning detection module is fixed inside the housing and is electrically connected to the main control module, and is used to collect meter asset data and real-time location information and feed it back to the main control module;
[0008] The main control module is fixed inside the housing and is used to perform the following steps:
[0009] Acquire operation information, and control the front rotating metering module to rotate to a preset collection angle based on the operation information, so that the front rotating metering module collects the meter data set at the preset collection angle;
[0010] Control the built-in positioning detection module to collect meter asset data and real-time location information based on operation information;
[0011] Based on the meter data set and meter asset data, consistency verification is performed to obtain the verification test results, and then an electronic work order is generated based on the verification test results, real-time location information and operation information to complete the rapid removal and recovery process.
[0012] The above scheme provides a device that arranges several required acquisition modules in the same acquisition direction and fixes them to form a front rotating metering module, so that multi-angle acquisition can be achieved during measurement and the consistency of the acquisition direction can be ensured. Therefore, when collecting data from the electric meter, it can realize rapid data collection and complete data consistency verification through several different acquisition modules at the same time, and control the operation process of each module and store and merge the data information to generate an electronic work order through the control module, so that the information of the rapid disassembly and processing process can be visualized and persistently stored, which is convenient for data playback and query export, effectively and reasonably standardizes the process of disassembly and assembly of the electric energy meter, and improves service quality and work efficiency.
[0013] Furthermore, the device also includes a rotating shaft, wherein: the bottom of the front rotating metering module is fixedly connected to the side of the rotating shaft, and the rotating shaft is rotatably fixedly connected to the outer side of the top of the shell.
[0014] In the above scheme, by setting a rotating shaft to connect the front rotary metering module and the shell of the device, the front rotary metering module can be driven to adjust to any angle, breaking the limitations of the original acquisition equipment caused by the acquisition angle and the angle of the screen, etc., and achieving consistency in the acquisition direction of each acquisition module in the module during integration, meeting the requirements of multi-channel concurrent acquisition.
[0015] Furthermore, several acquisition modules include: a barcode recognition module, an infrared recognition module, a stop code reading module and an image acquisition module, wherein: the meter data set includes the meter asset number, the meter number, the Bluetooth communication address, the meter status, the stop code information, the stop code data information and the meter image information; the barcode recognition module is used to obtain the meter asset number, the meter number and the Bluetooth address; the infrared recognition module is used to read the meter status and the stop code information; the stop code reading module is used to perform stop code recognition and obtain the stop code data information; the image acquisition module is used to obtain the meter image information.
[0016] In the above scheme, the several acquisition modules that constitute the front rotating metering module are integrated by a barcode recognition module, an infrared recognition module, a stop code reading module and an image acquisition module. During the acquisition, the several acquisition modules are simultaneously performed and the collected data are fed back to the main control module, and the required information is quickly identified and read, thereby obtaining the meter data set, realizing the detection and collection of the meter status and other meter information, and meeting the requirements of power collection.
[0017] Furthermore, the built-in positioning detection module includes an electric meter asset identification module and a Bluetooth module, wherein: the electric meter asset identification module is electrically connected to the main control module, and is used to obtain electric meter asset data based on the electric meter asset tag; the Bluetooth module is electrically connected to the main control module, and is used to obtain real-time location information.
[0018] In the above solution, the meter asset data and real-time location information are collected through the built-in positioning detection module to prepare data materials for the consistency verification of the meter data.
[0019] Furthermore, the main control module is also used to verify abnormal situations based on the meter asset data and meter data set acquisition, obtain abnormal verification results, and execute abnormal response actions based on the abnormal verification results.
[0020] In the above scheme, the main control module verifies the meter information in real time during the data collection process for abnormal conditions and executes corresponding abnormal response actions based on the abnormality verification results, thereby realizing real-time monitoring of the meter operation status, so that the device can immediately execute corresponding actions when abnormal conditions occur, avoiding situations where the operation poses safety risks due to meter abnormalities without knowing or making erroneous operations, and ensuring the safety and quality of the process of checking and removing the electric energy meter.
[0021] Furthermore, the device also includes a bottom module, which is fixed inside the shell and electrically connected to the main control module, wherein: the main control module is used to obtain a printing signal to control the bottom module to print paper stickers based on the electronic work order based on the printing signal; the bottom module is used to print paper stickers based on the electronic work order.
[0022] In the above scheme, the function of on-site printing is realized by setting the bottom module, so that the paper sticker containing the dismantled meter information and operation information can be directly pasted on the meter being dismantled. Subsequently, by scanning and identifying the paper sticker, the work order data can be viewed and synchronized on-site and offline, meeting the requirements for power work order output and providing data guarantee for the realization of intelligent mobile power operations.
[0023] Furthermore, the device also includes a display screen, which is fixedly connected to the surface of the shell, electrically connected to the main control module, and electrically connected to the output end of the front rotary metering module for displaying the meter data set, operation information and printing signals.
[0024] In the above scheme, a display screen is fixedly arranged on the surface of the shell, which is separated from the front rotating metering module for collecting the meter data set information. Multi-angle collection can be achieved while keeping the screen stationary, which is convenient for the operator to monitor the operation process when the meter data set exists.
[0025] The above scheme provides a portable meter disassembly and rapid processing device, which forms a front rotating metering module by arranging several required acquisition modules in the same acquisition direction and then fixing them, so that multi-angle acquisition can be achieved during measurement and the consistency of the acquisition direction can be ensured. Therefore, when collecting data from the meter, rapid data acquisition and data consistency verification can be achieved through several different acquisition modules at the same time. The control module controls the operation process of each module and stores and merges the data information to generate an electronic work order, so that the information of the rapid disassembly and recovery process can be visualized and persistently stored, which is convenient for data playback and query export, and effectively and reasonably standardizes the process of meter installation and disassembly. By adding a real-time monitoring function, the meter status is monitored in real time during the rapid installation and disassembly of the meter, and abnormal situations are responded to in time, ensuring the safety and quality of the process of checking and disassembling the meter, and improving service quality and work efficiency.
[0026] The present invention also provides a method for processing a portable meter dismantling and fast processing device, which is implemented by using a portable meter dismantling and fast processing device, and includes the following steps:
[0027] Acquire operation information, and control the front rotating metering module to rotate to a preset collection angle based on the operation information, so that the front rotating metering module collects the meter data set at the preset collection angle;
[0028] Control the built-in positioning detection module to collect meter asset data and real-time location information based on operation information;
[0029] Based on the meter data set and meter asset data, consistency verification is performed to obtain the verification test results, and then an electronic work order is generated based on the verification test results, real-time location information and operation information to complete the rapid removal and recovery process.
[0030] The above scheme provides a processing method for a device, which controls the front rotating metering module of the device to rotate to a preset collection angle, so that when collecting data from the electric meter, it can realize concurrent one-time and rapid collection of the electric meter data set at any angle, and control the built-in positioning detection module to detect and obtain the electric meter asset data to complete the consistency verification. After the verification is completed, the relevant data information is stored and merged to generate an electronic work order, so that the information of the rapid disassembly and processing process can be visualized and persistently stored, which is convenient for data playback and query export, effectively and reasonably standardizing the process of installation and disassembly of electric energy meters, and improving service quality and work efficiency.
[0031] Furthermore, abnormal situation verification is performed based on the meter asset data and the meter data set to obtain abnormality verification results, and then abnormal response actions are performed based on the abnormality verification results.
[0032] In the above scheme, real-time monitoring of the operation of the electric meter is achieved by verifying the abnormal conditions of the electric meter information in real time during the data collection process and executing corresponding abnormal response actions based on the abnormality verification results. This allows the device to immediately execute corresponding actions when abnormal conditions occur, avoiding situations where the user is unaware of or makes erroneous operations due to safety risks caused by abnormalities in the electric meter, thereby ensuring the safety and quality of the process of checking and removing the electric meter.
[0033] Furthermore, the method also includes: obtaining a printing signal, and controlling the bottom module to print a paper label based on the electronic work order based on the printing signal.
[0034] In the above scheme, by printing paper stickers based on electronic work orders, paper stickers containing meter information and operation information can be directly pasted on the meter being removed. Subsequently, by scanning and identifying the paper stickers, on-site and offline viewing and synchronization of work order data can be achieved, meeting the requirements for power work order output and providing data guarantee for realizing smart mobile power operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 A schematic diagram of a portable electric meter disassembly and recovery rapid processing device provided by an embodiment of the present invention;
[0036] Figure 2 A schematic diagram of a front rotating metering module in a portable electric meter disassembly and quick processing device provided by an embodiment of the present invention;
[0037] Figure 3 A schematic side view of a front rotating metering module in a portable electric meter disassembly and quick processing device provided by an embodiment of the present invention;
[0038] Figure 4 A schematic diagram of a framework of a portable electric meter disassembly and rapid processing device provided by an embodiment of the present invention;
[0039] Figure 5 A schematic diagram of a processing method of a portable electric meter dismantling rapid processing device provided by an embodiment of the present invention;
[0040] Figure 6 A schematic diagram of a disassembly APP operation process of a portable electric meter disassembly rapid processing device provided by an embodiment of the present invention;
[0041] In the figure: 1. Shell; 2. Rotating shaft; 3. Front rotary metering module; 31. Barcode recognition module; 32. Infrared recognition module; 33. Stop code reading module; 34. Image acquisition module; 4. Acquisition direction; 5. Electric meter to be detected; 6. Main control module; 7. Built-in positioning detection module; 8. Paper outlet hole; 9. Placement slot; 10. Battery; 11. Interface module; 12. Bottom module. DETAILED DESCRIPTION
[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] Embodiment 1:
[0044] This embodiment provides a portable meter disassembly and recovery rapid processing device, comprising a housing 1, and further comprising: a front rotating metering module 3, a main control module 6 and a built-in positioning detection module 7, such as Figure 1 As shown, where:
[0045] The front rotary metering module 3 is composed of several acquisition modules with the same acquisition direction fixedly connected side by side, the bottom of the front rotary metering module 3 is rotatably fixedly connected to the outside of the shell 1, several acquisition module control ends together constitute the front rotary metering module 3 control end, several acquisition module output ends together constitute the front rotary metering module 3 output end, the front rotary metering module 3 control end is electrically connected to the control end of the main control module 6, the front rotary metering module 3 control end is electrically connected to the control end of the main control module 6, and the front rotary metering module 3 is used for concurrently collecting meter data sets at one time and feeding them back to the main control module 6;
[0046] The built-in positioning detection module 7 is fixed inside the housing 1, and the built-in positioning detection module 7 is electrically connected to the main control module 6, and is used to collect the meter asset data and real-time location information and feed it back to the main control module 6;
[0047] The main control module 6 is fixed inside the housing 1 and is used to perform the following steps:
[0048] Acquire operation information, and control the front rotating metering module 3 to rotate to a preset collection angle based on the operation information, so that the front rotating metering module 3 collects the meter data set at the preset collection angle;
[0049] Based on the operation information, the built-in positioning detection module 7 is controlled to collect the meter asset data and real-time location information;
[0050] Based on the meter data set and meter asset data, consistency verification is performed to obtain the verification test results, and then an electronic work order is generated based on the verification test results, real-time location information and operation information to complete the rapid removal and recovery process.
[0051] During the specific implementation process, the existing devices for dismantling and recovering old electric meters often have the following problems: the actual readings of the old electric energy meters dismantled and recovered do not match or are inaccurate with the registration books; on-site personnel use paper and pen to record the on-site dismantling and recovery, which makes it easy for data to be lost; there is no standardized process, and visual supervision is difficult, making it difficult to verify and trace objections later; the operation process is cumbersome and requires approval at each level in the intranet business system, and if the approval is not timely, the next step of work cannot be carried out; traditional tools have complex or single functions and are inconvenient to carry, and the original communication methods and methods cannot meet the collection requirements. For abnormally damaged electric meters, the stop code cannot be collected and recovered through traditional methods; due to the limitations of existing equipment or methods, the speed of reading meter data is slow and cannot meet real-time requirements, especially when quick decision-making is required; the equipment structure and operation process are complex, requiring professional training and skills to operate, and the threshold for use is high.
[0052] A rapid disassembly and recovery device provided in this embodiment forms a front rotating metering module 3 by arranging several required acquisition modules in the same acquisition direction and fixing them thereafter, so that multi-angle acquisition can be achieved during measurement and the consistency of the acquisition direction can be ensured. Furthermore, when collecting data from the electric meter, rapid data acquisition and consistency verification of the data can be achieved through several different acquisition modules at the same time. The control module controls the operation flow of each module and stores and merges the data information to generate an electronic work order, so that the rapid disassembly and recovery process information can be visualized and persistently stored, which is convenient for data playback and query export, effectively and reasonably standardizes the process of installing and disassembling the electric energy meter, and improves service quality and work efficiency.
[0053] Optionally, the device further comprises a rotating shaft 2 , wherein: the bottom of the front rotating metering module 3 is fixedly connected to the side of the rotating shaft 2 , and the rotating shaft 2 is rotatably fixedly connected to the outer side of the top of the housing 1 .
[0054] In the specific implementation process, by setting a rotating shaft 2 to connect the front rotating metering module 3 and the housing 1 of the device, the front rotating metering module 3 can be driven to adjust to any angle, breaking the limitations of the original acquisition equipment caused by the acquisition angle and the angle of the screen, etc., and achieving consistency in the acquisition direction of each acquisition module in the module during integration, thereby meeting the requirements of multi-channel concurrent acquisition.
[0055] Optionally, several acquisition modules include: a barcode recognition module, an infrared recognition module, a stop code reading module and an image acquisition module, wherein: the meter data set includes the meter asset number, the meter number, the Bluetooth communication address, the meter status, the stop code information, the stop code data information and the meter image information; the barcode recognition module 31 is used to obtain the meter asset number, the meter number and the Bluetooth address; the infrared recognition module is used to read the meter status and the stop code information; the stop code reading module is used to perform stop code recognition and obtain the stop code data information; the image acquisition module 34 is used to obtain the meter image information.
[0056] In the specific implementation process, the front rotary metering module 3 is as follows Figure 2 As shown, the acquisition direction 4 of the barcode recognition module 31, the infrared recognition module 32, the stop code reading module 33 and the image acquisition module 34 is always consistent; its side view is as shown Figure 3 As shown, A, B, and C respectively represent the positions at which the front rotary metering module 3 rotates for collection when the electric meter 5 to be tested is located in different collection directions 4; the stop code reading module 33 can adopt a stop code fast OCR module; the highly integrated front rotary metering module in the device is provided with an electric energy meter interface, a current transformer and a voltage measurement function, which can simultaneously obtain electric energy metering data such as current, voltage and power factor, and realize efficient data collection.
[0057] In the specific implementation process, when the image acquisition module 34 obtains the meter image information, after taking the image through the module camera, the image processing algorithm is used for recognition and reading: image text recognition based on deep learning, such as the meter OCR recognition system based on text detection, detection frame correction and text recognition deep learning and image training; it is known that the LED display screens of common electric energy meters in the domestic power grid are all LED fonts, the fonts on the meter nameplates are basically common Chinese fonts, and the barcodes have three templates: meter asset number, meter number and meter Bluetooth address; based on this requirement, the data set required for OCR is collected and labeled, and the data is classified into training set and verification set, and the verification set is used for verification after training; the data after taking pictures or scanning is decoded and processed to extract the meter image information such as the barcode information or physical information of the on-site electric energy meter, and the meter image information includes the specially identified meter stop code information, asset information, meter number information, Bluetooth MAC information, etc., which can be used for later verification.
[0058] Optionally, the built-in positioning detection module 7 includes an electric meter asset identification module and a Bluetooth module, wherein: the electric meter asset identification module is electrically connected to the main control module 6 for obtaining electric meter asset data based on the electric meter asset tag; the Bluetooth module is electrically connected to the main control module 6 for obtaining real-time location information.
[0059] In the specific implementation process, the meter asset identification module can adopt an ultra-high frequency RFID meter asset identification module. For any meter that needs to be removed, after the operator arrives at the site, he uses the device to select the reason for removal, automatically creates a removal work order, and visually checks the appearance and type of the meter; then sends out detailed operation information to control the front rotary metering module 3 to collect the meter data set at one time, control the built-in positioning detection module 7 to obtain the meter asset data and real-time location information, and check the consistency of the data, save the operation information, merge the electronic preservation work order, and realize data persistence; then print the paper sticker containing the removed energy meter information and operation information on site, the paper sticker can be in the form of a QR code, which is convenient for scanning to obtain information; finally, remove the meter on site, and paste the paper sticker containing the stop code information on the removed meter.
[0060] Optionally, the main control module 6 is further used to verify abnormal situations based on the meter asset data and the meter data set, obtain abnormal situation verification results, and perform abnormal response actions based on the abnormal situation verification results.
[0061] In the specific implementation process, abnormal situations are verified by comparing the collected data. If the data is abnormal, inconsistent, etc., or all collection schemes are unable to obtain the collected data, the meter is considered abnormal and the removal task is marked as abnormal.
[0062] In the specific implementation process, the control module is also used for data storage and encoding: all collected data and operation records (i.e., job information) are encoded and stored for subsequent analysis and processing. The encoding may include identifying and organizing different data types (such as forward active power, reverse active power, address location, etc.); and then visualizing the network quality data: finally, the analysis results are presented in a visual way, for example, the status of the work order is marked in different colors on the list to help users understand and use the data more easily.
[0063] Optionally, the device also includes a bottom module, which is fixed inside the shell 1 and electrically connected to the main control module 6, wherein: the main control module 6 is used to obtain a printing signal to control the bottom module to print paper stickers based on the electronic work order based on the printing signal; the bottom module is used to print paper stickers based on the electronic work order.
[0064] In the specific implementation process, the bottom module can adopt a thermal printing module, and a placement slot is set on the shell 1 for placing the required printing paper.
[0065] Optionally, the device also includes a display screen, which is fixedly connected to the surface of the shell 1, electrically connected to the main control module 6, and electrically connected to the output end of the front rotary metering module 3, for displaying the meter data set, operation information and printing signals.
[0066] During the specific implementation process, different visualization methods and tools can be selected, such as graphics, tables, report generation tools, etc., and presented on a display screen or printed to meet the user's visualization needs.
[0067] In the specific implementation process, the device can also be equipped with a communication module, such as an RS485 module, etc., for data transmission, and can communicate with the central server or monitoring system in real time to realize remote monitoring of the operating status of the device, obtain meter data and electronic work orders at any time, and can remotely send commands and configuration parameters to improve the convenience and real-time management. The device also integrates a barcode recognition module 31, an infrared recognition module 32, a stop code fast OCR module, an image acquisition module 34, an ultra-high frequency RFID meter asset recognition module, a Bluetooth module, an RS485 module, and a thermal printing module, which can quickly recognize meter asset information, stop code data and other information, greatly shortening the operation time. The average operation time for collection and consistency verification based on this device and the generation of electronic work orders is less than 30 seconds, which is much faster than the existing operation process. And it is applicable to a wider range of application scenarios, such as a wide range of compatible devices: supporting electricity meters (including smart electricity meters, smart gateway terminals, and Internet of Things meters) and mainstream protocols (including DLT645-1997, DLT645-2007, and DLT698.45), and because of its higher integration, it can identify stop code data in non-standard protocols through fast OCR; it has stronger exception handling capabilities: because it can collect more data, the device supports more processing methods, and can collect data for situations such as missing barcodes, damaged screens, and non-standard protocol markings. Finally, the device provided in this embodiment has the advantages of being lighter, more portable, and lower cost due to its highly integrated design.
[0068] The above scheme provides a portable meter disassembly and rapid processing device, which forms a front rotating metering module 3 by arranging several required acquisition modules in the same acquisition direction and then fixing them, so that multi-angle acquisition can be achieved during measurement and the consistency of the acquisition direction can be ensured, and then when collecting data from the meter, rapid data acquisition and data consistency verification can be achieved through several different acquisition modules at the same time; the control module controls the operation process of each module and stores and merges the data information to generate an electronic work order, so that the information of the rapid disassembly and processing process can be visualized and persisted, which is convenient for data playback and query export, and effectively and reasonably regulates the process of electric energy meter installation and disassembly; by adding a real-time monitoring function, the status of the electric energy meter is monitored in real time during the rapid installation and disassembly of the electric energy meter, and abnormal situations are responded to in time, ensuring the safety and quality of the process of checking and disassembling the electric energy meter, and improving service quality and work efficiency.
[0069] Embodiment 2:
[0070] This embodiment provides a method for processing a portable electric meter dismantling fast processing device, such as Figure 4 As shown, a portable meter disassembly and recovery rapid processing device is used to implement the method, which includes the following steps:
[0071] S41: acquiring operation information, and controlling the front rotating metering module 3 to rotate to a preset collection angle based on the operation information, so that the front rotating metering module 3 collects the meter data set at the preset collection angle;
[0072] S42: Control the built-in positioning detection module 7 to collect meter asset data and real-time location information based on the operation information;
[0073] S43: Perform consistency verification based on the meter data set and the meter asset data to obtain the verification test results, and then generate an electronic work order based on the verification test results, real-time location information and operation information to complete the rapid removal and recovery process.
[0074] The above scheme provides a processing method for a device, which controls the front rotating metering module 3 of the device to rotate to a preset collection angle, so that when collecting data from the electric meter, it can realize concurrent one-time and rapid collection of the electric meter data set at any angle, and control the built-in positioning detection module 7 to detect and obtain the electric meter asset data to complete the consistency verification. After the verification is completed, the relevant data information is stored and merged to generate an electronic work order, so that the information of the rapid disassembly and recovery process can be visualized and persistently stored, which is convenient for data playback and query export, effectively and reasonably standardizing the process of installation and disassembly of electric energy meters, and improving service quality and work efficiency.
[0075] Optionally, abnormal situation verification is performed based on the meter asset data and the meter data set to obtain abnormal verification results, and then abnormal response actions are performed based on the abnormal verification results.
[0076] In the specific implementation process, the real-time monitoring of the operation of the electric meter is achieved by verifying the abnormal situation of the electric meter information in real time during the data collection process and executing the corresponding abnormal response actions according to the abnormal verification results. When an abnormal situation occurs, the device can immediately execute the corresponding action to avoid the situation where there is a safety risk in the operation due to the abnormality of the electric meter without knowing or making erroneous operations, thereby ensuring the safety and quality of the process of checking and removing the electric energy meter.
[0077] Optionally, the method further includes: obtaining a printing signal, and controlling the bottom module to print a paper sticker based on the electronic work order based on the printing signal.
[0078] In the specific implementation process, by printing paper stickers based on electronic work orders, paper stickers containing the meter information and operation information can be directly pasted on the meter being removed. Subsequently, by scanning and identifying the paper stickers, on-site and offline viewing and synchronization of the work order data can be achieved, meeting the requirements for power work order output, providing data guarantee for the realization of intelligent mobile power operations, and realizing the correlation confirmation of meter removal equipment, collection equipment and system information, avoiding the risk of data loss or equipment loss during data storage due to reasons such as loss of equipment nameplate and equipment damage.
[0079] Embodiment three:
[0080] This embodiment provides a portable meter disassembly and quick processing device, such as Figure 5 As shown, it includes: a housing 1, a front rotating acquisition module 3, a main control module 6, a built-in positioning detection module 7, a paper outlet 8, a placement slot 9, a battery 10, an interface module 11 and a bottom module 12, wherein:
[0081] The built-in positioning detection module 7 has a reading distance of more than 20 meters, allowing staff to operate in a larger range;
[0082] The paper outlet hole 8 is used to allow the printed paper strip to automatically extend outwards. The outlet hole is designed to be serrated so that the paper strip can be torn off quickly.
[0083] The placement slot 9 is used to prevent the thermal paper roll from printing paper stickers;
[0084] Battery 10 uses a large-capacity battery. A full charge of battery 10 can support the device in standby mode for 3 days.
[0085] The interface module 11 includes a USB interface and an RS485 interface for realizing data transmission, and can realize RS485 communication with the metering device through the USB OTG to RS485 interface.
[0086] The processing device provided in this embodiment belongs to the field of rapid collection. It is a portable device for on-site disassembly and recovery. It is mainly aimed at on-site outdoor scenes. It can be moved outdoors at will to perform disassembled meter data verification operations and can also be used in warehouse scenes.
[0087] Embodiment 4:
[0088] The present embodiment provides a removal APP of a portable meter removal quick processing device, and the removal APP includes: a process auxiliary module and a query export module, wherein: the process auxiliary module is used to create a blank work order and obtain operation information, so as to control the front rotating metering module 3 to collect the meter data set based on the operation information, and control the built-in positioning detection module 7 to collect the meter asset data and real-time location information based on the operation information, so that the control module obtains the verification and detection results based on the meter data set and the meter asset data, and then generates an electronic work order based on the verification and detection results, real-time location information and operation information; the process auxiliary module is also used to obtain abnormal verification results; the query export module is used to obtain query signals, so as to obtain electronic work orders based on the query signals; the query export module is also used to obtain printing signals, so as to control the bottom module to print paper stickers based on the printing signals and the electronic work order.
[0089] In the specific implementation process, when a portable meter dismantling and fast processing device is used for dismantling, the operation execution process in the dismantling APP is as follows: Figure 6 As shown, including:
[0090] S61: Create an initial work order and select the reason for removal;
[0091] S62: Acquire operation information, and control the front rotating metering module 3 to collect the meter data set concurrently at one time based on the operation information;
[0092] S63: Control the built-in positioning detection module 7 to collect meter asset data and real-time location information based on the operation information;
[0093] S64: obtaining a verification and detection result based on the electric meter data set and the electric meter asset data, so as to generate an electronic work order based on the verification and detection result, the real-time location information, and the operation information combined with the initial work order;
[0094] S65: Obtain a printing signal to control the bottom module to print a paper sticker based on the printing signal and the electronic work order.
[0095] During the specific implementation process, the process auxiliary module will automatically record the data of the dismantling process according to specific steps, including preparation work, operation information, meter asset barcode, stop code information, current indication number, location information, confirmation signature and other information.
[0096] In the specific implementation process, the dismantling APP also includes a submission module, which is used to check the dismantling process after completing the meter dismantling process, and obtain the signature information to confirm and save the electronic work order. After creating the initial work order, first visually check the meter and enter the visual inspection results into the initial work order, then perform manual operations and enter the manual operation information; after completing the rapid dismantling process to generate an electronic work order, obtain the signature information to confirm and save the electronic work order, then dismantle the meter on site, and paste the printed paper sticker on the dismantled meter. That is, based on a series of standardized processes such as visual inspection, manual operation, data collection (barcode scanning, image acquisition, infrared reading, positioning operation), signature, saving, printing, and uploading, a report on the verification of the dismantling of the electric energy meter is generated after the dismantling process is completed. The report content contains the operation records of each step and the information of the signer.
[0097] The removal APP provided by the above scheme realizes data visualization, synchronization and display. After the operation is completed, it will generate a visual verification report and electronic work order for the removed electricity meter that supports offline verification, and supports data playback and query export. The report contains the specific information and operation time that occurred in each link of the removal and recovery of the electricity meter; the exported report can be printed into a barcode rich in the removal and recovery meter information and operation records and pasted on the removed electricity meter. Any staff member can realize on-site offline viewing and synchronization of the work order data by scanning the QR code on the removed electricity meter, and realize local persistence; and the removal speed is faster through the removal APP control device of this embodiment, which greatly shortens the operation time. The average operation time for the removal and recovery table verification process is less than 30 seconds, which is much faster than the existing operation process. It also realizes the connection between collection and marketing business and customer site, from data source to customer confirmation, can immediately verify data on site, realize electronic signature at the removal site, on-site barcode printing, on-site work order number confirmation, and can produce customer confirmation form through printer (i.e. removal of electricity meter report and electronic work order) and confirm with on-site customer; the removal APP can adopt a customized system based on Android, and through the standardization of reverse material recovery, identification, storage and scrap material processing, idle material reuse and other work, solve the problems of cumbersome process, low efficiency and low electronic work order procedures for rapid verification of removed meters.
[0098] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.
Claims
1. A portable meter dismantling and rapid processing device, comprising a housing, characterized in that: include: Front rotary metering module, main control module and built-in positioning detection module, including: The front rotary metering module is composed of several acquisition modules with the same acquisition direction fixedly connected side by side, the bottom of the front rotary metering module is rotatably fixedly connected to the outside of the shell, several acquisition module control ends together constitute the front rotary metering module control end, several acquisition module output ends together constitute the front rotary metering module output end, the front rotary metering module control end is electrically connected to the main control module control end, the front rotary metering module control end is electrically connected to the main control module control end, and the front rotary metering module is used for concurrently collecting meter data sets at one time and feeding them back to the main control module; The built-in positioning detection module is fixed inside the housing, and the built-in positioning detection module is electrically connected to the main control module, and is used to collect meter asset data and real-time location information and feed back to the main control module; The main control module is fixed inside the housing and is used to perform the following steps: Acquire operation information, and control the front rotating metering module to rotate to a preset collection angle based on the operation information, so that the front rotating metering module collects the meter data set at the preset collection angle; Control the built-in positioning detection module to collect meter asset data and real-time location information based on operation information; Based on the meter data set and meter asset data, consistency verification is performed to obtain the verification test results, and then an electronic work order is generated based on the verification test results, real-time location information and operation information to complete the rapid removal and recovery process.
2. A portable meter dismantling and rapid processing device according to claim 1, characterized in that: Also included is a rotating shaft, wherein: The bottom of the front rotary metering module is fixedly connected to the side of the rotating shaft, and the rotating shaft is rotatably fixedly connected to the outer side of the top of the shell.
3. A portable meter dismantling and rapid processing device according to claim 1, characterized in that: The acquisition modules include: a barcode recognition module, an infrared recognition module, a stop code reading module and an image acquisition module, wherein: The electric meter data set includes an electric meter asset number, an electric meter number, a Bluetooth communication address, an electric meter status, stop code information, stop code data information and an electric meter image information; The barcode recognition module is used to obtain the meter asset number, meter number and Bluetooth address; The infrared recognition module is used to read the meter status and stop code information; The stop code reading module is used to identify the stop code and obtain the stop code data information; The image acquisition module is used to obtain the image information of the electric meter.
4. A portable meter dismantling and rapid processing device according to claim 3, characterized in that: The built-in positioning detection module includes an electric meter asset identification module and a Bluetooth module, wherein: The meter asset identification module is electrically connected to the main control module and is used to obtain meter asset data based on the meter asset tag; The Bluetooth module is electrically connected to the main control module and is used to obtain real-time location information.
5. A portable meter dismantling and rapid processing device according to claim 1, characterized in that: The main control module is also used to verify abnormal situations based on the meter asset data and the meter data set, obtain abnormal verification results, and execute abnormal response actions based on the abnormal verification results.
6. A portable meter dismantling and rapid processing device according to claim 1, characterized in that: It also includes a bottom module, which is fixed inside the housing and electrically connected to the main control module, wherein: The main control module is used to obtain a printing signal, to control the bottom module to generate an electronic barcode based on the electronic work order based on the printing signal, and to print a paper label based on the electronic barcode; The bottom module is used to print paper stickers based on electronic bar codes.
7. A portable meter dismantling and rapid processing device according to claim 6, characterized in that: It also includes a display screen, which is fixedly connected to the surface of the shell, electrically connected to the main control module, and electrically connected to the output end of the front rotary metering module for displaying meter data sets, operation information and print signals.
8. A method for processing a portable electric meter by a quick processing device, characterized in that: The method is implemented by using a portable meter dismantling and rapid processing device as claimed in any one of claims 1 to 7, comprising the following steps: Acquire operation information, and control the front rotating metering module to rotate to a preset collection angle based on the operation information, so that the front rotating metering module collects the meter data set at the preset collection angle; Control the built-in positioning detection module to collect meter asset data and real-time location information based on operation information; Based on the meter data set and meter asset data, consistency verification is performed to obtain the verification test results, and then an electronic work order is generated based on the verification test results, real-time location information and operation information to complete the rapid removal and recovery process.
9. A method for processing a portable electric meter dismantling rapid processing device according to claim 8, characterized in that: Also includes: An abnormal situation is verified based on the meter asset data and the meter data set to obtain an abnormality verification result, and then an abnormal response action is performed based on the abnormality verification result.
10. The method for processing a portable electric meter dismantling rapid processing device according to claim 8, characterized in that: Also includes: Get the printing signal, and control the bottom module to print the paper sticker based on the electronic work order based on the printing signal.